Page 1: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

1utdallas.edu/~metin

Planning Demand and Supply in a Supply Chain

Capacity Planning and Assignment

Page 2: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

2

utdallas.edu/~metin

Aside: Continuous Compounding If my $1investment earns an interest of r per year, what is my

interest+investment at the end of the year? Answer: (1+r) If I earn an interest of r/2 per six months, what is my interest+ investment at the

end of the year? Answer: (1+r/2)2

If I earn an interest of (r/m) per (12/m) months, what is my interest+investment? Answer: (1+r/m)m

Think of continuous compounding as the special case of discrete-time compounding when m approaches infinity.

What if I earn an interest of (r/infinity) per (12/infinity) months?

1201

241

61

21

11

111

where1lim :Answer

0

m

n

rm

n!e

emr

See the appendix of scaggregate.pdf for more on continuous compounding.

Page 3: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

3

utdallas.edu/~metin

Deterministic Capacity Expansion Issues Single vs. Multiple Facilities

– Dallas and Atlanta plants of Lockheed Martin Single vs. Multiple Resources

– Machines and workforce; or aggregated capacity Single vs. Multiple Product Demands

– Have you aggregated your demand when studying the capacity? Expansion only or with Contraction

– Is there a second-hand machine market? Discrete vs. Continuous Expansion Times

– Can you expand SOM building capacity during the spring term? Discrete vs. Continuous Capacity Increments

– Can you buy capacity in units of 2.313832? Resource costs, economies of scale Penalty for demand-capacity mismatch

– Recallable capacity: Electricity block outs vs Electricity buy outs» Happens in Wisconsin Electricity market» What if American Airlines recalls my ticket

Single vs. Multiple decision makers

Page 4: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

4

utdallas.edu/~metin

A Simple Model

No stock outs. x is the size of the capacity increments.δ is the increase rate of the demand.

D(t)= tx

Demand

Capacity

Units

Time (t)x/

x

Page 5: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

5

utdallas.edu/~metin

Infinite Horizon Total Discounted Cost

f(x) is expansion cost of capacity increment of size x

)/exp(1)())/(exp()()()(exp)(

00

rxxfrxxfxfxkrxC

k

k

k

.1 %;5 ;)( 5.0 rxxf

C(x) is the long run (infinite horizon) total discounted expansion cost

Page 6: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

6

utdallas.edu/~metin

Solution of the Simple Model

0

5

10

15

20

25

1 10 20 30 40 50 60 70 80 90 100

Expansion Size

Dis

coun

ted

Expa

nsio

n C

ost

Solution can be: Each time expand capacity by an amount that is equal to 30-week demand.

Page 7: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

7

utdallas.edu/~metin

Shortages, Inventory Holding, Subcontracting

Use of Inventory and subcontracting to delay capacity expansions

Demand

Units

Time

Capacity

Surpluscapacity

Inventorybuild up

Inventorydepletion

Subcontracting

Page 8: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

8

utdallas.edu/~metin

Stochastic Capacity Planning: The case of flexible capacity

Plant 1 and 2 are tooled to produce product A Plant 3 is tooled to produce product B A and B are substitute products

– with random demands DA + DB = Constant

1

2

3

A

B

Plants Products

y1A=1, y2A=1, y3A=0

y1B=0, y2B=0, y3B=1

Page 9: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

9

utdallas.edu/~metin

Capacity allocation

Say capacities are r1=r2= r3=100 Suppose that DA + DB = 300 and DA >100 and DB >100

Scenario DA DB X1A X2A X3A X1B X2B X3B Shortage

1 200 100 100 100 100 0

2 150 150 100 50 100 50 B

3 100 200 100 0 100 100 B

With plant flexibility y1A=1, y2A=1, y3A=0, y1B=0, y2B=0, y3B=1.

If the scenarios are equally likely, expected shortage is 50.

Page 10: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

10

utdallas.edu/~metin

Capacity allocation with more flexibility

Say capacities are r1=r2= r3=100 Suppose that DA + DB = 300 and DA >100 and DB >100

Scenario DA DB X1A X2A X3A X1B X2B X3B Shortage

1 200 100 100 100 0 100 0

2 150 150 100 50 50 100 0

3 100 200 100 0 100 100 0

With plant flexibility y1A=1, y2A=1, y3A=0, y1B=0, y2B=1, y3B=1.

Flexibility can decrease shortages. In this case, from 50 to 0.

Page 11: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

11

utdallas.edu/~metin

A Formulation with Known Demands: Dj=dj

i denotes plants j denotes products, not necessarily substitutes

cij tooling cost to configure plant i to produce j

mj contribution to margin of producing/selling a unit of j

ri capacity at plant i Dj=dj product j demand yij=1 if plant i can produce product

j, 0 o.w. xij=units of j produced at plant i }1,0{y , 0x

dx

rx

rxSubject to

xm c-Max

ijij

ji

ij

ijiij

jiij

ji,ijjij

ji,ij

jproduct each for

jproduct and iplant each for

iplant each for

y

y

- If DA=200 and DB=100, then y1A=y2A=y3B=1.- If DA=100 and DB=200, then y1A=y2B=y3B=1.

Solutions depend on scenarios:

Page 12: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

12

utdallas.edu/~metin

Unknown Demands: Dj=djk with probability pk

Dj=djk product j demand

under scenario k xij

k= units of j produced at plant i if scenario k happens

yij=1 if plant i can produce product j, 0 o.w. Does yij differ under different scenarios?

Should my variable depend on scenarios? (Yes / No)Anticipatory variable and Nonanticapatory variable }1,0{y , 0x

dx

rx

rx

Subject to

xmp c-Max

ijkij

kj

i

kij

ijikij

ji

kij

k ji,

kijj

kij

ji,ij

k scenario and

iproduct each for

k scenario and

jproduct i,plant each for

k scenario and

iplant each for

y

y

Page 13: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

13

utdallas.edu/~metin

Reality Check: How do car manufacturers assign products to plants? With the last formulation, we treated the problem of assigning products to

plants. This type of assignment called for tooling/preparation of each plant

appropriately so that it can produce the car type it is assigned to. These tooling (nonanticipatory) decisions are made at most once a year and

manufacturers work with the current assignments to meet the demand. When market conditions change, the product-to-plant assignment is revisited.

– Almost all car manufacturers in North America are retooling their previously truck manufacturing plants to manufacture compact cars as consumer demand basically disappeared for trucks with high gas prices.

– Also note that the profit margin made from a truck sale is 2-5 times more than the margin made from a car sale. No wonder why manufacturers prefer to sell trucks!

In the following pages, you will find the product to plant assignment of major car manufacturers in the North America. These assignments were updated in the summer of 2008 just about the time when manufacturers started talking about retooling plants to produce compact cars.

Page 14: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

14

utdallas.edu/~metin

All of Toyota Plants in the North America

Toyota. Tijuana, MexicoTacoma

Toyota. Long BeachHino

Nummi: Toyota-GM. Freemont.Corolla, Tacoma, Pontiac Vibe

Toyota. San AntonioTundra

Toyota. Blue SpringsHighlander

Toyota. GeorgetownAvalon, Camry, Solara

Toyota. PrincetonTundra, Suquoia, Sienna

Toyota-Subaru. LaFayetteCamry

Toyota. CambridgeCorolla, Matrix, Lexus, Rav4

Page 15: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

15

utdallas.edu/~metin

All of Honda Plants in the North America

Honda. El Salto, MeAccord

Honda. LincolnOdyssey, Pilot

Honda. MarysvilleAccord, Acura

Honda. DecaturTBO in 2008

Honda. Alliston, Ca.Civic, Acura, Odyssey,

Pilot, Ridgeline

Page 16: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

16

utdallas.edu/~metin

All of Nissan Plants in the North America

Nissan. CantonQuest, Armada,

Titan, Infiniti, Altima

Nissan. SmyrnaFrontier, Xterra, Altima,

Maxima, Pathfinder

Page 17: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

17

utdallas.edu/~metin

All of Hyundai-Kia Plants in the North America

Hyundai. MontgomerySonata, Santa Fe

Kia. LaGrangeTBO in 2009

Page 18: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

18

utdallas.edu/~metin

All of Mercedes and BMW Plants in the North America

Mercedes. TuscaloosaM, R classes

BMW. SpartanburgZ4, X5, X6

M roadster, coupes

Page 19: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

19

utdallas.edu/~metin

All of Ford Plants in the North America

Ford. Hermosillo, Mex. Ford Fusion, Lincoln MKZ, Mercury Milan

Ford. Kansas CityEscape, Escape Hybrid,

Mazda Tribute, Mercury Mariner, F-150

Ford. Cuatitlan, Mex. F-150, 250, 350, 450, 550,Ikon

Ford. Saint PaulRanger, Mazda B series

Ford. LouisvilleF-250, F-550, Explorer,Mercury Mountaineer

Ford. ChicagoTaurus, Mercury Sable

Ford. Avon LakeE Series

Ford. Saint Thomas, Ca.Crown Victoria, Grand Marquis

Ford. Oakville, Ca.Edge, Lincoln MKX

Ford. WayneFocus, Expedition, Lincoln Navigator

Ford. Flat RockMustang, Mazda 6

Ford. DearbornF-150, Lincoln Mark LT

Ontario, Michigan, Illinois, Indiana, Ohio in Focus

Page 20: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

20

utdallas.edu/~metin

All of Chrysler Plants in the North America

Chrysler. Toluca, Mex.Chrysler PT Cruise, Dodge Journey

Ontario, Michigan, Illinois, Indiana, Ohio in Focus

Chrysler. Saltillo, Mex.Dodge Ram

Chrysler. NewarkDodge Durango, Chrysler Aspen

Will close in 2009

Chrysler. Fenton-SouthGrand Voyager, Grand Caravan, Cargo Van

Chrysler. Fenton-NorthDodge Ram

Chrysler. BelvidereDodge Caliber, Jeep

Compass, Jeep PatriotChrysler. ToledoJeep Liberty, Dodge Nitro

Chrysler. Brampton, CaChrysler 300,

Dodge Challenger, Dodge Charger

Chrysler. Windsor, CaDodge Grand Caravan, Chrysler Town

Chrysler. Detroit-Jefferson NorthJeep Grand Cherokee and Commander

Chrysler. Detroit-Conner Ave.Dodge Viper, SRT 10 Roadster

Chrysler. WarrenDodge Ram, Dakota, Mitsubishi Raider

Chrysler. Sterling HeightsDodge Avenger, Chrysler Sebring

Page 21: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

21

utdallas.edu/~metin

All of GM Plants in the North America

GM. Ramos Arizpe, Mex.Pontiac Aztek, Chevy Cavalier, Chevrolet

Checy, Pontiac Sunfire, Buick Rendezvous

Ontario, Michigan, Illinois, Indiana, Ohio in Focus

GM. Silao, Mex.Chevrolet Suburban, Chevrolet Avalanche,

GMC Yukon, Cadillac Escalade

GM. Toluca, Mex.Chevrolet Kodiak Truck

Stopping in 2008

GM. ArlingtonChevy Tahoe,

Suburban, GMC Yukon,

Cadillac Escalade

GM. ShreveportChevy Colorado,

GMC Canyon, Isuzu brands, Hummer H3

GM. FairfaxChevy Malibu, Malibu Maxx, Saturn Aura

GM. WentzvilleChevy Express, GMC Savana

GM. DoravilleChevy Uplander, Pontiac Montana

GM. Spring HillSaturn Ion and Vue

Currently down

GM. Bowling GreenCadillac XLR, Chevy Corvette

GM. WilmingtonSaturn L series, Pontiac Solstice

GM. LordstownChevy Cobalt, Pontiac

Pursuit, G4, G5

GM. MoraineChevy Trailblazer, GMC

Envoy, Oldsmobile Bravada, Isuzu Ascender, Saab 9-7X

Will stop in 2010

GM. Fort WayneChevy Silverado,

GMC Sierra

GM. JanisvilleChevy Tahoe,

Suburban, GMC YukonWill stop in 2010

GM. Oshawa, CaChevy Impala, Buick Allure,

Chevy Silverado, GMC Sierra.Trucks will stop in 2009. GM. Lansing-Grand River

Cadillac E-SRX

GM. Lansing-Delta TownshipBuick Enclave, Saturn Outlook, GMC Acadia

GM. FlintGMC Sierra, Chevy Silverado, Chevy - GMC medium trucks.

GM. PontiacChevy Silverado, GMC Sierra

GM. DetroitBuick Lucerne, Cadillac DTS

GM. OrionPontiac G6,

Chevrolet Malibu

Page 22: utdallas.edu/~metin Planning Demand and Supply in a Supply Chain

22

utdallas.edu/~metin

Summary

Capacity Planning Product-to-plant Assignment