volume 3, issue 1261 june 15th, 2015 … · shawn and kelvin pour station walls at northern ......
TRANSCRIPT
Doug’s Corner
VOLUME 3, ISSUE 1261
COURTEOUS
RESPONSIVE
DEPENDABLE
IN THIS ISSUE
Doug’s Corner1-3
Traffic/Active Work4-5
Construction Notices6-8
Other Resourses9
June 15th, 2015
ONTRACTOR’SCWU
EEKLYPDATE BETHANY HOME ROAD TO DUNLAP AVENUE
1
The first of three Traction Power Substations in place
New faces on the project - meet intern Zach
Travis Pettera welds rebar ahead of a track pour
Doug’s Corner
My Weekin Pictures
ONTRACTOR’SCWU
EEKLYPDATE BETHANY HOME ROAD TO DUNLAP AVENUE
2
facebook.com/doug.ststevens
instagram.com/nwx_phx
#MOVEPHX
Our highly-skilled track crew installs an insulated joint
ONTRACTOR’SCWU
EEKLYPDATE
Doug’s Corner
My Weekin Pictures
facebook.com/doug.ststevens
/maxxtransit
BETHANY HOME ROAD TO DUNLAP AVENUE
3
#MOVEPHX
Shawn and Kelvin pour station walls at Northern
Montebello Station - not the end of the line for long
ONTRACTOR’SCWU
EEKLYPDATE WORK ACTIVITIES AND TRAFFIC CONTROL
06.15.15
NORTHDunlapAvenue
toOrangewood
Avenue
Dunlap Avenue/19th Avenue IntersectionNo restrictions
Dunlap Avenue to Butler DriveLandscaping, Sidewalk, TPSS Building Installation, Punch List Items• One (1) lane both northbound and southbound 19th Avenue will be main-
tained.
Butler Drive/19th Avenue IntersectionTraffic signal base removal• Shoulder restrictions possible from Monday, June 15th through Friday
June 20th for removal of temporary traffic signal bases.
Butler Drive to Northern AvenueLandscaping, Irrigation, OCS Wire Pull, Punch List Items• One (1) lane both northbound and southbound 19th Avenue will be main-
tained.• Turn lanes at signalized intersections will be maintained.• No U-turns on 19th Avenue northbound or southbound at Las Palmaritas
through June 19th.• Las Palmaritas closed on Monday, June 15th for Traction Power Substa-
tion building intallation. Use El Caminito as alternate access.
Northern Avenue/19th Avenue IntersectionNo restrictions
Northern Avenue to Orangewood AvenueStation Work, OCS, Duct Bank, Track Installation• One (1) lane both northbound and southbound 19th Avenue will be main-
tained.• Turn lanes at signalized intersections will be maintained.
4
#MOVEPHX
/maxxtransit
ONTRACTOR’SCWU
EEKLYPDATE WORK ACTIVITIES AND TRAFFIC CONTROL
06.15.15
SOUTHOrangewood
Avenueto
MontebelloAvenue
Orangewood Avenue/19th Avenue IntersectionTrack Crossing• Orangewood Avenue track installation crossing June 15th through July
3rd. See map page six (6)• No through traffic on Orangewood Avenue at 19th Avenue June 15th
through July 3rd.• Right turns only from Orangewood Avenue to 19th Avenue both east-
bound and westbound June 15th through July 3rd.Orangewood Avenue to Glendale AvenueDemolition, Grading, Guideway Curb, Catch Basins, OCS, Asphalt• One (1) lane both northbound and southbound 19th Avenue will be main-
tained.• Turn lanes at signalized intersections will be maintained.Glendale Avenue/19th Avenue IntersectionDemolition, Grading, Curb and Gutter, Catch Basins, OCS, Asphalt• One (1) lane both northbound and southbound 19th Avenue will be main-
tained with no turn restrictions April 27th through July 2nd.• One (1) lane eastbound and westbound Glendale Avenue will be main-
tained with no turn restrictions through July 2nd. See map pages seven (7) and eight (8)
Glendale Avenue to Maryland AvenueStation Work, OCS, TPSS Building• One (1) lane both northbound and southbound 19th Avenue will be main-
tained.• Turn lanes at signalized intersections will be maintained.Maryland Avenue/19th Avenue IntersectionAsphalt• Maryland Avenue closed west of 19th Avenue on June 19th. • Use Glendale Avenue or Bethany Home Road as alternate access during
closure.Maryland Avenue to Bethany Home RoadContruct/Pour Track, OCS, Punch list, Landscaping• One (1) lane both northbound and southbound 19th Avenue will be main-
tained.• Turn lanes at signalized intersections will be maintained.Bethany Home Road/19th Avenue IntersectionNo RestrictionsBethany Home Road to Montebello AvenueInstall Pedestrian Hand Rail at Montebello Station• One lane will be maintained northbound and southbound 19th Avenue• Turn lanes at signalized intersections will be maintained. 5
#MOVEPHX
/maxxtransit
6
CN
QUESTIONS?VALLEY METROCommunity OutreachCoordinators
Carla Kahn (623) 261.2605Lisa Saldin (602) 495.8213
SSWJVCommunity OutreachSuperintendents
Mike Howard (602) 619.5813Ryan Clark (480) 271.4117
24/7 Project Hotline602.254.RAIL (7245)
STAY CONNECTED
Construction dates and restrictions are subject to change. For the latest infor-mation, visit the project web-site at:
valleymetro.org/northwest
facebook.com/valleymetro
Orangewood Avenue and 19th AvenueTrack Crossing
June 15th through July 3rd, 2015 Work Description• Constructing track and pouring concrete across Orange-
wood Avenue.Traffic Restrictions• No left turns from 19th Avenue northbound to Orangewood Ave-
nue westbound• No left turns from 19th Avenue southbound to Orangewood Ave-
nue eastbound• Right turn only from Orangewood eastbound to 19th northbound• Right turn only from Orangewood westbound to 19th southbound
ONSTRUCTIONOTICE
PedestrianCrossing
19th
Avenue
19th
Avenue
Orangewood Avenue Orangewood Avenue
7
CN
QUESTIONS?VALLEY METROCommunity OutreachCoordinators
Carla Kahn (623) 261.2605Lisa Saldin (602) 495.8213
SSWJVCommunity OutreachSuperintendents
Mike Howard (602) 619.5813Ryan Clark (480) 271.4117
24/7 Project Hotline602.254.RAIL (7245)
STAY CONNECTED
Construction dates and restrictions are subject to change. For the latest infor-mation, visit the project web-site at:
valleymetro.org/northwest
facebook.com/valleymetro
Glendale Avenue & 19th AvenueRoadway Work
June 8th through June 21st, 2015 Work Description• Demolition, Grading, Curb and Gutter, Catch Basins, As-
phaltTraffic Restrictions• One (1) lane both northbound and southbound 19th Avenue
will be maintained with no turn restrictions.• One (1) lane both eastbound and westbound Glendale Avenue
will be maintained with no turn restrictions.
ONSTRUCTIONOTICE
19th
Avenue
Glendale Avenue Glendale Avenue
19th
Avenue
8
CN
QUESTIONS?VALLEY METROCommunity OutreachCoordinators
Carla Kahn (623) 261.2605Lisa Saldin (602) 495.8213
SSWJVCommunity OutreachSuperintendents
Mike Howard (602) 619.5813Ryan Clark (480) 271.4117
24/7 Project Hotline602.254.RAIL (7245)
STAY CONNECTED
Construction dates and restrictions are subject to change. For the latest infor-mation, visit the project web-site at:
valleymetro.org/northwest
facebook.com/valleymetro
Glendale Avenue & 19th AvenueRoadway Work
June 22nd through July 2nd, 2015 Work Description• Demolition, Grading, Curb and Gutter, Catch Basins, As-
phaltTraffic Restrictions• One (1) lane both northbound and southbound 19th Avenue
will be maintained with no turn restrictions.• One (1) lane both eastbound and westbound Glendale Avenue
will be maintained with no turn restrictions.
ONSTRUCTIONOTICE
19th
Avenue
Glendale Avenue Glendale Avenue
19th
Avenue
CROSSWALK
CLOSED
ONTRACTOR’SCWU
EEKLYPDATE OTHER RESOURCES
9
/maxxtransitfacebook.com/doug.ststevens
#MOVEPHX