  • 5/19/2018 Underground Construction Pitfalls to Avoid

    1/69

    IEAust Singapore 12 Jan 2012 1

    Underground Construction

    Pitfalls to Avoid

    D Wen, BSc, PhDPE, PE(Geo), AC(Geo), CEng, MICE, MIEAust, CPEng

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    2/692IEAust Singapore 12 Jan 2012

    Soil Investigation & Interpretation

    Maintenance

    Interfaces Base Stability

    Gaps in Retaining Walls

    Buildings on Mixed Foundations

    Underground Construction - Pitfalls to Avoid

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    3/693IEAust Singapore 12 Jan 2012

    Soil Investigation & Interpretation

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    4/694IEAust Singapore 12 Jan 2012

    Soil Investigation & Interpretation

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    5/695IEAust Singapore 12 Jan 2012

    Interpreted Profile of Surface Wave Velocity

    Interpreted Rock Profile

    Soil Investigation & Interpretation

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    6/696IEAust Singapore 12 Jan 2012

    Soil Investigation & Interpretation

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    7/697IEAust Singapore 12 Jan 2012

    Maintenance

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    8/698IEAust Singapore 12 Jan 2012

    Maintenance

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    9/699IEAust Singapore 12 Jan 2012

    Maintenance

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    10/6910

    IEAust Singapore 12 Jan 2012

    Maintenance

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    11/6911

    IEAust Singapore 12 Jan 2012

    TBM Launching

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    12/6912

    IEAust Singapore 12 Jan 2012

    TBM Launching

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    13/6913

    IEAust Singapore 12 Jan 2012

    Braddell Road Proposed Depressed Road

    TBM Launching

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    14/6914

    IEAust Singapore 12 Jan 2012

    F1

    30m3 F1 sandsflowing into the

    TBM launching

    chamber through

    the gap between

    the TBM shield andthe shotcrete

    support of the

    launching

    chamber.

    Road closed foremergency repair.

    CPT carried out to

    confirm no cavities

    under road.

    TBM Launching

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    15/69

    15IEAust Singapore 12 Jan 2012

    TBM Launching

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    16/69

    16IEAust Singapore 12 Jan 2012

    TBM Launching or Docking

    Ground treatment for TBM launching /

    docking: TBM Length + One Ring Length

    Quality control of ground treatment

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    17/69

    17IEAust Singapore 12 Jan 2012

    Interface between Stable & Weak Soils

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    18/69

    18IEAust Singapore 12 Jan 2012

    600mm of

    settlement

    on CTE

    due to

    DTSS

    tunnelling

    Interface between Stable & Weak Soils

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    19/69

    19IEAust Singapore 12 Jan 2012

    Weak ground / strong, stable ground

    Face pressure governed by overlying

    weak ground

    Interface between Stable & Weak Soils

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    20/69

    20IEAust Singapore 12 Jan 2012

    IDEALISED PROFILE IN GRANITE

    Interface between Rock & Soil

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    21/69

    21IEAust Singapore 12 Jan 2012

    Interface between Rock & Soil

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    22/69

    22IEAust Singapore 12 Jan 2012

    Flushing of the annular gap

    Water ingress

    Limit of EPB Technology

    Coarse granular

    material / rocks

    Insufficient fines to form

    plastic plug

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    23/69

    23IEAust Singapore 12 Jan 2012

    Good EPB Spoil

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    24/69

    24IEAust Singapore 12 Jan 2012

    Difficult to Turn a Mixture of Cut Rock and Granular Spoil into EPB Spoil

    May Be Unable to Maintain Target Pressure

    Cut Rock & Granular Spoil

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    25/69

    25IEAust Singapore 12 Jan 2012

    Interface between Rock & Soil

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    26/69

    26IEAust Singapore 12 Jan 2012

    Interface between Rock & Soil

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    27/69

    27IEAust Singapore 12 Jan 2012

    Mixed face of strong or very strong rock

    with flowing or squeezing soils

    Predominantly granular spoil

    Need to have high face pressure, but spoil

    does not readily form a plug in EPB

    machines

    Interface between Rock & Soil

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    28/69

    28IEAust Singapore 12 Jan 2012

    Cutterhead Intervention

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    29/69

    29IEAust Singapore 12 Jan 2012

    Over-excavation by Slurry TBM

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    30/69

    30IEAust Singapore 12 Jan 2012

    Feeding Pipe

    Discharge Pipe

    Flow meterDensity meter

    Excavation Management System

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    31/69

    31IEAust Singapore 12 Jan 2012

    Normal Excavation Condition Over Excavation Condition

    Excavated

    Qty(Cum)

    Jack Stroke (m)

    Theoretical

    Value

    Theoretical

    Value

    Jack Stroke (m)

    Excavate

    dQty(Cum)

    Excavation Management System

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    32/69

    32IEAust Singapore 12 Jan 2012

    Base Stability of Excavation

    Hydraulic uplift

    D D

    Uk1

    k2

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    33/69

    33IEAust Singapore 12 Jan 2012

    Base Stability of Excavation

    Example of hydraulic uplift failure reported by Davies (1984)

    Hydraulic uplift

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    34/69

    34IEAust Singapore 12 Jan 2012

    Base Stability of Excavation

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    35/69

    35IEAust Singapore 12 Jan 2012

    Shaft Excavation

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    36/69

    36IEAust Singapore 12 Jan 2012

    Base Stability of Excavation

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    37/69

    37IEAust Singapore 12 Jan 2012

    Base Stability of Excavation

    B St bilit f E ti

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    38/69

    38IEAust Singapore 12 Jan 2012

    Base Stability of Excavation

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    39/69

    39IEAust Singapore 12 Jan 2012

    Gaps in Retaining Walls

    Soil stability in the gaps

    marine clay squeezing through the gaps into

    excavation, causing localized soil collapse

    Large ground settlements at areas with

    gaps in diaphragm walls

    Water leaking through the gaps into the

    excavation

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    40/69

    40IEAust Singapore 12 Jan 2012

    Gaps in Retaining Walls

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    41/69

    41IEAust Singapore 12 Jan 2012

    Gaps in Retaining Walls

  • 5/19/2018 Underground Construction Pitfalls to Avoid

    42/69

    42IEAust Singapore 12 Jan 2012

    -0

    .085

    -0

    .085

    -0

    .085

    -0

    .085

    -0

    .085

    -0.07-0.07-0.07-0.07-0.07

    -0.07

    -0.07

    -0.07

    -0.07

    -0.07

    -0.07

    -0.07

    -0.07

    -0.07

    -0.07

    -0.065

    -0.065

    -0.065

    -0.065

    -0.065 -0.06

    -0.06

    -0.06

    -0.06

    -0.06

    -0.

    06

    -0.

    06

    -0.

    06

    -0.0

    6

    -0.

    06

    -0.05

    -0.05

    -0.05-0.05

    -0.05-0.045

    -0.045

    -0.045

    -0.045

    -0.045 -0.035

    -0.035

    -0.035

    -0.035

    -0.035

    -0.03

    -0.03

    -0.03

    -0.03

    -0.03

    -0.0

    3

    -0.0

    3

    -0.03

    -0.0

    3

    -0.0

    3

    -0.03

    -0.03

    -0.03-0.03

    -0.03

    -0.025-0.025-0.025-0.025-0.025

    .25

    .25

    .025

    .25

    .25

    -0.025

    -0.025

    -0.025

    -0.025

    -0.025

    -0.0

    2

    -0.0

    2

    -0.0

    2

    -0.0

    2

    -0.0

    2

    -0.

    -0.

    -0.0

    -0.

    -0.

    -0.015

    -0.015

    -0.01

    5

    -0.015

    -0.015

    -0

    .015

    -0

    .015

    -0

    .015

    -0

    .015

    -0

    .015

    -0.01-0.01-0.01-0.01-0.01

    -0.005-0.005-0.005-0.005-0.005

    Gaps in Retaining Walls

    G

  • 5/19/2018 Underground Constr