vijayakumar janakiraman - nerva. · pdf filepeoplesoft hcm v9.1 to v9.2 and peopletools from...
TRANSCRIPT
© 2017 Cognizant © 2017 Cognizant
9th September 2017
PEOPLESOFT CUSTOMER SUCCESS STORIES FROM THE PARTNERS THAT MADE IT HAPPEN EMORY 9.2 UPGRADE Vijayakumar Janakiraman
© 2017 Cognizant 2
Oracle’s Cloud and other technologies play a critical role in supporting your digital transformation initiatives
• We are a long term, award winning Oracle partner.
• A proven leader in digital transformation.
• More than 200 successful projects using the Oracle Cloud.
• We have the end-to-end, best practice services, backed by deep industry expertise needed to deliver successful solutions for our clients across: Oracle HCM, ERP, SCM, CX, PaaS and IaaS.
Welcome to OOW ’17 - About Cognizant-KBACE
© 2017 Cognizant 3
Today’s Presenter
VijayaKumar JanakiramanSenior Manager - Projects,
EAS Oracle PeopleSoft
© 2017 Cognizant 4
Cognizant Solution OverviewEmory collaborated with Cognizant on upgrading
PeopleSoft HCM v9.1 to v9.2 and PeopleTools from V8.54 to V8.55
Solution Aligned with Emory’s Objectives
Enable Higher BusinessEffectiveness
Experienced Approach to 9.2 Enablement
9.2 Technical andFunctional Experts
Cognizant analyzed the fit/gap document to implement
• Standardization of business processes
• Improve user experience • Automate manual processes
Implement functionality to create Total Rewards Statement, Enable Fluid Self service components and implement work centers, dashboards & pivots
Experienced approach to leveraging PeopleSoft 9.2 out-of-the-box Fluid UI features
Leverage Usability/Mobility features from successful in-house implementations
Self Service
Activity Guides
Homepage Tiles
• Team of seasoned consultants with experience in PS & Fluid implementation
• Key personnel available at onsite for critical phases of the project
1800+ PeopleSoft consultants delivering business value to our clients
© 2017 Cognizant 5
Project Approach
Application Configuration design and CRP for SMEs. Detailed RICEW review and finalize the list of requirements for HCM
Functional and technical specifications for approved customizations & configure new functionalities
Technical build for RICEW approved components and Unit Testing
Support System Integration, Parallel and User Acceptance Testing
Build
Depl
oy Deployment plan including contingency, followed by deployment, cut-over to production and post go-live support to stabilize the system
SOLUTION DEPLOYMENT AND CUTOVER
SUPPORT TESTING
TECHNICAL BUILD AND UNIT TESTING
RICEW DESIGN & CONFIGURENEW FUNCTIONALITIES
ANALYZE RICEW & IMPLEMENT NEWFUNCTIONALITIES
Test
Dis
cove
ry,
Des
ign
& P
lan
© 2017 Cognizant 6
How was Emory Prepared ?Success of such projects highly depends on the successful Planning and Design phase. Key areas Emory was prepared on
• Pro-active Instance Planning -Prepared an exhaustive instance plan ensuring the instance availability for technical and functional work
• Planned Onboarding and security Accesses for Project team
Other Upgrade Resource Requirements Effective Change Control
• Established a strong Change Management Mechanism to iron out critical requirements that surface at later stages of the project
• Ensured all key stakeholders have knowledge on Fluid to ensure that Demonstration Workshops are off to a great start
• Identified Key SMEs from Healthcare and University for taking timely decisions in the upgrade
• Established Key SME Calendar and prioritized key resource availability for the project
Success is all about People
6
© 2017 Cognizant
8
7
6
5
4
3
2
1
7
Key Functionalities Implemented
7
Paycheck ModelerComplete Fluid Adoption
Fluid Org Chart Total Rewards Implementation
Fluid Dashboard and WorkcentersElastic Search
Smart HR for updating LicensesOne PerformanceManagement Form
© 2017 Cognizant 8
Benefits
8
7
65
4
3
2
1 HRDigitalization
ConfigurableTotal Rewards
More controlfor Business
over Fluid HR
Org Chart for University and
Healthcare
One Performance Management
forms
Workcenter for Improved
Administrative Productivity
Dashboardsfor Real-time
Analytics
© 2017 Cognizant
• Multi concurrent job situation in University and Healthcare
• Performance of Pivot Grid Analytics
• Use of Paycheck Modeler during Supplemental Payroll
• Org Chart Search using Preferred Name
• Fluid-to-Classic Navigation
• Mobile access to External URL on Homepage
• Accessing Attachments in Performance Document over mobile
• Mandatory Nomination of Participants in Performance
• Page Freeze with use of prompts in Fluid Tiles
9
Challenges
© 2017 Cognizant
8
6
4
2
7
5
3
1
10
Solutions
10
Workcenter based Pivot grids for better performance
Data Integrity for Total Rewards Org Chart and Check Modeler
Quick fix for using Preferred Name search in Org Chart
Availability of all deductions during supplemental payroll
Fluid Dashboard Tile for External URL
Use of Browser back button for Classic to Fluid Navigation
Configured Web profiles for Prompt issues in Tiles
Enabled Mandatory Nominate Participant
© 2017 Cognizant 11
Join our leadership at our Digital Innovations Center @ JilliansRequest a meeting now at http://cogniz.at/oow17
Jillian's San Francisco 175 Fourth Street
San Francisco CA 94103415.369.6100
Across from Moscone WestTo download this presentation visit
this page after the show: http://cogniz.at/6443
Join us at Jillian’s and receive an Ebook version of “What to do When
Machines Do Everything”, by Malcom Frank, Ben Pring, and Paul Roehrig