Doug’s Corner VOLUME 3, ISSUE 1261 COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE Doug’s Corner 1-3 Traffic/Active Work 4-5 Construction Notices 6-8 Other Resourses 9 June 15th, 2015 ONTRACTOR’S C W U EEKLY PDATE BETHANY HOME ROAD TO DUNLAP AVENUE 1 e first of three Traction Power Substations in place New faces on the project - meet intern Zach

Upload: trinhxuyen

Post on 04-Aug-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: VOLUME 3, ISSUE 1261 June 15th, 2015 … · Shawn and Kelvin pour station walls at Northern ... lane both northbound and southbound 19th Avenue will be main- ... June 15th for Traction

Doug’s Corner

VOLUME 3, ISSUE 1261

COURTEOUS

RESPONSIVE

DEPENDABLE

IN THIS ISSUE

Doug’s Corner1-3

Traffic/Active Work4-5

Construction Notices6-8

Other Resourses9

June 15th, 2015

ONTRACTOR’SCWU

EEKLYPDATE BETHANY HOME ROAD TO DUNLAP AVENUE

1

The first of three Traction Power Substations in place

New faces on the project - meet intern Zach

Page 2: VOLUME 3, ISSUE 1261 June 15th, 2015 … · Shawn and Kelvin pour station walls at Northern ... lane both northbound and southbound 19th Avenue will be main- ... June 15th for Traction

Travis Pettera welds rebar ahead of a track pour

Doug’s Corner

My Weekin Pictures

ONTRACTOR’SCWU

EEKLYPDATE BETHANY HOME ROAD TO DUNLAP AVENUE

2

facebook.com/doug.ststevens

instagram.com/nwx_phx

#MOVEPHX

Our highly-skilled track crew installs an insulated joint

Page 3: VOLUME 3, ISSUE 1261 June 15th, 2015 … · Shawn and Kelvin pour station walls at Northern ... lane both northbound and southbound 19th Avenue will be main- ... June 15th for Traction

ONTRACTOR’SCWU

EEKLYPDATE

Doug’s Corner

My Weekin Pictures

facebook.com/doug.ststevens

/maxxtransit

BETHANY HOME ROAD TO DUNLAP AVENUE

3

#MOVEPHX

Shawn and Kelvin pour station walls at Northern

Montebello Station - not the end of the line for long

Page 4: VOLUME 3, ISSUE 1261 June 15th, 2015 … · Shawn and Kelvin pour station walls at Northern ... lane both northbound and southbound 19th Avenue will be main- ... June 15th for Traction

ONTRACTOR’SCWU

EEKLYPDATE WORK ACTIVITIES AND TRAFFIC CONTROL

06.15.15

NORTHDunlapAvenue

toOrangewood

Avenue

Dunlap Avenue/19th Avenue IntersectionNo restrictions

Dunlap Avenue to Butler DriveLandscaping, Sidewalk, TPSS Building Installation, Punch List Items• One (1) lane both northbound and southbound 19th Avenue will be main-

tained.

Butler Drive/19th Avenue IntersectionTraffic signal base removal• Shoulder restrictions possible from Monday, June 15th through Friday

June 20th for removal of temporary traffic signal bases.

Butler Drive to Northern AvenueLandscaping, Irrigation, OCS Wire Pull, Punch List Items• One (1) lane both northbound and southbound 19th Avenue will be main-

tained.• Turn lanes at signalized intersections will be maintained.• No U-turns on 19th Avenue northbound or southbound at Las Palmaritas

through June 19th.• Las Palmaritas closed on Monday, June 15th for Traction Power Substa-

tion building intallation. Use El Caminito as alternate access.

Northern Avenue/19th Avenue IntersectionNo restrictions

Northern Avenue to Orangewood AvenueStation Work, OCS, Duct Bank, Track Installation• One (1) lane both northbound and southbound 19th Avenue will be main-

tained.• Turn lanes at signalized intersections will be maintained.

4

#MOVEPHX

/maxxtransit

Page 5: VOLUME 3, ISSUE 1261 June 15th, 2015 … · Shawn and Kelvin pour station walls at Northern ... lane both northbound and southbound 19th Avenue will be main- ... June 15th for Traction

ONTRACTOR’SCWU

EEKLYPDATE WORK ACTIVITIES AND TRAFFIC CONTROL

06.15.15

SOUTHOrangewood

Avenueto

MontebelloAvenue

Orangewood Avenue/19th Avenue IntersectionTrack Crossing• Orangewood Avenue track installation crossing June 15th through July

3rd. See map page six (6)• No through traffic on Orangewood Avenue at 19th Avenue June 15th

through July 3rd.• Right turns only from Orangewood Avenue to 19th Avenue both east-

bound and westbound June 15th through July 3rd.Orangewood Avenue to Glendale AvenueDemolition, Grading, Guideway Curb, Catch Basins, OCS, Asphalt• One (1) lane both northbound and southbound 19th Avenue will be main-

tained.• Turn lanes at signalized intersections will be maintained.Glendale Avenue/19th Avenue IntersectionDemolition, Grading, Curb and Gutter, Catch Basins, OCS, Asphalt• One (1) lane both northbound and southbound 19th Avenue will be main-

tained with no turn restrictions April 27th through July 2nd.• One (1) lane eastbound and westbound Glendale Avenue will be main-

tained with no turn restrictions through July 2nd. See map pages seven (7) and eight (8)

Glendale Avenue to Maryland AvenueStation Work, OCS, TPSS Building• One (1) lane both northbound and southbound 19th Avenue will be main-

tained.• Turn lanes at signalized intersections will be maintained.Maryland Avenue/19th Avenue IntersectionAsphalt• Maryland Avenue closed west of 19th Avenue on June 19th. • Use Glendale Avenue or Bethany Home Road as alternate access during

closure.Maryland Avenue to Bethany Home RoadContruct/Pour Track, OCS, Punch list, Landscaping• One (1) lane both northbound and southbound 19th Avenue will be main-

tained.• Turn lanes at signalized intersections will be maintained.Bethany Home Road/19th Avenue IntersectionNo RestrictionsBethany Home Road to Montebello AvenueInstall Pedestrian Hand Rail at Montebello Station• One lane will be maintained northbound and southbound 19th Avenue• Turn lanes at signalized intersections will be maintained. 5

#MOVEPHX

/maxxtransit

Page 6: VOLUME 3, ISSUE 1261 June 15th, 2015 … · Shawn and Kelvin pour station walls at Northern ... lane both northbound and southbound 19th Avenue will be main- ... June 15th for Traction

6

CN

QUESTIONS?VALLEY METROCommunity OutreachCoordinators

Carla Kahn (623) 261.2605Lisa Saldin (602) 495.8213

SSWJVCommunity OutreachSuperintendents

Mike Howard (602) 619.5813Ryan Clark (480) 271.4117

24/7 Project Hotline602.254.RAIL (7245)

STAY CONNECTED

Construction dates and restrictions are subject to change. For the latest infor-mation, visit the project web-site at:

valleymetro.org/northwest

facebook.com/valleymetro

Orangewood Avenue and 19th AvenueTrack Crossing

June 15th through July 3rd, 2015 Work Description• Constructing track and pouring concrete across Orange-

wood Avenue.Traffic Restrictions• No left turns from 19th Avenue northbound to Orangewood Ave-

nue westbound• No left turns from 19th Avenue southbound to Orangewood Ave-

nue eastbound• Right turn only from Orangewood eastbound to 19th northbound• Right turn only from Orangewood westbound to 19th southbound

ONSTRUCTIONOTICE

PedestrianCrossing

19th

Avenue

19th

Avenue

Orangewood Avenue Orangewood Avenue

Page 7: VOLUME 3, ISSUE 1261 June 15th, 2015 … · Shawn and Kelvin pour station walls at Northern ... lane both northbound and southbound 19th Avenue will be main- ... June 15th for Traction

7

CN

QUESTIONS?VALLEY METROCommunity OutreachCoordinators

Carla Kahn (623) 261.2605Lisa Saldin (602) 495.8213

SSWJVCommunity OutreachSuperintendents

Mike Howard (602) 619.5813Ryan Clark (480) 271.4117

24/7 Project Hotline602.254.RAIL (7245)

STAY CONNECTED

Construction dates and restrictions are subject to change. For the latest infor-mation, visit the project web-site at:

valleymetro.org/northwest

facebook.com/valleymetro

Glendale Avenue & 19th AvenueRoadway Work

June 8th through June 21st, 2015 Work Description• Demolition, Grading, Curb and Gutter, Catch Basins, As-

phaltTraffic Restrictions• One (1) lane both northbound and southbound 19th Avenue

will be maintained with no turn restrictions.• One (1) lane both eastbound and westbound Glendale Avenue

will be maintained with no turn restrictions.

ONSTRUCTIONOTICE

19th

Avenue

Glendale Avenue Glendale Avenue

19th

Avenue

Page 8: VOLUME 3, ISSUE 1261 June 15th, 2015 … · Shawn and Kelvin pour station walls at Northern ... lane both northbound and southbound 19th Avenue will be main- ... June 15th for Traction

8

CN

QUESTIONS?VALLEY METROCommunity OutreachCoordinators

Carla Kahn (623) 261.2605Lisa Saldin (602) 495.8213

SSWJVCommunity OutreachSuperintendents

Mike Howard (602) 619.5813Ryan Clark (480) 271.4117

24/7 Project Hotline602.254.RAIL (7245)

STAY CONNECTED

Construction dates and restrictions are subject to change. For the latest infor-mation, visit the project web-site at:

valleymetro.org/northwest

facebook.com/valleymetro

Glendale Avenue & 19th AvenueRoadway Work

June 22nd through July 2nd, 2015 Work Description• Demolition, Grading, Curb and Gutter, Catch Basins, As-

phaltTraffic Restrictions• One (1) lane both northbound and southbound 19th Avenue

will be maintained with no turn restrictions.• One (1) lane both eastbound and westbound Glendale Avenue

will be maintained with no turn restrictions.

ONSTRUCTIONOTICE

19th

Avenue

Glendale Avenue Glendale Avenue

19th

Avenue

CROSSWALK

CLOSED