warm asphalt plant #91 columbus ohio - flexible … · 2011-10-12 · warm asphalt plant #91...

64
WARM ASPHALT WARM ASPHALT PLANT #91 PLANT #91 COLUMBUS OHIO COLUMBUS OHIO FLEXIBLE PAVEMENTS FLEXIBLE PAVEMENTS ANNUAL MEETING ANNUAL MEETING MARCH 29, 2006 MARCH 29, 2006 Larry Shively The Shelly Company

Upload: others

Post on 11-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

WARM ASPHALT WARM ASPHALT PLANT #91 PLANT #91

COLUMBUS OHIOCOLUMBUS OHIOFLEXIBLE PAVEMENTS FLEXIBLE PAVEMENTS

ANNUAL MEETINGANNUAL MEETINGMARCH 29, 2006MARCH 29, 2006

Larry Shively

The Shelly Company

Page 2: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

WHAT IS WARM ASPHALT?WHAT IS WARM ASPHALT?

•• PROCESS BY HMA: PROCESS BY HMA: CAN BE PRODUCED AND CAN BE PRODUCED AND PLACED AT LOWER PLACED AT LOWER TEMPERATURES TEMPERATURES

•• SOME ROAD FOREMEN SAY THE SOME ROAD FOREMEN SAY THE INDUSTRY HAS BEEN INDUSTRY HAS BEEN PRODUCING THIS TYPE OF MIX PRODUCING THIS TYPE OF MIX FOR YEARS!!FOR YEARS!!

Page 3: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Why Warm Asphalt?Why Warm Asphalt?

•• Reduce production and laydown Reduce production and laydown temperaturestemperatures

•• Reduce emissionsReduce emissions•• Reduce energy costsReduce energy costs•• Reduce aging of binderReduce aging of binder•• Other Possible Benefits:Other Possible Benefits:

–– Cool weather paving (extend season)Cool weather paving (extend season)–– Compaction aid for stiff mixesCompaction aid for stiff mixes

Page 4: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Why Warm Asphalt?Why Warm Asphalt?

Research by Stroup-Gardiner and Lange at AUIndicates increased emissions with increased temp.

Page 5: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Comparison of Visible EmissionsComparison of Visible Emissions

311 °F 230 °F

Page 6: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

What are Warm Asphalt Mixes?What are Warm Asphalt Mixes?

Several process have been developed to Several process have been developed to improve mixture workability allowing improve mixture workability allowing lower production and laydown lower production and laydown temperaturestemperatures–– WAM Foam WAM Foam –– Shell/Kolo VeidekkeShell/Kolo Veidekke–– ZeoliteZeolite –– Eurovia/Hubbard ConstructionEurovia/Hubbard Construction–– Sasobit Sasobit –– Sasol Int./Moore and MungerSasol Int./Moore and Munger–– New processesNew processes

•• MeadWetvacoMeadWetvaco

Page 7: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

ZeoliteZeolite

•• Zeolites are crystalline hydrated aluminum Zeolites are crystalline hydrated aluminum silicatessilicates

•• AsphaAspha--minmin®®, is a special Zeolite added to the , is a special Zeolite added to the hot mix asphalt in the temperature range of hot mix asphalt in the temperature range of 100 to 200 100 to 200 °°C (212 to 392 C (212 to 392 °°F)F)

•• When the Zeolite is heated; it gives up itWhen the Zeolite is heated; it gives up it’’s s internal moisture, approximately 21% by internal moisture, approximately 21% by weight, weight, microscopicallymicroscopically foaming the asphaltfoaming the asphalt

Page 8: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Above 100°C the water is slowly released providing a workable mix at a lower

temperature.

Page 9: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

AsphaAspha--minmin

Page 10: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Granulated asphaGranulated aspha--minmin®®

Page 11: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Addition of Addition of asphaaspha--minmin®®

•• AsphaAspha--min is added at an addition rate min is added at an addition rate of 0.3% by weight of mixof 0.3% by weight of mix

•• 6 pounds of Aspha6 pounds of Aspha--min per tonmin per ton

Page 12: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Creates a controlled Creates a controlled microscopic foaming effectmicroscopic foaming effect

Creates an increased volume Creates an increased volume of the binder in the mixof the binder in the mix

Creates micro pores in the mix Creates micro pores in the mix making a higher workability of making a higher workability of the mix along with obtaining a the mix along with obtaining a higher higher compactabilitycompactability

Previously only possible at Previously only possible at higher temperatureshigher temperatures

Page 13: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Type of Mineral Filler Bin usedType of Mineral Filler Bin used

Page 14: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Calibrating the FeederCalibrating the FeederThe outlet is removedThe outlet is removed

A container is placed under the hopper A container is placed under the hopper and the unit startedand the unit started

Page 15: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Bags of AsphaBags of Aspha--minmin

Page 16: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

HAD SOME PROBLEMS WITH HAD SOME PROBLEMS WITH FEED SYSTEMFEED SYSTEM

Page 17: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Drum mix plant Drum mix plant

Aspha-min blown into drum close to binder delivery point.

Page 18: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

TRANSPARENT HOSE TO MONITOR FLOW

Page 19: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

MAIN ENTRANCE TO MAIN ENTRANCE TO PLANT SITEPLANT SITE

Page 20: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

MAIN ENTRANCE TO MAIN ENTRANCE TO PLANT SITEPLANT SITE

Page 21: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

TYPE 2 PG 70-22

TYPE 1 PG 70-22

PAVEMENT DESIGN

Not drawn to scale

TYPE 2 PG 70-22

3”

3”

3”

Page 22: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Mixes were designed using Marshall Mixes were designed using Marshall Mix Design Procedures per ODOT Mix Design Procedures per ODOT

specificationsspecifications75 blows75 blows

Page 23: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Production TemperaturesProduction Temperatures

•• EACH OF THE TWO MIXES WERE EACH OF THE TWO MIXES WERE PRODUCED AT:PRODUCED AT:

•• 300 300 °°FF•• 240240--255 255 °°FF•• 230230--235 235 °°FF

Page 24: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Mix Design IssuesMix Design Issues

•• What temperature should specimens be What temperature should specimens be compacted?compacted?

•• TSR TSR •• Volumetrics at plantVolumetrics at plant•• Superpave vs. MarshallSuperpave vs. Marshall

Page 25: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Type 2 Zeolite Mix % Air Voids

22.5

33.5

44.5

55.5

66.5

77.5

88.5

9

4.0 4.5 5.0 5.5 6.0

% AC

% A

ir V

oids Original Design

Zeolite 255Zeolite 235

4.74.7 5.35.35.45.4

Page 26: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

WHAT BINDER CONTENT WHAT BINDER CONTENT SHOULD WE USE?SHOULD WE USE?

•• DECIDED TO USE THE ORGINAL DECIDED TO USE THE ORGINAL DESIGN BINDER CONTENTDESIGN BINDER CONTENT

•• WILL COMPACT SPECIMENS AT THE WILL COMPACT SPECIMENS AT THE DESIGN TEMPERATURE NOT THE DESIGN TEMPERATURE NOT THE PLACEMENT TEMPERATURESPLACEMENT TEMPERATURES

Page 27: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Type 1 Zeolite Mix % Air Voids

11.5

22.5

33.5

44.5

55.5

66.5

77.5

88.5

9

5.5 6.0 6.5 7.0 7.5

% AC

% A

ir V

oids Original Design

Zeolite 255FZeolite 235F

Page 28: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

SAME ISSUE WITH TYPE 1SAME ISSUE WITH TYPE 1

•• DECIDED TO STAY WITH ORIGINAL DECIDED TO STAY WITH ORIGINAL DESIGN TEMPERATURESDESIGN TEMPERATURES

•• WILL USE ORIGINAL MARSHALL MIX WILL USE ORIGINAL MARSHALL MIX DESIGNDESIGN

Page 29: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

APA RUT TESTINGAPA RUT TESTING

Page 30: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

T-2 WARM ASPHALT STUDY LOADED WHEEL TEST COMPARISON

0

0.05

0.1

0.15

0.2

0.25

0.3

0.35

0 1000 2000 3000 5000 7000

# OF CYCLES

DEF

. IN

INC

HES

Original Design255F235F

T-2 WARM ASPHALT STUDY LOADED WHEEL TEST COMPARISON

0

0.05

0.1

0.15

0.2

0.25

0.3

0.35

0 1000 2000 3000 5000 7000

# OF CYCLES

DEF

. IN

INC

HES

Original Design255F235F

Page 31: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

T-1 WARM ASPHALT STUDY LOADED WHEEL TEST COMPARISON

0

0.05

0.1

0.15

0.2

0.25

0.3

0 1000 2000 3000 5000 7000

# OF CYCLES

DEF

. IN

INC

HES

Original Design266F246F

Page 32: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

TSRTSR

•• EXAMINED THE TSR VALUES IN THE EXAMINED THE TSR VALUES IN THE LABORATORY AS RELATED TO LABORATORY AS RELATED TO ORIGINAL DESIGN AND EACH ORIGINAL DESIGN AND EACH TEMPERATURE TEMPERATURE

Page 33: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

TYPE 2 Zeolite Tensile Strength Ratio

40

45

50

55

60

65

70

75

80

85

ORIGINAL DESIGN ZEOLITE 255F ZEOLITE 235F

Mix Type

TSR

Rat

io

Page 34: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

TYPE 1 Zeolite Tensile Strength Ratio

40

45

50

55

60

65

70

75

80

85

90

ORIGINAL DESIGN ZEOLITE 255F ZEOLITE 235F

Mix Type

TSR

Rat

io

Page 35: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

0102030405060708090

Des

ign

803

Lab

Sec.

1

Sec

4

ControlEuro ZeoliteUS Zeolite

SISTER COMPANY PIKE INDUSTRIES FOUND SOME ISSUES WITH TSR

Page 36: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

PRODUCTIONPRODUCTION•• ASTEC DOUBLE BARRELASTEC DOUBLE BARREL•• CALIBRATED THE ASPHACALIBRATED THE ASPHA--MIN TO MIN TO

PLANTPLANT’’S EXPECTED TONS PER HOURS EXPECTED TONS PER HOUR•• EXPECTED TPH EXPECTED TPH -- 200200--250 TPH250 TPH•• SILO STORAGE TIME APPROX 20SILO STORAGE TIME APPROX 20--30 30

MINUTESMINUTES•• WEATHER: COOL LOW MID 40WEATHER: COOL LOW MID 40’’S HIGH 65S HIGH 65

Page 37: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

FIRST MATERIAL PRODUCEDFIRST MATERIAL PRODUCED

•• The material coming The material coming out of the dryerout of the dryer--drum drum discharge chute was discharge chute was uncoateduncoated

•• When the material When the material was loaded into the was loaded into the truck the material truck the material was coated!was coated!

Page 38: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

During production, noticed higher amp draw for the slant conveyor

Page 39: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Production Production

•• Easier to produce than expectedEasier to produce than expected•• Some concerns about baghouse Some concerns about baghouse

temperaturetemperature•• Did experience decrease in tons per Did experience decrease in tons per

hourhour

Page 40: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly
Page 41: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Seeing is Believing!Seeing is Believing!

Hot Mix 314 F Warm Mix 254 F

Page 42: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

LaydownLaydown

•• Did not tell crew Did not tell crew temperatures at firsttemperatures at first

•• Fewer paver fumesFewer paver fumes•• Private crew did the Private crew did the

hand workhand work•• Little to no build up Little to no build up

in trucksin trucks

Page 43: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Warm Asphalt Mix Warm Asphalt Mix at lower temperature at lower temperature could be handled in could be handled in the same way as the same way as normal HMAnormal HMA

Page 44: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

TYPE 2 PLACEMENTTYPE 2 PLACEMENT

Page 45: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

CompactionCompaction

Page 46: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

CONDUCTED NUCLEAR GAUGE TESTSCONDUCTED NUCLEAR GAUGE TESTS

Page 47: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Mix cooled quicklyMix cooled quickly

Page 48: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Loadout with Warm AsphaltLoadout with Warm Asphalt

Page 49: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

LoadoutLoadout

Page 50: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

TEST RESULTS OF TEST RESULTS OF PRODUCED MIXPRODUCED MIX

•• TSR TYPE 2 ONE HOUR CURE= TSR TYPE 2 ONE HOUR CURE= 87%87%•• TSR TYPE 1 ONE HOUR CURE= TSR TYPE 1 ONE HOUR CURE= 80%80%•• BETTER THAN MIX DESIGN RESULTSBETTER THAN MIX DESIGN RESULTS

Page 51: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Cores yielded good densityCores yielded good density

Page 52: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

TYPE 2 PG 70-22 95.3%(230F)95.3%(230F)

TYPE 1 PG 70-22 94.4%94.4% (230F)(230F)

PAVEMENT DENSITYPAVEMENT DENSITY--AVERAGEAVERAGEBASED ON FIELD MTD 1 HOUR CUREBASED ON FIELD MTD 1 HOUR CURE

TYPE 2 PG 70-22 96.5% (240F)96.5% (240F)

AVERAGE DENSITY STANDARD AVERAGE DENSITY STANDARD TEMPERATURES 93%TEMPERATURES 93%

Page 53: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Cure Time Cure Time –– Early ConcernEarly Concern

•• In some cases, Europeans allow In some cases, Europeans allow pavement to pavement to ““curecure”” before allowing before allowing traffic on roadway traffic on roadway

•• When does Warm AsphaltWhen does Warm Asphalt’’s workability s workability end?end?

•• Will pavements rut if traffic allowed on Will pavements rut if traffic allowed on an hour or so after placement? an hour or so after placement?

Page 54: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

ConclusionsConclusions--ProPro

•• Mix can be produced and placed at Mix can be produced and placed at lower temperatureslower temperatures

•• Density did not seem to be an issueDensity did not seem to be an issue•• Lower emissions from load out and Lower emissions from load out and

paving spreadpaving spread•• Workability improvedWorkability improved•• Fuel savingsFuel savings

Page 55: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

ConclusionsConclusions--ConCon

•• Expense of the additive offsets fuel savingsExpense of the additive offsets fuel savings•• Concerned about lower temperatures in Concerned about lower temperatures in

BaghouseBaghouse--corrosion, caking of bagscorrosion, caking of bags•• Possible lower Possible lower tphtph, more load on slant , more load on slant

conveyorconveyor•• Low TSR values in design stageLow TSR values in design stage--did not see did not see

stripping in placestripping in place--may be too soonmay be too soon•• Need larger project to gain experienceNeed larger project to gain experience

Page 56: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

A Word About CostA Word About Cost

•• Most additives, warm asphalt or other, Most additives, warm asphalt or other, are expected to increase the price of the are expected to increase the price of the HMAHMA

•• Some processes or additives may Some processes or additives may require plant/production modificationsrequire plant/production modifications

•• It is not anticipated that the fuel savings It is not anticipated that the fuel savings will totally offset these costswill totally offset these costs

Page 57: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Questions to be answeredQuestions to be answered

•• Are there economic benefits?Are there economic benefits?•• How will compaction be affected?How will compaction be affected?•• What temperature should volumetric What temperature should volumetric

specimens be compacted?specimens be compacted?•• AntistripAntistrip -- Is it needed?Is it needed?•• DOT acceptance?DOT acceptance?•• EPA possible involvement???EPA possible involvement???

Page 58: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly
Page 59: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly
Page 60: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Projected cost savings used oilProjected cost savings used oil

Warm Asphalt Cost of Fuel Savingsbased on Used Oil

$1.20

$1.30

$1.40

$1.50

$1.60

$1.70

$1.80

$1.90

$2.00

325 300 275 250 225

Temperature of Mix

Dol

lar P

er T

on o

f Fue

l

Page 61: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly

Economics of warm asphaltEconomics of warm asphalt

•• ZeoliteZeolite--$0.60 per pound (not including $0.60 per pound (not including shipping)shipping)

•• 0.3% per ton of mix0.3% per ton of mix•• 6 # per ton6 # per ton•• $3.60 per ton of mix$3.60 per ton of mix

Page 62: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly
Page 63: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly
Page 64: WARM ASPHALT PLANT #91 COLUMBUS OHIO - Flexible … · 2011-10-12 · WARM ASPHALT PLANT #91 COLUMBUS OHIO FLEXIBLE PAVEMENTS ANNUAL MEETING MARCH 29, 2006 Larry Shively The Shelly