watershed delineation for hydropower project

22
Watershed delineation to propose a hydropower project in Shoghor-Chitral Aamir Zaman Aqeel Tariq Azeem Zafar Mudassar Sarwar

Upload: armughan-saad

Post on 16-Mar-2016

257 views

Category:

Documents


0 download

DESCRIPTION

Watershed delineation to propose Hydropower project

TRANSCRIPT

Page 1: Watershed delineation for Hydropower project

Watershed delineation to propose a hydropower project in Shoghor-Chitral• Aamir Zaman

• Aqeel Tariq

• Azeem Zafar

• Mudassar Sarwar

Page 2: Watershed delineation for Hydropower project

Content

• Introduction

• Objective

• Site description

• Methodology

• Recommendations

Page 3: Watershed delineation for Hydropower project

Study Area

• 36.02.01N – 71.33.20E

• Altitude 3700ft

• Shoghor-Chitral

• Mountainous area

• Chitral River

• Glaciers

• Energy source

• Kerosene oil till 80s

• 1990 Micro Hydel Projects (AKRSP)

Page 4: Watershed delineation for Hydropower project

ObjectivePurpose of our analysis was to calculate watershed delineation to

propose a suitable site for a hydropower project.

Page 5: Watershed delineation for Hydropower project

Requirements

• ArcGIS - Arc Hydro

• Data Elevation Model

• Satellite Imagery

• Physiography

• Regional Geological and Tectonic Setting

• Site Stratigraphic Information

Page 6: Watershed delineation for Hydropower project

General Geology

• Rock types

• Metamorphic• Chitral Slate (Slates, Phyllite, Siltstone)

• Tectonically Less active

Page 7: Watershed delineation for Hydropower project

FLOW DIRECTION

FILL

DEM

ACQUISITION OF POINT DATA

Set up ARCGIS working environment

Page 8: Watershed delineation for Hydropower project

WATERSHED DELINEATION

STREAM LINK

STREAM NETWORK

FLOW ACCUMULATION

Page 9: Watershed delineation for Hydropower project

Why we choose 10m DEM?• 30m DEM generally flows

within the valley but deviates from actual channel location.

• 10m DEM produce much realistic flow paths that follow the channels.

Page 10: Watershed delineation for Hydropower project

Fill DEM

• The Fill sinks operation removes local depressions from a DEM by replacing these local depressions by flat areas in the output DEM.

Page 11: Watershed delineation for Hydropower project

Fill DEM

• Depressions that consist of a single pixel.

• Find a sink that consists of a single pixel (pixel in red).

• Assign to this pixel, the smallest value found among its 8 neighbor pixels (pixel in green).

Page 12: Watershed delineation for Hydropower project

Fill DEM

• Depressions that consist of multiple pixels.

• outlet for this depression is determined.

• the height values of this depression will be increased to the smallest height value of a pixel.

• that is adjacent to the outlet for this depression/sink, and that would contribute to the initial sink

• Pixels at the border of the map are never changed.

Page 13: Watershed delineation for Hydropower project

Fill DEM

Page 14: Watershed delineation for Hydropower project

Flow Direction

• focal function

• Flow direction operation determines into which neighboring pixel any water in a central pixel will flow.• Flow direction is calculated for every

central pixel in input blocks of 3 by 3 pixels, each time comparing the value of the central pixel with the value of its 8 neighboring pixels.

• The output map contains flow directions as N (to the North), NE (to the North East), etc.

Page 15: Watershed delineation for Hydropower project

Flow Accumulation

• The Flow accumulation operation determines the number of pixels that naturally drain into outlets.

• The output map contains cumulative hydrologic flow values that represent the number of input pixels which contribute any water to the outlets (or sinks if these have not been removed).

Result of Flow accumulation. Result of Flow accumulation when Fill sinks is not used.

Page 16: Watershed delineation for Hydropower project

Stream Network

• Stream networks are delineated from a digital elevation model (DEM) using the output from the Flow Accumulation function.

• Flow accumulation in its simplest form is the number of upslope cells that flow into each cell.

Page 17: Watershed delineation for Hydropower project

Stream Link

• The Stream Link function allows you to assign unique values to each of the links in a raster linear network.

Page 18: Watershed delineation for Hydropower project

Watershed Delineation

• Flow direction and stream link are use to delineate watershed.

Page 19: Watershed delineation for Hydropower project
Page 20: Watershed delineation for Hydropower project

Recommendations

• Large amount of glacial water wasted.

• Area is also in Energy crises.

• Foundation conditions are favorable for construction of the hydropower projects

• Pouring point of whole area is in SHOGHOR.

• Hydro power potential of this river is modest but it can fulfill the needs of the locals.

Page 21: Watershed delineation for Hydropower project
Page 22: Watershed delineation for Hydropower project

Gracias!