Page 1: Timberlane School Field Restoration Project Middle School Freshman JV

T imber lane Schoo lF ie ld Res to ra t i on P ro jec t

Middle School Freshman

JV

Page 2: Timberlane School Field Restoration Project Middle School Freshman JV

Tonight

• To review JV/ Middle School Baseball Field proposed renovation donation:• Dugouts• Batting cages• General Field Improvements• Long term Goals

• Proposed value

• Phase one: $19,369.25• Phase two: $20,366.00

Page 3: Timberlane School Field Restoration Project Middle School Freshman JV

Quick update

What we’ve accomplished so far!

Page 4: Timberlane School Field Restoration Project Middle School Freshman JV

Where We Started

Page 5: Timberlane School Field Restoration Project Middle School Freshman JV

Day 1 irrigation

Page 6: Timberlane School Field Restoration Project Middle School Freshman JV

Shine on me!

Page 7: Timberlane School Field Restoration Project Middle School Freshman JV

Phase 1

Two 9’ x 50’ dugouts

Construction to be supervised by Jim Hughes and Angelo Fantasia

Construction•Reinforced Concrete Pads•8’ CMU three courses high•2 X 6 stick Construction

Proposed Cost $19,369.25

Page 8: Timberlane School Field Restoration Project Middle School Freshman JV

Phase 2 Batting CagesTwo 70’ X 16’ x12’ Batting Cages

Internal Net to fit inside cages

Increased value at practices

Saves on existing infrastructure

Access from dug out directly into batting cage

Proposed Cost $20,366.00

Page 9: Timberlane School Field Restoration Project Middle School Freshman JV

Batting Cage

T

Dugout

Dugou

tSeat

s

Seats

Battin

g Cage

310’

350’

Page 10: Timberlane School Field Restoration Project Middle School Freshman JV

Design Advantages

Batting Cages:

Extensions of backstop

Used as on deck circle

and bullpen

Increase efficiency of

practice time

Dugouts:

Provides a dry and

sheltered area for players

Adds separation

from students and fans

Page 11: Timberlane School Field Restoration Project Middle School Freshman JV

Field Needs

Long Term Project

•Bleachers•Outfield fence•Lights

Page 12: Timberlane School Field Restoration Project Middle School Freshman JV

Proposed Screening

Serves three purposesPrivacy from Batting cages and other

fields.Mode of corporate donationsTeam logo

Page 13: Timberlane School Field Restoration Project Middle School Freshman JV

Proposed Value

JV FIELD RESTORATIONItem Materials Total cost Alt Extension

Dug outs 2 x 50' x 12' 2x6x8 with 4x8 siding 1,259.65$ 2,519.30$ 8" CMU 375.00$ 750.00$ Paint/ nials/ rental 925.00$ 925.00$

roof 1,857.00$ 3,714.00$ Timbertech benches 1,885.95$

Pad 1,250.00$ 2,500.00$ Labor 3,537.50$ 7,075.00$

Footings and foundation Total Dug out 19,369.25$

Fence /Poles batting cages 9,585.00$ 19,166.00$ 19,166.00$

Netting 1,200.00$

20,366.00$

Page 14: Timberlane School Field Restoration Project Middle School Freshman JV

Master Plan

Parent Participation

• Communications• Participation• Fund Raising• Team Building

projects• Short Term Field Plan• Long Term Plan

Donations

• Corporate Sponsorships

• Donation acknowledgement

• Sign of recognition• Corporate

involvement• Fund raising

activities

Page 15: Timberlane School Field Restoration Project Middle School Freshman JV

Value vs. Cost

• Batting cages– Cost to contract = $20,366.00–Material Cost:• Fence $ 1000.00• Misc. $ 200.00• Net $ 650.00• Labor $ 0.00 ____________Total cost $1850.00