the stibo graphic case evaluation of wbl at stibo

15
20th May 2005 Mondragon 1 The Stibo Graphic Case Evaluation of WBL at Stibo

Upload: toni

Post on 30-Jan-2016

64 views

Category:

Documents


0 download

DESCRIPTION

The Stibo Graphic Case Evaluation of WBL at Stibo. Stibo Graphic A/S. Stibo Graphic A/S offers advanced publishing solutions – both printed and electronic – for publishers of telephone directories, catalogues, periodicals and magazines. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: The Stibo Graphic Case  Evaluation of WBL at Stibo

20th May 2005 Mondragon 1

The Stibo Graphic Case

Evaluation of WBL at Stibo

Page 2: The Stibo Graphic Case  Evaluation of WBL at Stibo

20th May 2005 Mondragon 2

Stibo Graphic A/S

• Stibo Graphic A/S offers advanced publishing solutions – both printed and electronic – for publishers of telephone directories, catalogues, periodicals and magazines.

• Stibo Graphic A/S is a division of the company Stibo A/S. The group operates on a global level (in Europe, North America and the Far East) and has approx. 1,000 employees.

Page 3: The Stibo Graphic Case  Evaluation of WBL at Stibo

20th May 2005 Mondragon 3

SALSA project

• Customer Project

• Salsa is an application for mobile sales. The system ensures a fully electronic workflow when selling ads in directories.

Page 4: The Stibo Graphic Case  Evaluation of WBL at Stibo

SALSA

1/10- 03 1/10-04

Stibo Graphic ’Customer Project’

Primary persons involved:

Manager:•Head of Solutions

Learners:•PhD•M.Sc. E E•B.Sc. E E

Page 5: The Stibo Graphic Case  Evaluation of WBL at Stibo

20th May 2005 Mondragon 5

Phases in a WBL-course

Contact phaseInitiating discussion of Learning ObjectivesLearning ObjectivesLearning Contract

- Implementation of WBL

- Evaluation of Learning Objectives

Page 6: The Stibo Graphic Case  Evaluation of WBL at Stibo

20th May 2005 Mondragon 6

SALSA –Learning Contract

4 Learning Objectives was defined:

• Project Management

• Estimation

• Re-engineering

• Architecture

Page 7: The Stibo Graphic Case  Evaluation of WBL at Stibo

SALSA

PROJECT MANAGEMENT

Estimation Re-engineering Architecture

Structure

1/3- 04 1/10-04

Page 8: The Stibo Graphic Case  Evaluation of WBL at Stibo

20th May 2005 Mondragon 8

Phases in a WBL-course

Contact phaseInitiating discussion of Learning ObjectivesLearning ObjectivesLearning ContractImplementation of WBL

- Evaluation of Learning Objectives

Page 9: The Stibo Graphic Case  Evaluation of WBL at Stibo

SALSA

1/3- 04 1/10-04

WBL Process

Page 10: The Stibo Graphic Case  Evaluation of WBL at Stibo

20th May 2005 Mondragon 10

Phases in a WBL-course

Contact phaseInitiating discussion of Learning ObjectivesLearning ObjectivesLearning ContractImplementation of WBLEvaluation of Learning Objectives

Page 11: The Stibo Graphic Case  Evaluation of WBL at Stibo

20th May 2005 Mondragon 11

Evaluation of Learning ObjectivesPost Mortem evaluation was carried out in September 2004.

• The learners was introduced to Post Mortem method and Project Management theory The Post Mortem was successful:• Opportunity to discuss estimation in the project and to look for

successes and failures• Elaborate on learning from both the successes and the failures

• The post mortem was evaluated as the last activity and the learners had learned both about Project Management and about doing Post Mortems

Page 12: The Stibo Graphic Case  Evaluation of WBL at Stibo

20th May 2005 Mondragon 12

Evaluation of WBL at STIBO

General comments on WBL at STIBO

Comments from:

• Learners

• Manager

• Teacher

• Administrator

Page 13: The Stibo Graphic Case  Evaluation of WBL at Stibo

SALSA

PROJECT MANAGEMENT

Estimation Re-engineering Architecture

1/3- 04 1/8-04 1/10-04

PR

OJE

CT

M

AN

AG

EM

EN

T

AdditionalContract

WBL at STIBO

Page 14: The Stibo Graphic Case  Evaluation of WBL at Stibo

20th May 2005 Mondragon 14

Comments from Learners

• Learning Objectives changed through the WBL course

• Our goal was to learn as much as possible!

• More would have been gained by being more focused on actual needs

• Pointed remarks from colleagues not involved in WBL

Page 15: The Stibo Graphic Case  Evaluation of WBL at Stibo

20th May 2005 Mondragon 15

Comments from Manager• The strength is a taylor-made WBL

– According to the company strategy– According the need of the individual engineering– According to the need of a single project

• 20-50 % CEE is suitable for WBL• Absent at traditional courses / Not absent at WBL

- dilemma• University ’long-haired’ theory meet practical

workday in company• Arrange and organize meetings