the coastal highway route e39 kjersti kvalheim dunham ... extreme crossings along the e39 ... the...

35
14.11.2017 Extreme crossings along the E39 The Coastal Highway Route E39 – Kjersti Kvalheim Dunham Illustration from Sulafjorden: Rambøll/Sweco

Upload: dinhhanh

Post on 21-Jun-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

14.11.2017

Extreme crossings along the E39The Coastal Highway Route E39 – Kjersti Kvalheim Dunham

Illustration from Sulafjorden: Rambøll/Sweco

Page 3: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

The current E39

14/11/2017

● E39 Kristiansand-

Trondheim

nearly 1100 km,

including 7 ferry

connections

● E39 ferry connection

Kristiansand-Hirtshals

● Aalborg: The E39 joins

the E45 which continues

to Italy

Page 4: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

An improved and continuous E39 - what does that mean?

● Open road 24/77 ferry connections removed

● Travel and transport timereduced from 21 hours to 11 hours

● New solutions and new competence

– Similar bridge solutions have never been built before

14/11/2017

Illustration: NPRA

Page 5: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

Counties along the E39

2016-2040

14/11/2017

Inhabitants as of 1 Jan 2017

MØRE OG ROMSDAL

266 274SOGN OG FJORDANE

110 266HORDALAND

519 963

Rogaland

472 024

SØR-TRØNDELAG

317 363

VEST-AGDER

184 116

● 1/3 of thecountry’spopulation

● Approx. 60 % ofour export value

Source: Central Bureau of Statistics (SSB). Map details: Norwegian Mapping Authority

Page 6: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

Major savings for freight transport

Transport costs

14/11/2017

21 hours8 ferriesNOK 28355

9381

6410

6410

13477

6996

6996

5497

9222

1003

0 5000 10000 15000 20000 25000 30000

2016

2035

2050

Dist.avhengige kostander Tidskostnader

11 hours0 ferriesNOK 22628

11 hours0 ferriesNOK 14408

Page 7: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

History

● 2013: National Transport Plan (NTP)2014 – 2023

– Ambition: An improved and continuous E39 Coastal Highway

– Time frame: 20 years if completed as one project

– Cost: NOK 150 billion

– Travel time: A reduction of 7-8 hours

● A united Storting adopts the plan

The Coastal Highway Route E39

14/11/2017

Dagbladet, 7 March 2013

Page 8: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

How it can it be built in 20 years

An improved and continuous E39

14.11.2017 Investment: 5-20 billion NOK every year for 20 years

Page 9: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

Priorities as of March 3rd 2016

Nye Veier AS

14.11.2017Kilde: Nye Veier AS

Page 10: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

The NTP 2018 - 2029

● The E39 is to be developed into a continuous coastal highway without ferries

● Several parts on land, and three of thefjord-crossings are in the 12-year plan. One more of the crossings may comewithin the period.

● All political parties (with exeption of one) wants the Coastal Highway

● We have started with a new development plan!

The Coastal Highway Route E39

14.11.2017

Page 11: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

New development plan

● Costs:

– Already substancial cost reductions

– Divided into shorter distances?

– More partly development? (2 lanes first, 4 later)

● How many years to compleation?

● Will be ready in february 2018, Together with NPRAsStrategic programme 2018 – 2022

Coastal Highway Route E39

14.11.2017

Delstrekning/parsell 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

Kristiansand-SøgneSøgne-LyngdalLyngdal-ÅlgårdÅlgård-HoveHove-SandvedSandved-SmieneSmiene-HarestadHarestad-Arsvågen Rogfast

Arsvågen-VågVåg-Heiane Bømlafjorden

Heiane-ÅdlandÅdland-Svegatjørn Bjørnafjorden

Svegatjørn-RådalRådal-VågsbotnVågsbotn- KnarvikKnarvik-OstereideOstereide-OppedalOppedal-Lavik Sognefjorden

Lavik-TorvundBogstunnelen-Gaular gr.Dregebø-Sande NSande N-StorehaugStorehaug-VassendenVassenden-ByrkjeloByrkjelo-Grodås Nordfjorden

Grodås-VoldaVolda-FureneFurene-Hareid Eiksund/Vartdalsfjorden

Hareid-Sulesund Sulafjorden

Sulesund-VegsundVegsund-BreivikaÅlesund-Molde Romsdalsfjorden

Molde-ÅrøÅrø-HjelsetHjelset-BergsøyaBergsøya-Betna Halsafjorden

Betna-StormyraStormyra-ThamshamnThamshamn-Klett

The plan from 2016

Page 12: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

What does it require to make it happen?

14/11/2017

● Development of new technology and more knowledge– Five highly challenging fiord crossings

– Looking at offshore methodology for technology development and qualification

– Studying wind, wave and current conditions

● Building competenceMore than 50 PhDs from the Norwegian University of Science and Technology (NTNU), Chalmers, the University of Stavanger (UiS) and others (including postdocs)

● Funding– Development costs: Requires funds to be allocated at an earlier stage than for traditional

road projects

New solutions and new competence

Page 13: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

The Coastal Highway Route E39

14.11.2017

Steering

committeDirector General NPRA

Project

managerKjersti K. Dunham

Strategies

Kjetil Strand

Planniing &

constructionKjartan Hove

Society

Cathrine Helle-Tautra

Contracts

Jan Eirik Henning

Fjord

crossings

Mathias E. Eidem

Risk Management and

Techn. QualificationTore Askeland

Sustainable

infrastructure

Communication

Linda Grønstad

Reference group

County Mayors

PhD/PostDoc/Professors at the universities

NB Planning and building is the responsibility of the NPRA regions

Page 14: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

Challenging fiord crossings

The E39 Coastal Highway Route

Fiord Length (km) Depth (m)

Halsafjorden 2 5-600

Julsundet 1.6 5-600

Romsdalsfjorden 13 330

Sulafjorden 3.8 500

Vartdalsfjorden 2.1 600

Nordfjorden 1.4 500

Sognefjorden 3.7 1250

Bjørnafjorden 5 5-600

Langenuen 1.3 500

Boknafjorden 27 390

14/11/2017= subsea tunnel

Page 15: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

14.11.2017

Page 16: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

Alternative solutions for the large fiord crossings

• Suspension bridge

• Floating bridge (combined with suspension/cable-stayed bridges)

• Submerged floating tube bridge (floating tunnel)

• Immersed tunnel/subsea rock tunnel

14/11/2017

Page 17: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

The history of Suspension bridges in Norway 1972-2013

14/11/2017 Source: Kristian Berntsen

Page 18: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

14/11/2017

Page 19: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

Suspension bridge across Julsundet

● Romsdalsfjorden

14/11/2017

Page 20: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

Floating bridge - combined with cable-stayed bridge on floating pontoons

Based on off-

shore

technology -

tension-leg

platforms (TLP)

Illustrations: NPRA

Page 21: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

Submerged floating tube bridge anchored to pontoons on the surface

Aas-Jakobsen/COWI/Johs Holt/Skanska/NGI

14/11/2017

Illustrations: NPRA

Page 22: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

Ship passage

Page 23: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating
Page 24: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

14.11.2017

Page 25: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

Teknologidagene 2017Online until January !

14/11/2017 Photos: Samferdselsdepartementet, Statens vegvesen, Wuhan university and private

Floating bridgeTLP suspension bridge

Submerged floating tube bridge

Dynamic loads

Danish superprojects

One Road – One Belt

Page 26: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

Knowledge saves money!

Research /PhDs and PostDocs

14.11.2017

Page 27: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

Stor nasjonal og internasjonal● Ferjefri og utbedret E39

14.11.2017

How comfortable would you feel driving through a submerged tunnel? (Image credit: Statens Vegvesen/NPRA)

Forbes, 22.07.16

Page 29: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

14/11/2017

Page 30: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

Energy harvesting, storage, efficiency improvement and charging

“Sustainable infrastructure”

Potential assessed with regard to:Wave power • Tidal power plants • Wind power• Solar power

Power road?

14/11/2017

E39 shares knowledge with ongoing projects, and is used as a pilot for ElinGo, Rogfast Pluss and other R&D Projects.

Page 31: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

How to build a bridge with no emissions?

1. E39 as a renewable European electricity hub2. Safe and ice-free Road using renewable thermal energy sources 3. Next generation of ice-free Roads4. Smart oppvarming av brudekker (NTNU)5. Vegutforming for å redusere utslipp (NTNU)6. Bruk av steinressurser lokalt (NTNU)7. Constructed storm water systems extended to provide biodiversity neutral roads8. Graphene Reinforced Composite for Asphalt Pavements9. Graphene Enhanced Cementitious Materials 10. The role of microbiological biofilm communities for degradation of sprayed

concrete in subsea tunnels11. Saving weigh by laser welded sandwich steel elements12. Light-weight Steel Bridge (innovative welding treatment)13. Infrastructure performance viewer

PhD work within E39, sustainable infrastructure

14/11/2017

How can you get the results –online 1 hour lectures – seewww.vegvesen.no/ferjefrie39

Page 32: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

1-hour online lecture; Sustainable Infrastructure

● 29/9 ’17 Giuseppe Marinelli Energy Friendly Road Design

● 27/10 ’17 Maria Täljegård The E39 as a renewable European electicity hub

● 10/11 ‘17 Diego Maria Barbieri Bruk av lokale steinressurser

● 16/11 ‘17 Gaylord Kabongo Booto LCA and sustainability thinking in large infrastructure projects

● 1/12 ‘17 Josef Johnsson Safe and ice-free bridges using renewable thermal energy sources

● 8/12 ‘17 Raheb Mirzanamadi Safe and ice-free bridges using renewable thermal energy sources

● 15/12 ‘17 Zhenhua Sun Constructed stormwater management

● 5/1 ‘18 Tobias Alexander Danner Relevance of crack width and decompression requirements (limits) of reinforced concrete structures.

● 19/1 ‘18 Babak Ebrahimi Infrastructure performance viewer

● 26/1 ‘18 Peter Nilsson Laser welded sandwich steel elements

● 2/2 ‘18 Hrefna Run Vignisdottir LCA and sustainability thinking in large infrastructure projects

● 8/2 ‘18 Reignard Tan Evaluation and improvement of crack width calculation methods for large-scale concrete structures

● 9/2 ‘18 Sabina Karacic Biofilm deterioration in sub-sea tunnels / The role of microbiological biofilm

● 16/2 ‘18 Janne Siren Fjærestad Smart oppvarming av brudekker

● 1/3 ‘18 Poja Shams Hakimi Sustainable Design of Light-weight Steel Bridge

● 2/3 ‘18 Govindan Induchoodan Graphene enhanced Asphalt

● 9/3 ‘18 Ashenafi Yifru Effective Countermeasures for the debris & mud flow hazards along the E39 highway

● 16/3 ‘18 Nan Wang Graphene enhanced cementitious Material

Join in on www.vegvesen.no/ferjefrie39

14/11/2017

Page 33: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

What’s going on?

www.vegvesen.no/ferjefrie39

14/11/2017

Page 34: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

A continuous and forever open road!

The E39 Coastal Highway Route

14/11/2017

Illustration: Global Maritime

• Technologically feasible • Possible from a planning perspective • Financial challenges

• http://www.vegvesen.no/ferjefriE39

Page 35: The Coastal Highway Route E39 Kjersti Kvalheim Dunham ... Extreme crossings along the E39 ... The Coastal Highway Route E39 14.11.2017. ... • Submerged floating tube bridge (floating

Kjersti K. Dunham, Project Manager Coastal Highway Route E39, NPRA14.11.2017

Atlanterhavsvegen

Thank you for having me!

[email protected]

www.vegvesen.no/ferjefrie39

https://www.youtube.com/watch?v=trwd3AhJJB0&t=44shttp://www.vegvesen.no/FerryFreeE39