us & washington construction cost outlook · 2020-06-09 · q4 2015 q1 2016 q2 2016 q3 2016 q4...
TRANSCRIPT
US & WashingtonConstruction Cost Outlook
Presentation to the Sound Transit Board
(System Expansion Committee)
Seattle February 14, 2019
Ken Simonson
Chief Economist, AGC of America
Headline Forecast• The US economy is still growing well:
- 304,000 jobs added in January, 2.8 million in past 12 months—the most since ‘15
- consumer, business confidence are generally high; recession probability is low
- but home & auto sales are slowing; trade & fiscal policy concerns continue
• Contractors remain busy and confident; construction employment at 11-year high with growth in most states and project categories
• Three concerns:
- impact of trade policies on materials costs and demand for construction
- widening labor shortage, worsened by hostile immigration policy
- rising interest rates may cut demand for income-producing projects, new homes
Source: Author
2
Summary
• Costs for many construction materials have risen sharply in the past two years
• Labor costs are accelerating as pool of experienced unemployed jobseekers dries up
• Contractors want to add workers in 2019 but expect difficulty finding them
• As a result, some contractors are increasing bid prices or completion times
Source: Author
3
Prices for key inputs have risen sharply(change in producer price indexes, Nov. 2017-2018 & Nov. 2016-2017)
Source: Bureau of Labor Statistics
3%
0%
13%
8%
42%
3%
9%
6%
20%
20%
0% 10% 20% 30% 40% 50%
Ready-mixed concrete
Paving mixtures
Aluminum mill shapes
Steel mill products
Diesel fuel
November 2017–November 2018 November 2016–November 2017
4
-24%
-20%
-16%
-12%
-8%
-4%
0%
4%
8%
12%
2008 2010 2012 2014 2016 2018
12
-mo
nth
% c
han
ge
Construction Employment Change from Year Ago1/08–12/18 (seasonally adjusted)
Washington 4.4%
Source: BLS
5
U.S. 4.1%
12/17–12/18:
Construction employment change by WA metro, 12/17–12/18
6
Over -10%
-5.1% to -10%
-0.1% to -5%
0.1% to 5%
5.1% to 10%
Over 10%
Shading based on unrounded numbers
0%
Source: BLS state and regional employment report
6
5.0%
4.0%
0%
1%
2%
3%
4%
5%
6%
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
12-mo % change in construction average hourly earnings
Job openings rate in construction
12/18
Construction job openings rate has been growing as pay accelerates (Dec. data, 2009-18)
Construction workforce indicators (not seasonally adjusted)
Source: Bureau of Labor Statistics
7
382,000
219,000
0
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
Hires
Openings
12/18
Construction openings: all-time high; hires steady(Dec. data, 2009-18)
US/WA Net % who expect dollar volume of projects to be higher
14%/38% Transportation (e.g., transit, rail, airport) 14%/11% Water/Sewer
17%/12% Public building 13%/0% Private Office
16%/12% Highway 12%/8% Manufacturing
16%/13% Hospital 11%/9% Higher Education
16%/6% K-12 school 10%/13% Power
15%/5% Federal (e.g., VA, GSA, USACE, NAVFAC) 5%/-6% Multifamily Residential
15%/12% Retail, Warehouse, Lodging
8
8
AGC members’ expectations for 2019—US & WA
Source: AGC 2019 Outlook Survey, Jan. 2019
Rising materials and labor costs may portend higher bid prices
Sources: Highway contract prices: Federal Highway Administration, National Highway Construction Cost IndexConst. pay and materials, services cost: Bureau of Labor Statistics, Current Employment Statistics, Producer Price Index
9
-3.0%
0.0%
3.0%
6.0%
9.0%
12.0%
15.0%
Q4 2015 Q1 2016 Q2 2016 Q3 2016 Q4 2016 Q1 2017 Q2 2017 Q3 2017 Q4 2017 Q1 2018 Q2 2018 Q3 2018
Cumulative change in highway bid prices and input costs, Dec. 2015–Sep. 201812-month % change, not seasonally adjusted
Const. wages & salaries
Cost of construction materials & services
Highway contract prices
AGC Outlook Survey: WA contractors expect to add workers but are having trouble finding them
Source: AGC 2019 Outlook Survey, Jan. 2019
10
55%
75%
77%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Will be hard/harder to find workers in 2019
Having trouble filling positions
Expect to add workers in 2019
AGC Outlook Survey: WA Firms with staffing challenges face higher costs and delays
Source: AGC 2019 Outlook Survey, Jan. 2019
11
20%
27%
29%
16%
0% 5% 10% 15% 20% 25% 30%
We've put longer completion times intobids/contracts
Projects have taken longer than we anticipated
We've put higher prices into bids/contracts
Costs have been higher than we anticipated
2017-2018 US summary and 2019 forecast
*Jan.-Nov. 2017 to Jan.-Nov. 2018
2017actual
2018actual
2019 forecast
Total spending 4% 4.5%* 5-8%
Goods & services inputs PPI 4.4% 3.8% 4-6%
Wages & salaries (avg. hourly earnings)
3.1% 3.6% 3.5-4.5%
12
AGC economic resources(email [email protected])
• The Data DIGest: weekly 1-page email (subscribe at http://store.agc.org)
• monthly press releases: spending; producer price indexes; national, state, metro employment with rankings
• yearly employment & outlook surveys, state and metro data, fact sheets: www.agc.org/learn/construction-data
13