the pavement number as a structural design methodthe pavement number as a structural design method...

41
SARF/IRF 2014 | 2-4 September, South Africa The Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions

Upload: others

Post on 07-Apr-2020

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

SARF/IRF 2014 | 2-4 September, South Africa

The Pavement Number as a Structural Design Method

Dr Fenella Johns Rubicon Solutions

Page 2: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Background

• TG2 (Foamed bitumen) (2002) – Uncomfortable with structural design method

– Conservative designs

– Loose links between mix and structural design

• SAMDM – Powerful, but many flaws

– Loose guidelines for inputs

– Very difficult to validate new criteria (transfer functions) with real field data

Page 3: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Background

• Relook at methods

– Sponsored by SABITA and Gauteng (GDPTRW)

– Started process in 2005

– Much discussion with relevant role players

• Priorities

– Use real field data to develop and validate structural design methods

– Robust systems, not open to abuse

– Strong links between mix design, structural design and specifications

– Clear guidelines for use

Page 4: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Background

• Resulted in Material Classification and Pavement Number Methods

– Formally published in TG2 (2009)

– Not only applicable to BSMs

Page 5: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Pavement Design Methods

• Empirical

– Primarily based on observations of performance

• Mechanistic-empirical

– Considers the pavement as a mechanism, with stresses and strains

– Links the calculated stresses and strains under loading to observations of performance

Page 6: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Pavement Design Methods

• Empirical – AASHTO

– DCP

• Mechanistic-Empirical – South African Mechanistic Design Method

(SAMDM)

– With it’s associated failure criteria and transfer functions

- PAVEMENT NUMBER (knowledge based)

Page 7: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Knowledge Based Approach

• Gather all available field performance data • Utilise best elements of mechanistic analysis • Robust and easy to use • Validated! • Develop clear, strong links to field testing

(material classification) and specifications • Data Sets

– 20 field sites – 7 HVS Sites (22 test sections) – Construction, maintenance & performance information – TRH4 catalogue

Page 8: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Pavement Number

• Based on the Structural Number Concept

– Old AASHTO method

• Improved by incorporating

– Established design principles

– Local experience

• Calibrated for long term field performance

Page 9: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Structural Number Revisited

CBR 7-15%

150 mm ETB

200 mm C4

40 mm AC Thick1 x A1 = SN1

Thick2 x A2 = SN2

Thick3 x A3 = SN3

SN = SN1 + SN2 + SN3

Adjusted for Subgrade Conditions

Page 10: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Disadvantages of SN Approach

• Non-uniqueness of the index

– Switching base and subbase give same SN

• Insensitivity to placement of weak layers

CBR 7-15%

150 mm G1

150 mm C4

40 mm AC Thick1 x A1 = SN1

Thick2 x A2 = SN2

Thick3 x A3 = SN3

SN = SN1 + SN2 + SN3

These limitations are overcome by incorporating design rules of thumb that make the SN more “intelligent”.

Page 11: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Pavement Number

• Structural Number

– modified with rules of thumb

• Calibrated & validated

– Field data

– Catalogues of design

– Experience

Page 12: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Rules of Thumb

• Structural capacity is a function of the combined long term load spreading of all pavement layers

• Subgrade quality is the point of departure for design

• The type and quality of the base layer is critical

Says Who?

• Established knowledge in guidelines and textbooks

• Trends in well established design catalogues (TRH4)

• Trends in LTPP and HVS section performance

Page 13: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Rules of Thumb

• Effective Long Term Stiffness (ELTS)

• Modular Ratio

• Maximum Allowable Stiffness

• Base Confidence Factor

Page 14: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Modular Ratio

• The stiffness of one layer as a ratio of the layer underneath

CBR 7-15%

150 mm G3

200 mm G6

40 mm AC

E = 300

E = 150

= 2

MR for BSMs higher than granular

materials due to increased cohesion

Page 15: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Effective Long Term Stiffness (ELTS)

• Represents the average stiffness of the material over the design life

• Depends on the material type/quality

• Model-specific parameter

– Not measured in the lab or field

• To calculate:

Modular Ratio x Support Stiffness

Maximum Allowable Stiffness Minimum

Given values for DEMAC

Page 16: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Quality of Base Material

• Base Confidence Factor (BCF)

– Recognizes the importance of appropriate base material

– Ensures poor designs are disqualified

Page 17: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Material Class Modular Ratio Max Allowable

Stiffness

Base

Confidence

Asphalt 5 2500 1

Seals 2 800 N/A

BSM1 3 600 1

BSM2 2 450 0.7

G1 3 700 1.1

G2 2 500 0.8

G3 2 400 0.7

G4 1.8 375 0.2

G5 1.8 320 0.1

G6 1.8 180 -2

G7 1.7 140 -2.5

G8 1.6 100 -3.0

G9 1.4 90 -4.0

G10 1.2 70 -5.0

C1 & C2 9 1500 0.8

C3 4 550 0.6

C4 3 400 0.4

Page 18: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Subgrade Characterization

• Starting point for design

• Determine stiffness based on Material Class

Design equivalent

material class

Stiffness value

(MPa)

DE-G6 or better 180

DE-G7 140

DE-G8 100

DE-G9 90

DE-G10 70

• Adjust for climate

• Adjust for cover depth (stress-sensitivity)

Page 19: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Climate Adjustment

Climate /

Weinert N

Values

Adjustment

Factor

Wet

(N < 2)

0.6

Moderate

(N = 2 to 5)

0.9

Dry

(N > 5)

1.0

Page 20: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Subgrade Cover Adjustment

-15

-10

-5

0

5

10

15

400 450 500 550 600 650 700 750 800 850 900

Ad

jus

tme

nt

to S

ub

gra

de

Sti

ffn

es

s (

MP

a)

Thickness of Subgrade Cover (mm)

If Cover Thickness (in mm) is:

> 800, then Adjustment = +10 MPa

< 500, then Adjustment = -10 MPa

else:

Adjustment = -10 + [(Cover-500)/300] * 20 MPa

Page 21: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Thickness Limits

Material type Layer situation Thickness limits

Minimum Maximum

Asphalt Surfacing 20 50

Seals Surfacing 5 5

BSMs Base and subbase 100 350

Cement stabilised Subbase 100 400

Granular (G1-G10) Base, subbase &

selected

100 300

• Must have 5 layers

Page 22: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Traffic Limits

• PN applicable to

– 1 to 30 MESA

Page 23: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

PN example

Page 24: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

118 MPa

6. Calculate Layer ELTS Values

118 MPa

4. Adjust for cover

Example, Moderate Region

1. Material Classes

2. Determine subgrade stiffness

3. Adjust for climate

CBR 7-15%

180 mm G6

200 mm C4

150 mm BSM2

150 mm G7

5. Assign modular ratio’s and max stiffness

MR = 1.8, EMax = 180

MR = 3, EMax = 400

MR = 2, EMax = 450

7. Layer PN = thickness * ELTS

8. PN = layer PN

6. ELTS = min (Esupport * MR , Emax)

ELTS = min(212,180)

ELTS = 180

ELTS = 400

Thickness Adj = 0.4

ELTS = 450

BCF = 0.7

180 mm G6

200 mm C4

150 mm BSM2

150 mm G7

Page 25: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Design Criteria

0

5

10

15

20

25

30

35

0 10 20 30 40 50

Pavement Number

Min

imu

m S

tru

ctu

ral C

ap

acit

y

(ME

SA

)

Category A

Category B

Not a transfer function

Rather, design frontier

Page 26: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Calibration

0

5

10

15

20

25

30

35

40

45

0 5 10 15 20 25 30 35 40 45 50 55

Pavement Number

Str

uctu

ral C

ap

acit

y / T

raff

ic A

cco

mm

od

ate

d (

mesa)

TRH4 Cat A

TRH4 Cat B

LTPP Sound

LTPP Warning

LTPP Failed

HVS Sound

HVS Warning

HVS Failed

Criteria Cat A

Criteria Cat B

Page 27: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Advantages of PN

• Simple method for determining structural capacity

• Valid for most SA materials

• Easy to understand & use

• Robust, and cannot be easily manipulated

• Utilizes well known rules of thumb

• Well and explicitly validated with TRH4, LTPP and HVS datasets

• Requires Material Class as design inputs

Page 28: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

PN Software

• www.asphaltacademy.co.za/bitstab

• Any changes in constants will be posted on website

Page 29: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

PN example Subgrade class G7

Initial stiffness

Climate Moderate

Climate adj

Cover depth

Cover adj.

SG ELTS

Mat

class

Thick T

check

MR Max E ELTS Thick

adj

BCF Layer

PN

Seal 5

BSM2 200

C4 200

G6 180

G7 N/A

Page 30: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

PN example Subgrade class G7

Initial stiffness 140

Climate Moderate

Climate adj 0.9

Cover depth

Cover adj. -4

SG ELTS

Mat

class

Thick T

check

MR Max E ELTS Thick

adj

BCF Layer

PN

Seal 5 5 2 800 1 N/A

BSM2 200 ✓ 2 450 1 1

C4 200 ✓ 3 400 0.4 N/A

G6 180 ✓ 1.8 180 1 N/A

G7 N/A N/A N/A 1 N/A

Design

equivalent

material

class

Stiffness

value (MPa)

G6 or better 180

G7 140

G8 100

G9 90

G10 70

Page 31: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

PN example Subgrade class G7

Initial stiffness 140

Climate Moderate

Climate adj 0.9

Cover depth

Cover adj. -4

SG ELTS

Mat

class

Thick T

check

MR Max E ELTS Thick

adj

BCF Layer

PN

Seal 5 5 2 800 1 N/A

BSM2 200 ✓ 2 450 1 1

C4 200 ✓ 3 400 0.4 N/A

G6 180 ✓ 1.8 180 1 N/A

G7 N/A N/A N/A 1 N/A

Climate /

Weinert N

value

Adjustment

factor

Wet (N < 2) 0.6

Moderate

(N = 2 to 5)

0.9

Dry (N > 5) 1.0

Page 32: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

PN example Subgrade class G7

Initial stiffness 140

Climate Moderate

Climate adj 0.9

Cover depth

Cover adj. -4

SG ELTS

Mat

class

Thick T

check

MR Max E ELTS Thick

adj

BCF Layer

PN

Seal 5 5 2 800 1 N/A

BSM2 200 ✓ 2 450 1 1

C4 200 ✓ 3 400 0.4 N/A

G6 180 ✓ 1.8 180 1 N/A

G7 N/A N/A N/A 1 N/A

DEMC BSM1 BSM2

Modular Ratio 3.0 2.0

Max Allowed

Stiffness

600 450

BCF 1.0 0.7

Thickness limit 100 to 350

mm

100 to 350

mm

Page 33: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

PN example

Mat

class

Thick T

check

MR Max E ELTS Thick

adj

BCF Layer

PN

Seal 5 5 2 800 1 N/A

BSM2 200 ✓ 2 450 1 1

C4 200 ✓ 3 400 0.4 N/A

G6 180 ✓ 1.8 180 1 N/A

G7 N/A N/A N/A 1 N/A

-15

-10

-5

0

5

10

15

400 450 500 550 600 650 700 750 800 850 900

Ad

justm

en

t to

Su

bg

rad

e S

tiff

ness (

MP

a)

Thickness of Subgrade Cover (mm)

If Cover Thickness (in mm) is:

> 800, then Adjustment = +10 MPa

< 500, then Adjustment = -10 MPa

else:

Adjustment = -10 + [(Cover-500)/300] * 20 MPa

Subgrade class G7

Initial stiffness 140

Climate Moderate

Climate adj 0.9

Cover depth 585

Cover adj. -4

SG ELTS

Page 34: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

PN example Subgrade class G7

Initial stiffness 140

Climate Moderate

Climate adj 0.9

Cover depth 585

Cover adj. -4

SG ELTS 122

Mat

class

Thick T

check

MR Max E ELTS Thick

adj

BCF Layer

PN

Seal 5 5 2 800 1 N/A

BSM2 200 ✓ 2 450 1 1

C4 200 ✓ 3 400 0.4 N/A

G6 180 ✓ 1.8 180 1 N/A

G7 N/A N/A N/A 1 N/A

140 * 0.9 - 4 = 122

Page 35: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

PN example Subgrade class G7

Initial stiffness 140

Climate Moderate

Climate adj 0.9

Cover depth 585

Cover adj. -4

SG ELTS 122

Mat

class

Thick T

check

MR Max E ELTS Thick

adj

BCF Layer

PN

Seal 5 5 2 800 1 N/A

BSM2 200 ✓ 2 450 1 1

C4 200 ✓ 3 400 0.4 N/A

G6 180 ✓ 1.8 180 1 N/A

G7 N/A N/A N/A 122 1 N/A

Page 36: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

PN example Subgrade class G7

Initial stiffness 140

Climate Moderate

Climate adj 0.9

Cover depth 585

Cover adj. -4

SG ELTS 122

Mat

class

Thick T

check

MR Max E ELTS Thick

adj

BCF Layer

PN

Seal 5 5 2 800 1 N/A

BSM2 200 ✓ 2 450 1 1

C4 200 ✓ 3 400 0.4 N/A

G6 180 ✓ 1.8 180 1 N/A

G7 N/A N/A N/A 122 1 N/A

Calculation of ELTS

122*1.8 = 220

180

But, max is 180

Page 37: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

PN example Subgrade class G7

Initial stiffness 140

Climate Moderate

Climate adj 0.9

Cover depth 585

Cover adj. -4

SG ELTS 122

Mat

class

Thick T

check

MR Max E ELTS Thick

adj

BCF Layer

PN

Seal 5 5 2 800 800 1 N/A

BSM2 200 ✓ 2 450 450 1 1

C4 200 ✓ 3 400 400 0.4 N/A

G6 180 ✓ 1.8 180 180 1 N/A

G7 N/A N/A N/A 122 1 N/A

Page 38: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

PN example Subgrade class G7

Initial stiffness 140

Climate Moderate

Climate adj 0.9

Cover depth 585

Cover adj. -4

SG ELTS 122

Mat

class

Thick T

check

MR Max E ELTS Thick

adj

BCF Layer

PN

Seal 5 5 2 800 800 1 N/A

BSM2 200 ✓ 2 450 450 1 1 9.0

C4 200 ✓ 3 400 400 0.4 N/A

G6 180 ✓ 1.8 180 180 1 N/A

G7 N/A N/A N/A 122 1 N/A

Calculation of layer PN

(450 * 200)/10000 * 1 = 9.0

Page 39: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

PN example Subgrade class G7

Initial stiffness 140

Climate Moderate

Climate adj 0.9

Cover depth 585

Cover adj. -4

SG ELTS 122

Mat

class

Thick T

check

MR Max E ELTS Thick

adj

BCF Layer

PN

Seal 5 5 2 800 800 1 N/A 0.4

BSM2 200 ✓ 2 450 450 1 0.1 9.0

C4 200 ✓ 3 400 400 0.4 N/A 3.2

G6 180 ✓ 1.8 180 180 1 N/A 3.2

G7 N/A N/A N/A 122 1 N/A 15.8

Page 40: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

Design Criteria

0

5

10

15

20

25

30

35

0 10 20 30 40 50

Pavement Number

Min

imu

m S

tru

ctu

ral C

ap

acit

y

(ME

SA

)

Category A

Category B

Not a transfer function

Rather, design frontier

Page 41: The Pavement Number as a Structural Design MethodThe Pavement Number as a Structural Design Method Dr Fenella Johns Rubicon Solutions . Background • TG2 (Foamed bitumen) (2002)

PN example Subgrade class G7

Initial stiffness 140

Climate Moderate

Climate adj 0.9

Cover depth 585

Cover adj. -4

SG ELTS 122

Mat

class

Thick T

check

MR Max E ELTS Thick

adj

BCF Layer

PN

Seal 5 5 2 800 800 1 N/A 0.4

BSM2 200 ✓ 2 450 450 1 0.1 9.0

C4 200 ✓ 3 400 400 0.4 N/A 3.2

G6 180 ✓ 1.8 180 180 1 N/A 3.2

G7 N/A N/A N/A 122 1 N/A 15.8

Cat A 3.0

Cat B 3.6