trd meeting@cern august 2007 a. marín (gsi) 6/11/2015 status trd cooling trd status meeting august...
Post on 19-Dec-2015
250 views
TRANSCRIPT
TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23
STATUS TRD COOLINGSTATUS TRD COOLING
TRD STATUS MEETING August 2007TRD STATUS MEETING August 2007
TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23
• Pressure sensors/relief valves:•Available•Pre-Assembly needs to be done (end of August?)•Installation needs to be done
• Improvement/modification of the cooling plant•Add an alarm on the total flow. Will be done by the cooling group. 2-3 weeks because of holidays.
• Remote control.• Jorge managed to connect to PLC• A. Agustinus will provide generic framework end of August
TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23
Status of remote controlStatus of remote control
TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23
Status of remote controlStatus of remote control
TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23
• Test with SM-mockup:•Being assembled ( finished end of next week)•Star test @CERN in all sectors on week 34
TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23
PipesPipes
4315 bended pipes ready to be gluedpipes glued for ~2 SM in Muenster+~1.3 in HD
TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23
Thermal ScreenThermal Screen
Connections at cooling plant ready