50
Technical Committee on Liquefied Petroleum Gas SUPPLEMENT TO THE AGENDA Doubletree Hotel Downtown 1646 Front Street San Diego, CA 92101 January 18-19, 2011 Contents: 1. Written report of the Formal Interpretations Task Group 2. Recommended actions from the Bulk Plant Definitions Task Group 3. Editorial proposals recommended for treatment as a group 4. Supplemental information from B. Mahre in support of Log #23 5. Supplemental information from J. Stannard in support of Log #43 6. New recommended Committee Proposal on movement of cylinders in buildings 7. New Discussion Item from R. Muellerleile on incorporation of liquid withdrawal valve into container valve

Upload: truongkien

Post on 27-Sep-2018

232 views

Category:

Documents


0 download

TRANSCRIPT

Technical Committee on Liquefied Petroleum Gas

SUPPLEMENT TO THE AGENDA

Doubletree Hotel Downtown 1646 Front Street

San Diego, CA 92101 January 18-19, 2011

Contents:

1. Written report of the Formal Interpretations Task Group 2. Recommended actions from the Bulk Plant Definitions Task Group 3. Editorial proposals recommended for treatment as a group 4. Supplemental information from B. Mahre in support of Log #23 5. Supplemental information from J. Stannard in support of Log #43 6. New recommended Committee Proposal on movement of cylinders in buildings 7. New Discussion Item from R. Muellerleile on incorporation of liquid withdrawal valve into container valve

Formal Interpretations Task Group Report

Formal Interpretation Task Group: FI LPG-5: Recommend adding text and graphic from handbook (Exhibit 6.1) to annex A of the code. Add “navigable waterway” to “street or highway” caption. 3.3.10 (58-04-3): Recommend the FI be withdrawn because topic is covered in A.3.3.10. 5.9.5 (92-1): Recommend the FI be withdrawn because this is a restatement of the equivalency clause in 1.5. 5.12.4 (58-01-3): Recommend the FI be withdrawn because definition of container appurtenance makes it clear that the ESV does not qualify as a container appurtenance. 6.3.9 (58-08-1): Recommend adding an annex paragraph A.6.3.8 “Building openings in the context of 6.3.8 are any opening that communicates air from the exterior to the interior of the building, including windows, doors, or dryer vent terminations below the level of the relief valve discharge.” Recommend that the FI be withdrawn if such change is made. Table 6.5.3 (95-1): Recommend the making the following changes to line K of the table: K. Flammable and Class II combustible liquid aboveground containers, aboveground containers, and filling connections of containers underground. If such changes are made, recommend withdrawing the FI. 6.12 (79-1): Recommend the FI be withdrawn because 6.12.5 of the current edition covers this explicitly. 6.12 (79-2): Recommend the FI be withdrawn because task group members believe that the interpretation is fundamentally flawed. Subsection 6.12.1 refers to the nominal size of the transfer piping, and does not provide an exclusion for piping that has been reduced downstream. 6.13 (58-04-1) The FI should be retained for now. 6.19.7.1 (FI 89-2) The FI should be retained for now. The task group recommends establishing a new task group to look at 6.19.7.1 and 6.19.7.2 to develop annex text to further define “classroom demonstrations” and “research and experimental purposes”.

6.19.9.1 (FI 89-3) The FI should be withdrawn because the topic is explicitly covered by 6.19.9.4. 6.25.3.1 (FI 58-04-4) The task group recommends adding the following annex text: A.6.25.3.1 Where there are multiple containers of less than 4,000 gallons water capacity each, the term “aggregate water capacity” refers to the total capacity of a group of aboveground containers located closer to one another than the minimum separation required for “Aboveground Containers” between containers and property lines prescribed by Table 6.3.1. Containers must still be installed with the minimum separation distances between each other as specified in Table 6.3.1. If this language is adopted, the task group recommends withdrawing the FI. 6.25.3.2 (FI 58-01-2) The task group recommends modifying A.6.25.3 as follows: The National Fire Protection Association and the National Propane Gas Association, through a grant with the Propane Education and Research Council, have developed and published the “Fire Safety Analysis Manual for LP-Gas Storage Facilities” in order to provide a format and guidance for propane industry personnel or other competent persons to perform the performance of a fire safety analysis in conjunction with the requirements of NFPA 58. If such changes are made, the task group recommends withdrawing the FI. 9.7.2.2 (FI 58-04-2) Add annex text as follows: A.9.7.2.2 The term “congested area” is intended to describe situations where access to the vehicle during an emergency would be impeded or where moving the vehicle away from an emergency would be prevented. If the changes are made, the task group recommends withdrawing the FI. 11.8.4.3 (FI 89-1) Add new annex text as follows: A.11.8.4.3 The intent of 11.8.4.3 does not limit the location of the valve as long as it is protected in accordance with 11.8.2.2 and does not require the use of any tools. If such changes are made, the task group recommends withdrawing the FI.

Bulk Plant Definitions Task Group

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #6 Final Action: Accept in Principle(3.3.10 Bulk Plant)_______________________________________________________________________________________________Submitter: Bill Mahre, Propane Technical ServicesRecommendation: Revise text to read as follows:

3.3.10 Bulk Plant. A facility, with an aggregate water capacity of more than 4000 gallons (15.1 m3), where the primary

function is to store LP-Gas prior to further distribution. LP-Gas is received by cargo tank vehicle, railroad tank car, orpipeline, and then distributed by portable container (package) delivery, or by cargo tank vehicle. or through gas piping.Substantiation: The striking out of 'through gas piping' is made in this definition and will appear in three additionalsections titled as Sections 3.3.10.1; 3.3.10.2; and 3.3.10.3.Committee Meeting Action: Accept in PrincipleSee Log #164.Committee Statement: The committee revised the definition in Log #164 to further delineate between bulk plants andindustrial plants. The language approved in Log #164 accomplishes this delineation and further edits the definition bymoving extraneous information to the annex.

_______________________________________________________________________________________________58- Log #7 Final Action: Reject(3.3.10.1 Commercial Bulk Plant (New) )_______________________________________________________________________________________________Submitter: Bill Mahre, Propane Technical ServicesRecommendation: Add new text to read as follows:

3.3.10.1 Commercial Bulk Plant. A facility with an aggregate water capacity of more than 4000 gallons (15.1 m3),

where the primary function is to store LP-Gas prior to further distribution. LP-Gas is received by cargo tank vehicle,railroad tank car, or pipeline, and then distributed by liquid or vapor through gas piping.Substantiation: This new addition will properly identify the installation and use of this storage facility.Committee Meeting Action: RejectCommittee Statement: The committee does not agree that a new commercial bulk plant definition is needed. Bulkplant is a term well understood in the industry. The committee accomplished the submitter's intent of delineating bulkretail operations from other large bulk storage facilities by creating a definition for an industrial plant in Log #164.

_______________________________________________________________________________________________58- Log #8 Final Action: Accept in Principle(3.3.10.2 Industrial Bulk Plant (New) )_______________________________________________________________________________________________Submitter: Bill Mahre, Propane Technical ServicesRecommendation: Add new text to read as follows:

3.3.10.2 Industrial Bulk Plant. A facility with an aggregate water capacity of more than 4000 gallons (15.1 m3), where

the primary function is to store LP-Gas prior to further distribution. LP-Gas is received by cargo tank vehicle, railroadtank car, or pipeline, and then distributed by liquid or vapor through gas piping. This installation will provide LP-Gas to anatural gas utility for redistribution or LP-Gas directly into distribution piping system.Substantiation: This new addition will properly identify the installation and use of this storage facility.Committee Meeting Action: Accept in PrincipleSee Log #164.Committee Statement: The committee accomplished the submitter's intent of delineating between retail bulk plantfacilities and other large bulk storage in Log #164. The committee determined that an industrial plant should include allbulk storage facilities that are not retail bulk plants.

1Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #9 Final Action: Reject(3.3.10.3 Agricultural Bulk Plant (New) )_______________________________________________________________________________________________Submitter: Bill Mahre, Propane Technical ServicesRecommendation: Add new text to read as follows:

3.3.10.3 Agricultural Bulk Plant. A facility with an aggregate water capacity of more than 4000 gallons (15.1 m3),

where the primary function is to store LP-Gas prior to further distribution. LP-Gas is received by cargo tank vehicle, andthen distributed by liquid or vapor through gas piping. This installation will provide LP-Gas distribution for agriculturalpurposes.Substantiation: This new addition will properly identify the installation and use of this storage facility.Committee Meeting Action: RejectCommittee Statement: The committee disagrees that a separate definition is needed for an agricultural bulk plant.The committee delineated retail bulk plants from all other types of bulk storage by creating a definition for industrialplant. Large bulk storage at agricultural facilities, including farms, will now be classified as industrial plants.

_______________________________________________________________________________________________58- Log #25 Final Action: Reject(6.18)_______________________________________________________________________________________________Submitter: Bill Mahre, Propane Technical ServicesRecommendation: Revise text to read as follows:6.18 Bulk Plants and Industrial LP-Gas SystemsContainer LP-Gas Systems

Substantiation: This title change will reflect the changes in 3.3.10.Committee Meeting Action: RejectCommittee Statement: The committee rejected the new definitions for other types of bulk plants, therefore the existingtitle is still accurate and descriptive.

_______________________________________________________________________________________________58- Log #26 Final Action: Reject(6.18.1)_______________________________________________________________________________________________Submitter: Bill Mahre, Propane Technical ServicesRecommendation: Revise text to read as follows:6.18.1 Operations and Maintenance. The provisions of Chapter 14 shall apply to all new and existing LP-Gas

installations at bulk plants, industrial plants occupancies, commercial plants, and industrial plants, motor fuel (AutoGas)plants and refrigerated plants.Substantiation: This title change will reflect the changes in 3.3.10.Committee Meeting Action: RejectCommittee Statement: The committee rejected the new definitions for commercial, refrigerated and autogas plants,therefore the proposed changes would be inappropriate.

2Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #27 Final Action: Reject(14.1)_______________________________________________________________________________________________Submitter: Bill Mahre, Propane Technical ServicesRecommendation: Revise text to read as follows:14.1 Scope. This chapter includes requirements related to the operations and maintenance of bulk plants, commercial

plants, industrial plants, motor fuel plants (AutoGas) refrigerated plants, marine, and pipeline LP-Gas systems. Theprovisions of this chapter shall be applicable to all new and existing installations.Substantiation: This title change will reflect the changes in 3.3.10.Committee Meeting Action: RejectCommittee Statement: The committee rejected the new definitions for commercial, refrigerated and autogas bulkplants, therefore the proposed changes to 14.1 would be inappropriate.

_______________________________________________________________________________________________58- Log #28 Final Action: Reject(6.18.4.2(D) (New) )_______________________________________________________________________________________________Submitter: Bill Mahre, Propane Technical ServicesRecommendation: Add new text to read as follows:6.18.4.2(D) Fencing shall not be required at agricultural plants as described in 3.3.10.4.

Substantiation: This new section will not require a 6 ft (1.8 m) high industrial type fence, chain-link, or equivalentprotection. These types of bulk container installations are located on private property and have multi use distribution foragricultural uses on site. There is no safety hazard if other provisions of the Code on tampering are in compliance.Committee Meeting Action: RejectCommittee Statement: The committee rejected the new definition for agricultural bulk plant, therefore the newsentence addressing such plants is not appropriate. However, the committee accomplished the submitter's intent of notrequiring security fencing around bulk storage at farms in Log #164.

3Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #164 Final Action: Accept in Principle(3.3.10 Bulk Plant)_______________________________________________________________________________________________Submitter: Bill Mahre, Propane Technical ServicesRecommendation: Revise text to read as follows:3.3.10 Bulk Plant. A facility where the primary function is to store LP-Gas prior to further distribution. LP-Gas is

received by cargo tank vehicle, railroad tank car, or pipeline and then distributed by portable container (package)delivery, by cargo tank vehicle, or through gas piping.

Container Plants. A facility which is constructed with an excess of 4000 (15.2 m3) water gallon capacity container(s)

designed to store and distribute LP-Gas.3.3.10.1 Bulk Plant. A facility where the primary function is to store LP-Gas prior to further distribution. LP-Gas is

received by cargo tank vehicle, railroad tank car, or pipeline and then distributed by portable container (package)delivery, cargo tank vehicle and motor vehicle containers.3.3.10.2 Commercial Plant. A facility where the primary function is to store LP-Gas prior to further distribution. LP-Gas

is received by cargo tank vehicle, railroad tank car, or pipeline and then distributed by portable container (package)delivery, or by cargo tank vehicle and through gas piping to remote facilities.3.3.10.3 Industrial Plant. A facility where the primary function is to store LP-Gas prior to supplying product to the

interconnected piping system within the site. LP-Gas is received by cargo tank vehicle and railroad tank car. Distributionmay also include portable containers and motor vehicle containers used on site.3.3.10.4 Agricultural Plant. A facility where the primary function is to store LP-Gas prior to supplying product to the

interconnected piping systems within the site. LP-Gas is received by cargo tank vehicle. Distribution may also includeportable container (package) motor fuel (AutoGas) containers. This plant is designed to distribute LP-Gas for agriculturalpurposes only.3.3.10.5 Motor Fuel Plant (AutoGas). A facility where the primary function is to store LP-Gas prior to supplying product

to the interconnected piping system within the site. LP-Gas is received by cargo motor vehicle. Distribution is limited toliquid transfers to motor fuel (AutoGas) containers and motor vehicle containers.3.3.10.6 Refrigerated Plants. A facility which the LP-Gas is stored at temperatures below outside ambient air

temperatures. These installation requirements are located in the provisions of Chapter 12 of this Code. LP-Gas isreceived by cargo tank vehicle, railroad tank car, pipeline or marine shipping vessels.Substantiation: This new description will describe the majority of storage facilities and their intended use. The presentCode has sections which are designed for use in only one of the categories. As modifications or additions are made tothe Code a reference can be made to this section for detailed descriptions of intended purpose. An example in aproposal for 3.3.10.5 has been submitted by NPGA to make an exception for a motor fuel dispenser and allow the liquidoutlet valve to remain open when not in use. See 6.18.1, 6.18.4.2 and 14.2.Committee Meeting Action: Accept in Principle3.3.10* Bulk Plant. A facility that stores more than 4000 gallons of LP-Gas prior to further distribution as a liquid for useat other facilities. where the primary function is to store LP-Gas prior to further distribution. LP-Gas is received by cargotank vehicle, railroad tank car, or pipeline, and then distributed by portable container (package) delivery, by cargo tankvehicle, or through gas piping.A.3.3.10  Bulk Plant. Bulk plants receive gas through a variety of methods, such as railroad tank car, transport, cargotank vehicle, gas piping, or watercraft. These plants are generally utilized store LP-Gas prior to being sent on fordomestic, commercial, agricultural, institutional, and industrial applications or for the storage of product awaiting deliveryto the end user. A facility that transfers LP-Gas from railroad tank cars from a private track directly into cargo tankvehicles is also considered a bulk plant. Such plants could have container-filling and truck loading/unloading facilities onthe premises. Normally, no persons other than the plant management or plant employees have access to thesefacilities. It is not the intent of the definition to exclude facilities that use propane at the site, such as for building heating.

3.3.31 Industrial Plant. A facility that stores more than 4000 gallons of LP-Gas for use at the facility or to distributevapor to other facilities.[Renumber subsequent.]A.3.3.31 Industrial plant is a term used in NFPA 58 to include all LP-Gas storage facilities that use the gas on site. Theyare found at industrial plants, farms, engine fueling stations, schools, hotels, and other locations. It is not the intent ofthe definition to exclude facilities that have a small use of propane off the site, such as for vehicles, where such use isnot the major use of the gas stored.

4Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 586.18.4.2 Areas that include features required in 6.18.4.1(2) shall be enclosed with a minimum 6 ft (1.8 m) high industrialtype fence, chain-link fence, or equivalent protection. This requirement shall not apply to containers located at farms notopen to the public.

Committee Statement: The definition of Bulk Plant is revised and a new definition of Industrial Plant is added to claritywhat a Bulk Plant is to differentiate it from an Industrial Plant. The size criterion of > 4000 gallons is added to clearlystate the committee’s intent that the additional requirements for these plants do not apply to smaller storage facilities.Reference to railcar transfer facilities is deleted as the subject is well covered in 7.2.2. The annex text provides guidancewhere a plant is used primarily as a Bulk Plant or Industrial Plant, with other incidental use of the LP-Gas.

The revision to 6.18.4.2 recognizes the significantly lower probability of tampering at Industrial Plants located at farms.It is recognized that some farms may be open to the public for sale of the crop, and that the security requirementsshould apply where the public may have access to the farm.

5Printed on 1/10/2012

Editorial Proposals Recommended for

Treatment as a Group

New Chair Report 1/10/2012

Log Proposal No. Code Reference Log Proposal No. Code Reference

67 1.3.2(3)58-69 4.3.158-70 4.5.158-71 4.5.258-72 5.2.4.158-74 5.7.5.6(B)58-75 5.7.5.858-76 5.9.4, 5.9.4.1, 5.9.4.2, Table58-77 5.9.558-78 5.1258-79 5.17.158-80 5.21.9 and 5.21.9.158-81 6.3.1 through 6.3.458-82 6.458-83 6.5.158-84 6.6.2.158-85 6.6.3.3 and 6.6.3.758-86 6.6.6.2 and 6.6.6.358-87 6.6.758-88 6.7, 6.7.2.12, 6.7.2.14, and58-89 6.8.1.158-90 6.8.1.458-91 6.8.258-92 6.9.158-93 6.9.3 and 6.9.458-94 6.12.958-95 6.1858-96 6.19.1.258-97 6.19.4.958-98 6.19.12, 6.23.7.3, and58-99 6.23.858-100 6.24.3.258-101 6.24.3.12 through 6.24.3.1658-102 6.24.4.1 and 6.24.4.358-103 6.25.1 and 6.25.458-105 7.2.3.258-106 Table 7.4.2.258-107 8.5.2 and 8.5.358-109 9.4.4.558-112 9.4.1058-113 11.4.1.5 and 11.4.1.658-114 11.4.1.1758-115 11.7.3.158-116 11.8.5.2(J)58-

117 11.12.158-118 11.13.2.1, 11.13.2.2,58-119 11.15.1.558-120 12.3.4.3, 12.3.4.7, and58-121 13.2.2 and 13.3.2.258-122 14.2.2.2, 14.2.2.3, and58-123 A.3.3.27.658-124 A.5.7.8.8, A.5.9.5(D),58-125 A.6.1.8 and A.6.3.1.158-127 A.11.12.2.258-128 Figure I.1(a)58-129 Figure I.1(b) and Figure58-130 K.3.158-

1

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #67 Final Action:(1.3.2(3))_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:1.3.2(3) LP-Gas (including refrigerated storage) utility gas plants (including refrigerated storage). (See NFPA 59, Utility

LP-Gas Plant Code).Substantiation: “Including refrigerated storage” modifies “LP-Gas utility gas plants” and not “LP-Gas”.

_______________________________________________________________________________________________58- Log #69 Final Action:(4.3.1)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:4.3.1 Stationary Installations. Plans for stationary installations utilizing storage containers of over 2000 gal (7.6 m3 )

individual water capacity, or with aggregate water capacity exceeding 4000 gal (15.1 m 3 ), and all rooftop installations ofASME containers shall be submitted to the authority having jurisdiction before the installation is started, by the person orcompany that either installs or contracts to have the containers installed. before the installation is started. [See also6.19.11.1(F)1].Substantiation: Changing the position of the prepositional phrase improves the grammar and clarity of thisrequirement.

_______________________________________________________________________________________________58- Log #70 Final Action:(4.5.1)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:4.5.1 LP-gas stored or used in systems within the scope of this code shall contain less ammonia than the quantity is

required to turn the color of red litmus paper to blue.Substantiation: The changes improve the clarity and grammar of the section.

_______________________________________________________________________________________________58- Log #71 Final Action:(4.5.2)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:4.5.2 The initial fill of LP-Gas in a transportation or storage system that has been converted from ammonia to LP-Gas

service shall be tested for ammonia contamination. A test for ammonia shall be performed on the LP-Gas prior tothe initial use or transfer of LP-Gas from a transportation or storage system that has been converted fromammonia service.Substantiation: The changes improve the clarity and grammar of the section.

1Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #72 Final Action:(5.2.4.1)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:5.2.4.1 The service pressure of cylinders shall be in accordance with the appropriate regulations published under 49

CFR, “Transportation”.Substantiation: The NFPA Manual of Style prohibits the use of vague and unenforceable terms in 2.2.2Unenforceable Terms. “Appropriate” is a vague and unenforceable term and is meaningless in this paragraph.

_______________________________________________________________________________________________58- Log #74 Final Action:(5.7.5.6(B))_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:5.7.5.6(B) Universal-type cylinders, where…marked as follows.

Substantiation: See substantiation in 3.3.16.1 for Changing “Universal-type” cylinder to “Universal Cylinder” (withoutthe dash) per the definition title found in 3.3.16.1. Change provides consistency throughout NFPA 58.

_______________________________________________________________________________________________58- Log #75 Final Action:(5.7.5.8)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:5.7.5.8 (1A) Variable liquid … be installed.5.7.5.8 (2B)..If temperature correction markings are provided on variable liquid level gauges on containers greater than

1200 gal (4.5 m3) that will be used for volumetric filling as allowed by 7.4.3.2(A), 7.4.3.2(B), and 7.4.3.3, the markingsshall indicate the maximum liquid level at liquid temperatures in accordance with Tables 7.4.3.3(b) 7.4.2.3(b) or7.4.3.3(c) 7.4.2.3(c). Temperature markings shall be from 20°F to 115°F (-6.7°C to 46°C), with increments not to exceed20 F° (11.1°C) for propane, for 50/50 butane-propane mixtures, and for butane.5.7.5.8 (3C)..Dials of magnetic … or underground service.5.7.5.8 (4D).. The dials of gauges … shall be so marked.

Substantiation: 5.7.5.8(1) through (4) is the numbering system for lists, but the text includes subparagraphs of fullrequirements and should be numbered as (A) through (D) according to the numbering system requirements of the NFPAManual of Style. We have agreed to use parenthetical capital letters for numbering subparagraphs in NFPA 58.Parenthetical numbers are used for lists that are also well defined in the NFPA Manual of Style. There was no change inthe paragraph text except for 5.7.5.8(B) to correct references to paragraph numbers that changed elsewhere in NFPA58.Table reference changes in 5.7.5.8(B) are Errata from the new 2011 Edition.

2Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #76 Final Action:(5.9.4, 5.9.4.1, 5.9.4.2, Table 5.9.4.2, and 5.9.4.3)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:5.9.4 Fittings for Metallic Pipe and Tubing Fittings shall be steel, brass, copper, malleable iron, or ductile (nodular)

iron.5.9.4.1 Fittings shall be steel, brass, copper, malleable iron, or ductile (nodular) iron.5.9.4.2 5.9.4.1 Pipe fittings shall have a minimum pressure rating as specified in Table 5.9.4.2 5.9.4.1 and shall comply

with the following:(1) Cast iron pipe fittings shall not be used.(2) Brazing filler material shall have a melting point that exceeds 1000o F. (538o C.)5.9.4.3 5.9.4.2 Metal tube fittings shall have a minimum pressure rating as specified in Table 5.9.4.2 5.9.4.1.Table 5.9.4.2 Table 5.9.4.1 Service Pressure Rating of Pipe, Tubing Tube Fittings, and Valves

Substantiation: Requirements in a subsection should be numbered and not dangle to the titled subparagraph as theyare the first subdivision of a subsection. Text in original 5.9.4 is moved without change to new paragraph 5.9.4.1. Old5.9.4.1 and 5.9.4.2 along with Table 5.9.4.1 is renumbered accordingly.

_______________________________________________________________________________________________58- Log #77 Final Action:(5.9.5)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:5.9.5* Fittings for Polyethylene and Polyamide Pipe and Tubing Joints in polyamide and polyethylene pipe and

polyethylene tubing shall be made by heat fusion, by compression-type mechanical fittings, or by factory-assembledtransition fittings.5.9.5.1 Joints in polyamide--------assembled transition fittings.5.9.5.2 5.9.5(A) Polyethylene pipe--------threaded or miter joint.5.9.5.3 5.9.5(B) Polyamide and polyethylene--------conform to one of the following.(1) ASTM D 2683…(2) ASTM D 3261…(3) ASTM F 1055…(4) ASTM F 1733…5.9.5.4 5.9.5(C) Installation instructions--------heat fusion fittings5.9.5.5* 5.9.5(D)* Mechanical fittings--------and the following:5.9.5.5(A) Mechanical joints---------pipe and tubing.5.9.5.5(B) Compressed-type--------to support the pipe.5.9.5.5(C) Gasket material--------polyethylene pipe material5.9.5.6 5.9.5(E) Anodeless risers shall comply with the following:5.9.5.6(A) 5.9.5(1) The metal-gas carrying--------Schedule 40 pipe.5.9.5.6(B) 5.9.5(2) Factory-assembled anodeless risers------with written procedures.5.9.5.6(C) 5.9.5(3) Field-assembled anodeless risers----LP-Gas by the manufacturer. and shall be designed

certified--------“Transportation”; and 6.9.4.3 and 6.9.4.4.5.9.5.6(D) Field-assembled anodeless risers shall and shall and be designed certified to meet the requirements of

Category 1 of ASTM D 2513, Standard Specification for Thermoplastic Gas Pressure Pipe, Tubing and Fittings , U.S.Department of Transportation, 49 CFR 192.181 (e), “Transportation”; and 6.9.4.3 and 6.9.4.4.5.9.5.6(E) 5.9.5(4) The manufacturer shall provide ------49 CFR 192.283(b).

Substantiation: This renumbering meets the requirements of the NFPA Manual of Style and maintains the principle ofonly one requirement per subdivision. Text in original 5.9.5 is moved without change to new paragraph 5.9.5.1. Thedeleted part in new 5.9.5.6(C) is now new 5.9.5.6(D).

3Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #78 Final Action:(5.12)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:5.12 Valves Other Than Container Valves5.12.1 Materials Pressure-containing metal parts of valves shall be of steel, ductile (nodular) iron, malleable iron, or

brass.5.12.1.1 Pressure-containing metal parts of valves shall be of steel, ductile (nodular) iron, malleable iron, or brass.5.12.1.2 (A) Ductile iron shall meet--------------------------or equivalent.5.12.1.3 (B) Malleable iron shall meet ------------------ or equivalent.5.12.1.4 (C) All materials used-----------------------under service conditions.5.12.2 Valves in Piping Systems. Valves shall have a service pressure rating as specified in Table 5.9.4.15.12.2.1 5.12.2 Valves shall have a---------specified in Table 5.9.4.2 5.9.4.1.5.12.2.2 5.12.3 Manual shutoff valves------- for container valves (See 5.7.4).5.12.2.3 5.12.4 Emergency shutoff valves (See 6.12)----means of closing:(1) Automatic---------.(2) Manual shutoff----remote location.(3) Manual shutoff-----installed location.5.12.2.4 5.12.5 Where fusible elements------250o F (1210 C ).5.12.2.5 5.12.6 Valves in polyethylene----that have shown to be resistant to the action of LP-Gas and comply with

ASTM D 2513.5.12.2.6 Valves in polyamide---polyamide material as defined in ASTM D 2513.5.12.2.7 Metallic valves in polyethylene----in accordance with Section 6.16.5.12.2.8 5.12.7 Valves shall be recommended-----by the manufacturer.

Substantiation: The numbering system of Section 5.12 is renumbered to meet the requirements for the numberingsystem in the NFPA Manual of Style. In 5.12.1 a title is given to 5.12.1 and the text is moved without change to new5.12.1.1. In 5.12.2 a title is given to 5.12.2 and the text is moved without change to new 5.12.2.1.

_______________________________________________________________________________________________58- Log #79 Final Action:(5.17.1)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:5.17.1 Pressure-Containing Metal Parts General

Substantiation: The new title covers what is addressed in the subsection.

4Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #80 Final Action:(5.21.9 and 5.21.9.1)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:5.21.9 Vaporizer Pressure Relief Valve The minimum rate of discharge in cubic feet of air per minute for pressure

relief valves for LP-Gas vaporizers, either of the indirect type or direct-fired type, shall comply with 5.21.9(A) through5.21.9(C).5.21.9.1 The minimum rate of discharge in cubic feet of air per minute for pressure relief valves for LP-Gas vaporizers,

either of the indirect type or direct-fired type, shall comply with 5.21.9.2 through 5.21.9.4. 5.21.9(A) through 5.21.9(C).5.21.9.2 (A) Based on conservative--------equivalent air rate.5.21.9.3 (B) If the vaporizer----------required relief valve capacity.5.21.9.4 (C) The minimum rate of discharge in cubic feet of air per minute for pressure relief valves for LP-Gas

vaporizers , of either the indirect type or direct-fired type , shall be at least150 percent of the rated vaporizer capacity.Substantiation: In 5.21.9 the text is moved to new paragraph 5.21.9.1 without change. Renumber subparagraphs (A),(B) and (C). Remove the two commas in new 5.21.9.4. With renumbering, this subsection now meets the numberingrequirements of the NFPA Manual of Style and corrects the punctuation.

5Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #81 Final Action:(6.3.1 through 6.3.4)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.3.1 6.3.1* Aboveground Containers. Containers installed outside of buildings, whether of the portable type replaced

on a cylinder exchange basis or permanently installed and refilled at the installation, shall be located with respect to theadjacent containers, important building, group of buildings, or line of adjoining property that can be built upon, inaccordance with Table 6.3.1, Table 6.4.2, Table 6.4.5.8, and 6.3.2 through 6.3.11.6.3.1.1* Containers installed outside of buildings, whether of the portable type replaced on a cylinder exchange basis

or permanently installed and refilled at the installation, shall be located with respect to the adjacent containers, importantbuilding, group of buildings, or line of adjoining property that can be built upon, in accordance with Table 6.3.1 6.3.1.1,Table 6.4.2 6.4.1.2, Table 6.4.5.8 6.4.4.9, and 6.3.1.2 6.3.2 through 6.3.4.5 6.3.11 .Table 6.3.1.1 6.3.1 Separation Distances-----------That Can Be Built UponNOTE: Changes to the Table notes are as follows:a See 6.3.2 6.3.4b See 6.3.4.5 6.3.12c See 6.3.4.4 6.3.11d See 6.3.4.3 6.3.9e See 6.3.4.1, 6.3.4.2, and 6.3.4.3 6.3.7, 6.3.8, and 6.3.9f See 6.3.1.3 6.3.36.3.1.2 6.3.2 When the provisions of 6.26.3-------------through 30,000 gal (7.6 m3 through 114 m3 ) water capacity.6.3.1.3 6.3.3 The 25 ft (7.6 m) minimum distance------------------------more than 125 gal (0.5 m3 )water capacity.6.3.2 6.3.4 Underground or Mounded ASME Containers. Minimum distances for underground…………..reduced to

10 ft (3 m).6.3.2.1 Minimum distances for underground-------reduced to 10 ft (3 m).6.3.2.2 6.3.4.1 Distances for all underground------from the container surface.6.3.2.3 6.3.4.2 No part of an underground------that can be built upon.6.3.3 Minimum Separation Distances for ASME Containers6.3.3.1 6.3.5 The minimum separation distances specified in Table 6.3.1.1 6.3.1 ---------reduced to 10 ft (3 m).6.3.3.2 6.3.6 If the aggregate water capacity--------shall comply with Table 6.3.1.1 and the following:(A) (1) The aggregate-------------per container.(B) (2) If more than one-------at least 25 ft ((7.6 m).(C) (3) The minimum distances between containers shall not be applied to installations covered by 6.3.3.2 6.3.6.Table 6.3.4 6.3.8 Separation Distance Between ------and Building Openings NOTE: No changes are needed in the

text of this table.6.3.4 6.3.7 Separation Distance Between Container Pressure Relief Valve and Building Openings.6.3.4.1 6.3.7 Cylinders shall not be located-------of its perimeter or more.6.3.4.2 6.3.8 The distance measured------in accordance with Table 6.3.4 6.3.8.6.3.4.3 6.3.9 The distance measured in any direction---------air intakes shall be in accordance with Table 6.3.4 6.3.8.6.3.4.4 6.3.10 Access at the ends or sides-----working with cranes or hoists.6.3.4.5 6.3.11 The horizontal distance between-------shall comply with the following:(2) The horizontal distance specified in 6.3.4.5(1) 6.3.11(1) shall be at least 50 percent of the separation distance

required in Table 6.3.1.1 6.3.1.Substantiation: In 6.3.1 add a new title and move unchanged text to new paragraph 6.3.1.1*. In 6.3.4 add a new titleand move unchanged text to new paragraph 6.3.2. Add new titles for renumbered paragraphs 6.3.3 and 6.3.4. Newsubsection numbers with titles plus new paragraph, subparagraph, and listing numbers are corrected as necessary andadded to comply with the NFPA Manual of Style. The grouped and related paragraphs, subparagraphs, and listingsunder these titled subsections make it much easier to search for and find the requirements in the code. Punctuation isalso corrected.

6Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #82 Final Action:(6.4)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.4 Other Container Location Requirements.6.4.1 ASME Multi-container Requirements Where storage containers having an aggregate water capacity of more

than 4000 gal (15.1m3) are located in heavily populated or congested areas, the siting provisions of 6.3.1 and Table6.3.1 shall be permitted to be modified as indicated by the fire safety analysis described in 6.25.3.6.4.1.1 6.4.1 Where storage containers having an aggregate water capacity of more than 4000 gal (15.1 m 3 ) are

located in heavily populated or congested areas, the siting provisions of 6.3.1.1 6.3.1 and Table 6.3.1.1 6.3.1 shall bepermitted to be modified as indicated by the fire safety analysis described in 6.25.3.6.4.1.2 6.4.2 Aboveground multicontainer multi-container installations------fire protection provided in Table 6.4.1.2

6.4.2.Table 6.4.1.2 6.4.2 Maximum Number---------Their Separation DistancesFire Protection Provided by Hose streams only (see 6.4.1.2) (6.4.2) and 6.25.3.1)6.4.1.3 6.4.3 Where the provisions-------required in Table 6.4.1.2 6.4.2.6.4.2 6.4.4 Underground and Mounded ASME Containers. Underground or mounded ASME containers shall be

located in accordance with 6.4.4.1 through 6.4.4.5.6.4.2.1 6.4.4 Underground and mounded ASME containers shall be located in accordance with 6.4.2.2 6.4.4 1 through

6.4.2.3 6.4.4.2.6.4.2.2 6.4.4.1 Underground or mounded-------any buildings.6.4.2.3 6.4.4.2 Buildings shall not be------mounded containers.6.4.3 General Requirements. (Note: Add new title)6.4.3.1 6.4.4.3 The sides of adjacent containers shall be separated in accordance with Table 6.3.1.1 6.3.1 but shall not

be separated by less than 3 ft (1 m).6.4.3.2 6.4.4.4 Where containers are installed ---------not be limited.6.4.3.3 6.4.4.5 Where more than one row-------not less than 10 ft (3 m).6.4.4 6.4.5 Additional Container Installation Requirements. (Note: Add new title)6.4.4.1 6.4.5 Additional container installation requirements shall comply with 6.4.4.2 through 6.4.4.13 6.4.5.1 through

6.4.5.12 , 6.4.4.14 6.4.6 , 6.4.5.1 6.4.7.6.4.4.2 6.4.5.1 Containers shall not be stacked one above the other.6.4.4.3 6.4.5.2 Loose or piled--------by a minimum of 10 ft (3 m).6.4.4.4* 6.4.5.3* The area under containers-------is prevented.6.4.4.5 6.4.5.4 LP-Gas containers----------combustible liquids.6.4.4.6 6.4.5.5 The minimum horizontal------shall be 20 ft (6 m).6.4.4.7 6.4.5.6 The requirements of 6.4.4.6 6.4.5.5 shall not apply where LP-Gas containers of 125 gal (0.5 m3 ) or less

water capacity are installed adjacent to fuel oil supply tanks of 660 gal (2.5 m3 ) or less capacity.6.4.4.8 6.4.5.7 No horizontal separation----------in accordance with NFPA 30, Flammable and Combustible Liquids

Code.6.4.4.9* 6.4.5.8* The minimum separation between LP-Gas containers and oxygen or gaseous hydrogen containers

shall be in accordance with Table 6.4.4.9 6.4.5.8 .6.4.4.10 6.4.5.9 Where protective structures-------minimum distance shall apply.6.4.4.11 6.4.5.10 The minimum separation-------NFPA 55, Compressed Gases and Cryogenic Fluids Code.6.4.4.12 6.4.5.11 Where LP-Gas cylinders--------Marking of Compressed Gas Cylinders.6.4.4.13 6.4.5.12 An aboveground LP-Gas container and any of its parts shall not be located within 6 ft (1.8 m) of a

vertical plane beneath overhead electric power lines that are nominally over 600 volts ,nominal.6.4.4.14* 6.4.6* Refrigerated LP-Gas containers-------in accordance with Section 12.3.6.4.5 6.4.7* Structure Requirements (Note: Add new title) Structures such as fire walls, fences, earth or concrete

barriers, and other similar structures shall not be permitted around or over installed nonrefrigerated containers unlessspecifically allowed as follows:6.4.5.1* 6.4.7* Structures such as fire walls, fences, earth or concrete barriers, and other similar structures shall not be

permitted around or over installed non-refrigerated containers unless specifically allowed as follows:(2) Structures used to prevent flammable or combustible liquid accumulation or flow shall be permitted in accordance

7Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58with 6.4.4.4 6.4.5.3.(3) Structures between LP-Gas containers and gaseous hydrogen containers shall be permitted in accordance with

6.4.4.10 6.4.5.9.Table 6.4.4.9 6.4.5.8 Separation Distances--------Hydrogen Containers

Substantiation: New subsection numbers with titles plus new paragraph, subparagraph, and listing numbers arecorrected as necessary and added to comply with the NFPA Manual of Style. The grouped and related paragraphs,subparagraphs, and listings under these titled subsections make it much easier to search for and find the requirementsin the code. Punctuation is also corrected.

_______________________________________________________________________________________________58- Log #83 Final Action:(6.5.1)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.5.1* Transfer of Liquids Liquid shall be transferred into containers, including containers mounted on vehicles, only

outdoors or in structures specially designed for such purpose.6.5.1.1 6.5.1* Liquid shall be transferred-------designed for such purpose.6.5.1.2 6.5.1.1 The transfer of liquid-------shelter or canopy. (See 6.24.3.3)6.5.1.3 6.5.1.2 Structures housing transfer operations----comply with Chapter 10.6.5.1.4 6.5.1.3 The transfer of liquid-------contained in 6.6.7 and 6.19.11.6.5.1.5 6.5.1.4 The transfer hose shall not be routed in or through any building except those specified in 6.5.1.3

6.5.1.2.6.5.1.6 6.5.2 Filling of containers------filled at that location.6.5.2 6.5.3 Container Point of Transfer Location Requirements.6.5.2.1 6.5.3 If the point of transfer of containers located outdoors in stationary installations is not located at the

container, it shall be located in accordance with Table 6.5.2 6.5.3.6.5.2.2 6.5.4 Containers not located in stationary installations shall be filled at a location determined by the point of

transfer in accordance with Table 6.5.2 6.5.3.6.5.3 Separation Distance from Point of Transfer.6.5.3.1 6.5.4.1 If the point of transfer is a component of a system covered by Section 6.23 or Chapter 11, the

requirements of parts A, B, and C of Table 6.5.2 6.5.3 shall not apply to the structure containing the point of transfer.6.5.3.2 6.5.4.2 If LP-Gas is vented to the atmosphere under the conditions stipulated in 7.3.1(5), the distances in Table

6.5.2 6.5.3 shall be doubled.6.5.3.3 6.5.4.3 If the point of transfer is housed in a structure complying with Chapter 10 , and the common walls

comply with 10.2.1, separation distances in Table 6.5.2 6.5.3 shall not be required where the common walls comply with10.3.1.3.6.5.3.4 6.5.4.4 The distances in Table 6.5.2 6.5.3 , parts B, C, D, E, F(2), and J , shall be reduced by one-half where

the system incorporates the provisions of low emission transfer as provided in 6.26.5.Table 6.5.2 6.5.3 Distances Between Point of Transfer and Exposures

Correct note c below Table 6.5.2 as follows:c See 6.5.3.4 6.5.4.4.NOTE: No other changes recommended for Table 6.5.2

Substantiation: New subsection numbers with titles plus new paragraph, subparagraph, and listing numbers arecorrected as necessary and added to comply with the NFPA Manual of Style. The grouped and related paragraphs,subparagraphs, and listings under these titled subsections make it much easier to search for and find the requirementsin the code. Punctuation is also corrected.

8Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #84 Final Action:(6.6.2.1)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.6.2.1 Cylinders shall be installed only aboveground and shall be set upon a firm foundation or otherwise be firmly

secured. The cylinder shall not be in contact with the soil. (See 6.6.2.2)6.6.2.2 The cylinder shall not be in contact with the soil.6.6.2.3 6.6.2.2 Flexibility shall be provided in the connecting piping. Where flexible connectors are used, they shall

comply with 6.9. (See 6.6.2.4)6.6.2.4 Where flexible connectors are used, they shall comply with 6.9.6.

Substantiation: Paragraphs 6.6.2.1 and 6.6.2.2 contain 2 requirements in each paragraph. Move the secondrequirement in each paragraph to its own paragraph. Renumber the separate requirements accordingly. The NFPAManual of Style requires that each requirement have its own paragraph.

_______________________________________________________________________________________________58- Log #85 Final Action:(6.6.3.3 and 6.6.3.7)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.6.3.3 Support of Horizontal ASME Containers Support of horizontal ASME containers shall comply with the

following requirements:(A) Horizontal ASME containers--------in accordance with Table 6.6.3.3(A).6.6.3.7 If the container is mounted on or is part of a vehicle in accordance with 5.2.7.2(A), the unit shall be located in

accordance with 6.3.1.1 6.3.1.Substantiation: Bold titles are not allowed for paragraphs and are limited to sections and subsections according to theNFPA Manual of Style and 6.6.3.3 is a paragraph. The change to 6.6.3.7 corrects a reference number.

9Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #86 Final Action:(6.6.6.2 and 6.6.6.3)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.6.6.2 Partially underground, un-mounded ASME containers shall be installed as follows:(A) (1) The portion of the container below the surface of the ground, and for a vertical distance of at least 3 in. (75 mm)

above the surface shall comply with the corrosion protection requirements of 6.6.6.1(I) through (M). The abovegroundportion of the container shall comply with 6.6.1.4.(B) The aboveground portion of the container shall be painted to comply with 6.6.1.4.(C) (2) Containers shall be set level------tamped into place.(D) (3) Backfill shall be free of rocks and abrasives.(E) (4) Spacing provisions shall be as specified for aboveground containers in 6.3.1.1 6.3.1 and Table 6.3.1.1 6.3.1 .(F) (5) The container shall be located------protected against such damage.6.6.6.3 Mounded containers shall be installed as follows:(A)* (1)* Mounding material shall be earth--------of at least 1 ft (0.3 m).(B) (2) A protective cover---------- subject to erosion.(C) (3) Container valves----------materials. , as follows:(D) (a) Where containers are mounded-------minimum clear area.(E) (b) Bottom connections that extend-------act on the connections.(F) (4) Mounded containers shall comply--------6.6.6.1(I) through (M).

Substantiation: New subsection numbers plus new subparagraph 6.6.6.2(B), and listing numbers are corrected asnecessary and added to comply with the NFPA Manual of Style. The grouped and related paragraphs, subparagraphs,and listings under these titled subsections make it much easier to search for and find the requirements in the code.Punctuation is also corrected.

10Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #87 Final Action:(6.6.7)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.6.7 Installation of Containers on Roofs of Buildings.6.6.7.1 Installation of containers on roofs of buildings shall be prohibited , unless approved by the authority having

jurisdiction and the fire departments.6.6.7.2 Where the authority having jurisdiction and the fire department have approved the installation of a container, it

shall comply with 6.6.7.2(A) through 6.6.7.2(S). the following.(A) (1) The building shall-------Types of Building Construction.(B) (2) LP-Gas containers--------------water capacity or less.(C) (3) The aggregate water---------meet the following criteria:(1) (a) It shall not exceed------in one location.(2) (b) Additional Installations------at least 50 ft (15 m) apart.

(D) (4) An ASME container---------controls of the container.(E) (5) Containers shall be installed in external locations only.(F) (6) Where a fill line------outside the building.(G) (7) The fill connection----------outside the building.(H) (8) The fill connection-------------above ground level.(I) (9) Containers shall be installed on a level surface.(J) (10) The container shall be-------the building structure.(K) (11) The support-------------as the building.(L) (12) The roof on-------------required by local codes.(M) (13) Containers shall be located-------and ventilating systems.(N) (14) The location of containers--------the required maintenance.(O) (15) The location of the container--------another method to reach it.(P) (16) If the installation requires the use of more than one container, the distances between containers from Table

6.3.1.1 6.3.1 shall apply.(Q) (17) If the container location----------shall have the following appurtenances:(1) (a) Filler valve See5.7.4.1(H) with back check valve)(2) (b) Filler valve cap(3) (c) Two control valves(4) (d) Hydrostatic relief valve(5) (e) Venting line

(R) (18) The liquid fill and vapor fill connections shall be conspicuously marked or labeled.(S) (19) A fire safety analysis-------------------in accordance with 6.25.3.

Substantiation: New subsection numbers and listing numbers are corrected as necessary and added to comply withthe NFPA Manual of Style. The grouped and related paragraphs, subparagraphs, and listings under these titledsubsections make it much easier to search for and find the requirements in the code. Punctuation is also corrected. In6.6.7.2(Q)(1) the reference number is added which references 3 different allowable filler valve options.

11Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #88 Final Action:(6.7, 6.7.2.12, 6.7.2.14, and 6.7.2.15)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.7 Installation of Container Appurtenances.6.7.2.12 Pressure relief valve discharge on underground containers of more than 2000 gal (7.6 m3 ) or less water

capacity shall be piped vertically and directly upward to a point at least 7 ft (2.1 m) above the ground. (See 6.7.2.13)6.7.2.14 Where installed, the discharge piping shall comply with 6.7.2.14(A) through 6.7.2.14(F). the following:(A) (1) Piping shall be supported and protected against physical damage.(B) (2) Piping from aboveground containers shall be sized to provide the rate of flow specified in 5.7.2.6 5.7.2.5. (Note

5.7.2.5 is an error in the paragraph number).(C) (3) Piping from underground containers shall be sized to provide rate of flow specified in 5.7.2.7. 5.7.2.8. (Note

5.7.2.7 is an error in the paragraph number).(D) (4) Piping shall be metallic and have a melting point over 1500 0 F. (816 0 C).(E) (5) Discharge piping shall be------------------function of the valve.(F) (6) Return bends and restrictive pipe-------shall not be used.6.7.2.15 Where installed, the discharge piping shall be supported and protected against physical damage.

Substantiation: New subsection numbers and listing numbers are corrected as necessary and added to comply withthe NFPA Manual of Style. The grouped and related paragraphs, subparagraphs, and listings under these titledsubsections make it much easier to search for and find the requirements in the code. Paragraph 6.7.2.15 is deleted as itis a duplicate of 6.7.2.14(A).

_______________________________________________________________________________________________58- Log #89 Final Action:(6.8.1.1)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.8.1.1 First stage or high pressure regulators shall be directly attached, or attached by flexible metallic connector , to

the vapor service valve used on stationary (permanent) container installations, and to interconnecting piping ormanifolded stationary (permanent) container installations, or to a vaporizer outlet.Substantiation: Delete the comma “,” between “connector to” in the 2nd sentence. The comma is not needed to makethe text read correctly.

_______________________________________________________________________________________________58- Log #90 Final Action:(6.8.1.4)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.8.1.4 First stage and high pressure regulators-----except as follows:(1) Regulators on cylinders installed indoors in accordance with Section 6.19. 6.17.

Substantiation: Correct section reference. Section 6.17 addresses the installation of Pumps, Compressors, and othermiscellaneous equipment. Section 6.19 addresses LP-Gas Systems in Buildings or on Building Roofs or ExteriorBalconies.

12Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #91 Final Action:(6.8.2)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.8.2 Selection of Pressure Regulators. A two-stage regulator system, an integral two-stage regulator, or a 2 psi

regulator system shall be required on all piping systems that serve ½ psig (3.4 kPag) appliance systems [normallyoperated at 11 in. water column (2.7 kPag) pressure].6.8.2.1 A two-stage regulator system, an integral two-stage regulator, or a 2 psi regulator system shall be required on

all fixed piping systems that serve ½ psig (3.4 kPag) appliance systems [normally operated at 11 in. water column (2.7kPag) pressure].6.8.2.2 6.8.2(A) The requirement for two-stage regulation shall include fixed piping systems for appliances on

recreational vehicles----------and food service vehicle installations.6.8.2.3 6.8.2(B) Single-stage regulators shall not be installed in fixed piping systems after June 30, 1997 , except for

installations covered in 6.8.2.4 6.8.2(C).6.8.2.4 6.8.2(C) Single-stage regulators shall be permitted--------input ratings of 100,000 Btu/hr (29 kW) or less.6.8.2.5 6.8.2(D) Gas distribution systems--------of the second-stage regulators.6.8.2.6 6.8.2(E) High-pressure regulators---------------separate overpressure protection device.6.8.2.7 6.8.2(F) The overpressure protection device described in 6.8.2.6 6.8.2(E) shall limit the outlet pressure of the

second-stage regulator to 2.0 psig (14 kPag) when the regulator seat disc is removed and with an inlet pressureequivalent to the maximum outlet pressure setting of the high-pressure regulator.6.8.2.8 6.8.2(G) Systems consisting of listed components that provide an equivalent level of overpressure protection

shall be exempt from the requirements requirement of 6.8.2.6 and 6.8.2.7 6.8.2 .6.8.2.9* 6.8.2(H)* A 2 psi regulator system shall consist of a first-stage regulator and a 2 psi service regulator in

compliance with the requirements of 5.8.1.13 5.8.1.2 in conjunction with a line pressure regulator in compliance withANSI Z21.80/CSA 6.22, Standard for Line Pressure Regulators.Substantiation: The text in 6.8.2 is moved to 6.8.2.1. The word “fixed” is added as reference only to renumberedparagraphs 6.8.2.1, 6.8.2.2, and 6.8.2.3 as the Errata Sheet Number: 58-11-1 has already added the term to the code.New subsection numbers with titles plus new paragraph, subparagraph, and listing numbers are corrected as necessaryand added to comply with the NFPA Manual of Style. The grouped and related paragraphs, subparagraphs, and listingsunder these titled subsections make it much easier to search for and find the requirements in the code.

13Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #92 Final Action:(6.9.1)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.9.1 Piping System Service Limitations.6.9.1.1 The physical state (vapor or liquid) and pressure-------shall be as follows:(A) (1) Outdoor LP-Gas liquid or vapor metallic piping----------------no pressure limitations.(B) (2) Outdoor underground LP-Gas liquid and vapor polyamide piping system-----pressure of the piping being

installed.(C) (3) Polyethylene piping systems shall be limited to the following:(1) (a) Vapor service--------30 psig (208 kPag)(2) (b) Installation outdoors and underground

(D)* (4)* LP-Gas vapors at pressures exceeding 20 psig------in accordance with one of the following:(1) (a) The buildings or structures------------in accordance with 6.19.2 and 6.19.12.(2) (b) The buildings or separate areas-------house the following:

(a) i. Equipment for vaporization----------or distribution(b) ii. Internal combustion engines-------having a similar hazard(c) iii. Engine-mounted fuel vaporizers

(3) (c) Industrial occupancies are in accordance with 6.9.1.2.(E) (5) Corrugated stainless steel piping------not exceeding 5 psig (34 kPag).6.9.1.2* LP-Gas vapor fixed piping systems------comply with the following:(A) (1) The industrial equipment------greater than 20 psig (138 kPag).(B) (2) Pressure relief valve protection shall be provided for the vapor piping system that will limit any overpressure in

the piping system to not more than 10 percent of the design pressure of the system.(C) (3) Pressure relief valve discharge shall be vented directly to the outdoors.(D) (4) A low-temperature control system shall positively shut off the flow of the LP-Gas into the vapor piping system

when the temperature of the LP-Gas vapor is reduced to its condensation point at the maximum design operatingpressure of the system.6.9.1.3 Liquid piping systems in buildings and structures feeding a vaporizer other than those covered by 6.9.1.1(D)

6.9.1.1(4) shall comply with the material requirements of Chapters 5 and 6 Chapter 11.Substantiation: Recommended changes were made to all of the above Sections and subsections to correct thenumbering style to comply with the NFPA Manual of Style. Recommended changes to correct reference numberingwere also addressed and were updated and corrected.

14Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #93 Final Action:(6.9.3 and 6.9.4)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.9.3.3 Metallic piping shall comply with 6.9.3.3(A) through 6.9.3.3(C). the following:(A) (1) Piping used at pressures----------at least 350 psig (2.4 MPag).(B) (2) Vapor LP-Gas piping with operating pressures in excess of 125 psig (0.9 MPag) and liquid piping not covered

by 6.9.3.3(A) 6.9.3.3(1) shall be designed for a working pressure of at least 250 psig (1.7 MPag).(C) (3) Vapor LP-Gas piping-----------at least 125 psig (0.9 MPag).6.9.3.4 Pressure relief valve discharge piping shall be exempt from the requirement of 6.9.3.3(C) 6.9.3.3 (3).6.9.3.5 Metallic pipe joints shall be permitted to be threaded, flange, welded, or brazed using pipe and fittings that

comply with 5.9.3, and 5.9.4, and 6.9.3.5(A) through 6.9.3.5(H). as follows:(A) (1) Metallic threaded-------Table 6.9.3.5.(B) (2) Fittings and flanges-------which they are used.(C) (3) Brazed joints shall----------exceeding 10000 F (5380 C).(D) (4) Gaskets used to retain---------action of LP-Gas.(E) (5) Gaskets shall be made---------protected against fire exposure.(F) (6) When a flange opened, the gasket shall be replaced.(G) (7) Aluminum O-rings----------shall be permitted to be used.(H) (8) Nonmetallic gaskets---------shall be permitted to be used.6.9.4.5* Polyamide and polyethylene piping shall be installed in accordance with the following:(1) designed to sustain and minimize the thrust Thrust forces caused by contraction or expansion of the piping or by

anticipated external or internal loading shall be minimized.(2) Each joint shall be designed to sustain the thrust forces.6.9.4.9 Where polyamide and polyethylene pipe or tubing is inserted into an existing steel pipe, it shall comply with

6.9.4.9(A) and 6.9.4.9(B). the following shall apply.(A) (1) The polyamide or polyethylene pipe----------during the insertion process.(B) (2) The leading end----------------closed prior to insertion.

Substantiation: Recommended editorial changes to comply with the NFPA Manual of Style. New subsection numbersand listing numbers are corrected as necessary and added to comply with the NFPA Manual of Style. The grouped andrelated paragraphs, subparagraphs, and listings under these titled subsections make it much easier to search for andfind the requirements in the code. Paragraph 6.9.4.5 parts (1) and (2) combined into one paragraph in 6.9.4.5 with nosubparts.

15Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #94 Final Action:(6.12.9)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.12.9 Emergency shutoff valves required by the code shall be tested annually for the functions required by 5.12.4(2)

and (3) 5.12.2.3(2) and (3) and the results of the test shall be documented. Backflow check valves installed inlieu of emergency shutoff valves shall be checked annually for proper operation. The results of the test shall bedocumented. (Last 2 sentences become new paragraph 6.12.10.)6.12.10 (New) Backflow check valves installed in lieu of emergency shutoff valves shall be checked annually

for proper operation and the .The results of the test shall be documented.6.12.11 6.12.10 All new and existing emergency shutoff valves shall comply with 6.12.11.1 through 6.12.11.3 as

follows:6.12.11.1 (1) Each emergency shutoff valve--------remote emergency shutoff device.6.12.11.2 (2) The shutoff device---------from the emergency shutoff valve.6.12.11.3 (3) Where an emergency shutoff valve-------in accordance with 6.11.4 and 6.11.5.6.12.12 6.12.11 Emergency shutoff valves for railroad tank car transfer systems shall be in accordance with 6.18.2.6,

6.26.4, 7.2.3.7 and 7.2.3.8.Substantiation: Recommended numbering changes to comply with the NFPA Manual of Style. The last half of 6.12.9was moved to new 6.12.10 and an editorial change was made to 6.12.9.

_______________________________________________________________________________________________58- Log #95 Final Action:(6.18)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.18 Bulk Plant and Industrial Occupancy LP-Gas Systems6.18.1 Operations and Maintenance. The provisions of Chapter 14 shall apply to bulk plants , and industrial

occupancies. and industrial plants. .6.18.2 Installation of Liquid Transfer Facilities.6.18.2.1 Points of transfer or the nearest part of a structure housing transfer operations shall be located in accordance

with 6.5.2.1 6.5.3 and 6.5.2.2 6.5.4 .6.18.2.2 Buildings used exclusively for housing pumps or vapor compressors shall be located in accordance with

6.5.2.2 6.5.4 , considering the building as one that houses a point of transfer.6.18.2.6 Where a hose or swivel-type piping is used for liquid transfer, it shall be protected as follows:(1) An emergency shutoff valve shall be installed at the railroad tank car end of the hose or swivel-type piping where

flow into and out of the railroad tank car is possible.(2) An emergency shutoff valve or a back flow check valve shall be installed on the railroad tank car end of the hose or

swivel swivel-type piping where flow is only into the railroad-type railroad tank car.Substantiation: Industrial plants have been replaced with industrial occupancies per the definition in 3.3.31 andrecommended changes for renumbering corrections are included.Words have been changed for consistency.

16Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #96 Final Action:(6.19.1.2)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.19.1.2 Cylinders in use shall mean connected for use.(D) Liquid LP-Gas shall be piped into buildings or structures only for the purposes specified in 6.9.1.1(D) 6.9.1.1(4).

Substantiation: Recommended renumbering to comply with the NFPA Manual of Style.

_______________________________________________________________________________________________58- Log #97 Final Action:(6.19.4.9)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.19.4.9. Where cylinders are manifolded together for connection to a heater(s) on another floor, the following shall

apply:(A) (1) Heaters shall not be installed on the same floor with manifolded cylinders.(B) (2) The total water capacity-----------propane capacity.(C) (3) Manifolds of more than 735 lb--------------by at least 50 ft (15 m).

Substantiation: Recommended renumbering to comply with the NFPA Manual of Style.

_______________________________________________________________________________________________58- Log #98 Final Action:(6.19.12, 6.23.7.3, and 6.23.7.10)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.19.12.2 Liquid LP-Gas piped into buildings under construction or major renovation in accordance with 6.9.1.1(D)(1)

6.9.1.1.(4)(a) .6.23.7.3 Where the device or appliance, such as a cargo heater or cooler, is designed to be in operation while the

vehicle is in transit, such as a cargo heater or cooler, a means such as an excess flow valve to stop the flow of gas inthe event of a line break ,such as an excess flow valve, shall be installed.6.23.7.10 A permanent caution plate shall be provided, affixed to either the appliance or the vehicle outside of any

enclosure and shall be adjacent to the container(s), and shall include the following instructions items:(NOTE: No change to the subparts under 6.23.7.10 subparts (1) through(4).)

Substantiation: Recommend changes to numbering, correcting terms, and minor editorial changes to clarifyrequirements in the subdivisions shown above.

17Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #99 Final Action:(6.23.8)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.23.8 General Precautions. Mobile units containing hot plates and other cooking equipment, including mobile

kitchens and catering vehicles, shall be provided with at least one approved portable fire extinguisher rated inaccordance with NFPA 10, Standard for Portable Fire Extinguishers, at not less than 10-B:C. (Move above text into andreword as new paragraph 6.23.8.1 below.) Where fire extinguishers have more than one letter classification, they can beconsidered as meeting the requirements of each letter class. (Move sentence into and reword as new paragraph6.23.8.2 below.)6.23.8.1 Mobile units including mobile kitchens and catering vehicles that contain containing hot plates and other

cooking equipment including mobile kitchens and catering vehicles shall be provided with at least one approved portablefire extinguisher rated in accordance with NFPA 10, Standard for Portable Fire Extinguishers, at not less than 10-B:C.6.23.8.2 Where fire extinguishers have more than on letter classification, they shall can be considered as meeting the

requirements of each letter class.Substantiation: Recommended changes are to improve the sentence structure for clarity in 6.23.8.1. The 2nd part of6.23.8 is moved to new paragraph 6.23.8.2 so that each requirement is in its own paragraph. “Can” is changed to “Shall”per the NFPA Manual of Style and to be consistent with the same text found in 6.25.4.2, and 8.5.2, 9.3.5, and 9.4.7 arealso being changed. The NFPA Manual of Style allows only one requirement in each subdivision; the two requirementsare changed into two separate paragraphs.

_______________________________________________________________________________________________58- Log #100 Final Action:(6.24.3.2)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.24.3.2 Vehicle fuel dispensers and dispensing stations shall not be located within a building or structure, unless they

comply with except as allowed in Chapter 10.Substantiation: Clarify 6.24.3.2 and the added phrase “or structure” is consistent with wording in Chapter 10.

_______________________________________________________________________________________________58- Log #101 Final Action:(6.24.3.12 through 6.24.3.16)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.24.3.12 All dispensers either shall be installed on a concrete foundation or shall be part of a complete storage and

dispensing unit mounted on a common base and installed in accordance with 6.6.3.1(G). Protection against physicaldamage shall be provided for dispensers.6.24.3.13 Dispensers shall be protected from physical damage.6.24.3.14 6.24.3.13 A listed quick-acting--------the transfer hose.6.24.3.15 6.24.3.14 An identified and----------or other emergency.6.24.3.16 6.23.3.15 The markings ---------------point of liquid transfer.

Substantiation: Separate the two requirements in 6.24.3.12 into two separate paragraphs 6.24.3.12 and 6.24.3.13.Renumber existing 6.24.3.13, 6.24.3.13, and 6.24.3.14 as a result of separating text in paragraph 6.24.3.12.

18Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #102 Final Action:(6.24.4.1 and 6.24.4.3)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.24.4.1 Hose shall comply with the following:(1) Hose length---------authority havening jurisdiction.(2) All hose shall be listed.(3) When not in use, the hose shall be secured to protect them the hose from damage.6.24.4.3 Dispensing devices-------as follows:(1) Conventional systems----------Class I liquids.(2) Low emission transfer systems in accordance with 6.26.5 Section 6.26 shall be at least 5 ft (1,5 m) for any

dispensing device for Class I liquids.Substantiation: The above contains a grammar correction and corrections for a reference number error.

_______________________________________________________________________________________________58- Log #103 Final Action:(6.25.1 and 6.25.4)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:6.25.1 Application. Section 6.25 applies to fire protection for industrial occupancies plants ,bulk plants, and dispensing

stations.6.25.4.2 Each industrial occupancy plant , bulk plant, and distributing point shall be provided with at least one approved

portable fire extinguisher having a minimum capacity of 18 lb (8.2 kg) of dry chemical with a B:C rating. Where fireextinguishers have more than one letter classification, they shall be considered to satisfy the requirements of each letterclass.6.25.4.3 Where fire extinguishers have more than one letter classification, they shall be considered to satisfy the

requirements of each letter class.6.25.4.4* 6.25.4.3* LP-Gas fires shall not be extinguished until the source of the burning gas has been shut off.6.25.4.5 6.25.4.4 Emergency controls shall be conspicuously marked, and the controls shall be located so as to be

readily accessible in emergencies.Substantiation: The definition of an industrial plant was rejected by the Committee and the definition of an industrialoccupancy, 3.3.31, remains in NFPA 58 as shown above. The NFPA Manual of Style Paragraph does not allow tworequirements in one paragraph. 6.25.4.2 has two requirements in the same paragraph. The second requirement ismoved to 6.25.4.3 and 6.25.4.3 and 6.25.4.4 are renumbered.

_______________________________________________________________________________________________58- Log #105 Final Action:(7.2.3.2)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: 7.2.3.2 Sources of ignition-----------------vented to the atmosphere.(A) Internal combustion engines--------------------with the exception of the following:(1) Engines of LP-Gas cargo tank vehicles, constructed and operated in compliance with Chapter 9, while such

engines are driving transfer pumps and compressors on these vehicles to load containers in accordance with 6.5.2.26.5.4.(2) Engines for industrial (and forklift) trucks powered by LP-Gas used in installed in buildings as provided in Section

11.13.Substantiation: Paragraph 7.2.1.3 is revised to improve grammar, 7.2.3.2(A)(1) has a reference correction, and7.2.3.2(A)(2) was clarified by adding what was covered in Section 11.13

19Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #106 Final Action:(Table 7.4.2.2)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise Table 7.4.2.2 Maximum Filling Limit by Weight of LP-Gas Containers (Percent ofMarked Water Capacity in Pounds) as follows:

***Insert Table 7.4.2.2 here***

Substantiation: The recommended changes to Table 7.4.2.2 are to clearly separate aboveground containers fromunderground containers in the table. The present version of the table appears as though it only covers abovegroundcontainers. The vertical double spacing that I was unable to correct should be single-spaced by our editors in the finalversion.

_______________________________________________________________________________________________58- Log #107 Final Action:(8.5.2 and 8.5.3)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:8.5.2 The required fire extinguisher shall be located not more than 50 ft (15 m) from the storage location. Where fire

extinguishers have more than one letter classification, they can be considered to satisfy the requirements ofeach letter class.8.5.3 Where fire extinguishers have more than one letter classification, they can shall be considered to satisfy the

requirements of each letter class.Substantiation: The 2nd part of 8.5.2 is moved to new paragraph 8.5.3 so that each requirement is in its ownparagraph. “Can” is changed to “Shall” per the NFPA Manual of Style and to be consistent with the same text found in6.25.4.2. The NFPA Manual of Style allows only one requirement in each subdivision; the two requirements are changedinto two separate paragraphs.

_______________________________________________________________________________________________58- Log #109 Final Action:(9.4.4.5)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:9.4.4.5 Where wet hose is carried while connected to the truck’s liquid pump discharge piping, an automatic device ,

such as a differential back pressure valve differential regulator shall be installed between the pump discharge and thehose connection to prevent liquid discharge while the pump is not operating.Substantiation: This valve is already addressed in 6.24.3.5 and is called a differential back pressure valve and weshould not use two different names for the same valve.

20Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #112 Final Action:(9.4.10)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:9.4.10 Smoking Prohibition. No person shall smoke or carry lighted smoking material as follows:(1) On or within 25 ft (7.6 m)of a vehicle that contains is containing LP-Gas liquid or vapor(2) At points of liquid transfer(3) When delivering or connecting to containers

Substantiation: The recommended change corrects the grammar in 9.4.10(1).

_______________________________________________________________________________________________58- Log #113 Final Action:(11.4.1.5 and 11.4.1.6)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:11.4.1.5 Containers shall be fabricated so they can be equipped with a fixed maximum liquid level gauge as follows:(1) The fixed maximum liquid level gauge shall be capable of indicating the maximum permitted filling level in

accordance with 7.4.3.2(A) 7.4.2.2 .11.4.1.6 Systems complying with provisions of 6.26.5 6.26.3 have a water- and weather-resistant label placed near the

bleeder valve with the following text: “ Do not use fixed maximum liquid level gauge at low emission transfer stations”.Substantiation: Correction of reference numbers and remove the hyphen after water in 11.4.1.6.

_______________________________________________________________________________________________58- Log #114 Final Action:(11.4.1.17)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:11.4.1.17 Where the fixed maximum liquid level gauge is not used during filling , in accordance with 11.4.1.16, the

fixed maximum liquid level gauge or other approved means shall be used annually to verify the operation of theoverfilling prevention device.(A) If the container is found to be overfilled during the test, corrective action shall be taken.(B) The result shall be documented.(C) A label shall be affixed to the container near the fill point indicating the expiration date of the successful test.

Substantiation: There are three requirements following the initial requirement. These have been subdivided into threesubparagraphs in order to comply with NFPA Manual of Style.

21Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #115 Final Action:(11.7.3.1)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:11.7.3 Hose, Hose Connections, and Flexible Connectors.11.7.3.1 Hose, hose connections, and flexible hose connectors (see 3.3.23) (see 3.3.26) used for conveying LP-Gas

liquid or vapor at pressures in excess of 5 psig (34.5 kPag) shall be fabricated of materials resistant to the action ofLP-Gas both as liquid and vapor, and the hose and flexible hose connector shall be reinforced with stainless steel wirebraid.Substantiation: The recommended change to 11.7.3.1 corrects a reference number error. 3.3.26 is a definition forGas-Air Mixer and not Flexible Connectors.

_______________________________________________________________________________________________58- Log #116 Final Action:(11.8.5.2(J))_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:11.8.5.2(J) Where a pipeaway system is not required, the pressure relief valve shall have a protective cover in

accordance with 11.8.5.2 .Substantiation: The recommended change to 11.8.5.2(J) deletes an invalid reference phrase.

_______________________________________________________________________________________________58- Log #117 Final Action:(11.12.1)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:11.12.1 Label Requirements. Each over-the-road general purpose vehicle powered by LP-Gas shall be identified with

a weather-resistant diamond-shaped label (Move 1st

part of sentence to new 11.12.1.1) located on an exterior verticalor near vertical surface on the lower right rear of the vehicle (on the trunk lid of a vehicle so equipped but not on thebumper of any vehicle) inboard from any other markings. (Move last half to new 11.12.1.2)11.12.1.1 Each over-the-road general-purpose vehicle powered by LP-Gas shall be identified with a weather-resistant

diamond-shaped label.11.12.1.2 The label shall be located on a exterior vertical or near vertical surface on the lower right rear of the vehicle

(on the trunk lid of a vehicle so equipped but not on the bumper of any vehicle) inboard from any other markings.11.12.2 Label Size11.12.1.3 11.12.2.1 The label shall be a minimum of 43/4 in. (120 mm) long by 3 1/4 in. (83 mm) high.11.12.1.4* 11.12.2.2 The marking shall consist of a border and the word PROPANE [ 1 in. (25 mm) minimum height

centered in the diamond] in silver or white reflective luminous material on a black background.Substantiation: There are four label requirements and with the changes there are four paragraphs and two titles tomake to make the requirements easy to find.

22Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #118 Final Action:(11.13.2.1, 11.13.2.2, 11.13.2.8, and 11.13.4.4)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:11.13.2.1 Cylinders shall be designed, constructed, or fitted for installation and filling in either the vertical or horizontal

position or, if of the cylinder is a universal cylinder type, in either position.11.13.2.2 The cylinder shall be in the design position while being filled or , if of the a universal cylinder type, shall be

filled in either position.11.13.2.8 Industrial truck cylinders shall have pressure relief valves installed in accordance with 5.7.4.1(L).11.13.4.4 All cylinders used in industrial truck service (including forklift truck cylinders) shall have the cylinder pressure

relief valve replaced in accordance with 5.7.2.14 5.7.2.13 .Substantiation: In 11.13.2.1 and 11.13.2.2 “universal type” is changed to “universal cylinder” to agree with thedefinition in 3.3.16.1 and editorial changes were made to make the text read better. In 11.13.2.8 “pressure” is added tobe consistent with terms used in the reference number 5.7.4.1(L). In 11.13.4.4, the reference number is change tocorrect a typing error in the reference number. 5.7.2.14 addresses pressure relief valve replacement and not 5.7.2.13.

_______________________________________________________________________________________________58- Log #119 Final Action:(11.15.1.5)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:11.15.1.5 Engines used to drive portable pumps and compressors or pumps shall be equipped in accordance with

5.17.6.Substantiation: The requirement addresses both portable pumps and stationary pumps. Removing “portable” and “orpumps” still allows the requirement to apply to all pumps.

_______________________________________________________________________________________________58- Log #120 Final Action:(12.3.4.3, 12.3.4.7, and 12.3.4.8)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:Chapter 12 Refrigerated Containers12.3.4.3 and 12.3.4.3(1) through (7) – Replace “tank” with “container” in 12.3.4.3, 12.3.4.3(1), (2), (3), (4), and twice in

(6).12.3.4.7 – Replace “tank” with “container” twice.12.3.4.8 – Replace “tank” with “container”.

Substantiation: The word “container” is in the title of the chapter and everywhere else except in the subdivisionspointed out above.

23Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #121 Final Action:(13.2.2 and 13.3.2.2)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:13.2.2 Electrical Equipment. All electrical equipment and wiring installed on the pier or dock shall comply with

6.22.2.1.13.3.2.2 Electrical Equipment. Electrical power Power –operated valves ----------as well as locally.

Substantiation: The NFPA Manual of Style does not allow bold titles for paragraphs.

_______________________________________________________________________________________________58- Log #122 Final Action:(14.2.2.2, 14.2.2.3, and 14.3.1.4)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:Chapter 14 Operations and Maintenance14.2.2.2 General operating procedures shall include the following:(2) ----6.4.4.3 6.4.5.2(4) ----6.4.4.12 6.4.5.11, 6.12.11(2) 6.12.10(2), 6.24.3.15 6.24.3.14, 6.25.4.5 6.25.4.4, 6.26.5.3(B) 6.26.5.1(B).(7)----6.25.4.4 6.25.4.314.2.2.3 Loading and unloading procedures shall include the following:(9) 6.25.4.4 6.25.4.3, 6.25.4.5 6.25.4.414.3.1.4 The written procedures shall address the following requirements, where applicable:(1) 6.6.6.1(I) 6.6.6.1(H), 6.6.6.2(A) 6.6.6.2(1), 6.6.6.3(A) 6.6.6.3(1), 6.6.6.3(F) 6.6.6.3(4)(3) 6.24.4.1 6.25.4.1 and add 13.4.6

Substantiation: The above shows the corrected reference numbers.

_______________________________________________________________________________________________58- Log #123 Final Action:(A.3.3.27.6)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:Annex A Explanatory MaterialA.3.3.27.6 Slip Tube Gauge. The installation fitting for the tube is designed so such that the tube can be slipped in

and out of the container and so such that the liquid level at the inner end of the tube can be determined by observingwhen the shutoff valve vents liquid.Substantiation: The recommended changes improve the grammar and help clarify the definition of the gauge.

24Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #124 Final Action:(A.5.7.8.8, A.5.9.5(D), A.6.4.5.3, A.6.4.5.8, A.6.4.6, A.6.4.7, A.6.5.1, A.6.9.1.1(4), and A.6.25.4.3)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:NOTE: The following are the corrected numbers shown in Annex A to cover the recommended number changes

already shown in this document as follows:A.5.7.9 A.5.7.9A.5.9.5.5 A.5.9.5(D)A.6.4.4.4 A6.4.5.3A.6.4.4.9 A.6.4.5.8A.6.4.4.14 A.6.4.6A.6.4.5.1 A.6.4.7A.6.5.1.1 A.6.5.1A.6.9.1.1(D) A.6.9.1.1(4)A.6.25.4.4 A.6.25.4.3

Substantiation: These are all double checked number changes for items in Annex A.

_______________________________________________________________________________________________58- Log #125 Final Action:(A.6.1.8 and A.6.3.1.1)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:NOTE: Following are other recommended changes to the text in Annex A as follows:A.6.1.3NOTE: At the end of paragraph A.6.1.3 change reference “5.12.4” to “5.12.2.2” 5.12.2.3.A.6.3.1.1 A.6.3.1 In the first line change “Table 6.3.1” to “Table 6.3.1.1”.

Substantiation: These are recommended reference number changes to comply with this document.

_______________________________________________________________________________________________58- Log #127 Final Action:(A.11.12.2.2)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:A.11.12.1.4 See Figure A.11.12.1.4.FIGURE A.11.12.1.4 FIGURE A.11.12.2.2 (Title under Figure A.11.12.2.2)

Substantiation: These are recommended reference number changes to comply with this document.

25Printed on 1/10/2012

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #128 Final Action:(Figure I.1(a))_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise Figure I.1(a) Cylinders Notes as follows:Note 1: Add “Refer to Table 6.3.4” Refer to Table 6.3.8 (Deleted text was Added by Errata Sheet 58-11-1) at the end of

Note 1.Note 2: If the cylinder is filled on site at the point of use from a bulk truck, the filling connection and vent valve must

be at least 10 ft from any exterior source of ignition, openings into direct-vent appliances, or mechanical ventilation airintakes. Refer to 6.3.9 6.3.4.3.Text underneath the drawing of the cylinder filled on site should read as follows: “Cylinder filled on site at the point of

use from bulk truck”. (This text was Added by Errata Sheet 58-11-1)Note 3: Change “Refer to 6.3.8” to “Refer to 6.3.4.2”.

Substantiation: In Note 1, Note 2 and Note 3, these are recommended reference number changes to comply with thenew numbering which has been changed to conform to the NFPA Manual of Style.. In Note 2, the addition of “at thepoint of use” between “site” and “from” is a clarification as the same phrase was added by Errata Sheet 58-11-1 for thecylinder to which Note 2 applies.

_______________________________________________________________________________________________58- Log #129 Final Action:(Figure I.1(b) and Figure I.1(c))_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:Figure I.1(b) Aboveground ASME Containers.NOTE: The following changes are recommended for Figure I.1 (b) as follows:Note 1: At the end of Note 1 change “Refer to 6.3.9” to “ Refer to 6.3.4.3”.Note 2: Change “Refer to 6.3.8” to “Refer to 6.3.4.2”.Note 3: At the end of Note 3 change “Refer to 6.3.3” to “Refer to 6.3.1.3”.Figure I.1(c) Underground ASME Containers.NOTE: The following changes are recommended fir Figure I.1(c) as follows:Note 1: At the end of Note 1 change “Refer to 6.3.9” to “Refer to 6.3.4.3”.Note 2: At the end of Note 2 change “Refer to 6.3.4.2” to “Refer to 6.3.2.3”.

Substantiation: These are recommended reference number changes to comply with the new numbering which hasbeen changed to conform to the NFPA Manual of Style.

_______________________________________________________________________________________________58- Log #130 Final Action:(K.3.1)_______________________________________________________________________________________________Submitter: Bruce J. Swiecicki, National Propane Gas Association / Rep. NPGA Technology, Standards and SafetyCommitteeRecommendation: Revise text to read as follows:Annex K Burial and Corrosion Protection for Underground and Mounded ASME ContainersK.3.1 A periodic test program----------------should be made available to the container owner. [See 6.6.6.1(K)]

Substantiation: Addition of reference gives more detailed information on the testing programs.

26Printed on 1/10/2012

B. Mahre Revised Proposal

Log#23

NFPA Technical Committee Document Proposal Form

NOTE: All Proposals must be received by 5:00 pm EST/EDST on the published Proposal Closing Date.

For further information on the standards-making process, please contact the Codes and Standards Administration at 617-984-7249 or visit www.nfpa.org/codes.

For technical assistance, please call NFPA at 1-800-344-3555.

FOR OFFICE USE ONLY

Log #:

Date Rec’d:

Please indicate in which format you wish to receive your ROP/ROC electronic paper download (Note: If choosing the download option, you must view the ROP/ROC from our website; no copy will be sent to you.)

Date 09/20/2011 Name Bill Mahre Tel. No. 651-777-8565

Company Propane Technical Services

Street Address 1195 Sterling Circle N City Maplewood State MN Zip 55119

Please indicate organization represented (if any)

1. (a) NFPA Document Title Liquefied Petroleum Gases NFPA No. & Year 58 - 2011

(b) Section/Paragraph 6.18.2.6(3)

2. Proposal Recommends (check one): X new text revised text deleted text

3. Proposal (include proposed new or revised wording, or identification of wording to be deleted): [Note: Proposed text should be in legislative format; i.e., use underscore to denote wording to be inserted (inserted wording) and strike-through to denote wording to be deleted (deleted wording).]

6.18.2.6(3) Where a facility liquid transfer hose is installed at a bulk storage transfer station which is greater than 4000 (15.2 m3 ) water gallon capacity and designed to interconnect with cargo tank vehicles greater than 3500 (13.2 m3) water gallon capacity, in non-metered service, the transfer hose shall be equipped with a passive shut off device to protect the discharge of product in the event of a hose pull away or rupture.

Compliance with a passive shut off device may be mechanical, pneumatic, and electronic or any combination thereof. 4. Statement of Problem and Substantiation for Proposal: (Note: State the problem that would be resolved by your recommendation; give the specific reason for your Proposal, including copies of tests, research papers, fire experience, etc. If more than 200 words, it may be abstracted for publication.)

The present OSHA and DOT codes require the use of a passive shut off device on the liquid transfer hose which is carried on the cargo tank vehicle which has a capacity of 3500 (13.2 m3) or greater. If the facility hose is used, in lieu of the cargo tank vehicle hose, this will comply with the OSHA and DOT requirements. This new addition will affect new and major piping modifications to the container storage piping. OSHA and DOT will remain the enforcement agencies and this addition will provide the guidance of the proper equipment to be installed. SEE: 49 CFR 177.840(r) and OSHA 29 CFR 1910.110 (14)(3)

The compliance with a passive shut device, as a part of the facility hose, will not affect the liquid transfer from the bulk plant to bobtail trucks in metered service. The proposal will allow the use of existing technology and equipment to be applied to the facility hose for passive shut down and would not require the transfer driver to be within arm’s length of the manual shutoff device. A facility hose which is equipped a hose end valve will reduce the residual LP- Gas discharged from the hose during the bleed down. This proposal would be required on new construction or major repairs and would not affect existing facilities until the facility hose is replaced. 5. Copyright Assignment

(a) X I am the author of the text or other material (such as illustrations, graphs) proposed in this Proposal.

(b) Some or all of the text or other material proposed in this Proposal was not authored by me. Its source is as follows (please identify which material and provide complete information on its source):

I agree that any material that I author, either individually or with others, in connection with work performed by an NFPA Technical Committee shall be considered to be works made for hire for the NFPA. To the extent that I retain any rights in copyright as to such material, or as to any other material

authored by me that I submit for the use of an NFPA Technical Committee in the drafting of an NFPA code, standard, or other NFPA document, I hereby grant and assign all and full rights in copyright to the NFPA. I further agree and acknowledge that I acquire no rights in any publication of the NFPA and that copyright and all rights in materials produced by NFPA Technical Committees are owned by the NFPA and that the NFPA may register copyright in its own name.

Signature (Required)

PLEASE USE SEPARATE FORM FOR EACH PROPOSAL • email: [email protected] • NFPA Fax: (617) 770-3500 Mail to: Secretary, Standards Council, National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471

1/10/2012

J. Stannard “Snow on Roofs”

Log #43

1

,

SNOW SLIDING OFF OF ROOFS James H. Stannard, Jr.

October 10, 2011

In many parts of the country, snow can build-up on the roofs of buildings, either as the result of a seasonal accumulation or from a single severe storm. If the building has a sloped roof and the building is heated, it is not unusual for the snow to reach a depth that causes the snow to spontaneously slide off of the roof. There has been some concern that the snow falling off of the roof may damage items or equipment, such as gas meters and regulators. Both the Federal regulations (49CFR Part 192) and the “Liquefied Petroleum Gas Code (NFPA 58) address those concerns and require that the meter and regulators be protected from the forces anticipated by heavy snow.

When there is a spontaneous sliding of snow off of a sloped roof, the mass of snow accelerates from a stationary position and it gains speed as it slides. The initial mass of snow will break off as it passes over the eaves and will drop straight down. As the remaining mass accelerates, the snow will be projected farther away from the eaves. Thus, the snow that was at the top of the roof will land on the ground at a distance from the eave line. This phenomenon will often be observed in snow country alongside homes with wide eaves that haven’t been subjected to drifting snow, there is a pile of snow outside of the eave line and the ground next to the building itself may be actually bare.

Assume that snow accumulates on the roof of a building. The reach of the roof from eaves to peak = (L). The slope of the roof is (∅) and height of the eaves above grade is (h). The outer reach of the snow falling off of the roof is (R), measured from the drip-line. When break=away (i.e. start of snow movement) occurs, the friction factor approaches zero (0).

Let (g) equal the acceleration due to gravity:

L

h

R

2

𝑔 = 32.2 𝑓𝑡 𝑠𝑒𝑐2�

The acceleration due to gravity (𝑎𝑝), parallel to the roof’s surface is:

𝑎𝑝 = 𝑔 𝑠𝑖𝑛∅

The ultimate velocity (𝜕)of the sliding snow, parallel to the roof’s surface is:

𝜕 = �2𝑔𝐿 sin∅

The ultimate horizontal velocity (𝑉ℎ) of the snow leaving the eaves is:

𝑉ℎ= cos∅𝜕

The ultimate vertical velocity ( 𝑉𝑣) of the snow leaving the eaves is:

𝑉𝑣 = sin∅𝜕

The vertical velocity due to both the initial vertical velocity ( 𝑉𝑣) and that due to gravity is:

𝑉′ = 𝑉𝑣 + 𝑔𝑇

𝑉′ = 𝑑ℎ𝑑𝑇

∫𝑑ℎ = ∫(𝑉𝑣 + 𝑔𝑇)𝑑𝑇

ℎ = 𝑉𝑣𝑇 + 𝑔𝑇2

2

𝑔𝑇2

2+ 𝑉𝑣𝑇 − ℎ = 0

Which is a quadratic equation and:

3

𝑇 =−𝑉𝑣±�𝑉𝑣2+8𝑔ℎ

2𝑔

In order for time (𝑇) to be positive, the equation takes the form:

𝑇 =��𝑉𝑣2 + 8𝑔ℎ� − 𝑉𝑣

2𝑔

The outer reach (R) of the snow falling off of the roof is:

𝑅 = 𝑇𝑉ℎ

Then:

𝑅 = 𝜕 cos∅ ×��𝑉𝑣2+8𝑔ℎ�−𝑉𝑣

2𝑔

The ultimate velocity of the snow sliding off of a roof is a function of the length (L) and the slope (∅). For example: a roof with a 20 ft. length (L) and a slope (∅) of 30° the ultimate velocity (𝜕)of the sliding snow will be 25.4 ft/sec. while a steeper roof of the same length with a slope (∅) of 45° will have an ultimate velocity (𝜕) of 30.2 ft/sec. Finally an even steeper roof, such as might be found in the “Swiss chalet” type home with a slope (∅) of 60° will have an ultimate velocity (𝜕)of 33.4ft/sec.

For a single story structure with an eave height (h) of 12 ft and a slope (∅) of 30° the reach (R) will be 15.1 ft. For a similar two story structure with an eave height (h) of 20 ft. the reach (R) will be 20.5 ft.

Likewise, a single story structure with an eave height (h) of 12 ft and a slope (∅) of 45°, the reach (R) will be 9.0 ft. and the two story structure with the same slop and an eave height (h) of 20 ft. the reach (R) will be 12.6 ft.

In the case of the “Swiss chalet” type home with a slope (∅) of 60° and an eave height (h) of 12 ft the reach will only be 7.6 ft. and the two story version with an eave height (h) of 20 ft. will have a reach (R) of 10.9 ft.

4

It should be evident that, in those situations where drifting snow does not build up on the sides of a building, equipment installed at the side of the building under wide eaves is probably well protected from the forces caused by snow falling off of the roof of the structure. In the situation where the snow has gradually crept down the roof and is curled under the eaves, the snow will fall straight down and only a small portion of the roof load might impact any equipment behind the drip-line. Likewise, icicles tend to form at the edge of the eaves and will also fall straight down and be unlikely to impact any equipment protected by the wide eaves.

Requested CP Movement of Cylinders

In Buildings

Report on Proposals – June 2013 NFPA 58_______________________________________________________________________________________________58- Log #CP11 Final Action:(6.19.3.6)_______________________________________________________________________________________________Submitter: Technical Committee Liquefied Petroleum GasesRecommendation: 6.19.3.6  Transportation (movement) of cylinders having water capacities greater than 2.7 lb (1.2kg) within a building shall be restricted to movement directly associated with the uses covered by Section 6.19.(A)  Valve outlets on cylinders having water capacities greater than 2.7 lb (1.2 kg) shall be tightly plugged, capped, orsealed with a listed quick-closing coupling or a listed quick-connect coupling.(B)  Only emergency stairways not normally used by the public shall be used, and precautions shall be taken to preventthe cylinder from falling down the stairs where freight or passenger elevators are used.(C)  Freight or passenger elevators shall be permitted to beused when occupied only by those engaged in moving the cylinderEmergency stairways shall be occupied only by those engaged in moving the cylinder .

Substantiation: There was an editorial error in the 2001 edition that was not identified in subsequent revisions. Thetext as printed in the current edition is not clear. This proposal is to restore the text as published in the 1998 edition toclarify the requirement.

1Printed on 1/10/2012

R. Muellerleile Liquid Withdrawal

Valve Location

1

Beach, Denise

From: Rich [[email protected]]Sent: Thursday, January 05, 2012 12:26 PMTo: Bruce Swiecicki; [email protected]; Beach, Denise; Dick Hoffman; LP

Cylinder; Charlie BrownSubject: Emailing: New Liquid Withdrawal Valve Location On New UG TanksAttachments: New Liquid Withdrawal Valve Location On New UG Tanks.JPG

Follow Up Flag: Follow upFlag Status: Flagged

Please be advised that the placement of the liquid withdrawal valve location has been changed by various tank manufacturers of underground tanks, and re-located to the top of the tank riser, and (in this case), an integral component of the valve cluster. The following is a list of 3 basic questions this will now effect as relates to tank installation, codes, and CETEP training for our employees / Propane Emergencies training for firefighters: 1. Will this change the required protection around the underground risers? 2. Will this change modify the code to where these tanks can (or no longer can) be located? 3. Will this change the training requirements for CETP and Propane Emergencies? Since 1992, I have (as a Marketer) experienced approximately 5 incidents involving underground containers. Three of the five were a direct result of a vehicle: (snowplow, backhoe, and excavator clipping the top of a container dome, and snapping the relief valve). All three incidents were mitigated with a wooden plug. My concern reflects the fact that the wooden plug will no longer be effective....especially with a liquid release. My recent research indicates a savings to the tank manufactures (because of this modification) of less than $10 per container. I'm still trying to figure out how this occurred. Remember the 1 to 270 ratio. Please contact me if I can offer further assistance.