    ut pp in detail

    Application area pp

    Client 810

    user id pp01

    Unit testing AH

    sl no Bill of material

    1

    2 work center

    3 routing

    4 sop

    5 Demand management

    Page 1

  • 8/13/2019 Unit Testing Pp

    2/35

    ut pp in detail

    6 production planning

    7 production control

    8 settlement profile

    Page 2

  • 8/13/2019 Unit Testing Pp

    3/35

    ut pp in detail

    Project Envision

    01 unit te

    points to be tested tr code

    create of bom cs01

    change of bom cs02display of bom cs03

    create work center cr01

    change work center cr02

    display work center cr03

    create routing ca01

    change routing ca02

    display routing ca03

    create rough cut plan mc87

    change the plan mc88

    display plan mc89

    copying the inactive plan to a active

    plan mc74

    transferring of plan to demand

    managemnet mc78

    checking the plan in stock and reqt

    list md04

    Page 3

  • 8/13/2019 Unit Testing Pp

    4/35

    ut pp in detail

    crest cust ind reqrmnts (cir) md81

    change cust ind reqrmnts (cir) md82

    display cust ind reqrmnts (cir) md83

    create planned ind reqt.(pir) md61change planned ind reqt.(pir) md62

    display planned ind reqt.(pir) md63

    Page 4

  • 8/13/2019 Unit Testing Pp

    5/35

    ut pp in detail

    sting AK01

    Page 5

  • 8/13/2019 Unit Testing Pp

    6/35

    bom

    Unit testing for BOM in detail

    creation of a BOM

    sl no details of testing description input

    1 creation of a BOM

    a) Go to sap easy

    access and put

    transaction code cs01

    and observe that

    CREATE MATERIAL

    BOM screen opens CS01

    ENTER DETAILS

    b) ENTER THE

    DETAILS IN EACH

    FIELD

    plant,material,b

    om usage

    ENTER THE REQUIRED DETAILS of

    bom items

    c) ENTER THE REQUIRED

    DETAILS of bom items

    items and its

    unit of

    measurement

    SAVE THE BOM d) SAVE THE BOM Click on SAVE Button

    change of BOM

    sl no details of testing description input

    1 change a BOM

    a) Go to sap easy

    access and put

    transaction code cs02

    and observe that

    changeBOM screen

    opens cs02

    ENTER DETAILS B)ENTER DETAILS Material: Plant: Usage:

    Page 6

  • 8/13/2019 Unit Testing Pp

    7/35

    bom

    CHANGE THE REQUIRED DETAILS CHANGE THE REQUIRED VALUES

    Item Category:

    Component: Quantity:

    MESSAGE of the result

    a message should

    come as Bom change

    saved ------

    sl no details of testing description input

    1 OPEN TRANSACTION SCREENGo to sap easy access and put

    transaction code - CS03 CS03

    ENTER DETAILS

    ENTER THE DETAILS IN EACH

    FIELD Material: Plant: Usage:

    CHECK THE REQUIRED DETAILS CHECK THE REQUIRED VALUES

    Item Category:

    Component: Quantity:

    Display of a BOM

    Page 7

  • 8/13/2019 Unit Testing Pp

    8/35

    bom

    actual result expected result remark

    Bom creation

    screen opens

    Bom creation screen

    opens

    a new screen

    should open

    a new screen should

    open

    no error message

    should trigger

    no error message should

    triggerBOM Will get saved and

    message will display

    bom was saved

    BOM get saved and message

    displayed

    actual result expected result remark

    Bom change

    screen opens

    Bom change screen

    should open

    Press ENTER and observe

    that GENERAL ITEM

    OVERVIEW screen appears

    ITEM OVERVIEW screen should

    appear

    Page 8

  • 8/13/2019 Unit Testing Pp

    9/35

    bom

    Press ENTER and observe

    that System reads the Unit

    of Measure, Component

    Description data from thematerial master. Try to

    change the quantity of

    components and save is

    the Bom should save the

    details

    message

    displayed

    message should be

    displayed as Bom

    change was saved

    actual result expected result remark

    Press ENTER and observe

    that DISPLAY MATERIAL

    BOM screen opens

    MATERIAL BOM screen in display

    mode should open

    Press ENTER and observe

    that GENERAL ITEM

    OVERVIEW screen appears

    GENERAL ITEM OVERVIEW screen

    appears

    Item Category:

    Component: Quantity:

    displayed

    Item Category: Component:

    Quantity: should be displayed

    Page 9

  • 8/13/2019 Unit Testing Pp

    10/35

    wc

    Unit testing for work center

    creation of asl no details of testing description input

    1 creation of a work center

    Go to sap easy access

    menu and put transaction

    code cr01 CR01

    ENTER THE DETAILS IN EACH

    FIELD

    ENTER THE DETAILS IN

    EACH FIELD

    Plant: Work center

    name, Work center

    Category:

    ENTER THE REQUIRED DETAILS

    ENTER THE REQUIRED

    DETAILS

    Description: Work

    center Category: Person

    Responsible: Location:

    Usage: Standard Value

    Key:

    ENTER THE REQUIRED DETAILS

    ENTER THE REQUIRED

    DETAILS

    Control Key: Suitability:

    Set Type Key: Wage

    Group: Setup: MIN,

    Machine: MIN, Labour:

    MIN

    ENTER THE REQUIRED DETAILS

    ENTER THE REQUIRED

    DETAILS

    Capacity.cat: Set UP

    Formula: Processing

    Formula:

    ENTER THE REQUIRED DETAILS

    ENTER THE REQUIRED

    DETAILS

    Capacity Category

    Discription: Capacity

    Planner Group:

    Grouping: Factory

    Calender ID: Active

    Version: Base Unit Of

    Measure: Start : Finish:

    Length of Breaks:

    Capacity Utilization:

    No.of.Indiv.cap:

    ENTER THE REQUIRED DETAILS

    ENTER THE REQUIRED

    DETAILS

    Capacity Category:

    Setup Formula:

    Processing Formula:

    Location group:

    Std.queue time:

    Min.queue time:

    Page 10

  • 8/13/2019 Unit Testing Pp

    11/35

    wc

    ENTER THE REQUIRED

    DETAILS

    Cost Center: Activity

    Type:

    SAVE THE WORK CENTER SAVE THE WORK CENTER Click on SAVE Button

    sl no details of testing description input

    1 change a work center

    Go to sap easy access

    menu and put transaction

    code cr02 cr02

    ENTER DETAILS

    ENTER THE DETAILS IN

    EACH FIELD

    Plant: Work center

    name, Work center

    Category:

    CHANGE THE REQUIRED DETAILS

    CHANGE THE REQUIRED

    DETAILS

    Description: Work

    center Category: Person

    Responsible: Location:

    Usage: Standard Value

    Key:

    CHANGE THE REQUIRED DETAILS

    CHANGE THE REQUIRED

    DETAILS

    Control Key: Suitability:

    Set Type Key: Wage

    Group: Setup: MIN,

    Machine: MIN, Labour:

    MIN

    CHANGE THE REQUIRED DETAILS

    CHANGE THE REQUIRED

    DETAILS

    Capacity.cat: Set UP

    Formula: Processing

    Formula:

    CHANGE THE REQUIRED DETAILS

    CHANGE THE REQUIRED

    DETAILS

    Capacity Category

    Discription: Capacity

    Planner Group:

    Grouping: Factory

    Calender ID: Active

    Version: Base Unit Of

    Measure: Start : Finish:

    Length of Breaks:

    Capacity Utilization:

    No.of.Indiv.cap:

    Chang

    Page 11

  • 8/13/2019 Unit Testing Pp

    12/35

    wc

    CHANGE THE REQUIRED DETAILS

    CHANGE THE REQUIRED

    VALUES

    Capacity Category:

    Setup Formula:

    Processing Formula:

    Location group:

    Std.queue time:

    Min.queue time:

    CHANGE THE REQUIRED DETAILS

    CHANGE THE REQUIRED

    DETAILS

    Cost Center: Activity

    Type:

    SAVE THE WORK CENTER SAVE THE WORK CENTER Click on SAVE Button

    MESSAGE MESSAGE

    Display of a

    sl no details of testing description input

    1 display of work center

    Go to sap easy access

    menu and put transaction

    code cr03 cr03

    ENTER DETAILS

    ENTER THE DETAILS IN

    EACH FIELD

    Plant: Work center:,

    work center category

    CHECK THE REQUIRED DETAILS

    CHECK THE REQUIRED

    VALUES

    Description: Work

    center Category: Person

    Responsible: Location:

    Usage: Standard Value

    Key:

    CHECK THE REQUIRED DETAILS

    CHECK THE REQUIRED

    DETAILS

    Control Key: Suitability:

    Set Type Key: Wage

    Group: Setup: MIN,

    Machine: MIN, Labour:

    MIN

    CHECK THE REQUIRED DETAILS

    CHECK THE REQUIRED

    DETAILS

    Capacity.cat: Set UP

    Formula: Processing

    Formula:

    Page 12

  • 8/13/2019 Unit Testing Pp

    13/35

    wc

    CHECK THE REQUIRED DETAILS

    CHECK THE REQUIRED

    DETAILS

    Capacity Category

    Discription: Capacity

    Planner Group:

    Grouping: Factory

    Calender ID: ActiveVersion: Base Unit Of

    Measure: Start : Finish:

    Length of Breaks:

    Capacity Utilization:

    No.of.Indiv.cap:

    CHECK THE REQUIRED DETAILS

    CHECK THE REQUIRED

    DETAILS

    Capacity Category:

    Setup Formula:

    Processing Formula:

    Location group:

    Std.queue time:

    Min.queue time:

    CHECK THE REQUIRED DETAILS

    CHECK THE REQUIRED

    DETAILS

    Cost Center: Activity

    Type:

    Page 13

  • 8/13/2019 Unit Testing Pp

    14/35

    wc

    work centeractual result expected result remarkPut tr. Code cr01 and Press ENTER

    and observe that CREATE WORK

    CENTER screen opensCREATE

    WORK CENTER screen

    should open

    Press ENTER and observe that BASIC

    DATA screen appears BASIC DATA screen should appears

    Click on the 'Default Valeues' tab and

    observe that DEFAULT VALUES

    screen opens

    DEFAULT VALUES screen should

    open

    Click on the 'Capacity' tab and

    observe that CAPACITY OVERVIEW

    screen opens

    CAPACITY OVERVIEW screen should

    open

    Double Click on the 'Capacity

    Category' and observe that

    CAPACITY HEADER screen opens

    CAPACITY HEADER screen should

    open

    go back and click on the 'Scheduling'

    tab and observe that SCHEDULING

    screen opens SCHEDULING screen should open

    Click on the 'Costing' tab and

    observe that COST CENTER

    ASSIGNMENT screen opens COST CENTER screen should open

    Page 14

  • 8/13/2019 Unit Testing Pp

    15/35

    wc

    Press Enter

    data sholuld be accepted

    by the fields and and no

    error message sholuld

    display

    Work center Will get saved

    actual result expected result remarkPut tr. Code cr01 and Press ENTER

    and observe that Change WORK

    CENTER screen open change

    Change WORK CENTER screen

    should open

    Press ENTER and observe that BASIC

    DATA screen appears BASIC DATA screen should appears

    Click on the 'Default Valeues' tab and

    observe that DEFAULT VALUES

    screen opens

    DEFAULT VALUES screen should

    open

    Click on the 'Capacity' tab and

    observe that CAPACITY OVERVIEW

    screen opens

    CAPACITY OVERVIEW screen should

    openDouble Click on the 'Capacity

    Category' and observe that

    CAPACITY HEADER screen opens

    CAPACITY HEADER screen should

    open

    go back and click on the 'Scheduling'

    tab and observe that SCHEDULING

    screen opens SCHEDULING screen should open

    Work Center

    Page 15

  • 8/13/2019 Unit Testing Pp

    16/35

    wc

    Click on the 'Costing' tab and

    observe that COST CENTER

    ASSIGNMENT screen opens COST CENTER screen should open

    Press Enter

    data sholuld be accepted

    by the fields and and no

    error message sholuld

    display

    Work center Will get saved

    ork center

    actual result expected result remark

    DISPLAY of WORK CENTER screen

    opens

    DISPLAY of WORK CENTER screen

    should open

    Press ENTER and observe that BASIC

    DATA screen appears BASIC DATA screen should appear

    Click on the 'Default Valeues' tab and

    observe that DEFAULT VALUES

    screen opens

    Click on the 'Capacity' tab and

    observe that CAPACITY OVERVIEW

    screen opens

    Double Click on the 'Capacity

    Category' and observe that

    CAPACITY HEADER screen opens

    Page 16

  • 8/13/2019 Unit Testing Pp

    17/35

    wc

    go back and click on the 'Scheduling'

    tab and observe that SCHEDULING

    screen opens

    Click on the 'Costing' tab and

    observe that COST CENTER

    ASSIGNMENT screen opens

    Press Enter

    Page 17

  • 8/13/2019 Unit Testing Pp

    18/35

    routing

    Unit testing details of routin

    Creation o

    sl no details of testing description input

    to create a routingIN SAP EASY ACCESS TYPE IN

    COMMAND FIELD - CA01 ca01

    ENTER THE REQUIRED DETAILS

    ENTER THE DETAILS IN EACH

    FIELD Material: Plant:

    ENTER THE REQUIRED DETAILS ENTER THE REQUIRED VALUES

    Usage: Status:

    From Lot Size: To

    Lot Size:

    ENTER THE REQUIRED DETAILS ENTER THE REQUIRED VALUES

    Work Center:

    Control Key:

    ENTER THE REQUIRED DETAILS ENTER THE REQUIRED VALUES

    ENTER THE REQUIRED DETAILS ENTER THE REQUIRED VALUES

    Operation/Activity:

    Sequence:

    SAVE THE ROUTING SAVE THE ROUTING

    Click on SAVE

    Button

    MESSAGE MESSAGE

    change of a routing

    sl no details of testing description input

    1 change a routingIN SAP EASY ACCESS TYPE IN

    COMMAND FIELD CA02 ca02

    Page 18

  • 8/13/2019 Unit Testing Pp

    19/35

    routing

    ENTER DETAILS

    ENTER THE DETAILS IN EACH

    FIELD Material: Plant:

    CHANGE THE REQUIRED DETAILS CHANGE THE REQUIRED DETAILS

    Work Center:

    Control Key:

    CHANGE THE REQUIRED DETAILS CHANGE THE REQUIRED DETAILS

    CHANGE THE REQUIRED DETAILS CHANGE THE REQUIRED DETAILS

    Operation/Activity:

    Sequence:

    SAVE THE ROUTING Click on SAVE Button

    MESSAGE MESSAGE

    Display of routing

    sl no details of testing description input

    1 display of routingIN SAP EASY ACCESS TYPE IN

    COMMAND FIELD - CA03 ca03

    ENTER DETAILS

    ENTER THE DETAILS IN EACH

    FIELD Material: Plant:

    CHANGE THE REQUIRED DETAILS CHANGE THE REQUIRED DETAILS

    Work Center:

    Control Key:

    Page 19

  • 8/13/2019 Unit Testing Pp

    20/35

    routing

    CHANGE THE REQUIRED DETAILS CHANGE THE REQUIRED DETAILS

    CHANGE THE REQUIRED DETAILS CHANGE THE REQUIRED DETAILS

    Operation/Activity:

    Sequence:

    Page 20

  • 8/13/2019 Unit Testing Pp

    21/35

    routing

    routing

    actual result expected result remarkPress ENTER and observe

    that CREATE ROUTING

    screen opens

    CREATE ROUTING screen should

    open

    Press ENTER and observe

    that HEADER DETAILS

    screen appears

    Click on the 'Operation' tab

    and observe that

    OPERATION OVERVIEW

    screen opensSelect one operation and

    click on the 'Component

    Allocation' tab and observe

    that MATERIAL

    COMPONENT OVERVIEW

    screen opens

    Select the components and

    click on the 'New

    Assignment' tab and

    observe that NEW

    ASSIGNMENT Popup

    window opens

    Click on Continue and

    observe that components

    are allocated; go back

    Routing Will get saved

    Routing was saved with

    Group--- and material ---

    actual result expected result remarkPress ENTER and observe

    that CHANGE ROUTING

    screen opens

    Page 21

  • 8/13/2019 Unit Testing Pp

    22/35

    routing

    Press ENTER and observe

    that OPERATION

    OVERVIEW screen appears

    Select one operation and

    click on the 'ComponentAllocation' tab and observe

    that MATERIAL

    COMPONENT OVERVIEW

    screen opens

    Select the components and

    click on the 'New

    Assignment' tab and

    observe that NEW

    ASSIGNMENT Popup

    window opens

    Click on Continue and

    observe that components

    are allocated; go back

    Routing Will get saved

    Routing was saved with

    Group--- and material ---

    actual result expected result remarkPress ENTER and observe

    that DISPLAY ROUTING

    screen opens

    Press ENTER and observe

    that OPERATION

    OVERVIEW screen appears

    Select one operation and

    click on the 'Component

    Allocation' tab and observethat MATERIAL

    COMPONENT OVERVIEW

    screen opens

    Page 22

  • 8/13/2019 Unit Testing Pp

    23/35

    routing

    Select the components and

    click on the 'New

    Assignment' tab and

    observe that NEW

    ASSIGNMENT Popup

    window opens

    Click on Continue and

    observe that components

    are allocated; go back

    Page 23

  • 8/13/2019 Unit Testing Pp

    24/35

    SOP & DM

    Unit testing details SOP

    create rough cut plan

    sl no details of testing description input

    1 create rough cut plan

    go to sap easy menu put the

    trnsaction code mc87 and

    press enter mc87

    2 give all the details fill all the required fields Mat , plant,

    3 give all the details

    give the quantity accordind to

    the date or month or week of

    requirement required quantity

    4 ENTER THE REQUIRED DETAILSENTER THE DETAILS INEACH FIELD

    Sales Plan forOct:250, Nov:300

    5 SAVE THE SOP CLICK ON SAVE BUTTON

    6 OPEN TRANSACTION SCREEN

    IN SAP EASY ACCESS

    TYPE IN COMMAND FIELD -

    MC78 MC78

    7 ENTER THE REQUIRED DETAILS

    ENTER THE DETAILS IN

    EACH FIELD Source: 006

    8 OPEN TRANSACTION SCREEN

    IN SAP EASY ACCESS

    TYPE IN COMMAND FIELD -

    MC74 MC74

    9 ENTER THE REQUIRED DETAILS

    ENTER THE DETAILS IN

    EACH FIELD

    Version:A00;

    Requirement

    Type:VSF;

    Version:01

    10 OPEN TRANSACTION SCREEN

    IN SAP EASY ACCESS

    TYPE IN COMMAND FIELD -

    MD04 MD04

    11 ENTER THE REQUIRED DETAILS

    ENTER THE DETAILS IN

    EACH FIELD

    Material: ABC;

    Plant: AH01

    12 CHECK THE REQUIRED DETAILS

    CHECK THE DETAILS IN

    EACH FIELD

    Page 24

  • 8/13/2019 Unit Testing Pp

    25/35

    SOP & DM

    Change Rough Cut Plan

    sl no details of testing description input

    1 create rough cut plan

    go to sap easy menu put the

    trnsaction code mc88 and

    press enter mc88

    2 give all the details fill all the required fields Mat , plant,

    3 give all the details

    give the quantity accordind to

    the date or month or week of

    requirement required quantity

    4 ENTER THE REQUIRED DETAILS

    ENTER THE DETAILS IN

    EACH FIELD

    Sales Plan for

    Oct:250, Nov:300

    5 SAVE THE SOP CLICK ON SAVE BUTTON

    6 OPEN TRANSACTION SCREEN

    IN SAP EASY ACCESS

    TYPE IN COMMAND FIELD -

    MC78 MC78

    7 ENTER THE REQUIRED DETAILS

    ENTER THE DETAILS IN

    EACH FIELD Source: 006

    8 OPEN TRANSACTION SCREEN

    IN SAP EASY ACCESS

    TYPE IN COMMAND FIELD -

    MC74 MC74

    9 ENTER THE REQUIRED DETAILS

    ENTER THE DETAILS IN

    EACH FIELD

    Version:A00;

    Requirement

    Type:VSF;

    Version:01

    10 OPEN TRANSACTION SCREEN

    IN SAP EASY ACCESS

    TYPE IN COMMAND FIELD -

    MD04 MD04

    11 ENTER THE REQUIRED DETAILS

    ENTER THE DETAILS IN

    EACH FIELD

    Material: ABC;

    Plant: AH01

    12 CHECK THE REQUIRED DETAILSCHECK THE DETAILS INEACH FIELD

    escr p on: Transaction Code:

    Performed on:

    Page 25

  • 8/13/2019 Unit Testing Pp

    26/35

    SOP & DM

    sl no details of testing description input

    1 OPEN TRANSACTION SCREEN

    IN SAP EASY ACCESS

    TYPE IN COMMAND FIELD -

    MD63 MD63

    2 ENTER THE REQUIRED DETAILS

    ENTER THE DETAILS IN

    EACH FIELD

    Material: Plant:

    Version: From Date:To Date: Planning

    Period:

    3 ENTER THE REQUIRED DETAILS

    ENTER THE DETAILS IN

    EACH FIELD

    Plant: Requirement

    Type:

    4 CHECK THE REQUIRED DETAILS

    CHECK THE DETAILS IN

    EACH FIELD Quantity:

    Page 26

  • 8/13/2019 Unit Testing Pp

    27/35

    SOP & DM

    expected result actual result remark

    create planning screen should open

    create planning screen

    opens

    news screen opens

    create plan screen should

    open

    goto EDIT and Click on 'Create Production

    plan synchronous to Sales Plan' and

    observe that production Plan will getcreated

    Observe the Message that Plan saved

    under the version number 006

    Press ENTER and observe that COPY

    PLANNING VERSION screen opens

    Click on the INACTIVE button in 'Source

    Version' and select 006 version & Click on

    the ACTIVE button in the 'Target Version'

    and Click on COPY and observe the

    message that 'A00 version already Exits'and Pr ess Enter and observe that a pop-up

    window opens 'Do you want to Reset the

    version A00' and click on RESET button

    Press ENTER and observe that

    TRANSFER PLANNING DATA TO

    DEMAND MANAGEMENT screen opens

    Click on the TRANSFER NOW Button

    Press ENTER and observe that

    STOCK/REQUIREMENTS LIST screen

    opens

    Press Enter and observe the

    STOCK/REQUIREMENTS LIST AS OF ---

    HRS screen opens

    Observe that Planned Independent

    Requirements Created

    Page 27

  • 8/13/2019 Unit Testing Pp

    28/35

  • 8/13/2019 Unit Testing Pp

    29/35

    SOP & DM

    expected result actual result remarkPress ENTER and observe that DISPLAY

    PLANNED INDEPENDENT

    REQUIREMENTS screen opens PASS

    Click on the 'User Parameters' tab and

    observe that a popup window opens PASSClick on Continue and observe Information

    message appears that USER

    PARAMETERS WERE SAVED & Press

    Enter and observe that PLANNING TABLE

    screen opens PASS

    PASS

    Page 29

  • 8/13/2019 Unit Testing Pp

    30/35

  • 8/13/2019 Unit Testing Pp

    31/35

    sl no details of te description input

    1

    OPEN

    TRANSACTION

    SCREEN

    IN SAP EASY ACCESS TYPE IN

    COMMAND FIELD - MD63 MD63

    2

    ENTER THE

    REQUIRED

    DETAILS

    ENTER THE DETAILS IN EACH

    FIELD

    Version: From

    Date: To Date:

    Planning Period:

    3

    ENTER THE

    REQUIRED

    DETAILS

    ENTER THE DETAILS IN EACH

    FIELD

    Plant:

    Requirement

    Type:

    4

    CHECK THE

    REQUIRED

    CHECK THE DETAILS IN EACH

    FIELD Quantity:

    Transaction Code:

    Performed on:

  • 8/13/2019 Unit Testing Pp

    32/35

    expected result actual r remark

    Press ENTER and observe that CREATE

    PLANNED INDEPENDENT

    REQUIREMENTS screen opens

    Click on the 'User Parameters' tab and

    observe that a popup window opens

    Information message appears that USER

    PARAMETERS WERE SAVED & Press

    Enter and observe that PLANNING

    TABLE screen opens

    Click on SAVE button and the

    Requirement get saved

    Requirement saved

    expected result actual r remark

    Press ENTER and observe that

    CHANGE PLANNED INDEPENDENT

    REQUIREMENTS screen opens PASS

    Click on the 'User Parameters' tab and

    observe that a popup window opens PASS

    Click on Continue and observe

    Information message appears that USER

    PARAMETERS WERE SAVED & PressEnter and observe that PLANNING

    TABLE screen opens PASS

    Click on SAVE button and the

    Requirement get saved PASS

    Requirement saved PASS

    Independent Requirements

    Independent RequirementsMD62

    24/09/2011

    Independent RequirementsMD61

    24/09/2011

  • 8/13/2019 Unit Testing Pp

    33/35

    expected result actual r remarkPress ENTER and observe that

    DISPLAY PLANNED INDEPENDENT

    REQUIREMENTS screen opens PASS

    Click on the 'User Parameters' tab and

    observe that a popup window opens PASSClick on Continue and observe

    Information message appears that USER

    PARAMETERS WERE SAVED & Press

    Enter and observe that PLANNING

    TABLE screen opens PASS

    PASS

    MD63

    24/09/2011

  • 8/13/2019 Unit Testing Pp

    34/35

    MRP

    Unit testing details

    STEP NAME DESCRIPTION INPUT

    1

    OPEN

    TRANSACTION

    SCREEN

    IN SAP EASY ACCESS

    TYPE IN COMMAND FIELD

    - MD02 MD02

    2

    ENTER THEREQUIRED

    DETAILS

    ENTER THE DETAILS IN

    EACH FIELD AND SELECTTHE REQUIRED CHECK

    BOXES

    Material: Plant: Processing Key:

    Create Purchase Requisition:

    Delivery Schedules: Create MRP List:

    Planning Mode: Scheduling: Also

    Plan Unchanged Materials(Y/N);

    Display Results before they aresaved(Y/N); Display Material

    List(Y/N)

    3 MESSAGE

    4 SAVE THE MRP CLICK ON SAVE BUTTON

    Description: Single-Item, Multi-Level

    Transaction Code: MD02

    Performed on: 24/09/2011

    Page 34

  • 8/13/2019 Unit Testing Pp

    35/35

    MRP

    or MRP

    DESIRED RESULT PASS/FAIL COMMENTS

    Press ENTER and observe that SINGLE-ITEM,

    MULTI-LEVEL screen opens PASS

    Press Enter and observe the Information Message'Please Check Input Parameters'; check and Press

    Enter and observe the PLANNING LINES screen PASS

    MRP Carried out for Material --- PASS

    A screen opens with all the details of statistics,

    Parameters, Data base Statistics, Run Time

    Statistics related to that material PASS