thomas jefferson national accelerator facility page 1 slow controls ken livingston university of...

9
Thomas Jefferson National Accelerator Facility Page 1 Slow Controls Ken Livingston University of Glasgow

Upload: kellie-carr

Post on 31-Dec-2015

215 views

Category:

Documents


1 download

TRANSCRIPT

Thomas Jefferson National Accelerator Facility

Page 1

Slow Controls

Ken Livingston

University of Glasgow

Thomas Jefferson National Accelerator Facility

Page 2

Slow Controls

Slow controls are for

ConfiguringMonitoringArchiving

The experiment

Low Voltages.

High Voltages

Gas pressures

Thresholds

Targets

Magnets

Temperatures

Thomas Jefferson National Accelerator Facility

Page 3

Slow Controls: Core System

Experimental Physics and Industrial Control System

Widely used and supported at national labs (eg ANL, BNL)

Drivers for most hardware Already used for Hall-B / CLAS

Expertise within collaboration Used at MCC

Lots of on-site expertise Communication with other control sytems

PCL, LabView

Thomas Jefferson National Accelerator Facility

Page 4

Slow Controls: Hardware Support

A list of “standard” supported hardware has been compiled

Drivers exist (or will be written / updated) Detector groups strongly encouraged to use this.

Identify non-standard hardware Develop drivers

Time estimate: 1 person year.

Thomas Jefferson National Accelerator Facility

Page 5

Slow Controls: Front End

Control Systems StudioEclipse-based collections of tools to monitor and operate large scale control systems, such as the ones in the accelerator community.

Developed and used by many big labs (DESY, SNS, BNL)

Maintained and supported Easy to develop user GUIs Tool to convert old style .adl GUIs.

Will be used by Hall-D Much groundwork and testing already done.

CSS already being tested on existing CLAS EPICS

Thomas Jefferson National Accelerator Facility

Page 6

Slow Controls: Alarms

Single table or tree view

Sort by PV, Urgency, Severity .. Connect with:

Other CSS components Variable passing, alarm timelines E log entries Send alarm PV to other PV tool Web reports

Will be used by Hall-D

Much groundwork and testing already done

Best Ever Alarm SystemIntegrated into CSS

Thomas Jefferson National Accelerator Facility

Page 7

Slow Controls: Alarms – BEAST Technical View

Alarm Cfg & StateRDB

Alarm Cfg & StateRDB

IOCsIOCs

Alarm ServerCurrent Alarms: Acknowledged? Transient? Annunciated?

Alarm ServerCurrent Alarms: Acknowledged? Transient? Annunciated?

LOGLOG

MessageRDB

MessageRDB

JMS2

Speech

JMS2

Speech

JMS2

RDB

JMS2

RDB

Tomcat-Reports

Tomcat-Reports

CSS ApplicationsCSS Applications

Alarm Client GUI

JMS

Alarm Updates Ack’; Config UpdatesAnnunciationsLog Messages

TALKTALK ALARM_CLIENTALARM_CLIENTALARM_SERVERALARM_SERVER

PV Updates (Channel Access, …)

Thomas Jefferson National Accelerator Facility

Page 8

Slow Controls: Archiving

CSS has integrated archiving

RDB (Oracle, MySQL, PostgresSQL) Access to timelines etc – like live system.

MCC have developed MYA MySQL base EPICS Archiver Already tested and used Offered as a service to other Halls

CSS or MYA ? Hall D evaluated options - they will use MYA MYA integrated into CSS – best of both

MCC developing this CLAS 12 will use MYA + CSS

http://accelconf.web.cern.ch/accelconf/icalepcs2009/papers/wep021.pdf MYA – C. Slominski, Accel

Thomas Jefferson National Accelerator Facility

Page 9

Slow Controls: Summary

Core system: EPICS R3.14

Work well underway Supported hardware list produced Drivers ready within 1 year

Front End: CSS (Control Systems Studio) Installation and testing in progress.

Alarm: BEAST (Best Ever Alarm System) To be installed and tested over summer

Archiving (MYA) To be set up over next year in consultation with MCC