Wastewater Treatment Plant IMPROVEMENTS PROJECT Staff Presentation to City Council October 17, 2019 STEVENSON

Upload: others

Post on 09-Mar-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Wastewater Treatment Plant IMPROVEMENTS …...treatment plant (WWTP) is in need of upgrades to provide current and future capacity The General Sewer Plan/Facility Plan Update identified

W a s t e w a t e r Tre a t m e n t P la n t IMPROVEMENTS P ROJECT

Staff Presentation to City CouncilOctober 17, 2019

STEVENSON

Page 2: Wastewater Treatment Plant IMPROVEMENTS …...treatment plant (WWTP) is in need of upgrades to provide current and future capacity The General Sewer Plan/Facility Plan Update identified

Background

Project Schedule

Immediate Improvements

Preliminary Design

Implementation Plan

Next Steps

PRESENTATION OUTLINE

Page 3: Wastewater Treatment Plant IMPROVEMENTS …...treatment plant (WWTP) is in need of upgrades to provide current and future capacity The General Sewer Plan/Facility Plan Update identified

City’s wastewater treatment plant

(WWTP) is in need of upgrades to provide current and future

capacity

The General Sewer Plan/Facility Plan

Update identified ~$16 Million in

improvements

City’s consultant is currently designing the

first phase of these upgrades

BACKGROUND

Page 4: Wastewater Treatment Plant IMPROVEMENTS …...treatment plant (WWTP) is in need of upgrades to provide current and future capacity The General Sewer Plan/Facility Plan Update identified

PROJECT SCHEDULE

Page 5: Wastewater Treatment Plant IMPROVEMENTS …...treatment plant (WWTP) is in need of upgrades to provide current and future capacity The General Sewer Plan/Facility Plan Update identified

WWTP has had multiple permit violations

More were expected - full improvements won’t be complete until December 2022

Immediate upgrades fast-tracked to reduce permit violations in the interim

Immediate upgrades will be constructed by the end of the year

IMMEDIATE IMPROVEMENTS

Page 6: Wastewater Treatment Plant IMPROVEMENTS …...treatment plant (WWTP) is in need of upgrades to provide current and future capacity The General Sewer Plan/Facility Plan Update identified

Predesign report includes:Technical memos and

Prelim drawingsBasis for design of

Phase 1Cost estimate for

Phase 1Implementation plan

for Phase 1 and future improvements

Predesign report complete, submitted to Department of Ecology by October 31st.

PRELIMINARY DESIGN

Page 7: Wastewater Treatment Plant IMPROVEMENTS …...treatment plant (WWTP) is in need of upgrades to provide current and future capacity The General Sewer Plan/Facility Plan Update identified

DESIGN OF PHASE 1

Per the Facility Plan:

$10.9 Million to design and build

Phase 1

Cost saving measures to reduce cost and delay :

Remodel the existing lab

building instead of a new building

Delay construction of the sludge

thickening building

Delay construction of the second UV

channel

The current design:

$8.2 Million to design and build

Phase 1

Page 8: Wastewater Treatment Plant IMPROVEMENTS …...treatment plant (WWTP) is in need of upgrades to provide current and future capacity The General Sewer Plan/Facility Plan Update identified

SITE LAYOUT – PHASE 1

Page 9: Wastewater Treatment Plant IMPROVEMENTS …...treatment plant (WWTP) is in need of upgrades to provide current and future capacity The General Sewer Plan/Facility Plan Update identified

SITE LAYOUT – PHASE 2

Page 10: Wastewater Treatment Plant IMPROVEMENTS …...treatment plant (WWTP) is in need of upgrades to provide current and future capacity The General Sewer Plan/Facility Plan Update identified

SITE LAYOUT – PHASE 3

Page 11: Wastewater Treatment Plant IMPROVEMENTS …...treatment plant (WWTP) is in need of upgrades to provide current and future capacity The General Sewer Plan/Facility Plan Update identified

SITE LAYOUT – FUTURE

Page 12: Wastewater Treatment Plant IMPROVEMENTS …...treatment plant (WWTP) is in need of upgrades to provide current and future capacity The General Sewer Plan/Facility Plan Update identified

Funding Package A

$5.1M

Rock Creek Pump Station

Fairgrounds Pump Station

Cascade Avenue Pump Station

WWTP Flood Protection

WWTP Standby Generator & SCADA

Kanaka Pump Station

Cascade Interceptor

Funding Package B

$8.2M

WWTP Improvements

(Phase 1)

Funding Package C

$1.0M

WWTP Improvements

(Phase 2)

Funding Package D

$2.7M

WWTP Improvements

(Phase 3)

IMPLEMENTATION PLAN

Page 13: Wastewater Treatment Plant IMPROVEMENTS …...treatment plant (WWTP) is in need of upgrades to provide current and future capacity The General Sewer Plan/Facility Plan Update identified

Final design of Phase I

Improvements complete by June 2020

Funding procurement 2020-2021

Construction 2021-2022

NEXT STEPS