the upper paint creek watershed

11
Group 1: Annie Allison Prapti * The Upper Paint Creek Watershed

Upload: rhoda

Post on 22-Mar-2016

49 views

Category:

Documents


2 download

DESCRIPTION

The Upper Paint Creek Watershed. Group 1: Annie Allison Prapti. Counties: Madison, Fayette, Ross, Highland, Clinton Location: Located in the Southwest quadrant of Ohio Drains into the Ohio River . General Information. Land Use:. Sources of Impairment:. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: The Upper Paint Creek Watershed

Group 1:AnnieAllisonPrapti

*The Upper Paint Creek Watershed

Page 2: The Upper Paint Creek Watershed

*General Information

Counties:*Madison, Fayette,

Ross, Highland, ClintonLocation:*Located in the

Southwest quadrant of Ohio*Drains into the Ohio

River

Page 3: The Upper Paint Creek Watershed

Land Use:*Land is used for

agricultural reasons with some forest areas

Sources of Impairment:

*More General Information

Page 4: The Upper Paint Creek Watershed

*Hypothesis As the amount of agricultural areas

increase in the riparian zone, the fish diversity decreases.

Page 5: The Upper Paint Creek Watershed

65.0% 70.0% 75.0% 80.0% 85.0% 90.0% 95.0% 100.0%0.0

10.0

20.0

30.0

40.0

50.0

60.0Percent of Land Use and IBI Comparison

AvIBILinear (AvIBI)Linear (AvIBI)

Percent of Land Use

Mea

sure

of I

BI

R= -0.485

Page 6: The Upper Paint Creek Watershed

When the percent of agricultural land in the riparian zone increases

then the nitrate level should increase.

*Hypothesis

Nitrate Ion

Page 7: The Upper Paint Creek Watershed

* My Graph on Nitrates and Agriculture

Page 8: The Upper Paint Creek Watershed

*HypothesisIf the substrate quality is poor, the

fish diversity will also be poor.

Page 9: The Upper Paint Creek Watershed

100108

4

100109

7

100209

7

200108

6

200109

7

200100

6

300100

6

300208

7

300200

6

300300

6

300508

4

300500

6

400100

6

400200

6

400409

7

400509

7

400609

6

400709

7

400800

6

500109

7

500208

9

500200

6

500309

7

500409

70.0

10.0

20.0

30.0

40.0

50.0

60.0 The Substrate and IBI Levels

Av-SUB-STRATE

AvIBI

HucDates

Subs

trat

e/IB

I Lev

els

Page 10: The Upper Paint Creek Watershed

Current Conservation*Conservation Tilling: When

at least 30% of the soil is covered with residue*No-till farming: When the

most of the soil is covered all the time. The soil is also firmly compacted, which decreases runoff. *Strip farming is when the

farmers put vegetation in between the land

What can we do to help?

* Improve the quality of the riparian zone by planting more vegetation

*EPA requests 30ft of high quality riparian zone

*Use the prescribed amount of fertilizer

*Conclusion

Page 11: The Upper Paint Creek Watershed

*Thank You!

We want to say thank you to the chaperones, the teachers, the OSC staff, and OSU for doing this camp and helping out! It was really fun and we learned a lot about Environmental Science.