TransCanada Case Study: Emissions Management System Hasan Imran Senior Advisor, Climate Change October 23, 2007 US EPA Natural Gas STAR 14 th Annual Conference, Houston, Texas

Upload: dohanh

Post on 04-Aug-2018

227 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

TransCanada Case Study: Emissions Management System Hasan Imran Senior Advisor, Climate Change October 23, 2007

US EPA Natural Gas STAR 14th Annual Conference, Houston, Texas

Page 2: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

Agenda

� How does TransCanada track and manage its emissions?

� Development of an Emissions Management Strategy

� Creation of an Air Emissions Database

� Emissions Management Practices

� Continual Investment in R&D

� Quantifying Business Decisions � The Implementation of effective Practices and Procedures

TransCanada November 1, 2007 2

Page 3: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

TransCanada

� Leading North American company in natural gas transmission and power generation

� $25.9 Billion in pipe and power assets ($Cdn at December 31, 2006)

� 2007 named as a member of the Global 100 Most Sustainable Companies in the world

� Skilled, expert, energetic people with strong technical knowledge

� Strong financial position to capture opportunities going into the future

TransCanada November 1, 2007 3

Page 4: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

November 1, 2007TransCanada4

Quality assets and proposed projects

• approx. 59,000 km (36,500 miles) of wholly owned pipeline

– transports 15 billion cubic feet/day (Bcf/d) from virtually all major supply basins on the continent

• 2,969 km of proposed oil pipeline, capable of transporting 435,000 barrels per day

• 16 power facilities with 7,700 megawatts of power generation

• two proposed liquefied natural gas facilities

– 1.5 Bcf/d

Page 5: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

1990

19

91

1992

19

93

1994

19

95

1996

19

97

1998

19

9 9

2000

20

01

2002

20

03

2004

20

05

2006

GHG emissions from pipeline operations and methane reduction

TransCanada Pipeline Greenhouse Gas Emissions Breakdown

0

2000

4000

6000

8000

10000

12000

14000

16000

kilo

tonn

es C

O2

CARBON DIOXIDE METHANE NITROUS OXIDE INDIRECT PIPELINE EMISSIONS

TransCanada November 1, 2007 5

Page 6: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

Total Direct GHG Emissions and Methane Emission Reduction

TransCanada EmissionTransCanada Emission’’s Profiles Profile

Percent Change of GHG Emissions by Type '1990 to 2006'

67%

32%

1%

92%

6% 2%

CO2 CH4 N2O

kt C

O 2E

em

is si

o n s

1990 2006

•Decrease in methane emissions is due to effective leak detection and repair program (LDAR).

TransCanada November 1, 2007 6

Page 7: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

EMSEMS -- Emissions Management SystemEmissions Management System

TransCanada Emissions Management System

- CO2 - CO - CH4 - VOC’s- N2O - NOx

- transfer compression - pipeline inspection tools - buttering and hot tappingEnergy Efficiency and - stopple plugsconservation - repair sleeves - hot line lowering

R & D

Vented Emissions (CH4, CO2)

Fugitive Emissions Blowdown Emissions

LDAR (leak detection & repair)

HFS (measurement)

TransCanada November 1, 20077

- incineration

Combustion Emissions

Page 8: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

Methane (Fugitive) Emissions Management: Program Successes

Fugitive Emissions in million ft3 CH4

3233

710

0 500

1000 1500 2000 2500 3000 3500

78% Reduction = 2.5 Bcf

Natural Gas $23M

@ $7/GJ Natural Gas $5M @ $7/GJ

1997 2006

TransCanada November 1, 2007 8

Page 9: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

2006 CCME Pollution Prevention Award

TransCanada’s Fugitive Emissions Management Program is Recipient of 2006 CCME Award

TransCanada November 1, 2007 9

Page 10: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

Air Emissions Database System

Allows TransCanada to:

� Develop confidence in handling complex issues

� Effectively and Efficiently manage incoming emissions data

� Retrieve and Store information easily

� Reduce wait times for data

� Assumptions made can be stated and defended clearly

10 TransCanada November 1, 2007

Page 11: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

Emissions Data Management Before

Current State Of GHG & CAC Inventory Tracking

Throughput / fuel used

GHG Inventory (in Excel Work Book)

Cancarb Transportation

Fugitive Emissions

Utility Consumption Forecast

Emissions Savings

Mainline Gas Accounting

Alberta Gas Accounting

BC Gas Accounting

Pipeline System Design

Retriev

eValv

esan

d Meter

Station

s data

Obtain system statistics

Matrix (Mainline)

GSAM (Alberta)

IGMS (BC &

Foothills)

Plant Engineering GeoFind

Avantis

SAP

Extensity

Vehicle/ Fleet

Car Rental Company

From Power Plants

Employee of Environment Group

GeoFind

Retri

eve

Com

pres

sor

Stat

ion

data

Operations Planning, System Design

Throughput / fuel used

Throughput / fuel used

Volume of Gas transported and Distance of Haul Customer Solutions &

Gas Quality

Employees of Environment

Group & External

Consultants

CAC Inventory

11 TransCanada November 1, 2007

Page 12: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

Air Emission Data Management System User Experience

Air Emission Data

Management System Web

Portal

NPRI Air Contaminants

Electronic Reporting

opsEnvironmental

Microsoft Reporting Services

ADMS Database

Maintenance & Configuration Web Pages and Services

12 TransCanada November 1, 2007

Page 13: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

Air Emission Data Management System Logical Design and Interfaces

13 TransCanada November 1, 2007

Page 14: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

Air Emission Data Management System opsE Pipeline Hierarchy

Global libraries, such as *Reference and *Reports are included in all facility models.

This is a pipeline system.

This is a compressor station.

This is a compressor unit.

This is the NPRI Facility Information for Frenchman River compressor station.

14 TransCanada November 1, 2007

Page 15: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

Emissions Management Team

A group of experienced people from many departments of the company that regularly reviews progress and sets targets and goals

� Uses reports to review progress

� Efficient decisions can be made

� Information is transparent and consistent

� Assumptions are clear upfront

15 TransCanada November 1, 2007

Page 16: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

Blowdown Emissions Management

Control Methods and Technologies UsedControl Methods and Technologies Used•Scheduling Practices •Operational Adjustments •Transfer (Pull-down) Compressors •Buttered Stubs •Hot Tapping •Hot Line Lowering •Sleeves •Stopples

16 TransCanada November 1, 2007

Page 17: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

Supersonic Gas Injector

� Developed for capturing very low pressure vent gases and re-

injection into a high pressure gas stream without the use of

rotating machinery

� Savings

� 4 million ft3/yr of gas savings from one compressor

� Natural gas worth $28,000/yr/unit @$7/GJ

� GHG emissions

� Zero operating cost

17 TransCanada November 1, 2007

Page 18: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

Gas-Gas Ejector for Dry Gas Seal Leak Capture

Conceptual Flow Diagram US & Canadian patent filed

18 TransCanada November 1, 2007

Page 19: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

Global Pipeline Honorable Mention Award

Received at Rio Pipeline 2007 Conference,

Rio de Janeiro, Brazil

19 TransCanada November 1, 2007

Page 20: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

Use of Biofilteration for Methane reduction

� A joint venture of TransCanada & University of Calgary

� Methane gas can be oxidized biologically, with the use of methanotrophic bacteria

� Vented CH4 reduced to CO2: 21 times less global warming potential

� Implemented successfully at three sites

� No operating cost except

monitoring

� Almost 80% oxidation

rate achieved

� Biocell/Biocap/Biofilter

research received 2007

Emerald Award

20 TransCanada November 1, 2007

Page 21: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

Use of Incinerator for Blowdowns

• Incineration of blowdown gas instead of venting (after transfer compression)

� At Caron Compressor Station, Moose Jaw, November 2002

212

� Emission savings of 1,100 tCO2e 1315

0

500

1000

1500

tonn

e CO

2E

CO2 equivalent from methane venting

CO2 from methane incineration

GHG Emission Comparison with & without Incineration after Transfer Compression

� Worth $17,000 @$15/t CO2E

21 TransCanada November 1, 2007

Page 22: TransCanada Case Study: Emissions Management System · TransCanada Case Study: Emissions Management System ... Car Rental Company From Power ... TransCanada Case Study: Emissions

End Results - EMS

• Confidence

� The ability to quickly and accurately quantify inputs into important business decisions

� The success of our measurement program can be widely used

� The success of our Management System can be quantified

� Internal interest and buy-in is fostered

22 TransCanada November 1, 2007