Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting TRB ACD40 Williamsburg, VA

Upload: jarah

Post on 11-Jan-2016

23 views

Category:

Documents


0 download

DESCRIPTION

Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects. James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting TRB ACD40 Williamsburg, VA. Study Results Summarized. I-80 Davis OGAC – 8 years State Route 138, Los Angeles County – 3+ years - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

Update on Results of Long-term Traffic Noise

Measurements for Pavement Overlay Projects

James A. Reyff

Illingworth & Rodkin, Inc.

2006 Summer Meeting TRB ACD40

Williamsburg, VA

Page 2: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

Study Results Summarized

• I-80 Davis OGAC – 8 years

• State Route 138, Los Angeles County –

3+ years

• ADOT Pilot Studies – 2+ years

Page 3: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

I-80 Pavement Project

Location: I-80 just east of Davis and west of Sacramento, CA

Traffic: 1998 - 120,000 ADT (almost 10% trucks)2004 - 135,000 ADT

• Existing - Aged AC surfacing• DGAC (60mm) applied in June 1998• OGAC (25 mm) applied in July 1998

Page 4: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

I-80 Environment

Page 5: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

Existing AC Pavement

Page 6: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

6 Year Old OGAC

Page 7: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

I-80 Davis 8yr Findings

65

70

75

80

85

Measurement Condition

No

ise L

evel (d

BA

)

Meas WB Leq TNM Modeled

Page 8: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

I-80 Davis 7yr Findings

Seasonal Effect

65

70

75

80

Age of Pavement

Ave

rag

e M

easu

red

No

ise

Lev

el,

(dB

A)

Summer 78.6 72.8 73.3 73.7 73.3 73.7 74.6 74.8 75.1

Winter 74.2 73.9 74 74.6 75.1 75.1 75.7

Old AC

New 0.5yr 1 yr 1.5yr 2 yr 2.5yr 3 yr 3.5yr 4 yr 4.5yr 5 yr 5.5yr 6 yr 6.5yr 7 yr

Page 9: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

I-80 Davis 8yr FindingsCalculated Reduction from Baseline

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Age of Pavement

De

cre

as

e in

No

ise

Le

ve

l fr

om

Ba

se

lin

e C

on

dit

ion

, (d

BA

)

WB Reference 78.6 6.1 6.4 6.0 5.9 5.9 5.9 4.5 5.1 4.3 4.7

New OGAC

1 Mo. Aug

1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year

Page 10: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

I-80 Davis 8yr FindingsTire/Pavement Sound Intensity

96

98

100

102

104

106

108

Sep 02 Apr 03 Jun 04 Dec 04 Apr 05 Jun 05 Dec 05 Apr 06 Jun 06

So

un

d In

ten

sity

Lev

el, d

BA

Page 11: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

Frequency Spectra – 20m

7 Year Baseline

45

50

55

60

65

70

75

1/3rd Octave Center Frequency (Hz)

Noi

se L

evel

(d

BA

)

Baseline

1-Month

1-Year

2-Year

3-Year

4-Year

5-Year

6-Year

7-Year

8-Year

Page 12: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

35

40

45

50

55

60

65

No

ise L

ev

el

(d

B)

35

40

45

50

55

60

65

1/3rd Octave Center Frequency (Hz)

No

ise L

ev

el

(d

B)

Baseline 1-month 1 Year 2 Year 3 Year 5 Year 6 Year 7 Year 8 Year

Frequency Spectra – 145m

8 Year

BaselineDOWNWIND

UPWIND8 Year Baseline

Page 13: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

LA 138 Pavement Research• Research Site est. 2002• Two Measurement Techniques

– Statistical Passby– Onboard Tire/Pavement Sound

Intensity

• 5 Pavements types– DGAC– Thick OGAC (75mm)– Thin OGAC (30mm)– RAC– BWC

Page 14: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

LA 138 Results

• Initial results documented by Volpe and Caltrans (Illingworth & Rodkin)

• Initial levels up to 4 dBA lower than DGAC with Thick OGAC and RAC quietest

• Regular testing of Tire/pavement sound intensity – spring and fall

Page 15: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

LA 138 Results

0

1

2

3

4

5

6

7

8

OGAC - 75mm OGAC - 30mm RAC BWC

Red

uct

ion

in

No

ise

Lev

el,

dB

re

DG

AC

Passby at 25 ftPassby at 50 ftTire Intensity

Page 16: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

LA 138 Results

SI Level – Eastbound SR 138

94

95

96

97

98

99

100

101

102

103

DGAC OGAC (75mm) OGAC (30mm) RAC BWC

Ove

rall

So

un

d In

ten

sity

Lev

el, d

BA

94

95

96

97

98

99

100

101

102

103

DGAC OGAC (75mm) OGAC (30mm) RAC BWC

Oct-02 Mar-03

Jul-03 Oct-03

Apr-04 Jan-05

Apr-05 Jun-05

Oct-05

Page 17: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

Results of the Arizona Quiet Pavement Program – Sites 3D and 3E

Page 18: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

Site 3D – AZ Route 202

 

Random Transverse Tined PCC

ARFC

Page 19: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

250ft x 5ft50ft x 12ft & 5ft

100ft x 5ft

Site 3D Measurements

Page 20: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

Site 3D Results – Leq

 

55

60

65

70

75

80

85

90

10:0

0

10:3

0

11:0

0

11:3

0

7:25

7:55

8:25

8:55

9:05

9:35

10:0

5

10:3

5

9:00

9:30

10:0

0

10:3

0

Time of Day

So

un

d P

ress

ure

Lev

el, d

BA

50ft/12ft

50ft/5ft

100ft/5ft

250ft/5ft

Oct. 16, 2004 Oct. 17, 2004Oct. 05, 2003

Post Overlay

Oct. 06, 2003

Pre Overlay

Downwind

Downwind Downwind

Downwind

AM Rush Hour

Page 21: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

3D Results – Normalized for Traffic

Position

Measured Modeled

ChangePre Post Pre Post

50 ft/12ft 84.3 70.9 75.1 74.1 -12.4

50ft / 5ft 83.2 70.9 75.2 74.2 -11.3

100ft / 5ft 76.8 65.6 72.8 71.8 -10.1

250ft / 5ft 68.9 59.7 68.0 66.9 -8.1

Page 22: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

3D Results – Leq Data

60

65

70

75

80

85

90

10:0

0

11:2

0

7:40

8:45

10:0

5

9:25

9:30

10:5

0

9:55

9:00

10:2

0

9:40

9:00

10:2

0

9:40

Time of Day

Sou

nd P

ress

ure

Leve

l, dB

A

50ft/12ft 50ft/5ft 100ft/5ft 250ft/5ft

October 2004 March 2006

April 2004

Post Overlay

October 2005

Pre Overlay

March 2005

Page 23: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

Site 3E – AZ Route 101

 Uniform Transverse Tined PCC

ARFC

Page 24: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

Site 3E – Measurements

 

100ft x 5ft

50ft x 12ft & 5ft

100ft x 5ft

Page 25: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

Site 3E Results – Leq

 

60

65

70

75

80

85

90

9:00

9:30

10:0

0

10:3

0

9:25

9:55

10:2

5

10:5

5

9:20

9:50

10:2

0

10:5

0

9:30

10:0

0

10:3

0

11:0

0

Time of Day

So

un

d P

ress

ure

Lev

el, d

BA

50ft/12ft

50ft/5ft

100ft/5ft

Oct. 19, 2004 Oct. 20, 2004April 06, 2004

Post Overlay

April 07, 2004

Pre Overlay

Downwind Downwind DownwindDownwind

Page 26: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

3E Results – Normalized for Traffic

Position

Measured Modeled

ChangePre Post Pre Post

50 ft/12ft 84.2 74.9 80.2 79.8 -9.0

50ft / 5ft 81.6 73.2 79.9 79.8 -8.3

100ft / 5ft 78.6 69.8 76.9 76.8 -8.7

Page 27: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

3E Results – Leq Data

60

65

70

75

80

85

90

9:00

9:20

9:40

10:0

0

10:2

0

10:4

0

9:00

9:20

9:40

10:0

0

10:2

0

10:4

0

9:00

9:20

9:40

10:0

0

10:2

0

10:4

0

9:15

9:35

9:55

10:1

5

10:3

5

10:5

5

9:15

9:35

9:55

10:1

5

10:3

5

10:5

5

9:00

9:20

9:40

10:0

0

10:2

0

10:4

0

9:00

9:20

9:40

10:0

0

10:2

0

10:4

0

9:00

9:20

9:40

10:0

0

10:2

0

10:4

0

Time of Day

So

un

d P

ress

ure

Lev

el,

dB

A

50ft/8.7ft

50ft/5ft

100ft/5ft

October 2004 March 2006

April 2004

Post Overlay

October 2005

Pre Overlay

Page 28: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

Sound Level vs. DistanceMeasured PCC and ARFC

55

60

65

70

75

80

85

10 100

Distance from Near Travel Lane (meters)

Sou

nd P

ress

ure

Leve

l, dB

A

Measured ARFC Measured PCC

Page 29: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

Sound Level vs. DistanceMeasured and Modeled

55

60

65

70

75

80

85

10 100

Distance from Near Travel Lane (meters)

Sou

nd P

ress

ure

Leve

l, dB

A

Measured ARFC Modeled (Hard Ground) Modeled (Field Grass) Measured PCC

Page 30: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

250ft x 5ft50ft x 12ft & 5ft

100ft x 5ft

Site 3D Measurements

Page 31: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

Equivalent Noise Barrier Performance

Site at 100 ft

Measured Noise

ReductionNoise Barrier

Height

Site 3D 10 dBA 3.6m (12 ft)

Site 3E 9 dBA 3.0m (10 ft)

Page 32: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

I-280 San Mateo

• Existing PCC surface

• PCC and Rubberized Open Grade

• Onboard Tire/Pavement Sound Intensity

Page 33: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

Initial Results for I-280

0

1

2

3

4

5

6

7

Reduction by OGRA Reduction by TexturedGrinding PCC

Reduction by RegularGrinding PCC

Re

du

cti

on

in

So

un

d I

nte

nsi

ty L

ev

el,

dB

Page 34: Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects

Results for I-280 after 3 yrs

92

94

96

98

100

102

104

106

SB RAC(0) SB PCC SB PCC NB PCC NB PCC NB RAC(0)

So

un

d In

ten

sit

y L

ev

el,

dB

A

Existing PCC

2002

2005

RAC (O)