WHO WE ARESINO KAMI

Page 2: Tscg presentation english and tagalog for web

THIS IS NOT NEW TECHNOLOGYITO AY HINDI MAKABAGONG TEKNOLOHIYA

• INVENTED IN 1962 BY WESTERN FORMSNILIKHA NOONG 1962 NG WESTERN FORMS

• 10 MILLION HOMES IN 40 COUNTRIES SINCE 199510 MILYONG MGA TAHANAN SA 40 BANSA MULA 1995

Page 3: Tscg presentation english and tagalog for web

Things to RememberMga Bagay na Dapat Tandaan

• Less cost

• Mas kaunting gastos

• Four Times Faster

• Mas mabilis ng apat na beses

• Flexible designs

• Nababagong disenyo

• Safety – seismic and wind

• Kaligtasan – pagyanig at hangin

• More profit

• Mas malaking kita

Page 4: Tscg presentation english and tagalog for web

Building systems leader since 1955

Bumubuo ng mga sistema mula1955

Best-in-class aluminum hand-set forms

Pinakamahusay sa mga aluminum hand-set forms

2013 – forms placed 30 M cu ydsconcrete

2013 – Ang mga porma ay nakapaglagay ng 30 milyong kubikoyardang kongkreto

2013 – 500,000 housing units built with Western Forms in 45 countries

2013 – 500,000 na yunit ng pabahay ang naitayo ng Western Forms sa 45 bansa

Affiliate member Western Forms Group

Isang kaalyadong miyembro ngWestern Forms Group

Products and expertise used for rapid construction of concrete buildings

Gamit ang mga produkto at kagalingan para sa mabilis nakonstruksyon ng mgakongkretong gusali

International training and construction management services

Pandaigdigang pagsasanay at serbisyo sa pamamahala ngkonstruksyon

WF sister company

Kapatid na kumpanya ng WF

Rapid deployment of integrated development & construction solutions

Mabilis na paglawak ng pinagsamang pag-unlad at solusyon sa konstruksyon

Large scale mixed use projects for global clients

Proyektong may malawakan at iba’t ibang paggamit para sa mgakliyente sa buong mundo.

Optimize capital & human resources achieving high production efficiencies with maximum ROI

Sinusulit ang kapital at yamang-pantao na kung saan makakamitang mataas na kahusayan saproduksyon na may pinakamalaking pagbalik ng puhunan.

Page 5: Tscg presentation english and tagalog for web

OUR MISSIONANG AMING LAYUNIN

• Reduce the housing deficit in the Philippines

• Bawasan ang kakulangan ng pabahay sa Pilipinas.

• Build strong, long lasting, high quality homes made with concrete.

• Bumuo ng matatag, pangmatagalan, mataas na kalidad ng tahanan na gawa sakongkreto.

• Deliver house shells in a one day cycle.

• Maghatid ng mga balangkas ng bahay sa bawat araw.

• Reduce cost of construction compared to traditional post & beam with in-fill masonry.

• Bawasan ang gastos sa konstruksyon kumpara sa tradisyunal na poste at beam na may buhos na semento.

Page 6: Tscg presentation english and tagalog for web

WHAT THIS MEANS TO YOUANG IBIG SABIHIN NITO SA IYO

• Rapid delivery of high quality housing on mass scales at lower cost.

• Mabilis na paghatid ng mataas na kalidad ng pabahay na may malawakangpaggamit sa mas mababang halaga.

• Accelerate delivery of your product to market.

• Mabilis na paghatid ng iyong mga produkto sa merkado.

• Reduce impact of social housing mandates on your profits.

• Mababang epekto sa iyong kita ng mga regulasyon sa panlipunang pabahay.

• Lower your construction cost.

• Mababa ang iyong gastusin sa konstruksyon.

Page 7: Tscg presentation english and tagalog for web

WHAT THIS MEANS TO YOUANG IBIG SABIHIN NITO SA IYO

• Increase the quality of your housing product.

• Mataas ang kalidad ng iyong pabahay.

• Reduce cost of financing.

• Mababa ang gastusing pinasyal.

• Design flexibility.

• Nababagong disenyo.

Page 8: Tscg presentation english and tagalog for web

WHAT WE DOANG AMING MGAGAWAIN

• Industrialized construction – design, manufacture, train, produce.

• Disenyo ng industriyal na konstruksyon, lumikha, magturo, gumawa.

• Manufacture custom concrete forming equipment that enables entire concrete house shells to be formed and cast in one day cycles.

• Gumawa ng pasadyang kagamitan sa pagporma ng kongkreto nanagbibigay-daan sa buong balangkas ng kongretong bahay na mabuoat maporma sa buong araw.

• Useful life of equipment measured in thousands of cycles.

• Ang kapaki-pakinabang na itinatagal ng kagamitan ay nasusukat samga libong siglo.

Page 9: Tscg presentation english and tagalog for web

WHAT WE DOANG AMING MGAGAWAIN

• Amortized cost of forms pennies per square meter.

• Hulugang halaga ng mga porma na barya lamang kada metro kuwadrado.

• Training – forming, concrete placing, and construction management.

• Pagsasanay – pagporma, paglagay sa kongkreto, pamamahala sakonstruksyon.

• Uniform loading design concepts versus point load design with infill.

• Magkakatulad na konsepto ng disenyo sa pagkarga kumpara sadisenyong point load na may buhos na semento.

Page 10: Tscg presentation english and tagalog for web

Custom Forms Specific to Your DesignPasadyang Porma na Tiyak sa Iyong Disenyo

Page 11: Tscg presentation english and tagalog for web

MONOLITHIC CASTING WALLS AND FLOORSMONOLITIK NA PAGPORMA NG MGA PADER AT SAHIG

Page 12: Tscg presentation english and tagalog for web

UNIFORM LOADING DESIGN MAGKAKATULAD NA DISENYO NG PAGKARGA

Page 13: Tscg presentation english and tagalog for web

Std Height: 200 mm (8”)

Std Length (W1): Varies – 3000 mm

maximum

Thickness: 7.8 mm (.3078”)

Hole Pattern: 1-hole

Material: Aluminum

Weight: 5 lb per lf

Hardware: Cap PinLock, HD Form Clips,

and Pin & Wedge

Ledger System | 100 X 200

100 X 200 Ledger

Wall to Floor or Roof Connection

Koneksyon sa Pader at Sahig o Bubong

Page 14: Tscg presentation english and tagalog for web

WHAT WE HAVE DONEANG AMING MGA

NAGAWA

Page 15: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

De La Riva – Mexico

Page 16: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

De La Riva – Mexico

Page 17: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Structure Type

Casas Quma - Mexico

Page 18: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Structure Type

Casas Quma - Mexico

Page 19: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Trinity Housing – Trinidad-Tobago

Page 20: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

De La Riva – Mexico

Page 21: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Spectrum – Guatemala

Page 22: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

ViveICA – Paseos del Valle – Guadelajara, Mexico

Page 23: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

La Joila - Guatemala

Page 24: Tscg presentation english and tagalog for web

DESIGN ASSIST, FORMS, ON-SITE SERVICESMGA TULONG SA DISENYO, PAGPORMA,

SERBISYO SA MISMONG LUGAR NG PROYEKTO

Page 25: Tscg presentation english and tagalog for web
Page 26: Tscg presentation english and tagalog for web
Page 27: Tscg presentation english and tagalog for web
Page 28: Tscg presentation english and tagalog for web

VERTICAL CONSTRUCTION

BERTIKAL NA KONSTRUKSYON

Page 29: Tscg presentation english and tagalog for web
Page 30: Tscg presentation english and tagalog for web
Page 31: Tscg presentation english and tagalog for web
Page 32: Tscg presentation english and tagalog for web
Page 33: Tscg presentation english and tagalog for web
Page 34: Tscg presentation english and tagalog for web
Page 35: Tscg presentation english and tagalog for web
Page 36: Tscg presentation english and tagalog for web
Page 37: Tscg presentation english and tagalog for web
Page 38: Tscg presentation english and tagalog for web
Page 39: Tscg presentation english and tagalog for web
Page 40: Tscg presentation english and tagalog for web
Page 41: Tscg presentation english and tagalog for web

SOCIAL HOUSINGPANLIPUNANG PABAHAY

Page 42: Tscg presentation english and tagalog for web
Page 43: Tscg presentation english and tagalog for web
Page 44: Tscg presentation english and tagalog for web

HOW WE DO ITPAANO NAMIN GINAGAWA

Page 45: Tscg presentation english and tagalog for web
Page 46: Tscg presentation english and tagalog for web
Page 47: Tscg presentation english and tagalog for web
Page 48: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

ViveICA – Paseos del Valle – Guadelajara, Mexico

Page 49: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

ViveICA – Paseos del Valle – Guadelajara, Mexico

Page 50: Tscg presentation english and tagalog for web
Page 51: Tscg presentation english and tagalog for web
Page 52: Tscg presentation english and tagalog for web
Page 53: Tscg presentation english and tagalog for web
Page 54: Tscg presentation english and tagalog for web
Page 55: Tscg presentation english and tagalog for web

SCHEDULES AND LABOR COSTISKEDYUL AT GASTOS SA PAGGAWA

Page 56: Tscg presentation english and tagalog for web
Page 57: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Spectrum – Terrazas de Villaflores – Guatemala

Page 58: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Spectrum – Terrazas de Villaflores – Guatemala

Page 59: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Spectrum – Terrazas de Villaflores – Guatemala

Other Metrics (walls & elevated slabs)

Ground Floor

Number of Men on Shell

Crew Avg hours/ day1 day form

cycle Ext. Hours

12 Form workers 10 1 120

3 Electricians 4 1 12

6 Iron workers 4 1 24

2 Plumbers 4 1 8

4 Pour crew 3 1 12

27 Men 176

2nd Floor

Number of Men on Shell

Crew Avg hours/ day1 day form

cycle Ext. Hours

12 Form workers 10 1 120

3 Electricians 4 1 12

6 Iron workers 4 1 24

2 Plumbers 4 1 8

4 Pour crew 3 1 12

27 Men 176

Total man hours 352

Average wage rate/hour $ 3.00

Total Shell Labor $ 1,056.00 $ 7.28

$/m2 floor area

Cycle Time

1 Unit / 2 days

Page 60: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Infinite Concrete – Granada – Jamaica

Page 61: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Infinite Concrete – Project Name – Jamaica

Infinite Concrete

All values in USD

Descriptionm2 floor area (carpet area) $/ Unit

Avg. $/m2Floor Area

Selling Price 3 bedroom 116 $ 275,000.00 $ 2,370.00

Estimated Total Unit Cost Value $ 220,000.00 $ 1,896.55

Estimated Unit "Shell Cost" Value $ 99,000.00 $ 853.45

Estimated Unit Indirect cost value $ 121,000.00 $ 1,043.10

Page 62: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Infinite Concrete – Project Name – Jamaica

Other Metrics (walls & elevated slabs)

Ground Floor

Number of Men on Shell

CrewAvg hours/

day1 day form

cycle Ext. Hours

12 Form workers 10 1 120

2 Electricians 5 1 10

5 Iron workers 5 1 25

3 Plumbers 4 1 12

4 Pour crew 3 1 12

26 Men 179

2nd Floor

Number of Men on Shell

CrewAvg hours/

day1 day form

cycle Ext. Hours

6 Form workers 8 1 48

1 Electricians 5 1 5

3 Iron workers 5 1 15

2 Plumbers 4 1 8

4 Pour crew 3 1 12

16 Men 88

Total man hours 267

Average wage rate/hour $ 3.00

Total Shell Labor $ 801.00 $ 6.91

$/m2 floor area

Cycle Time

1 Unit / 2 days

Page 63: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Grupo Herso – San Nicholas – Mexico

Page 64: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Grupo Herso – San Nicholas – Mexico

Page 65: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Other Metrics (walls & elevated slabs)

Ground Floor

Number of Men on Shell

Crew Avg hours/ day1 day form

cycle Ext. Hours

8 Form workers 7 1 56

2 Electricians 6 1 12

5 Iron workers 6 1 30

2 Plumbers 4 1 8

4 Pour crew 3 1 12

21 Men 118

Other Metrics (walls & elevated slabs)

2nd Floor

Number of Men on Shell

Crew Avg hours/ day1 day form

cycle Ext. Hours

8 Form workers 7 1 56

2 Electricians 6 1 12

5 Iron workers 6 1 30

3 Plumbers 4 1 12

4 Pour crew 3 1 12

22 Men 122

Total man hours 240

Average wage rate/hour $ 3.00

Total Shell Labor $ 720.00 $ 12.63

$/m2 floor area

Cycle Time

1 Unit / 2 days

Grupo Herso – San Nicholas – Mexico

Page 66: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Inmobiliaria Residencial – Brisas Norte de Golf – Panama

Page 67: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Inmobiliaria Residencial – Brisas Norte de Golf – Panama

Page 68: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Inmobiliaria Residencial – Brisas Norte de Golf – Panama

Page 69: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Inmobiliaria Residential

All values in USD

Description

m2 floor area

(carpet area) $/ Unit

Avg. $/m2 Floor Area

Selling Price 3 bedroom 130 $ 180,000.00 $ 1,384.62

Estimated Total Unit Cost Value $ 144,000.00 $ 1,107.69

Estimated Unit "Shell Cost" Value $ 64,800.00 $ 498.46

Estimated Unit Indirect cost value $ 79,200.00 $ 609.23

Inmobiliaria Residencial – Brisas Norte de Golf – Panama

Page 70: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Other Metrics (walls & elevated slabs)

Ground Floor

Number of Men on Shell

Crew Avg hours/ day1 day form

cycle Ext. Hours

10 Form workers 10 1 100

3 Electricians 4 1 12

6 Iron workers 4 1 24

4 Plumbers 4 1 16

10 Pour crew 3 1 30

33 Men 182

2nd Floor

Number of Men on Shell

Crew Avg hours/ day1 day form

cycle Ext. Hours

12 Form workers 10 1 120

3 Electricians 4 1 12

8 Iron workers 4 1 32

4 Plumbers 4 1 16

12 Pour crew 3 1 36

39 Men 216

Total man hours 398

Average wage rate/hour $ 3.25

Total Shell Labor $ 1,293.50 $ 9.95

$/m2 floor area

Cycle Time

1 Unit / 2 days

Inmobiliaria Residencial – Brisas Norte de Golf – Panama

Page 71: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Altta Homes – San Pedrito – Mexico

Page 72: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Altta Homes – San Pedrito – Mexico

Page 73: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Altta Homes – San Pedrito – Mexico

Front FloorplanElevation

Rear FloorplanElevation

Page 74: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Altta Homes – San Pedrito – Mexico

Alta Homes

All values in USD

Description

m2 floor area

(carpet area) $/ Unit

Avg. $/m2 Floor Area

Selling Price 2 bedroom 61 $ 58,000.00 $ 950.82

Estimated Total Unit Cost Value $ 46,400.00 $ 760.66

Estimated Unit "Shell Cost" Value $ 20,880.00 $ 342.30

Estimated Unit Indirect cost value $ 25,520.00 $ 418.36

Page 75: Tscg presentation english and tagalog for web

w w w . w e s t e r n f o r m s . c o m

Altta Homes – San Pedrito – Mexico

Other Metrics (walls & elevated slabs)

Ground Floor

Number of Men on

Shell CrewAvg hours/

day1 day form

cycle Ext. Hours

8 Form workers 5 1 40

2 Electricians 3 1 6

3 Iron workers 4 1 12

2 Plumbers 3 1 6

4 Pour crew 3 1 12

19 Men 76

Total man hours 76

Average wage rate/hour $ 7.50

Total Shell Labor $ 570.00 $ 9.34

$/m2 floor area

Cycle Time

1 Unit / 1 Day

Page 76: Tscg presentation english and tagalog for web
Page 77: Tscg presentation english and tagalog for web
Page 78: Tscg presentation english and tagalog for web

Things to RememberMga Bagay na Dapat Tandaan

• Less cost

• Mas kaunting gastos

• Four Times Faster

• Mas mabilis ng apat na beses

• Flexible designs

• Nababagong disenyo

• Safety – seismic and wind

• Kaligtasan – pagyanig at hangin

• More profit

• Mas malaking kita

Page 79: Tscg presentation english and tagalog for web

HOW TO GET STARTEDPAANO MAGSIMULA

• Send us your blueprints

• Ipadala sa amin ang inyong mga blueprint• Select a project for consideration of cast-in-place construction using

removable concrete forms.

• Pumili ng proyektong binibigyan ng konsiderasyon ang cast-in-place nakonstruksyon gamit ang natatanggal na porma ng kongkreto.

• Contact Randal Parsley at: [email protected] or 720 549 9303 Ext. 103

• Kontakin si Randal Parsley sa: [email protected] or 720 549 9303 Ext. 103

Page 80: Tscg presentation english and tagalog for web

HOW TO GET STARTEDPAANO MAGSIMULA

• Evaluate & Layout Formwork

• Suriin at Iayos ang mga Kakailanganing Molde• Our design and technical teams will evaluate your project and consult with

you to develop a solution that meets your quality, cycle time, and final budget requirements.

• Susuriin ng aming koponan sa disenyo at teknikal ang inyong proyekto at sasangguni sa inyo upang bumuo ng solusyon na tutugon sa inyong mgapangangailangan sa kalidad, oras na gugugulin at kakailanganingpangkalahatang budget.

Page 81: Tscg presentation english and tagalog for web

THE END:AND THE BEGINING

ANG WAKAS:AT ANG PANIMULA