ulms unified library management system update: november 2005 andrew jackson senior information...

12
ULMS Unified Library Management System Update: November 2005 Andrew Jackson Senior Information Manager Knowledge Services Group 29 November 2005

Upload: kristin-weaver

Post on 13-Jan-2016

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: ULMS Unified Library Management System Update: November 2005 Andrew Jackson Senior Information Manager Knowledge Services Group 29 November 2005

ULMS

Unified Library Management SystemUpdate: November 2005

Andrew Jackson

Senior Information ManagerKnowledge Services Group

29 November 2005

Page 2: ULMS Unified Library Management System Update: November 2005 Andrew Jackson Senior Information Manager Knowledge Services Group 29 November 2005

On the road …

Visits to regional meetings and library services covering 9 Health Boards

Visits to 6 Special Board services

Visits to Strathclyde University, Glasgow Caledonian University, Paisley University and Edinburgh University to discuss metasearch solutions and library systems

Visit to London for a demonstration of Sirsi products

Page 3: ULMS Unified Library Management System Update: November 2005 Andrew Jackson Senior Information Manager Knowledge Services Group 29 November 2005

ULMS FAQs

Will I have to re-classify or re-catalogue my collection?

No – conversion to MARC21 is an automated process managed by the bibliographic data provider, myself, and the library service.

There is an opportunity to ‘tidy’ catalogue records before migration, to save on retrospective work.

Data conversion will not take place until early 2007

Page 4: ULMS Unified Library Management System Update: November 2005 Andrew Jackson Senior Information Manager Knowledge Services Group 29 November 2005

ISBNs

If ISBNs are important, is it only book data which will be held on the ULMS database?

No – all stock currently held on existing systems will be transferred into the ULMS database: books, videos, teaching kits, equipment, articles.

ISBNs provide an exact match on existing MARC records, thus providing high quality records where available.

Page 5: ULMS Unified Library Management System Update: November 2005 Andrew Jackson Senior Information Manager Knowledge Services Group 29 November 2005

Barcodes

Will I have to re-barcode my collection if items already have barcodes?

Possibly – if your barcode sequence matches that of another library service, both services will need to re-barcode from a central stock.

Barcodes will be provided from project funds.

Barcoding should be completed by December 2006.

Page 6: ULMS Unified Library Management System Update: November 2005 Andrew Jackson Senior Information Manager Knowledge Services Group 29 November 2005

Inter-lending

If I commit to Phase 1 of the project, is inter-lending across Health Boards mandatory?

No – services must be willing to begin formulating inter-lending solutions which provide an equitable service to local and non-local users.

The ULMS Inter-lending Sub-group will discuss the best approach for NHS Scotland, and invite responses.

“The supplying library has the ultimate right to decide whether to supply any requested item.”

http://www.ifla.org/VI/2/p3/model.htm

Page 7: ULMS Unified Library Management System Update: November 2005 Andrew Jackson Senior Information Manager Knowledge Services Group 29 November 2005

Resource booking

Will the ULMS contain a Resource Booking module for my Health Promotion service?

Yes – the specification document will ask for a Resource Booking module as mandatory.

Vendors will be asked to demonstrate how their product will meet the needs of NHS Scotland services.

I will investigate booking modules at other library sites and report back via LIS-NHSS.

Page 8: ULMS Unified Library Management System Update: November 2005 Andrew Jackson Senior Information Manager Knowledge Services Group 29 November 2005

Representation

As a Phase 1 service, how and when do I become involved if I’m not on the Working Group?

After the Working Group has chosen a preferred system (September 2006) a representative from all Phase 1 services / Health Boards will be required to sit on the Implementation Group.

I will be making site visits to all Phase 1 services throughout 2006 to fully discuss their requirements and support data export / MARC conversion.

Page 9: ULMS Unified Library Management System Update: November 2005 Andrew Jackson Senior Information Manager Knowledge Services Group 29 November 2005

Other support

If I’m not involved in Phase 1, can I still ask you for advice on non-ULMS catalogue mergers and other library system issues?

Yes – I’d be glad to discuss to any systems development issues within NHS Scotland, and contribute to discussions about catalogue mergers.

My role is to support library system developments where required, not just the ULMS.

Page 10: ULMS Unified Library Management System Update: November 2005 Andrew Jackson Senior Information Manager Knowledge Services Group 29 November 2005

What next?

There is a final 2005 meeting of the Working Group on 16th December.

On the same day, the Cataloguing sub-group and the Inter-lending sub-group will meet for the first time.

These sub-groups will consist of Working Group members, library staff with particular interests in cataloguing, and other staff not included in the Working Group due to number restrictions.

Page 11: ULMS Unified Library Management System Update: November 2005 Andrew Jackson Senior Information Manager Knowledge Services Group 29 November 2005

Commitments

Phase 1 commitment will be sought by the end of January 2006.

If services require more time to discuss ULMS issues with IT or Management, this may be stretched to the end of February.

If anyone would like to discuss the project, I am more than happy to make more site visits – or to re-visit sites in order to discuss specific issues in more depth.

Page 12: ULMS Unified Library Management System Update: November 2005 Andrew Jackson Senior Information Manager Knowledge Services Group 29 November 2005

The future …

“It sounds like you are certainly embarking on a massive project …”

(Alice E. Jacobs, National Library of Medicine)

NHS Scotland library staff will be leading the UK in shared systems development and collaborative practice.