CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013WEEK7 JOURNAL “OFF CAMPUS”NAME: ZEYU LI (VICKY)STUDENT NUMBER: 634091
BACKGROUND OF SITE
·Building company: MAXSTRA
·10 stories concrete construction, residential building including 55 apartments·span: 12m, length: 40m
·materials are all overseas
CONSTRUCTION SYSTTEM
·mainly mass construction, and framing·for big heavry building: column in the middle → transfers load to the ground floor
CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013WEEK7 JOURNAL “OFF CAMPUS”NAME: ZEYU LI (VICKY)STUDENT NUMBER: 634091
MATERIALS:GROUND FLOOR·in situ concrete: ground floor slab, ceiling
·precast concrete: wall
·dash lines: indicate the position of pipes
·concrete block = bricks:used in reinforcing·ceiling --- the difference between finish and not finish : gap
CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013WEEK7 JOURNAL “OFF CAMPUS”NAME: ZEYU LI (VICKY)STUDENT NUMBER: 634091·PVC: 1.sewage
2.downpiping3.rainwater/stormwater
* these three things don’t need to be PVC, but usually made of PVC
·copper
TOP FLOOR·flashing - covering PCR ---avoid moisture
·channel for more water flow·has pitch
CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013WEEK7 JOURNAL “OFF CAMPUS”NAME: ZEYU LI (VICKY)STUDENT NUMBER: 634091·universal beam (UB)
SECOND PLACE·purlin
·stud --- double, reinforced
CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013WEEK7 JOURNAL “OFF CAMPUS”NAME: ZEYU LI (VICKY)STUDENT NUMBER: 634091
·bathroom: reduce≈3cm
·not mainly concrete construction·galvanized steel --- avoid corrsion and rust
shinn
·board panel: 1.red --- fire resisting area. density > whiteblue
CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013WEEK7 JOURNAL “OFF CAMPUS”NAME: ZEYU LI (VICKY)STUDENT NUMBER: 634091
2.blue --- wet area (kitchen & laundry & bathroom)3.white --- regular
·timber logging: compare with steel → doesn’t twisting·cross-bracing system
·kiln dried hardwood---sliding door·yellow gap --- water pipes
NEARLY FINISHED ROOM·all the electronic wires are in one position
·steel --- artifical frame work
CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013WEEK7 JOURNAL “OFF CAMPUS”NAME: ZEYU LI (VICKY)STUDENT NUMBER: 634091
·fire resisting --- sprinkly system (60 meters)·post-tension cable/concrete
temporary fix
CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013WEEK7 JOURNAL “OFF CAMPUS”NAME: ZEYU LI (VICKY)STUDENT NUMBER: 634091
·MPA --- a method of meansure strength·precast panel --- make strong·reduce cost --- the aim : 1.steel: $8000/pre tone
2. Beam: $3000/m (UB30)·black finished ply --- formply (can be recycled)sacrificial formwork (steel formwork) --- cannot recycled or move, leave the
formwork there