timberlane school field restoration project middle school freshman jv
TRANSCRIPT
T imber lane Schoo lF ie ld Res to ra t i on P ro jec t
Middle School Freshman
JV
Tonight
• To review JV/ Middle School Baseball Field proposed renovation donation:• Dugouts• Batting cages• General Field Improvements• Long term Goals
• Proposed value
• Phase one: $19,369.25• Phase two: $20,366.00
Quick update
What we’ve accomplished so far!
Where We Started
Day 1 irrigation
Shine on me!
Phase 1
Two 9’ x 50’ dugouts
Construction to be supervised by Jim Hughes and Angelo Fantasia
Construction•Reinforced Concrete Pads•8’ CMU three courses high•2 X 6 stick Construction
Proposed Cost $19,369.25
Phase 2 Batting CagesTwo 70’ X 16’ x12’ Batting Cages
Internal Net to fit inside cages
Increased value at practices
Saves on existing infrastructure
Access from dug out directly into batting cage
Proposed Cost $20,366.00
Batting Cage
T
Dugout
Dugou
tSeat
s
Seats
Battin
g Cage
310’
350’
Design Advantages
Batting Cages:
Extensions of backstop
Used as on deck circle
and bullpen
Increase efficiency of
practice time
Dugouts:
Provides a dry and
sheltered area for players
Adds separation
from students and fans
Field Needs
Long Term Project
•Bleachers•Outfield fence•Lights
Proposed Screening
Serves three purposesPrivacy from Batting cages and other
fields.Mode of corporate donationsTeam logo
Proposed Value
JV FIELD RESTORATIONItem Materials Total cost Alt Extension
Dug outs 2 x 50' x 12' 2x6x8 with 4x8 siding 1,259.65$ 2,519.30$ 8" CMU 375.00$ 750.00$ Paint/ nials/ rental 925.00$ 925.00$
roof 1,857.00$ 3,714.00$ Timbertech benches 1,885.95$
Pad 1,250.00$ 2,500.00$ Labor 3,537.50$ 7,075.00$
Footings and foundation Total Dug out 19,369.25$
Fence /Poles batting cages 9,585.00$ 19,166.00$ 19,166.00$
Netting 1,200.00$
20,366.00$
Master Plan
Parent Participation
• Communications• Participation• Fund Raising• Team Building
projects• Short Term Field Plan• Long Term Plan
Donations
• Corporate Sponsorships
• Donation acknowledgement
• Sign of recognition• Corporate
involvement• Fund raising
activities
Value vs. Cost
• Batting cages– Cost to contract = $20,366.00–Material Cost:• Fence $ 1000.00• Misc. $ 200.00• Net $ 650.00• Labor $ 0.00 ____________Total cost $1850.00