VA-237 Multimodal Improvements Project Follow-Up Before & After Photos: Corridor-wide Upgraded Markings and Signage & Other Pedestrian or Intersection Improvements Fall 2019 VA-237 Multimodal Improvements: Recommendations Spring 2019 *Proposed Pedestrian Flashing Beacons & Speed Reduction in-progress at this time. * *

Upload: others

Post on 20-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: VA-237 Multimodal Improvements Project Follow-Up · Before & After Photos: Corridor-wide Upgraded Markings and Signage & Other Pedestrian or Intersection Improvements Fall 2019 VA-237

VA-237 Multimodal Improvements Project Follow-UpBefore & After Photos:

Corridor-wide Upgraded Markings and Signage & Other Pedestrian or Intersection Improvements

Fall 2019

VA-237 Multimodal Improvements:Recommendations Spring 2019

*Proposed Pedestrian Flashing Beacons & Speed Reduction in-progress at this time.

* *

Page 2: VA-237 Multimodal Improvements Project Follow-Up · Before & After Photos: Corridor-wide Upgraded Markings and Signage & Other Pedestrian or Intersection Improvements Fall 2019 VA-237

Fairfax Dr & N Vermont StBefore After

Added High Visibility Crosswalks & Stop Bars

Page 3: VA-237 Multimodal Improvements Project Follow-Up · Before & After Photos: Corridor-wide Upgraded Markings and Signage & Other Pedestrian or Intersection Improvements Fall 2019 VA-237

Fairfax Dr & N Taylor StBefore After

Added High Visibility Crosswalks

Page 4: VA-237 Multimodal Improvements Project Follow-Up · Before & After Photos: Corridor-wide Upgraded Markings and Signage & Other Pedestrian or Intersection Improvements Fall 2019 VA-237

Fairfax Dr & N Pollard StBefore After

Added Advanced Crosswalk Signage & Markings

Page 5: VA-237 Multimodal Improvements Project Follow-Up · Before & After Photos: Corridor-wide Upgraded Markings and Signage & Other Pedestrian or Intersection Improvements Fall 2019 VA-237

Fairfax Dr & N Pollard St (cont.)Before After

Added High Visibility Crosswalks & ImprovedBike Lane Markings

Page 6: VA-237 Multimodal Improvements Project Follow-Up · Before & After Photos: Corridor-wide Upgraded Markings and Signage & Other Pedestrian or Intersection Improvements Fall 2019 VA-237

Fairfax Dr & N Pollard St (cont.)Before After

Extended Curb to Reduce Pedestrian Crossing Distance & Vehicle Turning Speeds

Page 7: VA-237 Multimodal Improvements Project Follow-Up · Before & After Photos: Corridor-wide Upgraded Markings and Signage & Other Pedestrian or Intersection Improvements Fall 2019 VA-237

Fairfax Dr & N Oakland StBefore After

Extended Curb & Median to Create Pedestrian Refuges & Reduce Vehicle Turning Speeds; Removed Parking Space to

Enhance Driver Sight Line to Pedestrians

Page 8: VA-237 Multimodal Improvements Project Follow-Up · Before & After Photos: Corridor-wide Upgraded Markings and Signage & Other Pedestrian or Intersection Improvements Fall 2019 VA-237

Fairfax Dr & N Oakland St (cont.)Before After

Added Advanced Crosswalk Signage & Markings

Page 9: VA-237 Multimodal Improvements Project Follow-Up · Before & After Photos: Corridor-wide Upgraded Markings and Signage & Other Pedestrian or Intersection Improvements Fall 2019 VA-237

Fairfax Dr & N Lincoln StBefore After

Added Advanced Crosswalk Signage & Markings

Page 10: VA-237 Multimodal Improvements Project Follow-Up · Before & After Photos: Corridor-wide Upgraded Markings and Signage & Other Pedestrian or Intersection Improvements Fall 2019 VA-237

Fairfax Dr & N Kansas StBefore After

Added Advanced Crosswalk Signage & Markings

Page 11: VA-237 Multimodal Improvements Project Follow-Up · Before & After Photos: Corridor-wide Upgraded Markings and Signage & Other Pedestrian or Intersection Improvements Fall 2019 VA-237

Fairfax Dr & N Kenmore StBefore After

Added High Visibility Crosswalks; Extended Medians to Create a Pedestrian Refuge & Reduce Vehicle

Turning Speeds

Page 12: VA-237 Multimodal Improvements Project Follow-Up · Before & After Photos: Corridor-wide Upgraded Markings and Signage & Other Pedestrian or Intersection Improvements Fall 2019 VA-237

Fairfax Dr & Kenmore St (cont.)Before After

Added Advanced Crosswalk Signage & Markings

Page 13: VA-237 Multimodal Improvements Project Follow-Up · Before & After Photos: Corridor-wide Upgraded Markings and Signage & Other Pedestrian or Intersection Improvements Fall 2019 VA-237

10th St N & Irving StBefore After

Added New Crosswalks, Advanced Crosswalk Signage & Markings, & Curb Extensions

Page 14: VA-237 Multimodal Improvements Project Follow-Up · Before & After Photos: Corridor-wide Upgraded Markings and Signage & Other Pedestrian or Intersection Improvements Fall 2019 VA-237

10th St & Hudson StBefore After

Added Advanced Crosswalk Signage & Markings

Page 15: VA-237 Multimodal Improvements Project Follow-Up · Before & After Photos: Corridor-wide Upgraded Markings and Signage & Other Pedestrian or Intersection Improvements Fall 2019 VA-237

10th St N & Hudson St (cont.)Before After

Added Median Extension

Page 16: VA-237 Multimodal Improvements Project Follow-Up · Before & After Photos: Corridor-wide Upgraded Markings and Signage & Other Pedestrian or Intersection Improvements Fall 2019 VA-237

10th St & Garfield StBefore After

Added Advanced Crosswalk Signage & Markings & Removed Parking Space