************************************************************************** USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ---------------------------- Preparing Activity: USACE Superseding UFGS-23 23 00 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References are in agreement with UMRL dated April 2018 ************************************************************************** SECTION TABLE OF CONTENTS DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION 23 23 00 REFRIGERANT PIPING 10/07 PART 1 GENERAL 1.1 REFERENCES 1.2 SUBMITTALS 1.3 QUALITY ASSURANCE 1.3.1 Qualifications 1.3.2 Contract Drawings 1.4 DELIVERY, STORAGE, AND HANDLING 1.5 MAINTENANCE 1.5.1 General 1.5.2 Extra Materials PART 2 PRODUCTS 2.1 STANDARD COMMERCIAL PRODUCTS 2.2 ELECTRICAL WORK 2.3 REFRIGERANT PIPING SYSTEM 2.4 PIPE, FITTINGS AND END CONNECTIONS (JOINTS) 2.4.1 Steel Pipe 2.4.1.1 Welded Fittings and Connections 2.4.1.2 Threaded Fittings and Connections 2.4.1.3 Flanged Fittings and Connections 2.4.2 Steel Tubing 2.4.3 Copper Tubing 2.4.4 Solder 2.4.5 Brazing Filler Metal 2.5 VALVES 2.5.1 Refrigerant Stop Valves 2.5.2 Check Valves 2.5.3 Liquid Solenoid Valves 2.5.4 Expansion Valves 2.5.5 Safety Relief Valves 2.5.6 Evaporator Pressure Regulators, Direct-Acting 2.5.7 Refrigerant Access Valves 2.6 PIPING ACCESSORIES 2.6.1 Filter Driers SECTION 23 23 00 Page 1

Upload: truongtruc

Post on 25-Apr-2018

238 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

**************************************************************************USACE / NAVFAC / AFCEC / NASA UFGS- 23 23 00 ( Oct ober 2007) - - - - - - - - - - - - - - - - - - - - - - - - - - - -Pr epar i ng Act i v i t y: USACE Super sedi ng UFGS- 23 23 00 ( Apr i l 2006)

UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS

Ref er ences ar e i n agr eement wi t h UMRL dat ed Apr i l 2018**************************************************************************

SECTI ON TABLE OF CONTENTS

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

SECTI ON 23 23 00

REFRI GERANT PI PI NG

10/07

PART 1 GENERAL

1. 1 REFERENCES 1. 2 SUBMI TTALS 1. 3 QUALI TY ASSURANCE 1. 3. 1 Qual i f i cat i ons 1. 3. 2 Cont r act Dr awi ngs 1. 4 DELI VERY, STORAGE, AND HANDLI NG 1. 5 MAI NTENANCE 1. 5. 1 Gener al 1. 5. 2 Ext r a Mat er i al s

PART 2 PRODUCTS

2. 1 STANDARD COMMERCI AL PRODUCTS 2. 2 ELECTRI CAL WORK 2. 3 REFRI GERANT PI PI NG SYSTEM 2. 4 PI PE, FI TTI NGS AND END CONNECTI ONS ( JOI NTS) 2. 4. 1 St eel Pi pe 2. 4. 1. 1 Wel ded Fi t t i ngs and Connect i ons 2. 4. 1. 2 Thr eaded Fi t t i ngs and Connect i ons 2. 4. 1. 3 Fl anged Fi t t i ngs and Connect i ons 2. 4. 2 St eel Tubi ng 2. 4. 3 Copper Tubi ng 2. 4. 4 Sol der 2. 4. 5 Br azi ng Fi l l er Met al 2. 5 VALVES 2. 5. 1 Ref r i ger ant St op Val ves 2. 5. 2 Check Val ves 2. 5. 3 Li qui d Sol enoi d Val ves 2. 5. 4 Expansi on Val ves 2. 5. 5 Saf et y Rel i ef Val ves 2. 5. 6 Evapor at or Pr essur e Regul at or s, Di r ect - Act i ng 2. 5. 7 Ref r i ger ant Access Val ves 2. 6 PI PI NG ACCESSORI ES 2. 6. 1 Fi l t er Dr i er s

SECTI ON 23 23 00 Page 1

Page 2: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

2. 6. 2 Si ght Gl ass and Li qui d Level I ndi cat or 2. 6. 2. 1 Assembl y and Component s 2. 6. 2. 2 Gauge Gl ass 2. 6. 2. 3 Bul l ' s- Eye and I nl i ne Si ght Gl ass Ref l ex Lens 2. 6. 2. 4 Moi st ur e I ndi cat or 2. 6. 3 Vi br at i on Dampener s 2. 6. 4 Fl exi bl e Pi pe Connect or s 2. 6. 5 St r ai ner s 2. 6. 6 Pr essur e and Vacuum Gauges 2. 6. 7 Temper at ur e Gauges 2. 6. 7. 1 St em Cased- Gl ass 2. 6. 7. 2 Bi met al l i c Di al 2. 6. 7. 3 Li qui d- , Sol i d- , and Vapor - Fi l l ed Di al 2. 6. 7. 4 Ther mal Wel l 2. 6. 8 Pi pe Hanger s, I nser t s, and Suppor t s 2. 6. 9 Escut cheons 2. 7 FABRI CATI ON 2. 7. 1 Fact or y Coat i ng 2. 7. 2 Fact or y Appl i ed I nsul at i on

PART 3 EXECUTI ON

3. 1 EXAMI NATI ON 3. 2 I NSTALLATI ON 3. 2. 1 Di r ect i onal Changes 3. 2. 2 Funct i onal Requi r ement s 3. 2. 3 Fi t t i ngs and End Connect i ons 3. 2. 3. 1 Thr eaded Connect i ons 3. 2. 3. 2 Br azed Connect i ons 3. 2. 3. 3 Wel ded Connect i ons 3. 2. 3. 4 Fl ar ed Connect i ons 3. 2. 3. 5 Fl anged Connect i ons 3. 2. 4 Val ves 3. 2. 4. 1 Gener al 3. 2. 4. 2 Expansi on Val ves 3. 2. 4. 3 Val ve I dent i f i cat i on 3. 2. 5 Vi br at i on Damper s 3. 2. 6 St r ai ner s 3. 2. 7 Fi l t er Dr yer 3. 2. 8 Si ght Gl ass 3. 2. 9 Di schar ge Li ne Oi l Separ at or 3. 2. 10 Accumul at or 3. 2. 11 Fl exi bl e Pi pe Connect or s 3. 2. 12 Temper at ur e Gauges 3. 2. 13 Pi pe Hanger s, I nser t s, and Suppor t s 3. 2. 13. 1 Hanger s 3. 2. 13. 2 I nser t s 3. 2. 13. 3 C- Cl amps 3. 2. 13. 4 Angl e At t achment s 3. 2. 13. 5 Saddl es and Shi el ds 3. 2. 13. 6 Hor i zont al Pi pe Suppor t s 3. 2. 13. 7 Ver t i cal Pi pe Suppor t s 3. 2. 13. 8 Pi pe Gui des 3. 2. 13. 9 St eel Sl i des 3. 2. 13. 10 Hi gh Temper at ur e Gui des wi t h Cr adl es 3. 2. 13. 11 Mul t i pl e Pi pe Runs 3. 2. 13. 12 Sei smi c Requi r ement s 3. 2. 13. 13 St r uct ur al At t achment s 3. 2. 14 Pi pe Al i gnment Gui des

SECTI ON 23 23 00 Page 2

Page 3: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

3. 2. 15 Pi pe Anchor s 3. 2. 16 Bui l di ng Sur f ace Penet r at i ons 3. 2. 16. 1 Ref r i ger at ed Space 3. 2. 16. 2 Gener al Ser vi ce Ar eas 3. 2. 16. 3 Wat er pr oof Penet r at i ons 3. 2. 16. 3. 1 Wat er pr oof i ng Cl ampi ng Fl ange 3. 2. 16. 3. 2 Modul ar Mechani cal Type Seal i ng Assembl y 3. 2. 16. 4 Fi r e- Rat ed Penet r at i ons 3. 2. 16. 5 Escut cheons 3. 2. 17 Access Panel s 3. 2. 18 Fi el d Appl i ed I nsul at i on 3. 2. 19 Fi el d Pai nt i ng 3. 2. 19. 1 Col or Codi ng 3. 2. 19. 2 Col or Codi ng Scheme 3. 2. 20 I dent i f i cat i on Tags 3. 3 CLEANI NG AND ADJUSTI NG 3. 4 TRAI NI NG COURSE 3. 5 REFRI GERANT PI PI NG TESTS 3. 5. 1 Pr el i mi nar y Pr ocedur es 3. 5. 2 Pneumat i c Test 3. 5. 3 Evacuat i on Test 3. 5. 4 Syst em Char gi ng and St ar t up Test 3. 5. 5 Ref r i ger ant Leakage 3. 5. 6 Cont r act or ' s Responsi bi l i t y

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 23 23 00 Page 3

Page 4: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

**************************************************************************USACE / NAVFAC / AFCEC / NASA UFGS- 23 23 00 ( Oct ober 2007) - - - - - - - - - - - - - - - - - - - - - - - - - - - -Pr epar i ng Act i v i t y: USACE Super sedi ng UFGS- 23 23 00 ( Apr i l 2006)

UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS

Ref er ences ar e i n agr eement wi t h UMRL dat ed Apr i l 2018**************************************************************************

SECTI ON 23 23 00

REFRI GERANT PI PI NG10/07

**************************************************************************NOTE: Thi s gui de speci f i cat i on cover s t he r equi r ement s f or r ef r i ger ant pi pi ng syst ems i nsi de of bui l di ngs, or l eadi ng f r om equi pment adj acent t o buildings.

Adher e t o UFC 1- 300- 02 Uni f i ed Faci l i t i es Gui de Speci f i cat i ons ( UFGS) For mat St andar d when edi t i ng t hi s gui de speci f i cat i on or pr epar i ng new pr oj ect speci f i cat i on sect i ons. Edi t t hi s gui de speci f i cat i on f or pr oj ect speci f i c r equi r ement s by addi ng, del et i ng, or r evi s i ng t ext . For br acket ed i t ems, choose appl i cabl e i t em( s) or i nser t appr opr i at e i nf or mat i on.

Remove i nf or mat i on and r equi r ement s not r equi r ed i n r espect i ve pr oj ect , whet her or not br acket s ar e present.

Comment s, suggest i ons and r ecommended changes f or t hi s gui de speci f i cat i on ar e wel come and shoul d be submi t t ed as a Cr i t er i a Change Request ( CCR) .

**************************************************************************

PART 1 GENERAL

1. 1 REFERENCES

**************************************************************************NOTE: Thi s par agr aph i s used t o l i s t t he publ i cat i ons c i t ed i n t he t ext of t he gui de speci f i cat i on. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by basi c desi gnat i on onl y and l i s t ed i n t hi s par agr aph by or gani zat i on, desi gnat i on, dat e, and t i t l e.

Use t he Ref er ence Wi zar d' s Check Ref er ence f eat ur e when you add a Ref er ence I dent i f i er ( RI D) out s i de of t he Sect i on' s Ref er ence Ar t i c l e t o aut omat i cal l y pl ace t he r ef er ence i n t he Ref er ence Ar t i c l e. Al so use t he Ref er ence Wi zar d' s Check Ref er ence f eat ur e

SECTI ON 23 23 00 Page 4

Page 5: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

t o updat e t he i ssue dat es.

Ref er ences not used i n t he t ext wi l l aut omat i cal l y be del et ed f r om t hi s sect i on of t he pr oj ect speci f i cat i on when you choose t o r econci l e r ef er ences i n t he publ i sh pr i nt pr ocess.

**************************************************************************

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AI R- CONDI TI ONI NG, HEATI NG AND REFRI GERATI ON I NSTI TUTE ( AHRI )

AHRI 710 I - P ( 2009) Per f or mance Rat i ng of Li qui d- Li ne Driers

AHRI 711 ( 2009) Per f or mance Rat i ng of Li qui d- Li ne Driers

AHRI 720 ( 2002) Ref r i ger ant Access Val ves and Hose Connectors

AHRI 750 I - P ( 2016) Per f or mance Rat i ng of Ther most at i c Ref r i ger ant Expansi on Val ves

AHRI 751 SI ( 2016) Per f or mance Rat i ng of Ther most at i c Ref r i ger ant Expansi on Val ves

ANSI / AHRI 760 ( 2007) Per f or mance Rat i ng of Sol enoi d Val ves f or Use Wi t h Vol at i l e Ref r i ger ant s

AMERI CAN SOCI ETY OF HEATI NG, REFRI GERATI NG AND AI R- CONDI TI ONI NG ENGI NEERS ( ASHRAE)

ASHRAE 15 & 34 ( 2013) ASHRAE St andar d 34- 2016 Saf et y St andar d f or Ref r i ger at i on Syst ems/ ASHRAE St andar d 34- 2016 Desi gnat i on and Saf et y Cl assi f i cat i on of Ref r i ger ant s- ASHRAE St andar d 34- 2016

ASHRAE 17 ( 2015) Met hod of Test i ng Capaci t y of Ther most at i c Ref r i ger ant Expansi on Val ves

AMERI CAN WELDI NG SOCI ETY ( AWS)

AWS A5. 8/ A5. 8M ( 2011; Amendment 2012) Speci f i cat i on f or Fi l l er Met al s f or Br azi ng and Br aze Wel di ng

AWS BRH ( 2007; 5t h Ed) Br azi ng Handbook

AWS D1. 1/ D1. 1M ( 2015; Er r at a 1 2015; Er r at a 2 2016) St r uct ur al Wel di ng Code - St eel

AWS Z49. 1 ( 2012) Saf et y i n Wel di ng and Cut t i ng and Al l i ed Pr ocesses

SECTI ON 23 23 00 Page 5

Page 6: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

ASME I NTERNATI ONAL ( ASME)

ASME B1. 20. 1 ( 2013) Pi pe Thr eads, Gener al Pur pose ( I nch)

ASME B1. 20. 2M ( 2006; R 2011) Pi pe Thr eads, 60 Deg. Gener al Pur pose ( Met r i c)

ASME B16. 11 ( 2016) For ged Fi t t i ngs, Socket - Wel di ng and Threaded

ASME B16. 21 ( 2011) Nonmet al l i c Fl at Gasket s f or Pi pe Flanges

ASME B16. 22 ( 2013) St andar d f or Wr ought Copper and Copper Al l oy Sol der Joi nt Pr essur e Fi t t i ngs

ASME B16. 26 ( 2013) St andar d f or Cast Copper Al l oy Fi t t i ngs f or Fl ar ed Copper Tubes

ASME B16. 3 ( 2011) Mal l eabl e I r on Thr eaded Fi t t i ngs, Cl asses 150 and 300

ASME B16. 5 ( 2017) Pi pe Fl anges and Fl anged Fi t t i ngs NPS 1/ 2 Thr ough NPS 24 Met r i c/ I nch St andar d

ASME B16. 9 ( 2012) St andar d f or Fact or y- Made Wr ought St eel But t wel di ng Fi t t i ngs

ASME B31. 1 ( 2016; Er r at a 2016) Power Pi pi ng

ASME B31. 5 ( 2016) Ref r i ger at i on Pi pi ng and Heat Tr ansf er Component s

ASME B31. 9 ( 2017) Bui l di ng Ser vi ces Pi pi ng

ASME B40. 100 ( 2013) Pr essur e Gauges and Gauge Attachments

ASME BPVC SEC I X ( 2010) BPVC Sect i on I X- Wel di ng and Br azi ng Qualifications

ASTM I NTERNATI ONAL ( ASTM)

ASTM A193/ A193M ( 2016) St andar d Speci f i cat i on f or Al l oy- St eel and St ai nl ess St eel Bol t i ng Mat er i al s f or Hi gh- Temper at ur e Ser vi ce and Ot her Speci al Pur pose Appl i cat i ons

ASTM A334/ A334M ( 2004a; R 2016) St andar d Speci f i cat i on f or Seaml ess and Wel ded Car bon and Al l oy- St eel Tubes f or Low- Temper at ur e Ser vi ce

ASTM A53/ A53M ( 2012) St andar d Speci f i cat i on f or Pi pe, St eel , Bl ack and Hot - Di pped, Zi nc- Coat ed, Wel ded and Seaml ess

ASTM A653/ A653M ( 2017) St andar d Speci f i cat i on f or St eel Sheet , Zi nc- Coat ed ( Gal vani zed) or Zi nc- I r on Al l oy- Coat ed ( Gal vanneal ed) by

SECTI ON 23 23 00 Page 6

Page 7: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

t he Hot - Di p Pr ocess

ASTM B117 ( 2016) St andar d Pr act i ce f or Oper at i ng Sal t Spr ay ( Fog) Appar at us

ASTM B280 ( 2016) St andar d Speci f i cat i on f or Seaml ess Copper Tube f or Ai r Condi t i oni ng and Ref r i ger at i on Fi el d Ser vi ce

ASTM B32 ( 2008; R 2014) St andar d Speci f i cat i on f or Sol der Met al

ASTM B62 ( 2017) St andar d Speci f i cat i on f or Composi t i on Br onze or Ounce Met al Cast i ngs

ASTM B75/ B75M ( 2011) St andar d Speci f i cat i on f or Seaml ess Copper Tube

ASTM B813 ( 2016) St andar d Speci f i cat i on f or Li qui d and Past e Fl uxes f or Sol der i ng of Copper and Copper Al l oy Tube

ASTM D3308 ( 2012; R 2017) PSt andar d Speci f i cat i on f or TFE Resi n Ski ved Tape

ASTM D520 ( 2000; R 2011) Zi nc Dust Pi gment

ASTM E84 ( 2018) St andar d Test Met hod f or Sur f ace Bur ni ng Char act er i st i cs of Bui l di ng Materials

MANUFACTURERS STANDARDI ZATI ON SOCI ETY OF THE VALVE AND FI TTI NGS I NDUSTRY ( MSS)

MSS SP- 58 ( 1993; Reaf f i r med 2010) Pi pe Hanger s and Suppor t s - Mat er i al s, Desi gn and Manuf act ur e, Sel ect i on, Appl i cat i on, and Installation

U. S. DEPARTMENT OF DEFENSE ( DOD)

UFC 3- 310- 04 ( 2013; wi t h Change 1) Sei smi c Desi gn f or Buildings

1. 2 SUBMITTALS

**************************************************************************NOTE: Revi ew submi t t al descr i pt i on ( SD) def i ni t i ons i n Sect i on 01 33 00 SUBMI TTAL PROCEDURES and edi t t he f ol l owi ng l i s t t o r ef l ect onl y t he submi t t al s r equi r ed f or t he pr oj ect .

The Gui de Speci f i cat i on t echni cal edi t or s have desi gnat ed t hose i t ems t hat r equi r e Gover nment appr oval , due t o t hei r compl exi t y or cr i t i cal i t y , wi t h a " G. " Gener al l y, ot her submi t t al i t ems can be r evi ewed by t he Cont r act or ' s Qual i t y Cont r ol Syst em. Onl y add a “ G” t o an i t em, i f t he submi t t al i s suf f i c i ent l y i mpor t ant or compl ex i n cont ext of

SECTI ON 23 23 00 Page 7

Page 8: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

t he pr oj ect .

For submi t t al s r equi r i ng Gover nment appr oval on Ar my pr oj ect s, a code of up t o t hr ee char act er s wi t hi n t he submi t t al t ags may be used f ol l owi ng t he " G" desi gnat i on t o i ndi cat e t he appr ovi ng aut hor i t y. Codes f or Ar my pr oj ect s usi ng t he Resi dent Management Syst em ( RMS) ar e: " AE" f or Ar chi t ect - Engi neer ; " DO" f or Di st r i c t Of f i ce ( Engi neer i ng Di v i s i on or ot her or gani zat i on i n t he Di st r i c t Of f i ce) ; " AO" f or Ar ea Of f i ce; " RO" f or Resi dent Of f i ce; and " PO" f or Pr oj ect Of f i ce. Codes f ol l owi ng t he " G" t ypi cal l y ar e not used f or Navy, Ai r For ce, and NASA pr oj ect s.

Use t he " S" c l assi f i cat i on onl y i n SD- 11 Cl oseout Submi t t al s. The " S" f ol l owi ng a submi t t al i t em i ndi cat es t hat t he submi t t al i s r equi r ed f or t he Sust ai nabi l i t y eNot ebook t o f ul f i l l f eder al l y mandat ed sust ai nabl e r equi r ement s i n accor dance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG.

Choose t he f i r st br acket ed i t em f or Navy, Ai r For ce and NASA pr oj ect s, or choose t he second br acket ed i t em f or Ar my pr oj ect s.

**************************************************************************

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on; submi t t al s not havi ng a " G" desi gnat i on ar e f or [ Cont r act or Qual i t y Cont r ol appr oval . ] [ i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . ] Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y eNot ebook, i n conf or mance t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 02 Shop Dr awi ngs

Ref r i ger ant Pi pi ng Syst em; G[ , [ _____] ]

SD- 03 Pr oduct Dat a

Ref r i ger ant Pi pi ng Syst emSpar e Par t sQualificationsRef r i ger ant Pi pi ng Test s

Ver i f i cat i on of Di mensi ons

SD- 06 Test Repor t s

Ref r i ger ant Pi pi ng Test s

SD- 07 Cer t i f i cat es

Ser vi ce Or gani zat i on

SD- 10 Oper at i on and Mai nt enance Dat a

SECTI ON 23 23 00 Page 8

Page 9: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

Mai nt enance; G[ , [ _____] ]Oper at i on and Mai nt enance Manual s; G[ , [ _____] ]Demonst r at i ons; G[ , [ _____] ]

1. 3 QUALI TY ASSURANCE

1. 3. 1 Qualifications

**************************************************************************NOTE: I f t he need exi st s f or mor e st r i ngent r equi r ement s f or wel dment s, del et e t he f i r st br acket ed st at ement , ot her wi se del et e t he second. Regar di ng wel di ng Sect i on r ef er ence, use f i r st br acket ed st at ement f or Ar my pr oj ect s and del et e t he second opt i on of t he Navy Sect i on; and vi ce ver sa.

**************************************************************************

Submi t [ _____] copi es of qual i f i ed pr ocedur es, and l i s t of names and i dent i f i cat i on symbol s of qual i f i ed wel der s and wel di ng oper at or s, pr i or t o non- f act or y wel di ng oper at i ons. [ Pi pi ng shal l be wel ded i n accor dance wi t h t he qual i f i ed pr ocedur es usi ng per f or mance qual i f i ed wel der s and wel di ng oper at or s. Pr ocedur es and wel der s shal l be qual i f i ed i n accor dance wi t h ASME BPVC SEC I X. Wel di ng pr ocedur es qual i f i ed by ot her s, and wel der s and wel di ng oper at or s qual i f i ed by anot her empl oyer may be accept ed as per mi t t ed by ASME B31. 1. Not i f y t he Cont r act i ng Of f i cer 24 hour s i n advance of t est s t o be per f or med at t he wor k s i t e, i f pr act i cal . The wel der or wel di ng oper at or shal l appl y t he per sonal l y assi gned symbol near each wel d made, as a per manent r ecor d. St r uct ur al member s shal l be wel ded i n accor dance wi t h Sect i on [ 05 05 23. 16 STRUCTURAL WELDI NG] [ 05 12 00 STRUCTURAL STEEL] . ] [ Wel di ng and nondest r uct i ve t est i ng pr ocedur es ar e speci f i ed i n Sect i on [ 40 05 13. 96 WELDI NG PROCESS PI PI NG] [ 40 17 26. 00 20 WELDI NG PROCESS PI PI NG] . ]

1. 3. 2 Cont r act Dr awi ngs

Because of t he smal l scal e of t he dr awi ngs, i t i s not possi bl e t o i ndi cat e al l of f set s, f i t t i ngs, and accessor i es t hat may be r equi r ed. Car ef ul l y i nvest i gat e t he pl umbi ng, f i r e pr ot ect i on, el ect r i cal , st r uct ur al and f i ni sh condi t i ons t hat woul d af f ect t he wor k t o be per f or med and ar r ange such wor k accor di ngl y, f ur ni shi ng r equi r ed of f set s, f i t t i ngs, and accessor i es t o meet such condi t i ons.

1. 4 DELI VERY, STORAGE, AND HANDLI NG

Pr ot ect st or ed i t ems f r om t he weat her , humi di t y and t emper at ur e var i at i ons, di r t and dust , or ot her cont ami nant s. Pr oper pr ot ect i on and car e of al l mat er i al bot h bef or e and dur i ng i nst al l at i on i s t he Cont r act or ' s r esponsi bi l i t y . Repl ace any mat er i al s f ound t o be damaged at t he Cont r act or ' s expense. Dur i ng i nst al l at i on, cap pi pi ng and si mi l ar openi ngs t o keep out di r t and ot her f or ei gn mat t er .

1. 5 MAINTENANCE

1. 5. 1 General

Submi t Dat a Package 2 pl us oper at i on and mai nt enance dat a compl yi ng wi t h t he r equi r ement s of Sect i on 01 78 23 OPERATI ON AND MAI NTENANCE DATA and as speci f i ed her ei n.

SECTI ON 23 23 00 Page 9

Page 10: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

1. 5. 2 Ext r a Mat er i al s

**************************************************************************NOTE: Remove t hi s par agr aph i n Navy pr oj ect s.

**************************************************************************

Submi t spar e par t s dat a f or each di f f er ent i t em of equi pment speci f i ed, af t er appr oval of det ai l dr awi ngs and not l at er t han [ _____] mont hs pr i or t o t he dat e of benef i c i al occupancy. The dat a shal l i ncl ude a compl et e l i s t of par t s and suppl i es, wi t h cur r ent uni t pr i ces and sour ce of suppl y, a r ecommended spar e par t s l i s t f or 1 year of oper at i on, and a l i s t of t he par t s r ecommended by t he manuf act ur er t o be r epl aced on a r out i ne basi s.

PART 2 PRODUCTS

2. 1 STANDARD COMMERCI AL PRODUCTS

a. Pr ovi de mat er i al s and equi pment whi ch ar e st andar d pr oduct s of a manuf act ur er r egul ar l y engaged i n t he manuf act ur i ng of such pr oduct s, t hat ar e of a s i mi l ar mat er i al , desi gn and wor kmanshi p and t hat have been i n sat i sf act or y commer ci al or i ndust r i al use f or 2 year s pr i or t o bi d openi ng.

b. The 2 year use shal l i ncl ude appl i cat i ons of equi pment and mat er i al s under s i mi l ar c i r cumst ances and of s i mi l ar s i ze. The 2 year s exper i ence shal l be sat i sf act or i l y compl et ed by a pr oduct whi ch has been sol d or i s of f er ed f or sal e on t he commer ci al mar ket t hr ough adver t i sement s, manuf act ur er ' s cat al ogs, or br ochur es. Pr oduct s havi ng l ess t han a 2 year f i el d ser vi ce r ecor d wi l l be accept abl e i f a cer t i f i ed r ecor d of sat i sf act or y f i el d oper at i on, f or not l ess t han 6000 hour s excl usi ve of t he manuf act ur er ' s f act or y t est s, can be shown.

c. Pr oduct s shal l be suppor t ed by a ser vi ce or gani zat i on. Syst em component s shal l be envi r onment al l y sui t abl e f or t he i ndi cat ed l ocat i ons. Submi t a cer t i f i ed l i s t of qual i f i ed per manent ser vi ce or gani zat i ons f or suppor t of t he equi pment whi ch i ncl udes t hei r addr esses and qual i f i cat i ons. The ser vi ce or gani zat i ons shal l be r easonabl y conveni ent t o t he equi pment i nst al l at i on and be abl e t o r ender sat i sf act or y ser vi ce t o t he equi pment on a r egul ar and emer gency basi s dur i ng t he war r ant y per i od of t he cont r act .

d. Exposed equi pment movi ng par t s, par t s t hat pr oduce hi gh oper at i ng t emper at ur e, par t s whi ch may be el ect r i cal l y ener gi zed, and par t s t hat may be a hazar d t o oper at i ng per sonnel shal l be i nsul at ed, f ul l y encl osed, guar ded, or f i t t ed wi t h ot her t ypes of saf et y devi ces. I nst al l saf et y devi ces so t hat pr oper oper at i on of equi pment i s not i mpai r ed. Wel di ng and cut t i ng saf et y r equi r ement s shal l be i n accor dance wi t h AWS Z49. 1.

e. Manuf act ur er ' s st andar d cat al og dat a, at l east [ 5 weeks] [ _____] pr i or t o t he pur chase or i nst al l at i on of a par t i cul ar component , hi ghl i ght ed t o show mat er i al , s i ze, opt i ons, per f or mance char t s and cur ves, et c. i n adequat e det ai l t o demonst r at e compl i ance wi t h cont r act r equi r ement s. I ncl ude i n t he dat a manuf act ur er ' s r ecommended i nst al l at i on i nst r uct i ons and pr ocedur es. Pr ovi de dat a f or t he f ol l owi ng component s as a mi ni mum:

( 1) Pi pi ng and Fi t t i ngs( 2) Val ves

SECTI ON 23 23 00 Page 10

Page 11: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

( 3) Pi pi ng Accessor i es( 4) Pi pe Hanger s, I nser t s, and Suppor t s

2. 2 ELECTRI CAL WORK

**************************************************************************NOTE: Use t he f i r st br acket ed st at ement f or Ar my pr oj ect s or t he second f or Navy j obs; del et e t he non- appl i cabl e st at ement .

**************************************************************************

[ El ect r i cal equi pment and wi r i ng shal l be i n accor dance wi t h Sect i on 26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM. Fi el d wi r i ng shal l be i n accor dance wi t h manuf act ur er ' s i nst r uct i ons. ] [ Manual or aut omat i c cont r ol and pr ot ect i ve or s i gnal devi ces r equi r ed f or t he oper at i on speci f i ed and any cont r ol wi r i ng r equi r ed f or cont r ol s and devi ces speci f i ed, but not shown, shal l be pr ovi ded. ]

2. 3 REFRI GERANT PI PI NG SYSTEM

**************************************************************************NOTE: Thi s speci f i cat i on i s wr i t t en pr i mar i l y f or Gr oup A1 r ef r i ger ant s ( i . e. , R- 11, R- 12, R- 22, and R- 134a) . For i nf or mat i on on r ef r i ger ant c l assi f i cat i ons r ef er t o ASHRAE 15 & 34. I f t he pi pi ng syst em i s i nt ended f or ot her r ef r i ger ant s such as R- 123 ( Gr oup B1) or ammoni a ( Gr oup B2) , t hen t he desi gner wi l l have t o r esear ch ASHRAE 15 & 34 and ASME B31. 5 and modi f y t he speci f i cat i on appropriately.

**************************************************************************

Ref r i ger ant pi pi ng, val ves, f i t t i ngs, and accessor i es shal l be i n accor dance wi t h ASHRAE 15 & 34 and ASME B31. 5, except as speci f i ed her ei n. Ref r i ger ant pi pi ng, val ves, f i t t i ngs, and accessor i es shal l be compat i bl e wi t h t he f l ui ds used and capabl e of wi t hst andi ng t he pr essur es and t emper at ur es of t he ser vi ce. Ref r i ger ant pi pi ng, val ves, and accessor i es used f or r ef r i ger ant ser vi ce shal l be c l eaned, dehydr at ed, and seal ed ( capped or pl ugged) pr i or t o shi pment f r om t he manuf act ur er ' s pl ant . Submi t dr awi ngs, at l east [ 5] [ _____] weeks pr i or t o begi nni ng const r uct i on, pr ovi ded i n adequat e det ai l t o demonst r at e compl i ance wi t h cont r act r equi r ement s. Dr awi ngs shal l consi st of :

a. Pi pi ng l ayout s whi ch i dent i f y al l val ves and f i t t i ngs.

b. Pl ans and el evat i ons whi ch i dent i f y c l ear ances r equi r ed f or mai nt enance and oper at i on.

2. 4 PI PE, FI TTI NGS AND END CONNECTI ONS ( JOI NTS)

2. 4. 1 St eel Pi pe

St eel pi pe f or r ef r i ger ant ser vi ce shal l conf or m t o ASTM A53/ A53M, Schedul e 40, Type E or S, Gr ades A or B. Type F pi pe shal l not be used.

2. 4. 1. 1 Wel ded Fi t t i ngs and Connect i ons

But t - wel ded f i t t i ngs shal l conf or m t o ASME B16. 9. Socket - wel ded f i t t i ngs shal l conf or m t o ASME B16. 11. Wel ded f i t t i ngs shal l be i dent i f i ed wi t h t he

SECTI ON 23 23 00 Page 11

Page 12: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

appr opr i at e gr ade and mar ki ng symbol . Wel ded val ves and pi pe connect i ons ( bot h but t - wel ds and socket - wel ds t ypes) shal l conf or m t o ASME B31. 9.

2. 4. 1. 2 Thr eaded Fi t t i ngs and Connect i ons

Thr eaded f i t t i ng shal l conf or m t o ASME B16. 3. Thr eaded val ves and pi pe connect i ons shal l conf or m t o ASME B1. 20. 2MASME B1. 20. 1.

2. 4. 1. 3 Fl anged Fi t t i ngs and Connect i ons

Fl anges shal l conf or m t o ASME B16. 5, Cl ass 150. Gasket s shal l be nonasbest os compr essed mat er i al i n accor dance wi t h ASME B16. 21, 1. 59 mm 1/ 16 i nch t hi ckness, f ul l f ace or sel f - cent er i ng f l at r i ng t ype. Thi s gasket s shal l cont ai n ar ami d f i ber s bonded wi t h st yr ene but adei ne r ubber ( SBR) or ni t r i l e but adei ne r ubber ( NBR) . Bol t s, nut s, and bol t pat t er ns shal l conf or m t o ASME B16. 5. Bol t s shal l be hi gh or i nt er medi at e st r engt h mat er i al conf or mi ng t o ASTM A193/ A193M.

2. 4. 2 St eel Tubi ng

Tubi ng shal l be col d- r ol l ed, el ect r i c- f or ged, wel ded- st eel i n accor dance with ASTM A334/ A334M, Gr ade 1. Joi nt s and f i t t i ngs shal l be socket t ype pr ovi ded by t he st eel t ubi ng manuf act ur er .

2. 4. 3 Copper Tubi ng

Copper t ubi ng shal l conf or m t o ASTM B280 anneal ed or har d dr awn as r equi r ed. Copper t ubi ng shal l be sof t anneal ed wher e bendi ng i s r equi r ed and har d dr awn wher e no bendi ng i s r equi r ed. Sof t anneal ed copper t ubi ng shal l not be used i n s i zes l ar ger t han 35 mm 1- 3/ 8 i nches. Joi nt s shal l be br azed except t hat j oi nt s on l i nes 22 mm 7/ 8 i nchand smal l er may be f l ar ed. Cast copper al l oy f i t t i ngs f or f l ar ed copper t ube shal l conf or m t o ASME B16. 26 and ASTM B62. Wr ought copper and br onze sol der - j oi nt pr essur e f i t t i ngs shal l conf or m t o ASME B16. 22 and ASTM B75/ B75M. Joi nt s and f i t t i ngs f or br azed j oi nt shal l be wr ought - copper or f or ged- br ass sweat f i t t i ngs. Cast sweat - t ype j oi nt s and f i t t i ngs shal l not be al l owed f or br azed j oi nt s. Br ass or br onze adapt er s f or br azed t ubi ng may be used f or connect i ng t ubi ng t o f l anges and t o t hr eaded ends of val ves and equi pment .

2. 4. 4 Solder

Sol der shal l conf or m t o ASTM B32, gr ade Sb5, t i n- ant i mony al l oy f or ser vi ce pr essur es up t o 1034 kPa 150 psi g. Sol der f l ux shal l be l i qui d or past e f or m, non- cor r osi ve and conf or m t o ASTM B813.

2. 4. 5 Br azi ng Fi l l er Met al

Fi l l er met al shal l conf or m t o AWS A5. 8/ A5. 8M, Type BAg- 5 wi t h AWS Type 3 f l ux, except Type BCuP- 5 or BCuP- 6 may be used f or br azi ng copper - t o- copper joints.

2. 5 VALVES

Val ves shal l be desi gned, manuf act ur ed, and t est ed speci f i cal l y f or r ef r i ger ant ser v i ce. Val ve bodi es shal l be of br ass, br onze, st eel , or duct i l e i r on const r uct i on. Val ves 25 mm 1 i nch and smal l er shal l have br azed or socket wel ded connect i ons. Val ves l ar ger t han 25 mm 1 i nch shal l have [ t ongue- and- gr oove f l anged] [ but t wel ded] end connect i ons. Thr eaded end connect i ons shal l not be used, except i n pi l ot pr essur e or gauge l i nes

SECTI ON 23 23 00 Page 12

Page 13: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

wher e mai nt enance di sassembl y i s r equi r ed and wel ded f l anges cannot be used. I nt er nal par t s shal l be r emovabl e f or i nspect i on or r epl acement wi t hout appl y i ng heat or br eaki ng pi pe connect i ons. Val ve st ems exposed t o t he at mospher e shal l be st ai nl ess st eel or cor r osi on r esi st ant met al pl at ed car bon st eel . Di r ect i on of f l ow shal l be l egi bl y and per manent l y i ndi cat ed on t he val ve body. Cont r ol val ve i nl et s shal l be f i t t ed wi t h i nt egr al or adapt ed st r ai ner or f i l t er wher e r ecommended or r equi r ed by t he manuf act ur er . Pur ge, char ge and r ecei ver val ves shal l be of manuf act ur er ' s st andar d conf i gur at i on.

2. 5. 1 Ref r i ger ant St op Val ves

Val ve shal l be t he gl obe or f ul l - por t bal l t ype wi t h a back- seat i ng st em especi al l y packed f or r ef r i ger ant ser vi ce. Val ve packi ng shal l be r epl aceabl e under l i ne pr essur e. Val ve shal l be pr ovi ded wi t h a [ handwheel ] [ or ] [ wr ench] oper at or and a seal cap. Val ve shal l be t he st r ai ght or angl e pat t er n desi gn as i ndi cat ed.

2. 5. 2 Check Val ves

Val ve shal l be t he swi ng or l i f t t ype as r equi r ed t o pr ovi de posi t i ve shut of f at t he di f f er ent i al pr essur e i ndi cat ed. Val ve shal l be pr ovi de wi t h r esi l i ent seat .

2. 5. 3 Li qui d Sol enoi d Val ves

Val ves shal l compl y wi t h ANSI / AHRI 760 and be sui t abl e f or cont i nuous dut y wi t h appl i ed vol t ages 15 per cent under and 5 per cent over nomi nal r at ed vol t age at maxi mum and mi ni mum encount er ed pr essur e and t emper at ur e ser vi ce condi t i ons. Val ves shal l be di r ect - act i ng or pi l ot - oper at i ng t ype, packl ess, except t hat packed st em, seal capped, manual l i f t i ng pr ovi s i ons shal l be f ur ni shed. Sol enoi d coi l s shal l be moi st ur e- pr oof , UL appr oved, t ot al l y encapsul at ed or encapsul at ed and met al j acket ed as r equi r ed. Val ves shal l have saf e wor ki ng pr essur e of 2760 kPa 400 psi and a maxi mum oper at i ng pr essur e di f f er ent i al of at l east 1375 kPa 200 psi at 85 per cent r at ed vol t age. Val ves shal l have an oper at i ng pr essur e di f f er ent i al sui t abl e f or t he r ef r i ger ant used.

2. 5. 4 Expansi on Val ves

Val ve shal l conf or m t o AHRI 751 SI AHRI 750 I - P and ASHRAE 17. Val ve shal l be t he di aphr agm and spr i ng- l oaded t ype wi t h i nt er nal or ext er nal equal i zer s, and bul b and capi l l ar y t ubi ng. Val ve shal l be pr ovi ded wi t h an ext er nal super heat adj ust ment al ong wi t h a seal cap. I nt er nal equal i zer s may be ut i l i zed wher e f l owi ng r ef r i ger ant pr essur e dr op bet ween out l et of t he val ve and i nl et t o t he evapor at or coi l i s negl i gi bl e and pr essur e dr op acr oss t he evapor at or i s l ess t han t he pr essur e di f f er ence cor r espondi ng t o 1 degr ee C 2 degr ees F of sat ur at ed suct i on t emper at ur e at evapor at or condi t i ons. Bul b char ge shal l be det er mi ned by t he manuf act ur er f or t he appl i cat i on and such t hat l i qui d wi l l r emai n i n t he bul b at al l oper at i ng condi t i ons. Gas l i mi t ed l i qui d char ged val ves and ot her val ve devi ces f or l i mi t i ng evapor at or pr essur e shal l not be used wi t hout a di st r i but or or di schar ge t ube or ef f ect i ve means t o pr event l oss of cont r ol when bul b becomes war mer t han val ve body. Pi l ot - oper at ed val ves shal l have a char act er i zed pl ug t o pr ovi de r equi r ed modul at i ng cont r ol . A de- ener gi zed sol enoi d val ve may be used i n t he pi l ot l i ne t o c l ose t he mai n val ve i n l i eu of a sol enoi d val ve i n t he mai n l i qui d l i ne. An i sol at abl e pr essur e gauge shal l be pr ovi ded i n t he pi l ot l i ne, at t he mai n val ve. Aut omat i c pr essur e r educi ng or const ant pr essur e r egul at i ng expansi on val ves may be

SECTI ON 23 23 00 Page 13

Page 14: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

used onl y wher e i ndi ct ed or f or const ant evapor at or l oads.

2. 5. 5 Saf et y Rel i ef Val ves

Val ve shal l be t he t wo- way t ype, unl ess i ndi cat ed ot her wi se. Val ve shal l bear t he ASME code symbol . Val ve capaci t y shal l be cer t i f i ed by t he Nat i onal Boar d of Boi l er and Pr essur e Vessel I nspect or s. Val ve shal l be of an aut omat i cal l y r eseat i ng desi gn af t er act i vat i on.

2. 5. 6 Evapor at or Pr essur e Regul at or s, Di r ect - Act i ng

Val ve shal l i ncl ude a di aphr agm/ spr i ng assembl y, ext er nal pr essur e adj ust ment wi t h seal cap, and pr essur e gauge por t . Val ve shal l mai nt ai n a const ant i nl et pr essur e by bal anci ng i nl et pr essur e on di aphr agm agai nst an adj ust abl e spr i ng l oad. Pr essur e dr op at syst em desi gn l oad shal l not exceed t he pr essur e di f f er ence cor r espondi ng t o a 1 degr ee C 2 degr ees F change i n sat ur at ed r ef r i ger ant t emper at ur e at evapor at or oper at i ng suct i on t emper at ur e. Spr i ng shal l be sel ect ed f or i ndi cat ed maxi mum al l owabl e suct i on pr essur e r ange.

2. 5. 7 Ref r i ger ant Access Val ves

Ref r i ger ant access val ves and hose connect i ons shal l be i n accor dance wi t h AHRI 720.

2. 6 PI PI NG ACCESSORI ES

2. 6. 1 Fi l t er Dr i er s

Dr i er s shal l conf or m t o AHRI 711AHRI 710 I - P. Si zes 15 mm 5/ 8 i nch and l ar ger shal l be t he f ul l f l ow, r epl aceabl e cor e t ype. Si zes 13 mm 1/ 2 i nch and smal l er shal l be t he seal ed t ype. Cor es shal l be of sui t abl e desi ccant t hat wi l l not pl ug, cake, dust , channel , or br eak down, and shal l r emove wat er , aci d, and f or ei gn mat er i al f r om t he r ef r i ger ant . Fi l t er dr i er s shal l be const r uct ed so t hat none of t he desi ccant wi l l pass i nt o t he r ef r i ger ant l i nes. Mi ni mum bur st i ng pr essur e shal l be 10. 3 MPa 1, 500 psi .

2. 6. 2 Si ght Gl ass and Li qui d Level I ndi cat or

2. 6. 2. 1 Assembl y and Component s

Assembl y shal l be pr essur e- and t emper at ur e- r at ed and const r uct ed of mat er i al s sui t abl e f or t he ser vi ce. Gl ass shal l be bor osi l i cat e t ype. Fer r ous component s subj ect t o condensat i on shal l be el ect r o- gal vani zed.

2. 6. 2. 2 Gauge Gl ass

Gauge gl ass shal l i ncl ude t op and bot t om i sol at i on val ves f i t t ed wi t h aut omat i c checks, and packi ng f ol l ower s; r ed- l i ne or gr een- l i ne gauge gl ass; el ast omer or pol ymer packi ng t o sui t t he ser vi ce; and gauge gl ass guard.

2. 6. 2. 3 Bul l ' s- Eye and I nl i ne Si ght Gl ass Ref l ex Lens

Bul l ' s- eye and i nl i ne s i ght gl ass r ef l ex l ens shal l be pr ovi ded f or dead- end l i qui d ser vi ce. For pi pe l i ne mount i ng, t wo pl ai n l enses i n one body sui t abl e f or backl i ght ed v i ewi ng shal l be pr ovi ded.

SECTI ON 23 23 00 Page 14

Page 15: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

2. 6. 2. 4 Moi st ur e I ndi cat or

I ndi cat or shal l be a sel f - r ever si bl e act i on, moi st ur e r eact i ve, col or changi ng medi a. I ndi cat or shal l be f ur ni shed wi t h f ul l - col or - pr i nt i ng t ag cont ai ni ng col or , moi st ur e and t emper at ur e cr i t er i a. Unl ess ot her wi se i ndi cat ed, t he moi st ur e i ndi cat or shal l be an i nt egr al par t of each cor r espondi ng s i ght gl ass.

2. 6. 3 Vi br at i on Dampener s

Dampener s shal l be of t he al l - met al l i c bel l ows and woven- wi r e t ype.

2. 6. 4 Fl exi bl e Pi pe Connect or s

Connect or shal l be a composi t e of i nt er i or cor r ugat ed phosphor br onze or Type 300 Ser i es st ai nl ess st eel , as r equi r ed f or f l ui d ser vi ce, wi t h ext er i or r ei nf or cement of br onze, st ai nl ess st eel or monel wi r e br ai d. Assembl y shal l be const r uct ed wi t h a saf et y f act or of not l ess t han 4 at 150 degr ees C300 degr ees F. Unl ess ot her wi se i ndi cat ed, t he l engt h of a f l exi bl e connect or shal l be as r ecommended by t he manuf act ur er f or t he ser vi ce i nt ended.

2. 6. 5 Strainers

St r ai ner s used i n r ef r i ger ant ser vi ce shal l have br ass or cast i r on body, Y- or angl e- pat t er n, c l eanabl e, not l ess t han 60- mesh noncor r odi ng scr een of an ar ea t o pr ovi de net f r ee ar ea not l ess t han t en t i mes t he pi pe di amet er wi t h pr essur e r at i ng compat i bl e wi t h t he r ef r i ger ant ser vi ce. Scr eens shal l be st ai nl ess st eel or monel and r ei nf or ced spr i ng- l oaded wher e necessar y f or bypass- pr oof const r uct i on.

2. 6. 6 Pr essur e and Vacuum Gauges

Gauges shal l conf or m t o ASME B40. 100 and shal l be pr ovi ded wi t h t hr ot t l i ng t ype needl e val ve or a pul sat i on dampener and shut - of f val ve. Gauge shal l be a mi ni mum of 85 mm 3- 1/ 2 i nches i n di amet er wi t h a r ange f r om 0 kPa 0 psi g t o appr oxi mat el y 1. 5 t i mes t he maxi mum syst em wor ki ng pr essur e. Each gauge r ange shal l be sel ect ed so t hat at nor mal oper at i ng pr essur e, t he needl e i s wi t hi n t he mi ddl e- t hi r d of t he r ange.

2. 6. 7 Temper at ur e Gauges

Temper at ur e gauges shal l be t he i ndust r i al dut y t ype and be pr ovi ded f or t he r equi r ed t emper at ur e r ange. Gauges shal l have Cel s i us scal e i n 1 degr ee Fahr enhei t scal e i n 2 degr ees gr aduat i ons scal e ( bl ack number s) on a whi t e f ace. The poi nt er shal l be adj ust abl e. Ri gi d st em t ype t emper at ur e gauges shal l be pr ovi ded i n t her mal wel l s l ocat ed wi t hi n 1. 5 m 5 f eet of t he f i ni shed f l oor . Uni ver sal adj ust abl e angl e t ype or r emot e el ement t ype t emper at ur e gauges shal l be pr ovi ded i n t her mal wel l s l ocat ed 1. 5 t o 2. 1 m 5 t o 7 f eet above t he f i ni shed f l oor . Remot e el ement t ype t emper at ur e gauges shal l be pr ovi ded i n t her mal wel l s l ocat ed 2. 1 m 7 f eet above t he f i ni shed f l oor .

2. 6. 7. 1 St em Cased- Gl ass

St em cased- gl ass case shal l be pol i shed st ai nl ess st eel or cast al umi num, 229 mm 9 i nches l ong, wi t h c l ear acr yl i c l ens, and non- mer cur y f i l l ed gl ass t ube wi t h i ndi cat i ng- f l ui d col umn.

SECTI ON 23 23 00 Page 15

Page 16: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

2. 6. 7. 2 Bi met al l i c Di al

Bi met al l i c di al t ype case shal l be not l ess t han 89 mm 3- 1/ 2 i nches, st ai nl ess st eel , and shal l be her met i cal l y seal ed wi t h c l ear acr yl i c l ens. Bi met al l i c el ement shal l be s i l i cone dampened and uni t f i t t ed wi t h ext er nal cal i br at or adj ust ment . Accur acy shal l be one per cent of di al r ange.

2. 6. 7. 3 Li qui d- , Sol i d- , and Vapor - Fi l l ed Di al

Li qui d- , sol i d- , and vapor - f i l l ed di al t ype cases shal l be not l ess t han 89 mm 3- 1/ 2 i nches, st ai nl ess st eel or cast al umi num wi t h c l ear acr yl i c l ens. Fi l l shal l be nonmer cur y, sui t abl e f or encount er ed cr oss- ambi ent s, and connect i ng capi l l ar y t ubi ng shal l be doubl e- br ai ded br onze.

2. 6. 7. 4 Ther mal Wel l

Ther mal wel l shal l be i dent i cal s i ze, 13 or 19 mm 1/ 2 or 3/ 4 i nch NPT connect i on, br ass or st ai nl ess st eel . Wher e t est wel l s ar e i ndi cat ed, pr ovi de capt i ve pl ug- f i t t ed t ype 13 mm 1/ 2 i nch NPT connect i on sui t abl e f or use wi t h ei t her engr aved st em or st andar d separ abl e socket t her momet er or t her most at . Mer cur y shal l not be used i n t her momet er s. Ext ended neck t her mal wel l s shal l be of suf f i c i ent l engt h t o c l ear i nsul at i on t hi ckness by 25 mm 1 i nch.

2. 6. 8 Pi pe Hanger s, I nser t s, and Suppor t s

Pi pe hanger s, i nser t s, gui des, and suppor t s shal l conf or m t o MSS SP- 58.

2. 6. 9 Escutcheons

Escut cheons shal l be chr omi um- pl at ed i r on or chr omi um- pl at ed br ass, ei t her one pi ece or spl i t pat t er n, hel d i n pl ace by i nt er nal spr i ng t ensi on or set screws.

2. 7 FABRICATION

2. 7. 1 Fact or y Coat i ng

**************************************************************************NOTE: For equi pment t o be i nst al l ed out door s, adequat e pr ot ect i on wi l l be speci f i ed. Manuf act ur er s must submi t evi dence t hat uni t speci men have passed t he speci f i ed sal t spr ay f og t est . A 125 hour t est wi l l be speci f i ed i n a noncor r osi ve envi r onment and a 500 hour t est wi l l be speci f i ed i n a cor r osi ve envi r onment .

**************************************************************************

Unl ess ot her wi se speci f i ed, equi pment and component i t ems, when f abr i cat ed f r om f er r ous met al , shal l be f act or y f i ni shed wi t h t he manuf act ur er ' s st andar d f i ni sh, except t hat i t ems l ocat ed out s i de of bui l di ngs shal l have weat her r esi st ant f i ni shes t hat wi l l wi t hst and [ 125] [ 500] hour s exposur e t o t he sal t spr ay t est speci f i ed i n ASTM B117 usi ng a 5 per cent sodi um chl or i de sol ut i on. I mmedi at el y af t er compl et i on of t he t est , t he speci men shal l show no si gns of bl i s t er i ng, wr i nkl i ng, cr acki ng, or l oss of adhesi on and no s i gn of r ust cr eepage beyond 3 mm 1/ 8 i nch on ei t her s i de of t he scr at ch mar k. Cut edges of gal vani zed sur f aces wher e hot - di p gal vani zed sheet st eel i s used shal l be coat ed wi t h a z i nc- r i ch coat i ng conf or mi ng t o ASTM D520, Type I .

SECTI ON 23 23 00 Page 16

Page 17: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

2. 7. 2 Fact or y Appl i ed I nsul at i on

[ Ref r i ger ant suct i on l i nes bet ween t he cool er and each compr essor [ and col d gas i nl et connect i ons t o gas cool ed mot or s] ] [ Ref r i ger ant pumps and exposed chi l l ed wat er l i nes on absor pt i on chi l l er s] shal l be i nsul at ed wi t h not l ess t han 19 mm 3/ 4 i nch t hi ck uni cel l ul ar pl ast i c f oam. Fact or y i nsul at ed i t ems i nst al l ed out door s ar e not r equi r ed t o be f i r e- r at ed. As a mi ni mum, f act or y i nsul at ed i t ems i nst al l ed i ndoor s shal l have a f l ame spr ead i ndex no hi gher t han 75 and a smoke devel oped i ndex no hi gher t han 150. Fact or y i nsul at ed i t ems ( no j acket ) i nst al l ed i ndoor s and whi ch ar e l ocat ed i n ai r pl enums, i n cei l i ng spaces, and i n at t i c spaces shal l have a f l ame spr ead i ndex no hi gher t han 25 and a smoke devel oped i ndex no hi gher t han 50. Fl ame spr ead and smoke devel oped i ndexes shal l be det er mi ned by ASTM E84. I nsul at i on shal l be t est ed i n t he same densi t y and i nst al l ed t hi ckness as t he mat er i al t o be used i n t he act ual const r uct i on. Mat er i al suppl i ed by a manuf act ur er wi t h a j acket shal l be t est ed as a composi t e mat er i al . Jacket s, f aci ngs, and adhesi ves shal l have a f l ame spr ead i ndex no hi gher t han 25 and a smoke devel oped i ndex no hi gher t han 50 when t est ed i n accor dance wi t h ASTM E84.

PART 3 EXECUTI ON

3. 1 EXAMINATION

Af t er becomi ng f ami l i ar wi t h al l det ai l s of t he wor k, per f or m a ver i f i cat i on of di mensi ons i n t he f i el d. Submi t a l et t er , at l east [ 2] [ _____] weeks pr i or t o begi nni ng const r uct i on, i nc l udi ng t he dat e t he s i t e was v i s i t ed, conf or mat i on of exi st i ng condi t i ons, and any di scr epanci es f ound bef or e per f or mi ng any wor k.

3. 2 INSTALLATION

**************************************************************************NOTE: Bel owgr ound r ef r i ger ant pi pi ng shoul d be avoi ded i f at al l possi bl e. Di r ect bur i ed r ef r i ger ant pi pi ng wi l l not be i nst al l ed under any c i r cumst ances. I n t he event t hat bel owgr ound pi pe r out i ng i s t he onl y al t er nat i ve, t he pi pi ng wi l l be r out ed t hr ough an accessi bl e t r ench syst em ( i . e. concr et e, f i ber gl ass, PVC, et c) . The desi gner wi l l speci f i cal l y det ai l t he t r ench desi gn as wel l as f ul l y det ai l t he pi pi ng t echni ques necessar y t o accommodat e oi l c i r cul at i on at bot h f ul l and par t l oad condi t i ons. Oi l c i r cul at i on i s ext r emel y cr i t i cal t o t he successf ul oper at i on of any r ef r i ger ant syst em. Desi gner s wi l l avoi d cr eat i ng any oi l t r aps wi t hi n a r ef r i ger ant pi pi ng syst em.

**************************************************************************

Pi pe and f i t t i ng i nst al l at i on shal l conf or m t o t he r equi r ement s of ASME B31. 1. Cut pi pe accur at el y t o measur ement s est abl i shed at t he j obsi t e, and wor k i nt o pl ace wi t hout spr i ngi ng or f or c i ng, compl et el y c l ear i ng al l wi ndows, door s, and ot her openi ngs. Cut t i ng or ot her weakeni ng of t he bui l di ng st r uct ur e t o f aci l i t at e pi pi ng i nst al l at i on ar e not per mi t t ed wi t hout wr i t t en appr oval . Cut pi pe or t ubi ng squar e, r emover emoved by r eami ng, and per mi t f r ee expansi on and cont r act i on wi t hout causi ng damage t o t he bui l di ng st r uct ur e, pi pe, j oi nt s, or hanger s.

SECTI ON 23 23 00 Page 17

Page 18: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

3. 2. 1 Di r ect i onal Changes

Make changes i n di r ect i on wi t h f i t t i ngs, except t hat bendi ng of pi pe 100 mm 4 i nches and smal l er i s per mi t t ed, pr ovi ded a pi pe bender i s used and wi de weep bends ar e f or med. Mi t er i ng or not chi ng pi pe or ot her s i mi l ar const r uct i on t o f or m el bows or t ees i s not per mi t t ed. The cent er l i ne r adi us of bends shal l not be l ess t han 6 di amet er s of t he pi pe. Bent pi pe showi ng k i nks, wr i nkl es, f l at t eni ng, or ot her mal f or mat i ons wi l l not be accepted.

3. 2. 2 Funct i onal Requi r ement s

Pi pi ng shal l be i nst al l ed 4 mm/ m 1/ 2 i nch/ 10 f eet of pi pe i n t he di r ect i on of f l ow t o ensur e adequat e oi l dr ai nage. Open ends of r ef r i ger ant l i nes or equi pment shal l be pr oper l y capped or pl ugged dur i ng i nst al l at i on t o keep moi st ur e, di r t , or ot her f or ei gn mat er i al out of t he syst em. Pi pi ng shal l r emai n capped unt i l i nst al l at i on. Equi pment pi pi ng shal l be i n accor dance wi t h t he equi pment manuf act ur er ' s r ecommendat i ons and t he cont r act dr awi ngs. Equi pment and pi pi ng ar r angement s shal l f i t i nt o space al l ot t ed and al l ow adequat e accept abl e c l ear ances f or i nst al l at i on, r epl acement , ent r y, ser vi c i ng, and mai nt enance.

3. 2. 3 Fi t t i ngs and End Connect i ons

3. 2. 3. 1 Thr eaded Connect i ons

Make t hr eaded connect i ons wi t h t aper ed t hr eads and make t i ght wi t h PTFE t ape compl yi ng wi t h ASTM D3308 or equi val ent t hr ead- j oi nt compound appl i ed t o t he mal e t hr eads onl y. Show not mor e t han t hr ee t hr eads af t er t he j oi nt i s made.

3. 2. 3. 2 Br azed Connect i ons

Per f or m br azi ng i n accor dance wi t h AWS BRH, except as modi f i ed her ei n. Dur i ng br azi ng, f i l l t he pi pe and f i t t i ngs wi t h a pr essur e r egul at ed i ner t gas, such as ni t r ogen, t o pr event t he f or mat i on of scal e. Bef or e br azi ng copper j oi nt s, c l ean bot h t he out s i de of t he t ube and t he i nsi de of t he f i t t i ng wi t h a wi r e f i t t i ng br ush unt i l t he ent i r e j oi nt sur f ace i s br i ght and cl ean. Do not use br azi ng f l ux. Remove sur pl us br azi ng mat er i al at al l j oi nt s. Make st eel t ubi ng j oi nt s i n accor dance wi t h t he manuf act ur er ' s r ecommendat i ons. Pai nt j oi nt s i n st eel t ubi ng wi t h t he same mat er i al as t he baked- on coat i ng wi t hi n 8 hour s af t er j oi nt s ar e made. Pr ot ect t ubi ng agai nst oxi dat i on dur i ng br azi ng by cont i nuous pur gi ng of t he i nsi de of t he pi pi ng usi ng ni t r ogen. Suppor t pi pi ng pr i or t o br azi ng and do not spr i ng or f or ce.

3. 2. 3. 3 Wel ded Connect i ons

Wel ded j oi nt s i n st eel r ef r i ger ant pi pi ng shal l be f usi on- wel ded. Br anch connect i ons shal l be made wi t h wel di ng t ees or f or ged wel di ng br anch out l et s. Pi pe shal l be t hor oughl y c l eaned of al l scal e and f or ei gn mat t er bef or e t he pi pi ng i s assembl ed. Dur i ng wel di ng t he pi pe and f i t t i ngs shal l be f i l l ed wi t h an i ner t gas, such as ni t r ogen, t o pr event t he f or mat i on of scal e. Bevel i ng, al i gnment , heat t r eat ment , and i nspect i on of wel d shal l conf or m t o ASME B31. 1. Wel d def ect s shal l be r emoved and r ewel ded at no addi t i onal cost t o t he Gover nment . El ect r odes shal l be st or ed and dr i ed i n accor dance wi t h AWS D1. 1/ D1. 1M or as r ecommended by t he manuf act ur er . El ect r odes t hat have been wet t ed or t hat have l ost any of t hei r coat i ng shal l not be used.

SECTI ON 23 23 00 Page 18

Page 19: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

3. 2. 3. 4 Fl ar ed Connect i ons

When f l ar ed connect i ons ar e used, a sui t abl e l ubr i cant shal l be used bet ween t he back of t he f l ar e and t he nut i n or der t o avoi d t ear i ng t he f l ar e whi l e t i ght eni ng t he nut .

3. 2. 3. 5 Fl anged Connect i ons

When st eel r ef r i ger ant pi pi ng i s used, uni on or f l ange j oi nt s shal l be pr ovi ded i n each l i ne i mmedi at el y pr ecedi ng t he connect i on t o each pi ece of equi pment r equi r i ng mai nt enance, such as compr essor s, coi l s , chi l l er s, cont r ol val ves, and ot her s i mi l ar i t ems. Fl anged j oi nt s shal l be assembl ed squar e end t i ght wi t h mat ched f l anges, gasket s, and bol t s. Gasket s shal l be sui t abl e f or use wi t h t he r ef r i ger ant s t o be handl ed.

3. 2. 4 Valves

3. 2. 4. 1 General

Ref r i ger ant st op val ves shal l be i nst al l ed on each si de of each pi ece of equi pment such as compr essor s condenser s, evapor at or s, r ecei ver s, and ot her s i mi l ar i t ems i n mul t i pl e- uni t i nst al l at i on, t o pr ovi de par t i al syst em i sol at i on as r equi r ed f or mai nt enance or r epai r . St op val ves shal l be i nst al l ed wi t h st ems hor i zont al unl ess ot her wi se i ndi cat ed. Bal l val ves shal l be i nst al l ed wi t h st ems posi t i oned t o f aci l i t at e oper at i on and mai nt enance. I sol at i ng val ves f or pr essur e gauges and swi t ches shal l be ext er nal t o t her mal i nsul at i on. Saf et y swi t ches shal l not be f i t t ed wi t h i sol at i on val ves. Fi l t er dr yer s havi ng access por t s may be consi der ed a poi nt of i sol at i on. Pur ge val ves shal l be pr ovi ded at al l poi nt s of syst ems wher e accumul at ed noncondensabl e gases woul d pr event pr oper syst em oper at i on. Val ves shal l be f ur ni shed t o mat ch l i ne s i ze, unl ess ot her wi se i ndi cat ed or appr oved.

3. 2. 4. 2 Expansi on Val ves

Expansi on val ves shal l be i nst al l ed wi t h t he t her most at i c expansi on val ve bul b l ocat ed on t op of t he suct i on l i ne when t he suct i on l i ne i s l ess t han 54 mm 2- 1/ 8 i nches i n di amet er and at t he 4 o' c l ock or 8 o' c l ock posi t i on on l i nes l ar ger t han 54 mm 2- 1/ 8 i nches. The bul b shal l be secur el y f ast ened wi t h t wo cl amps. The bul b shal l be i nsul at ed. The bul b shal l i nst al l ed i n a hor i zont al por t i on of t he suct i on l i ne, i f possi bl e, wi t h t he pi gt ai l on t he bot t om. I f t he bul b must be i nst al l ed i n a ver t i cal l i ne, t he bul b t ubi ng shal l be f aci ng up.

3. 2. 4. 3 Val ve I dent i f i cat i on

**************************************************************************NOTE: Del et e l ast t wo sent ences when i dent i f i cat i on t ags ar e not consi der ed necessar y i n smal l pr oj ect s.

**************************************************************************

Each syst em val ve, i ncl udi ng t hose whi ch ar e par t of a f act or y assembl y, shal l be t agged. Tags shal l be i n al phanumer i c sequence, pr ogr essi ng i n di r ect i on of f l ui d f l ow. Tags shal l be embossed, engr aved, or st amped pl ast i c or nonf er r ous met al of var i ous shapes, s i zed appr oxi mat el y 34 mm 1- 3/ 8 i nch di amet er , or equi val ent di mensi on, subst ant i al l y at t ached t o a component or i mmedi at el y adj acent t her et o. Tags shal l be at t ached wi t h nonf er r ous, heavy dut y, bead or l i nk chai n, 14 gauge 14 gauge anneal ed

SECTI ON 23 23 00 Page 19

Page 20: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

wi r e, nyl on cabl e bands or as appr oved. Tag number s shal l be r ef er enced i n Oper at i on and Mai nt enance Manual s and syst em di agr ams.

3. 2. 5 Vi br at i on Damper s

Vi br at i on damper shal l be pr ovi ded i n t he suct i on and di schar ge l i nes on spr i ng mount ed compr essor s. Vi br at i on damper s shal l be i nst al l ed par al l el wi t h t he shaf t of t he compr essor and shal l be anchor ed f i r ml y at t he upst r eam end on t he suct i on l i ne and t he downst r eam end i n t he di schar ge line.

3. 2. 6 Strainers

St r ai ner s shal l be pr ovi ded i mmedi at el y ahead of sol enoi d val ves and expansi on devi ces. St r ai ner s may be an i nt egr al par t of an expansi on val ve.

3. 2. 7 Fi l t er Dr yer

A l i qui d l i ne f i l t er dr yer shal l be pr ovi ded on each r ef r i ger ant c i r cui t l ocat ed such t hat al l l i qui d r ef r i ger ant passes t hr ough a f i l t er dr yer . Dr yer s shal l be s i zed i n accor dance wi t h t he manuf act ur er ' s r ecommendat i ons f or t he syst em i n whi ch i t i s i nst al l ed. Dr yer s shal l be i nst al l ed such t hat i t can be i sol at ed f r om t he syst em, t he i sol at ed por t i on of t he syst em evacuat ed, and t he f i l t er dr yer r epl aced. Dr yer s shal l be i nst al l ed i n t he hor i zont al posi t i on except r epl aceabl e cor e f i l t er dr yer s may be i nst al l ed i n t he ver t i cal posi t i on wi t h t he access f l ange on t he bot t om.

3. 2. 8 Si ght Gl ass

A moi st ur e i ndi cat i ng s i ght gl ass shal l be i nst al l ed i n al l r ef r i ger ant c i r cui t s down st r eam of al l f i l t er dr yer s and wher e i ndi cat ed. Si t e gl asses shal l be f ul l l i ne s i ze.

3. 2. 9 Di schar ge Li ne Oi l Separ at or

Di schar ge l i ne oi l separ at or shal l be pr ovi ded i n t he di schar ge l i ne f r om each compr essor . Oi l r et ur n l i ne shal l be connect ed t o t he compr essor as r ecommended by t he compr essor manuf act ur er .

3. 2. 10 Accumulator

**************************************************************************NOTE: Suct i on l i ne accumul at or shoul d be i ncl uded under cer t ai n spl i t syst em appl i cat i ons, such as havi ng ext ended r ef r i ger ant l i nes, 15 m 50 f eet or l onger . I f accumul at or i s not used t hen del et e t hi s paragraph.

**************************************************************************

Accumul at or s shal l be pr ovi ded i n t he suct i on l i ne t o each compr essor .

3. 2. 11 Fl exi bl e Pi pe Connect or s

Connect or s shal l be i nst al l ed per pendi cul ar t o l i ne of mot i on bei ng i sol at ed. Pi pi ng f or equi pment wi t h bi di r ect i onal mot i on shal l be f i t t ed wi t h t wo f l exi bl e connect or s, i n per pendi cul ar pl anes. Rei nf or ced el ast omer f l exi bl e connect or s shal l be i nst al l ed i n accor dance wi t h manuf act ur er ' s i nst r uct i ons. Pi pi ng gui des and r est r ai nt s r el at ed t o f l exi bl e connect or s shal l be pr ovi ded as r equi r ed.

SECTI ON 23 23 00 Page 20

Page 21: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

3. 2. 12 Temper at ur e Gauges

Temper at ur e gauges shal l be l ocat ed speci f i cal l y on, but not l i mi t ed t o t he f ol l owi ng: [ t he sensi ng el ement of each aut omat i c t emper at ur e cont r ol devi ce wher e a t her momet er i s not an i nt egr al par t t her eof ] [ t he l i qui d l i ne l eavi ng a r ecei ver ] [ and] [ t he suct i on l i ne at each evapor at or or l i qui d cool er ] . Ther mal wel l s f or i nser t i on t her momet er s and t her most at s shal l ext end beyond t her mal i nsul at i on sur f ace not l ess t han 25 mm 1 i nch.

3. 2. 13 Pi pe Hanger s, I nser t s, and Suppor t s

Pi pe hanger s, i nser t s, and suppor t s shal l conf or m t o MSS SP- 58, except as modi f i ed her ei n. Pi pe hanger t ypes 5, 12, and 26 shal l not be used. Hanger s used t o suppor t pi pi ng 50 mm 2 i nches and l ar ger shal l be f abr i cat ed t o per mi t adequat e adj ust ment af t er er ect i on whi l e st i l l suppor t i ng t he l oad. Pi pi ng subj ect ed t o ver t i cal movement , when oper at i ng t emper at ur es exceed ambi ent t emper at ur es, shal l be suppor t ed by var i abl e spr i ng hanger s and suppor t s or by const ant suppor t hanger s.

3. 2. 13. 1 Hangers

Do not use Type 3 on i nsul at ed pi pi ng. Type 24 may be used onl y on t r apeze hanger syst ems or on f abr i cat ed f r ames.

3. 2. 13. 2 Inserts

Secur e Type 18 i nser t s t o concr et e f or ms bef or e concr et e i s pl aced. Cont i nuous i nser t s whi ch al l ow mor e adj ust ment s may be used i f t hey ot her wi se meet t he r equi r ement s f or Type 18 i nser t s.

3. 2. 13. 3 C-Clamps

Tor que Type 19 and 23 C- cl amps i n accor dance wi t h MSS SP- 58 and have bot h l ocknut s and r et ai ni ng devi ces, f ur ni shed by t he manuf act ur er . Fi el d- f abr i cat ed C- cl amp bodi es or r et ai ni ng devi ces ar e not accept abl e.

3. 2. 13. 4 Angl e At t achment s

Type 20 at t achment s used on angl es and channel s shal l be f ur ni shed wi t h an added mal l eabl e- i r on heel pl at e or adapt er .

3. 2. 13. 5 Saddl es and Shi el ds

Wher e Type 39 saddl e or Type 40 shi el d ar e per mi t t ed f or a par t i cul ar pi pe at t achment appl i cat i on, t he Type 39 saddl e, connect ed t o t he pi pe, shal l be used on al l pi pe 100 mm 4 i nches and l ar ger when t he t emper at ur e of t he medi um i s 16 degr ees C 60 degr ees F or hi gher . Type 40 shi el ds shal l be used on al l pi pi ng l ess t han 100 mm 4 i nches and al l pi pi ng 100 mm 4 i nches and l ar ger car r y i ng medi um l ess t han 16 degr ees C 60 degr ees F. A hi gh densi t y i nsul at i on i nser t of cel l ul ar gl ass shal l be used under t he Type 40 shi el d f or pi pi ng 50 mm 2 i nches and l ar ger .

3. 2. 13. 6 Hor i zont al Pi pe Suppor t s

Hor i zont al pi pe suppor t s shal l be spaced as speci f i ed i n MSS SP- 58 and a suppor t shal l be i nst al l ed not over 300 mm 1 f oot f r om t he pi pe f i t t i ng j oi nt at each change i n di r ect i on of t he pi pi ng. Pi pe suppor t s shal l be spaced not over 1. 5 m 5 f eet apar t at val ves. [ Pi pe hanger l oads suspended

SECTI ON 23 23 00 Page 21

Page 22: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

f r om st eel j oi st wi t h hanger l oads bet ween panel poi nt s i n excess of 23 kg 50 pounds shal l have t he excess hanger l oads suspended f r om panel poi nt s. ]

3. 2. 13. 7 Ver t i cal Pi pe Suppor t s

Ver t i cal pi pe shal l be suppor t ed at each f l oor , except at s l ab- on- gr ade, and at i nt er val s of not mor e t han 4. 5 m 15 f eet not mor e t han 2. 4 m 8 f eet f r om end of r i ser s, and at vent t er mi nat i ons.

3. 2. 13. 8 Pi pe Gui des

Type 35 gui des usi ng, st eel , r ei nf or ced pol yt et r af l uor oet hyl ene ( PTFE) or gr aphi t e s l i des shal l be pr ovi ded wher e r equi r ed t o al l ow l ongi t udi nal pi pe movement . Lat er al r est r ai nt s shal l be pr ovi ded as r equi r ed. Sl i de mat er i al s shal l be sui t abl e f or t he syst em oper at i ng t emper at ur es, at mospher i c condi t i ons, and bear i ng l oads encount er ed.

3. 2. 13. 9 St eel Sl i des

Wher e st eel s l i des do not r equi r e pr ovi s i ons f or r est r ai nt of l at er al movement , an al t er nat e gui de met hod may be used. On pi pi ng 100 mm 4 i nches and l ar ger , a Type 39 saddl e shal l be used. On pi pi ng under 100 mm 4 i nches, a Type 40 pr ot ect i on shi el d may be at t ached t o t he pi pe or i nsul at i on and f r eel y r est on a st eel s l i de pl at e.

3. 2. 13. 10 Hi gh Temper at ur e Gui des wi t h Cr adl es

Wher e t her e ar e hi gh syst em t emper at ur es and wel di ng t o pi pi ng i s not desi r abl e, t hen t he Type 35 gui de shal l i ncl ude a pi pe cr adl e, wel ded t o t he gui de st r uct ur e and st r apped secur el y t o t he pi pe. The pi pe shal l be separ at ed f r om t he s l i de mat er i al by at l east 100 mm 4 i nches, or by an amount adequat e f or t he i nsul at i on, whi chever i s gr eat er .

3. 2. 13. 11 Mul t i pl e Pi pe Runs

I n t he suppor t of mul t i pl e pi pe r uns on a common base member , a c l i p or c l amp shal l be used wher e each pi pe cr osses t he base suppor t member . Spaci ng of t he base suppor t member s shal l not exceed t he hanger and suppor t spaci ng r equi r ed f or an i ndi v i dual pi pe i n t he mul t i pl e pi pe r un.

3. 2. 13. 12 Sei smi c Requi r ement s

**************************************************************************NOTE: Pr ovi de sei smi c det ai l s , i f a Gover nment desi gner ( ei t her Cor ps of f i ce of A/ E) i s t he Engi neer of Recor d, and show on t he dr awi ngs. Del et e t he br acket ed phr ase " as shown on t he dr awi ngs" i f no sei smi c det ai l s ar e pr ovi ded. UFC 3- 310- 04 SEI SMI C DESI GN FOR BUI LDI NGS and Sect i ons 13 48 00 [ SEI SMI C] BRACI NG FOR MI SCELLANEOUS EQUI PMENT and 23 05 48. 19 [ SEI SMI C] BRACI NG FOR HVAC or 22 05 48. 00 20 MECHANI CAL SOUND, VI BRATI ON, AND SEI SMI C CONTROL pr oper l y edi t ed, must be i ncl uded i n t he cont r act document s.

**************************************************************************

Pi pi ng and at t ached val ves shal l be suppor t ed and br aced t o r esi st sei smi c l oads as speci f i ed under UFC 3- 310- 04 and Sect i ons 13 48 00 [ SEI SMI C] BRACI NG FOR MI SCELLANEOUS EQUI PMENT and [ 23 05 48. 19 [ SEI SMI C] BRACI NG FOR

SECTI ON 23 23 00 Page 22

Page 23: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

HVAC] [ 22 05 48. 00 20 MECHANI CAL SOUND, VI BRATI ON, AND SEI SMI C CONTROL] [ as shown on t he dr awi ngs] . St r uct ur al st eel r equi r ed f or r ei nf or cement t o pr oper l y suppor t pi pi ng, header s, and equi pment but not shown shal l be pr ovi ded under t hi s sect i on. Mat er i al used f or suppor t shal l be as speci f i ed under Sect i on 05 12 00 STRUCTURAL STEEL.

3. 2. 13. 13 St r uct ur al At t achment s

At t achment t o bui l di ng st r uct ur e concr et e and masonr y shal l be by cast - i n concr et e i nser t s, bui l t - i n anchor s, or masonr y anchor devi ces. I nser t s and anchor s shal l be appl i ed wi t h a saf et y f act or not l ess t han 5. Suppor t s shal l not be at t ached t o met al decki ng. Masonr y anchor s f or over head appl i cat i ons shal l be const r uct ed of f er r ous mat er i al s onl y. St r uct ur al st eel br acket s r equi r ed t o suppor t pi pi ng, header s, and equi pment , but not shown, shal l be pr ovi ded under t hi s sect i on. Mat er i al used f or suppor t shal l be as speci f i ed under Sect i on 05 12 00 STRUCTURAL STEEL.

3. 2. 14 Pi pe Al i gnment Gui des

Pi pe al i gnment gui des shal l be pr ovi ded wher e i ndi cat ed f or expansi on l oops, of f set s, and bends and as r ecommended by t he manuf act ur er f or expansi on j oi nt s, not t o exceed 1. 5 m 5 f eet on each si de of each expansi on j oi nt , and i n l i nes 100 mm 4 i nches or smal l er not mor e t han 600 mm 2 f eet on each si de of t he j oi nt .

3. 2. 15 Pi pe Anchor s

Anchor s shal l be pr ovi ded wher ever necessar y or i ndi cat ed t o l ocal i ze expansi on or t o pr event undue st r ai n on pi pi ng. Anchor s shal l consi st of heavy st eel col l ar s wi t h l ugs and bol t s f or c l ampi ng and at t achi ng anchor br aces, unl ess ot her wi se i ndi cat ed. Anchor br aces shal l be i nst al l ed i n t he most ef f ect i ve manner t o secur e t he desi r ed r esul t s usi ng t ur nbuckl es wher e r equi r ed. Suppor t s, anchor s, or st ays shal l not be at t ached wher e t hey wi l l i nj ur e t he st r uct ur e or adj acent const r uct i on dur i ng i nst al l at i on or by t he wei ght of expansi on of t he pi pel i ne. Wher e pi pe and condui t penet r at i ons of vapor bar r i er seal ed sur f aces occur , t hese i t ems shal l be anchor ed i mmedi at el y adj acent t o each penet r at ed sur f ace, t o pr ovi de essent i al l y zer o movement wi t hi n penet r at i on seal . Det ai l ed dr awi ngs of pi pe anchor s shal l be submi t t ed f or appr oval bef or e i nst al l at i on.

3. 2. 16 Bui l di ng Sur f ace Penet r at i ons

Sl eeves shal l not be i nst al l ed i n st r uct ur al member s except wher e i ndi cat ed or appr oved. Sl eeves i n nonl oad bear i ng sur f aces shal l be gal vani zed sheet met al , conf or mi ng t o ASTM A653/ A653M, Coat i ng Cl ass G- 90, 1. 0 mm ( 20 gauge) 20 gauge. Sl eeves i n l oad bear i ng sur f aces shal l be uncoat ed car bon st eel pi pe, conf or mi ng t o ASTM A53/ A53M, [ Schedul e 30] [ Schedul e 20] [ St andar d wei ght ] . Seal ant s shal l be appl i ed t o moi st ur e and oi l - f r ee sur f aces and el ast omer s t o not l ess t han 13 mm 1/ 2 i nch dept h. Sl eeves shal l not be i nst al l ed i n st r uct ur al member s.

3. 2. 16. 1 Ref r i ger at ed Space

Ref r i ger at ed space bui l di ng sur f ace penet r at i ons shal l be f i t t ed wi t h s l eeves f abr i cat ed f r om hand- l ay- up or hel i cal l y wound, f i br ous gl ass r ei nf or ced pol yest er or epoxy r esi n wi t h a mi ni mum t hi ckness equal t o equi val ent s i ze Schedul e 40 st eel pi pe. Sl eeves shal l be const r uct ed wi t h i nt egr al col l ar or col d s i de shal l be f i t t ed wi t h a bonded sl i p- on f l ange or ext ended col l ar . I n t he case of masonr y penet r at i ons wher e s l eeve i s

SECTI ON 23 23 00 Page 23

Page 24: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

not cast - i n, voi ds shal l be f i l l ed wi t h l at ex mi xed mor t ar cast t o shape of s l eeve and f l ange/ ext er nal col l ar t ype s l eeve shal l be assembl ed wi t h but y l el ast omer vapor bar r i er seal ant t hr ough penet r at i on t o col d s i de sur f ace vapor bar r i er over l ap and f ast ened t o sur f ace wi t h masonr y anchor s. I nt egr al cast - i n col l ar t ype s l eeve shal l be f l ashed [ as i ndi cat ed. ] [ wi t h not l ess t han 100 mm 4 i nches of col d s i de vapor bar r i er over l ap of s l eeve sur f ace. ] Nor mal l y noni nsul at ed penet r at i ng r ound sur f aces shal l be seal ed t o s l eeve bor e wi t h mechani cal l y expandabl e seal s i n vapor t i ght manner and r emai ni ng war m and col d s i de s l eeve dept h shal l be i nsul at ed wi t h not l ess t han [ 100] [ _____] mm [ 4] [ _____] i nches of f oamed- i n- pl ace r i gi d pol yur et hane or f oamed- i n- pl ace s i l i cone el ast omer . Vapor bar r i er seal ant shal l be appl i ed t o f i ni sh war m si de i nsul at i on sur f ace. War m si de of penet r at i ng sur f ace shal l be i nsul at ed beyond vapor bar r i er seal ed s l eeve i nsul at i on f or a di st ance whi ch pr event s condensat i on. Wi r es i n r ef r i ger at ed space sur f ace penet r at i ng condui t shal l be seal ed wi t h vapor bar r i er pl ugs or compound t o pr event moi st ur e mi gr at i on t hr ough condui t and condensat i on t her ei n.

3. 2. 16. 2 Gener al Ser vi ce Ar eas

Each sl eeve shal l ext end t hr ough i t s r espect i ve wal l , f l oor , or r oof , and shal l be cut f l ush wi t h each sur f ace. Pi pes passi ng t hr ough concr et e or masonr y wal l or concr et e f l oor s or r oof s shal l be pr ovi ded wi t h pi pe s l eeves f i t t ed i nt o pl ace at t he t i me of const r uct i on. Sl eeves shal l be of such s i ze as t o pr ovi de a mi ni mum of 6 mm 1/ 4 i nch al l - ar ound cl ear ance bet ween bar e pi pe and sl eeves or bet ween j acket ed- i nsul at i on and sl eeves. Except i n pi pe chases or i nt er i or wal l s, t he annul ar space bet ween pi pe and sl eeve or bet ween j acket over - i nsul at i on and sl eeve shal l be seal ed i n accor dance wi t h Sect i on 07 92 00 JOI NT SEALANTS.

3. 2. 16. 3 Wat er pr oof Penet r at i ons

Pi pes passi ng t hr ough r oof or f l oor wat er pr oof i ng membr ane shal l be i nst al l ed t hr ough a 5. 17 kg/ sq. m 17 ounce copper s l eeve, or a 0. 81 mm 0. 032 i nch t hi ck al umi num sl eeve, each wi t hi n an i nt egr al ski r t or f l ange. Fl ashi ng s l eeve shal l be sui t abl y f or med, and ski r t or f l ange shal l ext end not l ess t han 200 mm 8 i nches f r om t he pi pe and be set over t he r oof or f l oor membr ane i n a t r owel ed coat i ng of bi t umi nous cement . The f l ashi ng s l eeve shal l ext end up t he pi pe a mi ni mum of 50 mm 2 i nches above t he r oof or f l oor penet r at i on. The annul ar space bet ween t he f l ashi ng s l eeve and t he bar e pi pe or bet ween t he f l ashi ng s l eeve and t he met al - j acket - cover ed i nsul at i on shal l be seal ed as i ndi cat ed. Penet r at i ons shal l be seal ed by ei t her one of t he f ol l owi ng met hods.

3. 2. 16. 3. 1 Wat er pr oof i ng Cl ampi ng Fl ange

Pi pes up t o and i ncl udi ng 250 mm 10 i nches i n di amet er passi ng t hr ough r oof or f l oor wat er pr oof i ng membr ane may be i nst al l ed t hr ough a cast i r on s l eeve wi t h caul k i ng r ecess, anchor l ugs, f l ashi ng c l amp devi ce, and pr essur e r i ng wi t h br ass bol t s . Wat er pr oof i ng membr ane shal l be c l amped i nt o pl ace and seal ant shal l be pl aced i n t he caul k i ng r ecess.

3. 2. 16. 3. 2 Modul ar Mechani cal Type Seal i ng Assembl y

I n l i eu of a wat er pr oof i ng c l ampi ng f l ange and caul k i ng and seal i ng of annul ar space bet ween pi pe and sl eeve or condui t and s l eeve, a modul ar mechani cal t ype seal i ng assembl y may be i nst al l ed. Seal s shal l consi st of i nt er l ocki ng synt het i c r ubber l i nks shaped t o cont i nuousl y f i l l t he annul ar space bet ween t he pi pe/ condui t and s l eeve wi t h cor r osi on pr ot ect ed car bon

SECTI ON 23 23 00 Page 24

Page 25: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

st eel bol t s, nut s, and pr essur e pl at es. Li nks shal l be l oosel y assembl ed wi t h bol t s t o f or m a cont i nuous r ubber bel t ar ound t he pi pe wi t h a pr essur e pl at e under each bol t head and each nut . Af t er t he seal assembl y i s pr oper l y posi t i oned i n t he s l eeve, t i ght eni ng of t he bol t shal l cause t he r ubber seal i ng el ement s t o expand and pr ovi de a wat er t i ght seal r ubber seal i ng el ement s t o expand and pr ovi de a wat er t i ght seal bet ween t he pi pe/ condui t seal bet ween t he pi pe/ condui t and t he s l eeve. Each seal assembl y shal l be s i zed as r ecommended by t he manuf act ur er t o f i t t he pi pe/ condui t and s l eeve i nvol ved. The Cont r act or el ect i ng t o use t he modul ar mechani cal t ype seal s shal l pr ovi de s l eeves of t he pr oper di amet er s.

3. 2. 16. 4 Fi r e- Rat ed Penet r at i ons

Penet r at i on of f i r e- r at ed wal l s, par t i t i ons, and f l oor s shal l be seal ed as speci f i ed i n Sect i on 07 84 00 FI RESTOPPI NG.

3. 2. 16. 5 Escutcheons

Fi ni shed sur f aces wher e exposed pi pi ng, bar e or i nsul at ed, pass t hr ough f l oor s, wal l s, or cei l i ngs, except i n boi l er , ut i l i t y , or equi pment r ooms, shal l be pr ovi ded wi t h escut cheons. Wher e s l eeves pr oj ect s l i ght l y f r om f l oor s, speci al deep- t ype escut cheons shal l be used. Escut cheon shal l be secur ed t o pi pe or pi pe cover i ng.

3. 2. 17 Access Panel s

Access panel s shal l be pr ovi ded f or al l conceal ed val ves, vent s, cont r ol s, and i t ems r equi r i ng i nspect i on or mai nt enance. Access panel s shal l be of suf f i c i ent s i ze and l ocat ed so t hat t he conceal ed i t ems may be ser v i ced and mai nt ai ned or compl et el y r emoved and r epl aced. Access panel s shal l be as speci f i ed i n Sect i on 05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS.

3. 2. 18 Fi el d Appl i ed I nsul at i on

Fi el d i nst al l ed i nsul at i on shal l be as speci f i ed i n Sect i on 23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS, except as def i ned di f f er ent l y herein.

3. 2. 19 Fi el d Pai nt i ng

Pai nt i ng r equi r ed f or sur f aces not ot her wi se speci f i ed, and f i ni sh pai nt i ng of i t ems onl y pr i med at t he f act or y ar e speci f i ed i n Sect i on 09 90 00 PAI NTS AND COATI NGS.

3. 2. 19. 1 Col or Codi ng

**************************************************************************NOTE: Col or codi ng f or pi pi ng i dent i f i cat i on r equi r ed by t he usi ng agency wi l l be devel oped and i nser t ed i n t he " Col or Code Schedul e" i n Sect i on 09 90 00 PAI NTS AND COATI NGS. For Ai r For ce I nst al l at i ons, pi pi ng wi l l be col or - coded i n accor dance wi t h At t achment 4 of AFM 88- 15.

**************************************************************************

Col or codi ng f or pi pi ng i dent i f i cat i on i s speci f i ed i n Sect i on 09 90 00 PAI NTS AND COATI NGS.

SECTI ON 23 23 00 Page 25

Page 26: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

3. 2. 19. 2 Col or Codi ng Scheme

**************************************************************************NOTE: Col or Codi ng Scheme may be del et ed i f not r equi r ed i n t he pr oj ect . Use Sect i ons wi t h a 10 af t er t he Sect i on number and del et e t hose wi t h 20 f or Ar my pr oj ect s, and v i ce ver sa.

**************************************************************************

A col or codi ng scheme f or l ocat i ng hi dden pi pi ng shal l be i n accor dance wi t h [ Sect i on 22 00 00 PLUMBI NG, GENERAL PURPOSE] [ Sect i on 22 00 70 PLUMBI NG, HEALTHCARE FACI LI TI ES] .

3. 2. 20 I dent i f i cat i on Tags

**************************************************************************NOTE: Del et e t hi s par agr aph when i dent i f i cat i on t ags ar e not consi der ed necessar y on smal l pr oj ect s.

**************************************************************************

Pr ovi de i dent i f i cat i on t ags made of br ass, engr aved l ami nat ed pl ast i c or engr aved anodi zed al umi num i ndi cat i ng ser vi ce and i t em number on al l val ves and damper s. Tags shal l be 35 mm 1- 3/ 8 i nch mi ni mum di amet er and mar ki ng shal l be st amped or engr aved. I ndent at i ons shal l be bl ack f or r eadi ng c l ar i t y. Tags shal l be at t ached t o val ves wi t h No. 12 AWG copper wi r e, chr ome- pl at ed beaded chai n or pl ast i c st r aps desi gned f or t hat purpose.

3. 3 CLEANI NG AND ADJUSTI NG

Cl ean uncont ami nat ed syst em( s) by evacuat i on and pur gi ng pr ocedur es cur r ent l y r ecommended by r ef r i ger ant and r ef r i ger ant equi pment manuf act ur er s, and as speci f i ed her ei n, t o r emove smal l amount s of ai r and moi st ur e. Syst ems cont ai ni ng moder at e amount s of ai r , moi st ur e, cont ami nat ed r ef r i ger ant , or any f or ei gn mat t er shal l be consi der ed cont ami nat ed syst ems. Rest or i ng cont ami nat ed syst ems t o c l ean condi t i on i ncl udi ng di sassembl y, component r epl acement , evacuat i on, f l ushi ng, pur gi ng, and r e- char gi ng, shal l be per f or med usi ng cur r ent l y appr oved r ef r i ger ant and r ef r i ger at i on manuf act ur er ' s pr ocedur es. Rest or i ng cont ami nat ed syst ems shal l be at no addi t i onal cost t o t he Gover nment as det er mi ned by t he Cont r act i ng Of f i cer . Wat er shal l not be used i n any pr ocedur e or t est .

3. 4 TRAI NI NG COURSE

a. Submi t a schedul e, at l east [ 2] [ _____] weeks pr i or t o t he dat e of t he pr oposed t r ai ni ng cour se, whi ch i dent i f i es t he dat e, t i me, and l ocat i on f or t he t r ai ni ng. Conduct a t r ai ni ng cour se f or [ _____] member s of t he oper at i ng st af f as desi gnat ed by t he Cont r act i ng Of f i cer . The t r ai ni ng per i od shal l consi st of a t ot al [ _____] hour s of nor mal wor ki ng t i me and st ar t af t er t he syst em i s f unct i onal l y compl et ed but pr i or t o f i nal accept ance t est s.

b. The f i el d post ed i nst r uct i ons shal l cover al l of t he i t ems cont ai ned i n t he appr oved oper at i on and mai nt enance manual s as wel l as demonst r at i ons of r out i ne mai nt enance oper at i ons.

c. Submi t [ 6] [ _____] compl et e copi es of an oper at i on manual i n bound 216 by 279 8 1/ 2 by 11 i nch bookl et s l i s t i ng st ep- by- st ep pr ocedur es

SECTI ON 23 23 00 Page 26

Page 27: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

r equi r ed f or syst em st ar t up, oper at i on, abnor mal shut down, emer gency shut down, and nor mal shut down at l east [ 4] [ _____] weeks pr i or t o t he f i r st t r ai ni ng cour se. The bookl et s shal l i ncl ude t he manuf act ur er ' s name, model number , and par t s l i s t . The manual s shal l i ncl ude t he manuf act ur er ' s name, model number , ser vi ce manual , and a br i ef descr i pt i on of al l equi pment and t hei r basi c oper at i ng f eat ur es.

d. Submi t [ 6] [ _____] compl et e copi es of mai nt enance manual i n bound 216 by 279 8 1/ 2 x 11 i nch bookl et s l i s t i ng r out i ne mai nt enance pr ocedur es, possi bl e br eakdowns and r epai r s, and a t r oubl e shoot i ng gui de. The manual s shal l i ncl ude pi pi ng l ayout s and si mpl i f i ed wi r i ng and cont r ol di agr ams of t he syst em as i nst al l ed.

3. 5 REFRI GERANT PI PI NG TESTS

**************************************************************************NOTE: The f ol l owi ng r ef r i ger ant syst em t est s ar e f or f i el d f abr i cat ed r ef r i ger ant pi pi ng syst ems. The t est s do not appl y t o packaged, uni t ar y equi pment whi ch i s char ged at t he f act or y.

Wher e appl i cabl e condensi ng t emper at ur e i s over 54 degr ees C 130 degr ees F, equi pment and pi pi ng wi l l be capabl e of wi t hst andi ng l eak pr essur e t est s at not l ess t han t he desi gn pr essur e cor r espondi ng t o t he condensi ng pr essur e dur i ng t he hi gher ambi ent condi t i ons ( r ef er t o ASHRAE 15 & 34) .

**************************************************************************

Af t er al l component s of t he r ef r i ger ant syst em have been i nst al l ed and connect ed, subj ect t he ent i r e r ef r i ger at i on syst em t o pneumat i c, evacuat i on, and st ar t up t est s as descr i bed her ei n. Submi t a schedul e, at l east [ 2] [ _____] weeks pr i or t o t he st ar t of r el at ed t est i ng, f or each t est . I dent i f y t he pr oposed dat e, t i me, and l ocat i on f or each t est . Conduct t est s i n t he pr esence of t he Cont r act i ng Of f i cer . Wat er and el ect r i c i t y r equi r ed f or t he t est s wi l l be f ur ni shed by t he Gover nment . Pr ovi de al l mat er i al , equi pment , i nst r ument s, and per sonnel r equi r ed f or t he t est . Pr ovi de t he ser vi ces of a qual i f i ed t echni c i an, as r equi r ed, t o per f or m al l t est s and pr ocedur es i ndi cat ed her ei n. Fi el d t est s shal l be coor di nat ed wi t h Sect i on 23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG OF HVAC SYSTEMS. Submi t [ 6] [ _____] copi es of t he t est s r epor t i n bound 216 by 279 mm 8 1/ 2 by 11 i nch bookl et s document i ng al l phases of t he t est s per f or med. The r epor t shal l i ncl ude i ni t i al t est summar i es, al l r epai r s/ adj ust ment s made, and t he f i nal t est r esul t s.

3. 5. 1 Pr el i mi nar y Pr ocedur es

Pr i or t o pneumat i c t est i ng, equi pment whi ch has been f act or y t est ed and r ef r i ger ant char ged as wel l as equi pment whi ch coul d be damaged or cause per sonnel i nj ur y by i mposed t est pr essur e, posi t i ve or negat i ve, shal l be i sol at ed f r om t he t est pr essur e or r emoved f r om t he syst em. Saf et y r el i ef val ves and r upt ur e di scs, wher e not par t of f act or y seal ed syst ems, shal l be r emoved and openi ngs capped or pl ugged.

3. 5. 2 Pneumat i c Test

Pr essur e cont r ol and excess pr essur e pr ot ect i on shal l be pr ovi ded at t he sour ce of t est pr essur e. Val ves shal l be wi de open, except t hose l eadi ng t o t he at mospher e. Test gas shal l be dr y ni t r ogen, wi t h mi nus 55 degr ees C

SECTI ON 23 23 00 Page 27

Page 28: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

mi nus 70 degr ee F dewpoi nt and l ess t han 5 ppm oi l . Test pr essur e shal l be appl i ed i n t wo st ages bef or e any r ef r i ger ant pi pe i s i nsul at ed or cover ed. Fi r st st age t est shal l be at 69 kPa 10 psi wi t h ever y j oi nt bei ng t est ed wi t h a t hi ck soap or col or i ndi cat i ng sol ut i on. Second st age t est s shal l r ai se t he syst em t o t he mi ni mum r ef r i ger ant l eakage t est pr essur e speci f i ed in ASHRAE 15 & 34 wi t h a maxi mum t est pr essur e 25 per cent gr eat er . Pr essur e above 690 KPa 100 psi g shal l be r ai sed i n 10 per cent i ncr ement s wi t h a pr essur e accl i mat i z i ng per i od bet ween i ncr ement s. The i ni t i al t est pr essur e shal l be r ecor ded al ong wi t h t he ambi ent t emper at ur e t o whi ch t he syst em i s exposed. Fi nal t est pr essur es of t he second st age shal l be mai nt ai ned on t he syst em f or a mi ni mum of 24 hour s. At t he end of t he 24 hour per i od, t he syst em pr essur e wi l l be r ecor ded al ong wi t h t he ambi ent t emper at ur e t o whi ch t he syst em i s exposed. A cor r ect i on f act or of 2 kPa 0. 3 psi wi l l be al l owed f or each degr ee C F change bet ween t est space i ni t i al and f i nal ambi ent t emper at ur e, pl us f or i ncr ease and mi nus f or a decr ease. I f t he cor r ect ed syst em pr essur e i s not exact l y equal t o t he i ni t i al syst em t est pr essur e, t hen t he syst em shal l be i nvest i gat ed f or l eaki ng j oi nt s. To r epai r l eaks, t he j oi nt shal l be t aken apar t , t hor oughl y c l eaned, and r econst r uct ed as a new j oi nt . Joi nt s r epai r ed by caul k i ng, r emel t i ng, or back- wel di ng/ br azi ng shal l not be accept abl e. Fol l owi ng r epai r , t he ent i r e syst em shal l be r et est ed usi ng t he pneumat i c t est s descr i bed above. The ent i r e syst em shal l be r eassembl ed once t he pneumat i c t est s ar e sat i sf act or i l y compl et ed.

3. 5. 3 Evacuat i on Test

Fol l owi ng sat i sf act or y compl et i on of t he pneumat i c t est s, t he pr essur e shal l be r el i eved and t he ent i r e syst em shal l be evacuat ed t o an absol ut e pr essur e of 300 mi cr omet er s. Dur i ng evacuat i on of t he syst em, t he ambi ent t emper at ur e shal l be hi gher t han 2 degr ees C 35 degr ees F. No mor e t han one syst em shal l be evacuat ed at one t i me by one vacuum pump. Once t he desi r ed vacuum has been r eached, t he vacuum l i ne shal l be c l osed and t he syst em shal l s t and f or 1 hour . I f t he pr essur e r i ses over 500 mi cr omet er s af t er t he 1 hour per i od, t hen t he syst em shal l be evacuat ed agai n down t o 300 mi cr omet er s and l et set f or anot her 1 hour per i od. The syst em shal l not be char ged unt i l a vacuum of at l east 500 mi cr omet er s i s mai nt ai ned f or a per i od of 1 hour wi t hout t he assi st ance of a vacuum l i ne. I f dur i ng t he t est i ng t he pr essur e cont i nues t o r i se, check t he syst em f or l eaks, r epai r as r equi r ed, and r epeat t he evacuat i on pr ocedur e. Dur i ng evacuat i on, pr essur es shal l be r ecor ded by a t her mocoupl e- t ype, el ect r oni c- t ype, or a cal i br at ed- mi cr omet er t ype gauge.

3. 5. 4 Syst em Char gi ng and St ar t up Test

Fol l owi ng sat i sf act or y compl et i on of t he evacuat i on t est s, t he syst em shal l be char ged wi t h t he r equi r ed amount of r ef r i ger ant by r ai s i ng pr essur e t o nor mal oper at i ng pr essur e and i n accor dance wi t h manuf act ur er ' s pr ocedur es. Fol l owi ng char gi ng, t he syst em shal l oper at e wi t h hi gh- si de and l ow- si de pr essur es and cor r espondi ng r ef r i ger ant t emper at ur es, at desi gn or i mpr oved val ues. The ent i r e syst em shal l be t est ed f or l eaks. Fl uor ocar bon syst ems shal l be t est ed wi t h hal i de t or ch or el ect r oni c l eak detectors.

3. 5. 5 Ref r i ger ant Leakage

I f a r ef r i ger ant l eak i s di scover ed af t er t he syst em has been char ged, t he l eaki ng por t i on of t he syst em shal l i mmedi at el y be i sol at ed f r om t he r emai nder of t he syst em and t he r ef r i ger ant pumped i nt o t he syst em r ecei ver or ot her sui t abl e cont ai ner . Under no c i r cumst ances shal l t he r ef r i ger ant

SECTI ON 23 23 00 Page 28

Page 29: UFGS 23 23 00 Refrigerant Piping - Whole Building Design … 23 23 00.pdf ·  · 2018-02-22USACE / NAVFAC / AFCEC / NASA UFGS-23 23 00 (October 2007) ... 2.3 REFRIGERANT PIPING SYSTEM

be di schar ged i nt o t he at mospher e.

3. 5. 6 Cont r act or ' s Responsi bi l i t y

At al l t i mes dur i ng t he i nst al l at i on and t est i ng of t he r ef r i ger at i on syst em, t ake st eps t o pr event t he r el ease of r ef r i ger ant s i nt o t he at mospher e. The st eps shal l i ncl ude, but not be l i mi t ed t o, pr ocedur es whi ch wi l l mi ni mi ze t he r el ease of r ef r i ger ant s t o t he at mospher e and t he use of r ef r i ger ant r ecover y devi ces t o r emove r ef r i ger ant f r om t he syst em and st or e t he r ef r i ger ant f or r euse or r ecl ai m. At no t i me shal l mor e t han 85 g 3 ounces of r ef r i ger ant be r el eased t o t he at mospher e i n any one occur r ence. Any syst em l eaks wi t hi n t he f i r st year shal l be r epai r ed i n accor dance wi t h t he r equi r ement s her ei n at no cost t o t he Gover nment i ncl udi ng mat er i al , l abor , and r ef r i ger ant i f t he l eak i s t he r esul t of def ect i ve equi pment , mat er i al , or i nst al l at i on.

- - End of Sect i on - -