Page 1: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

0

1/1/2012

2012

Annual Environmental Report

Takeda Ireland Limited

IPPCL P0693-01

Page 2: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report
Page 3: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

2

2 Takeda Ireland Limited Annual Environmental Report 2012

EXECUTIVE SUMMARY

This Annual Environmental Report (AER) for Takeda Ireland Limited (Grange Castle)-TILGC

presents Environmental Management for the period of the 01st January to the 31st of December

2012.

The format of this report follows guidance issued by the Environmental Protection Agency and

presents information on environmental performance at TILGC.

In 2012 TILGC‟s main focus continued to be compliance with the licence and making

improvements on our existing environmental management system. There have been a number of

key achievements over this period which include:

Production of three API‟s SYR-322, TAK-375 and TAK-700;

Finalized the design and commencement of work on a new Wastewater Treatment Plant;

Installation of chemically resistant liners on 3 bunds.

Completion of a combined Environmental, Health and Safety Awareness Week by the

Environmental and Health and Safety Committees.

Introduction of Carbon Footprinting and Carpooling for the site.

Validation of environmental laboratory procedures.

Preparation for increased production levels and shift work in 2013.

TILGC is committed to continuing this high level of compliance and to continually improving on

environmental performance in the future. TILGC‟s good environmental record is testament to the

commitment of all employees in achieving environmental goals.

Report By: __________________________

Date: ___________

Aileen Newman EHS Engineer

Reviewed By: __________________________ Date: ___________ Damian Crowley

EHS Director

Approved By: __________________________ Date: ___________

Greg Timmons

President

Page 4: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

3 Takeda Ireland Limited Annual Environmental Report 2012

Page 5: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

4 Takeda Ireland Limited Annual Environmental Report 2012

TABLE OF CONTENTS

1. INTRODUCTION ........................................................................................ 6

2. SITE DESCRIPTION ................................................................................... 7

2.1. Site Location and Layout ............................................................................... 7 2.2. Site Activities .............................................................................................. 8 2.3. Environmental Management Policy ................................................................. 8 2.4. Organisational Chart ..................................................................................... 9

3. SUMMARY INFORMATION ....................................................................... 10

3.1. Emissions to Atmosphere Summary ............................................................. 10 3.2. Emissions to Sewer Summary ...................................................................... 11 3.3. Surface Water Discharge Summary .............................................................. 13 3.4. Groundwater Monitoring Summary ............................................................... 13 3.5. Resource Consumption Summary ................................................................. 15

3.5.1 Energy................................................................................................ 15 3.5.2 Water ................................................................................................. 18

3.6. Waste Management Report ......................................................................... 18 3.6.1 Hazardous Waste ................................................................................. 18 3.6.2 Non-Hazardous Waste .......................................................................... 19

3.7. Complaints Summary ................................................................................. 21 3.8. Environmental Incidents ............................................................................. 21

4. MANAGEMENT OF THE ACTIVITY ............................................................. 23

4.1. Environmental Management Programme Report ............................................. 23 4.1.1. Energy Usage ......................................................................................... 23 4.1.2. Waste .................................................................................................... 24 4.1.3. Emissions to Atmosphere ......................................................................... 25 4.1.4. Water .................................................................................................... 25 4.1.5. In House Analysis .................................................................................... 26 4.1.6. Environmental Awareness ......................................................................... 26 4.1.7. List I and II Substance Reduction and Elimination of Carcinogens in use ........ 27

4.2. Environmental Management Programme Proposal 2013 .................................. 28 4.3. European Pollution Transfer and Release (EPRTR) .......................................... 30

5. LICENCE SPECIFIC REPORTS ................................................................... 31

5.1. Bund Integrity Testing ................................................................................ 31 5.2. Tank and Pipeline Testing and Inspection ...................................................... 31 5.3. Noise Monitoring ........................................................................................ 32 5.4. Residuals Management Plan/Environmental Liabilities Risk Assessment ............. 33

APPENDIX 1: SURFACE WATER EMISSIONS ..................................................... 34

APPENDIX 2: EPRTR ......................................................................................... 36

Page 6: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

5 Takeda Ireland Limited Annual Environmental Report 2012

TABLE OF FIGURES

Figure 2.1.1 Site Location ................................................................................................ 7 Figure 3.1.1 Comparison of Emissions to Atmosphere with IPPCL Specifications ........................ 10 Figure 3.2.1 Comparison of Emissions to Sewer with IPPC Licence Specifications ...................... 12 Figure 3.4.1 Groundwater Monitoring Locations................................................................... 14 Figure 3.5.1 Summary of Electrical Consumption ................................................................. 16 Figure 3.5.2 Summary of Gas Consumption ........................................................................ 17 Figure 3.5.3 Breakdown of Energy Consumption (kWh) for 2012 ............................................ 17 Figure 3.6.1 Waste Composition (%) 2012 ......................................................................... 20

TABLE OF TABLES

Table 3.2.1 Summary Table for Emissions to Sewer (EP-WW-01) ........................................... 11 Table 3.3.1 Summary of Agency Monitoring Results on Surface Water .................................... 13 Table 3.4.1 Groundwater Monitoring Summary (MP-WG-01) ................................................. 15 Table 3.4.2 Groundwater Monitoring Summary (MP-WG-02) ................................................. 15 Table 3.5.1 Summary of Energy Consumption .................................................................... 16 Table 3.5.2 Summary of Water Consumption ...................................................................... 18 Table 3.6.1 Hazardous Waste Summary ............................................................................ 19 Table 3.6.2 Non-Hazardous Waste Summary ...................................................................... 20 Table 3.8.1 Summary of Environmental Incidents ................................................................ 22 Table 4.1.1 EMP Report-Objective 1 .................................................................................. 24 Table 4.1.2 EMP Report-Objective 2 .................................................................................. 25 Table 4.1.3 EMP Report-Objective 3 .................................................................................. 25 Table 4.1.4 EMP Report-Objective 4 .................................................................................. 25 Table 4.1.5 EMP Report-Objective 5 .................................................................................. 26 Table 4.2.1 EMP Proposal 2013 ........................................................................................ 29 Table 5.1.1 Bund Integrity Testing Schedule ...................................................................... 31 Table 5.3.1 Noise Monitoring Results ................................................................................. 32

Page 7: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

6

6 Takeda Ireland Limited Annual Environmental Report 2012

1. INTRODUCTION

Takeda Ireland Limited (Grange Castle)-TILGC was established in 2002. In that year the facility

was designed, an Environmental Impact Statement (EIS) was completed and planning permission

for the site was given. Construction on the site began in 2003 and in 2004 TILGC‟s Integrated

Pollution and Prevention Licence (IPPCL P0693-01) was granted. The commissioning and validation

of the plant was completed by the beginning of 2007. Commercial production began in April 2007

and to coincide with this the IPPCL was fully commenced.

TILGC is Takeda‟s first Active Pharmaceutical Ingredient (API) plant constructed outside Japan.

This is the fourth Annual Environmental Report (AER) for TILGC. It covers the 12 month period

from the 01st January until the 31st of December 2012.

The content of this AER is based on Schedule 5(i) Recording and Reporting to the Agency of the

IPPCL and follows guidelines set in the “Guidance Note for: Annual Environmental Report” issued

by the Agency.

Page 8: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

7 Takeda Ireland Limited Annual Environmental Report 2012

2. SITE DESCRIPTION

2.1. Site Location and Layout

The site is located in Grange Castle Business Park, Clondalkin, Dublin 22. This is a new industrial

estate which was previously used as farmland. TILGC‟s facility was constructed on a green field

site. At 38 acres it holds five buildings, the Administration Building, the Main Production Building,

the Utilities Building, the Warehouse and the Drum Store.

Building Area m2

Administration 2,650

Production 5,499

Utilities 716

Warehouse 634

Drum store 360

Figure 2.1.1 Site Location

TAKEDA

Page 9: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

8 Takeda Ireland Limited Annual Environmental Report 2012

2.2. Site Activities

TILGC is a multi-purpose API (Active Pharmaceutical Ingredient) Plant. It is primarily engaged in

the manufacture of pharmaceutical products from clinical trial stages through to launch and full

commercialisation. Due to the nature of the plant TILGC is continuously introducing new products

each year.

Over the period of this AER TILGC has produced three products which include TAK-700, TAK-375

and SYR-322. TAK-700 is a drug which is used to treat prostate cancer, TAK-375 is a drug used to

treat insomnia and SYR-322 is primarily used for the treatment of Type II diabetes.

2.3. Environmental Management Policy

Takeda is a global company which researches, develops, manufactures and markets a wide variety

of pharmaceuticals. Takeda strives towards better health for individuals and progress in medicine

by developing superior pharmaceutical products. TILGC regards environmental and energy

management as an integral and essential part of good business practice.

TILGC is committed to achieving and maintaining a high standard of environmental quality in all

our operations.

To achieve our goal and to set the standard, TILGC will:

At a minimum meet, and where appropriate exceed, the requirements of all applicable

legislation, corporate standards and industry standards to which TILGC subscribes.

Promote the concepts of continuous improvement and pollution prevention through the

setting and reviewing annually of environmental and energy efficiency objectives and

targets.

Provide all of the necessary information and resources to achieve objectives and targets.

Provide necessary training and support to employees so they can carry out their

environmental and energy management responsibilities effectively and professionally.

Implement a documentation system which will ensure that all documents required by the

IPPCL, environment and energy management system are generated and adequate records

are kept.

Keep up to date with all applicable legal requirements, industry standards and best

practices.

Make our environmental and energy management policy and records available to the

public and interested parties.

Promote the adoption of environmentally sound practices by contractors and suppliers.

Communicate our policy to all TILGC employees.

Ensure the Environmental and Energy Policy is reviewed regularly and updated as

necessary.

Page 10: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

9 Takeda Ireland Limited Annual Environmental Report 2012

2.4. Organisational Chart

President

Senior Directors

Manufacturing

Operations

Director

Quality

Director

Health, Safety

and

Environment

Director EHS Engineering

Director

Page 11: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

10 Takeda Ireland Limited Annual Environmental Report 2012

3. SUMMARY INFORMATION

3.1. Emissions to Atmosphere Summary

There are two main emission points specified in the IPPCL for TILGC – 1. EP-P1-02 (VOC Recovery

Unit) and 2. EP-P1-03 (Scrubber Hydrogenator). The Scrubber Hydrogenator has not been

operational since March 2010 and hence a summary of emissions has not been included for this

emission point for 2012. A summary of mass emissions to atmosphere from EP-P1-02, the VOC

Recovery Unit, for the period of 2010-2012 are presented in Table 3.1.1 and Figure 3.1.1. The

VOC recovery unit is used on a continuous basis when the plant is operating. The data presented is

based on monthly emissions monitoring of the parameters specified in the IPPCL, as analysed by

our external contract laboratory. All results were in compliance with the IPPCL.

Table 3.1.1 Summary Table for Emissions to Atmosphere (EP-P1-02)

Figure 3.1.1 Comparison of Emissions to Atmosphere with IPPCL Specifications

TA Luft

Class I (kg)

TA Luft

Class II (kg)

TA Luft

Class III (kg)

0

100

200

300

400

500

600

700

Licensed Mass

Emissions Mass Emissions 2012Mass Emissions 2011

Mass Emissions 2010

Parameter Unit

Licensed

Mass Emissions

Mass

Emissions 2012

Mass

Emissions 2011

Mass

Emissions 2010

% Compliance

TA Luft Class I

kg 88 <1 <1 <1 100

TA Luft Class II

kg 438 <2 <1 <1 100

TA Luft Class III

kg 657 <3 <1 <1 100

Page 12: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

11 Takeda Ireland Limited Annual Environmental Report 2012

3.2. Emissions to Sewer Summary

Emissions to sewer from TILGC are controlled under Schedule 2(i) of the IPPCL. Wastewater from

the laboratories, production building, boiler blow down sump, bunds and containment structures is

collected into our wastewater tanks. When the tanks are full they are pH adjusted and then the

wastewater is tested for pH and COD. If these parameters are within licence limits the wastewater

is then released to sewer. This is a batch operation with no continuous discharge to sewer.

A sample of wastewater discharged to sewer is taken and analysed on a monthly basis for the

parameters specified in Schedule 2(iii) of the IPPCL. These results are used with our continuous

monitoring results to calculate the mass emissions. The mass emission (kg) figure was determined

by multiplying the monthly data by the effluent flow mass emission for that month and adding the

sum for the year. A summary of our mass emissions is presented in table 3.2.1.

In addition to the parameters detailed in table 3.2.1, both pH and temperature were continuously

monitored on our DCS (Distributed Control System) during discharges. All emissions as detailed in

table 3.2.1 were 100% compliant with the IPPCL.

Table 3.2.1 Summary Table for Emissions to Sewer (EP-WW-01)

* Monitored on a monthly basis ** Monitored on a quarterly basis *** Monitored per batch release of wastewater **** Monitored on a continuous basis NS Not Specified

Parameter Unit

Licensed Mass

Emissions (Per

Annum)

Mass Emissions

2012

Mass Emissions

2011

Mass Emissions

2010

% Compliance

% of Licensed

Mass Emission

2012

BOD* Kg 222,650 525 310 234 100 <1

Suspended solids * Kg 44,530 204 204 377 100 <1

Sulphates (as SO4)* Kg 55,845 713 580 582 100 <10

Detergents (as MBAS)* Kg 11,315 2 0 0.1 100 <1

Phosphates (as PO4-P)* Kg 5,840 76 20 37.4 100 <10

Ammonia (as N)* Kg 11,315 4 0.33 35 100 <1

Organohalogens* Kg 10.95 <1 <1 <1 100 <10

Toluene* Kg 365 <1 <1 <1 100 <1

Fats, oil, grease* Kg 16,790 24 1 <1 100 <1

Organic solvents** Kg NS <1 <1 <1 100 <1

COD*** Kg 445,300 1,615 1,272 1,781 100 <1

Flow**** m3 110,960 6,825 7,693 7,885 100 <10

Page 13: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

12 Takeda Ireland Limited Annual Environmental Report 2012

Figure 3.2.1 Comparison of Emissions to Sewer with IPPC Licence Specifications

No samples were taken from emission point EP-WW-01 by the agency during the period of this

AER.

0

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

450,000

Licensed Mass

Emissions Mass Emissions

2012 Mass Emissions

2011 Mass Emissions

2010

0

2000

4000

6000

8000

10000

12000

14000

16000

Licensed Mass

Emissions Mass Emissions

2012 Mass Emissions

2011 Mass Emissions

2010

Page 14: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

13 Takeda Ireland Limited Annual Environmental Report 2012

3.3. Surface Water Discharge Summary

Surface water from the car park, roofs and non-bunded areas are collected in the attenuation

ponds. This water is discharged to the river Griffeen. The discharge point (EP-WS-01) from the

attenuation pond is monitored in compliance with schedule 4(i) of the IPPCL.

A visual inspection of the ponds is carried out on a daily basis and the discharge point is monitored

continuously for pH and TOC during discharges.

In accordance with condition 9.1.2 of our IPPCL warning and action limits of 20 and 30ppm

respectively were set in relation to TOC. TILGC have also set internal limits for pH of 7-9.

Any value outside of the warning limits will cause an alarm on our DCS. Values outside the action

range will cause the discharge valve to shut automatically and the surface water will be retained in

the attenuation ponds.

One samples was taken by the agency during the period of this AER, the results from this analysis

are presented in Table 3.3.1. The results were within TILGC‟s warning and action limits.

Table 3.3.1 Summary of Agency Monitoring Results on Surface Water

Sample Date pH COD (mg/L)

04th April 2012 7.9 13

Details of all the discharges are presented in Appendix 1.

3.4. Groundwater Monitoring Summary

Bi-annual monitoring of groundwater is required in accordance with Condition 9.3 of the IPPCL.

This monitoring was carried on two occasions during the period of this AER.

There are two groundwater monitoring points at TILGC, these are MP-WG-01 and MP-WG-02.

These monitoring locations are illustrated in figure 3.4.1.

Summaries of the monitoring results for the period of this AER and monitoring which was carried

out in 2010, 2011 and 2012 are detailed in tables 3.4.1 and 3.4.2. The results demonstrate that

the quality of groundwater under TILGC‟s facility has not been affected by activities on site.

Page 15: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

14

14 Takeda Ireland Limited Annual Environmental Report 2011

Figure 3.4.1 Groundwater Monitoring Locations

Page 16: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

15

15 Takeda Ireland Limited Annual Environmental Report 2012

Table 3.4.1 Groundwater Monitoring Summary (MP-WG-01)

Table 3.4.2 Groundwater Monitoring Summary (MP-WG-02)

3.5. Resource Consumption Summary

This section details figures for the total usage of energy and water at TILGC for 2010, 2011 and

2012. Production on site commenced in 2007; however levels of activity have been very low with

long periods of plant set up and cleaning. Due to this intermittent production and the multipurpose

nature of the plant there can be no meaningful comparison between resource consumption and

production figures. There is a two week shutdown in July of each year, as can be seen in figure

3.5.1 there is a noticeable dip in energy consumption during this period.

3.5.1 Energy

The two types of energy consumed at TILGC are electricity and gas. A breakdown of energy

consumption for 2012 is illustrated in figure 3.5.3.

TILGC utilises electricity from the mains supplied by ESBIE. The users of electricity on site include

ventilation and air conditioning, cooling, compressed air, vacuum pumps, motors and drives, trace

heating and lighting. Table 3.5.1 presents the electricity consumption at TILGC for 2010, 2011

and 2012. Figure 3.5.1 illustrates the electricity consumption for each month of 2010, 2011 and

2012. As illustrated in this figure, there was a small decrease in electricity consumption in 2012

relative to 2011. While this decrease might appear small we have considered it to be a significant

achievement considering production levels increased by approximately 75% in 2012. Again this

reduction is due to a number of energy saving initiatives which have been carried out on the site.

The source of this total electricity consumption data is from consumption reports provided by the

ESBIE.

Parameter Unit Jan

2012

July

2012

Jan

2011

July

2011

Jan

2010

Jul

2010

pH pH 6.6 7.1 7.4 6.8 7.3 6.6

COD mg/l 10 5 5 30 <5 <5

Total

Ammonia mg/l <2 <2 <2 <2 <2 <2

Conductivity µs/cm 707 715 908 969 1078 1025

Trace Organics

mg/l <2 <2 <2 <2 <2 <2

Parameter Unit Jan

2012

July

2012

Jan

2011

July

2011

Jan

2010

Jul

2010

pH pH 7.0 6.9 7.4 6.7 7.2 6.4

COD mg/l 14 13 58 20 7 <5

Total Ammonia

mg/l <2 <2 <2 <2 <2 <2

Conductivity µs/cm 806 773 944 801 811 965

Trace Organics

mg/l <2 <2 <2 <2 <2 <2

Page 17: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

16 Takeda Ireland Limited Annual Environmental Report 2012

TILGC utilises gas from the mains supplied by ESBIE. Natural gas is used to fuel the two main

boilers for the site (in a duty/stand by configuration) and two small gas burners in the admin

building which supply space and water heating for the whole site. Table 3.5.1 presents the gas

consumption at TILGC for 2010, 2011 and 2012. Figure 3.5.2 illustrates the gas consumption for

each month of 2010, 2011 and 2012. As illustrated in this figure, gas consumption is reduced over

the summer months; this is largely due to the reduced necessity for space heating. The source of

this total gas consumption data is from consumption reports provided by the ESBIE. There was

almost a 13% decrease in gas consumed on site since 2010. This reduction is mainly due to the

ramp down of most of the production building HVAC systems out of manned hours.

A programme for improvements in energy efficiency at TILGC has been included in the

Environmental Management Programme (Sections 4.1 and 4.2).

Table 3.5.1 Summary of Energy Consumption

2012 2011 2010

Electricity Consumption (kWh) 8,482,608 7,715,426 8,535,290

Gas Consumption (kWh) 13,425,547 13,710,006 15,750,147

Figure 3.5.1 Summary of Electrical Consumption

300000

400000

500000

600000

700000

800000

900000

1000000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

kW

h

Month

2010

2011

2012

Page 18: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

17 Takeda Ireland Limited Annual Environmental Report 2012

Figure 3.5.2 Summary of Gas Consumption

Figure 3.5.3 Breakdown of Energy Consumption (kWh) for 2012

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

1,600,000

1,800,000

2,000,000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

kW

h

Month

2010

2011

2012

39%61%

Electricity Consumption Gas Consumption

Page 19: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

18 Takeda Ireland Limited Annual Environmental Report 2012

3.5.2 Water

TILGC‟s single source of water is South Dublin County Council Mains. Water is used in the

manufacturing process, utilities (generation of steam) and for cleaning equipment. Water is

purified before it is used in the process.

Table 3.5.2 details the water consumption at TILGC for 2010, 2011 and 2012. Figure 3.5.4 shows

the water consumption for each quarter of 2010, 2011 and 2012. The source of this total water

consumption data is from the incoming flow meters to the site.

Table 3.5.2 Summary of Water Consumption

3.6. Waste Management Report

Waste generated at TILGC is classified into two categories, hazardous and non-hazardous.

The total quantities of hazardous waste generated on site in 2010, 2011 and 2012 are presented

in table 3.6.1. Table 3.6.2 presents all non-hazardous waste generated during the same time

period.

Figure 3.6.1 illustrates the composition of waste for 2012.

3.6.1 Hazardous Waste

During 2012, a total of approximately 1,300 Tonnes of hazardous waste was generated onsite. The

majority of this was aqueous solvent, which arose from production processes. Other hazardous

waste streams generated on site included solid hazardous waste, waste oils, spent fluorescent

tubes, batteries and waste electrical equipment.

In accordance with condition 7.7.4 of the IPPCL, documentation confirming acceptance and

disposal/recovery of all hazardous waste streams transferred from TILGC, are retained on-site for

inspection.

No waste was consigned from the site for recovery abroad as a „Green List‟ waste. There were no

rejected waste consignments during 2012.

The total quantities of hazardous waste generated on site in 2010, 2011 and 2012 are presented

in Table 3.6.1.

As shown in this table the volume of hazardous waste generated in 2012 has decreased from 2010

figures, and is primarily dependant on production activities.

2012 2011 2010

Water Consumption (m3) 11,645 19,384 15,055

Page 20: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

19 Takeda Ireland Limited Annual Environmental Report 2012

A programme to reduce the volume of hazardous waste is included in the Environmental

Management Programme (Sections 4.1 and 4.2).

Table 3.6.1 Hazardous Waste Summary

EWC Code Description

Total Quantity

Shipped in 2012 (t)

Total Quantity

Shipped in 2011 (t)

Total Quantity

Shipped in 2010 (t)

07 05 01* Aqueous Solvent (Low CV) 1047 728 815

07 05 04* Aqueous Solvent (High CV) 248 120 238

07 05 13* Solids- Disposable PPE, Fitters, Wipes,

Utilities, RPE 7.30 5.22 5.34

13 08 99* Mixed Oils 0.11 0.38 149

13 05 08* Interceptor Waste 1.5 - -

15 01 10* Solids-Packaging 2.73 2.51 1.84

15 02 02* Solids-Absorbents/Filters 0.50 0.18 0.29

16 05 06* Laboratory Chemicals 0.0 0.03 0.02

16 05 07* Discarded Inorganic Chemicals 0.07 0.16 0.11

16 05 08* Discarded Organic Chemicals 0.18 0.07 0.03

16 08 07* Spent catalysts contaminated with dangerous substances

- - 3.84

20 01 21* Fluorescent tubes and other mercury-containing waste

0.47 0.11 0.04

20 01 27* Paint, inks, adhesives and resins containing dangerous substances

- 0.01 0.24

20 01 33* Batteries- Mixture of 16 06 01*, 16 06 02* and 16 06 03*

- - 1.03

20 01 35* Waste Electrical & Electronic Equipment

0.18 1.29 0.91

3.6.2 Non-Hazardous Waste

During 2012, approximately 80 Tonnes of non-hazardous waste was generated onsite. Bund

washings resulting from the project to install chemically resistant liners in 3 bunds accounted for

the majority, approx 50%, of non-hazardous waste generated on site.

The remainder of the non-hazardous waste was generated from general waste and cleanout of

attenuation ponds. The total quantities of non-hazardous generated on site in 2010, 2011 and

2012 is presented in table 3.6.2.

Page 21: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

20 Takeda Ireland Limited Annual Environmental Report 2012

Table 3.6.2 Non-Hazardous Waste Summary

EWC Code

Description

Total Quantity

Shipped in 2012 (t)

Total Quantity

Shipped in 2011 (t)

Total Quantity

Shipped in 2010 (t)

20 03 99 Mixed Municipal Waste 10.95 12.05 17.6

Mixed Dry Waste 7.64 8.1 11.9

20 01 01 Paper and Cardboard 11.18 11.75 8.6

20 01 02 Glass 2.30 0.7 0.6

20 01 38 Wood 2.92 7.8 2.8

20 01 40 Metal 1.08 11.22 4.1

17 01 07 Construction and Demolition - 20.22 11.0

16 07 99 Wastewater Tank Silt - 7.9 -

19 08 05 Attenuation Pond Sludge 1.98 19.60 -

20 01 08 Compost 3.62 2.72 0.9

20 03 03 Bund Washings 37.99 - -

Figure 3.6.1 Waste Composition (%) 2012

76%

12%

1%11%

Aqueous Solvent (Low CV)

Aqueous Solvent (High CV)

Other Hazardous

Other Non-Hazardous

Page 22: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

21 Takeda Ireland Limited Annual Environmental Report 2012

3.7. Complaints Summary

In accordance with condition 12.3 of the IPPCL, TILGC is required to record and notify the Agency

of any environmental complaints received on a monthly basis. There were no complaints received

by TILGC in 2012.

3.8. Environmental Incidents

There were three environmental incidents reported to the Agency during the period of this AER.

These incidents are detailed in table 3.8.1. All incidents were reported in compliance with condition

4.1 of our IPPCL.

Page 23: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

22

Takeda Ireland Limited Annual Environmental Report 2012 22

Table 3.8.1 Summary of Environmental Incidents

No. Nature/Date of Incident

Authorities Contacted

Details Corrective and Preventative Actions Environmental

Impact Resolution

1 Release of R407C 28th March 2012

EPA A leak of approximately 38 Kg‟s of R407C on occurred on site.

Gas reclaimed, system pressure tested, found a pinhole leak, pinhole leak repaired, pressure tested the system again to ensure it was sealed and system recharged.

None System repaired

2 VOC System Fault 29th May 2012

EPA A number of disturbances to the VOC system in relation to high THC readings were observed during the period of May to August 2012.

An intensive investigation was carried out in order to determine the cause of these high THC readings and their environmental impact. This investigation determined that : -There was no environmental impact -The VOC was operating correctly -The condition of the beds were ok -The THC analyser was operating correctly -There were no unusual emissions from the plant -There were no similar previous incidents. There was some evidence to suggest that organic/acid or organic/base contact in the waste tanks may have resulted in the production of low molecular weight gases which the VOC system found difficult to treat.

None- Emissions remained below IPPCL Limits

-Review of the management of the MO (Waste Neutralisation) area -Development a monitoring plan -Development of a system for recording plant operations as soon as high THC readings are observed -Development of a standardised approach for investigation incidents in relation to high THC readings on the VOC system

3 VOC System Fault 03rd September 2012

EPA Bursting Disc Failure. A nitrogen valve feeding the bed became stuck resulting in a build up of pressure in the bed causing the bursting disc to fail.

None – No plant/tank farm activities at the time.

-The bursting disc was replaced and the valve was taken apart, reassembled and tested. -The VOC was returned to normal operations. -Valves are checked on an annual basis during shutdown.

Page 24: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

23

23 Takeda Ireland Limited Annual Environmental Report 2012

4. MANAGEMENT OF THE ACTIVITY

4.1. Environmental Management Programme Report

The following is a description of the Environmental Management Programme (EMP) completed

throughout 2012. Sections 4.1 and 4.2 present the EMP report for 2012 and the EMP Proposal for

2013, respectively.

The success and achievements associated with each of the proposed environmental objectives are

detailed under each of the applicable sections below.

4.1.1. Energy Usage

The 2012 EMP target in relation to this objective was to further progress the implementation of the

EN 16001 Energy Standard (now ISO 50001). This involved the following key actions;

Gain accreditation to ISO 50001

Implement phase 2 of the automatic monitoring system

Projects to improve efficiency of compressed air system

Provision of Training to engineering technicians on improvements to compressed air

system

Provision of awareness training as part of Environmental Week

Conduct Carbon Footprint Analysis of TILGC

A considerable amount of progress was made in relation to gaining ISO 50001 accreditation, a

mock audit was conducted in November 2012 which resulted in only minor observations. A full

accreditation audit has been scheduled for Q1 2013. Full accreditation was delayed due to

unrelated issues in the plant.

Phase 2 of the automatic monitoring system was implemented, this involved integration

of existing boiler gas and steam meters into our energy management software.

A review of the compressed air system was completed which identified isolation of the

dryer to be a potential energy saver. This was completed and an energy saving of

80,000 kwh was identified. Additional projects on the compressed air system were

identified for implementation in 2013.

Other projects implemented in 2012 under the energy management system included

optimisation of boiler controls, reduced HVAC operational hours and improved heat

tracing controls on external pipe work. Completion of these projects resulted in significant

energy savings which comprised of 6.2% electricity and 7.46% gas consumption on 2011 usage

Page 25: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

24 24 Takeda Ireland Limited Annual Environmental Report 2012

levels. This equated to a total saving of 1,502,142 kWh. This saving is considered to be a

significant achievement taking increased production levels, of approximately 75%, into account.

Training was provided to all relevant engineering technicians in the form of tool box talks.

An energy awareness programme was incorporated into the environmental, health and safety

awareness week which was held in November 2013. Carbon Footprinting and Carpooling for the

site was also launched during this week.

A summary of this objective is presented in table 4.1.1.

Table 4.1.1 EMP Report-Objective 1

4.1.2. Waste

This objective aimed to reduce the volume of bulk liquid waste leaving the site for disposal. This

involved the following key actions;

Finalize the design of the Wastewater Treatment Plant and

Commence Construction

The WWTP design was finalized in October 2012 with the completion of a HAZOP. Construction of

the WWTP also commenced in October and is scheduled for completion at the end of Q1 2013. As

there will be no change to the discharge point or discharge parameters construction of the WWTP

is being accommodated under condition 1.2 of the IPPCL subject to conditions outlined by the

Agency.

A summary of this is presented in table 4.1.2.

Objective 1: Energy Usage

Target Key Action(s) Timeframe Progress Status

1.1 Further progress the implementation of the ISO 50001 Energy Standard Reduce Energy Usage by 1% in line with Corporate Targets

Gain accreditation to

ISO 50001

Implement phase 2 of

the automatic monitoring system

Projects to improve

efficiency of compressed air system.

Provision of Training to engineering technicians on

improvements to compressed air system.

Provision of awareness training as part of Environmental Week.

Conduct a Carbon

Footprint Analysis of TILGC

December 2012

Significant Progress

Made. A mock audit was conducted in Nov 2012. Accreditation Audit Scheduled for Q1 2013.

Phase 2 of the automatic

monitoring system implemented

Project to improve

efficiency of compressed air system completed

Training provided to all

engineering technicians on improvement made.

EHS awareness week conducted in Nov 2013 which allowed for the provision of Energy Awareness Training as well as the launch of Carbon Footprinting for the site.

2012 Target Complete

Page 26: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

25 Takeda Ireland Limited Annual Environmental Report 2012

Table 4.1.2 EMP Report-Objective 2

4.1.3. Emissions to Atmosphere

The objective in relation to air emissions for 2012 aimed at compliance with F-Gas regulations.

This involved the following key action;

Review Maintenance work instructions/records to ensure full compliance with the F-Gas Regulations.

A review of contractors carrying out maintenance work on chiller systems was conducted. This

involved a review of method statements, work orders and certification of personnel conducting the

work. Copies of all relevant certification have been retained.

A summary of this is presented in Table 4.1.3.

Table 4.1.3 EMP Report-Objective 3

4.1.4. Water

This objective aimed to increase the chemical resistance and integrity of bunds on site by the

following key action:

Install chemically resistant liners in 3 bunds (Solvent, HCl and NaOH).

This was completed in August 2012. In order to do this scaffolding was erected over the entire

tank farm to make the area watertight. Specialist silicate based mortar was then applied to the

bund floors and walls and allowed to cure. The bunds were tested afterwards in accordance with

BS8007 and passed.

A summary of this is presented in table 4.1.4.

Table 4.1.4 EMP Report-Objective 4

Objective 2: Waste

Target Key Action(s) Timeframe Progress Status

2.1 Reduce the volume of bulk liquid waste sent off site for disposal

Finalise the WWTP

Design and commence construction of the WWTP.

December 2012

Design finalized and

construction commenced in Oct 2012.

Complete

Objective 3: Emissions to Atmosphere

Target Key Action(s) Timeframe Progress Status

3.1 Control Fluorinated Greenhouse Gases

Review Maintenance work instructions/records to ensure full compliance with the F-Gas Regulations.

December 2012

Review conducted in April 2012

Complete

Objective 4: Water

Target Key Action(s) Timeframe Progress Status

4.1 Ensure integrity of bunds

Install chemically resistant liners in

3 bunds (Solvent, HCl and NaOH).

Dec 2012 Liners installed

in August 2012

Complete

Page 27: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

26 26 Takeda Ireland Limited Annual Environmental Report 2012

4.1.5. In House Analysis

This objective aimed to validate in house analysis in accordance with EPA Guidance. This involved

the following key actions;

Perform Validation of COD and pH method of analysis on wastewater Ensure control

measures in place are appropriate for each chemical approved

Validation of in-house COD and pH methods was conducted by Quality Wizard in February 2012.

A summary of this is presented in table 4.1.5.

Table 4.1.5 EMP Report-Objective 5

4.1.6. Environmental Awareness

This objective aimed to increase Environmental Awareness on site through the following key

action:

Arrangement of an Environmental Awareness Week to address various environmental topics

of concern such as:

o Energy Management o Carbon Footprinting o Carpooling o General Awareness

A joint environmental health and safety week was held on the 05th-09th November 2012. The

theme of the week was “shared responsibility” and the aim was to make employees aware that we

are all responsible for protecting the environment and for the health & safety of ourselves as well

as others, not only at work but also in the home.

The event consisted of two environmental days. The first day focused on general environmental

awareness, a booklet on environmental systems and how Takeda protects the environmental was

produced. The booklet was simple and aimed at children so that employees could share the

information with their families. In conjunction with this an environment themed colouring

competition was held. The second day focused on Energy Conservation, Carbon Footprinting and

carpooling for the site were both launched on this day.

Events each day included a presentation on the relevant topic (presented on powerpoint, at a stall

and on TV in the canteen), distribution of Did You Information relating to the topic and a spot prize

question relating to the topic. In addition, an EHS Quiz was held on the final day, the questions

were taken from the material presented to employees during the week.

Objective 5: In-house analysis

Target Key Action(s) Timeframe Progress Status

5.1 Validation of in-house monitoring

Perform Validation of COD and pH method of analysis on wastewater

December 2012

Validation completed by Quality Wizard in February 2012.

Complete

Page 28: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

27 Takeda Ireland Limited Annual Environmental Report 2012

A summary of this is presented in table 4.1.6.

Table 4.1.6 EMP Report-Objective 6

4.1.7. List I and II Substance Reduction and Elimination of Carcinogens in use

This objective aimed to manage and control List I and II Substances and Carcinogens through

Chemical Management System. This involved the following key actions;

Retrospective evaluation of all chemicals on site.

A Hazardous Material Inventory Audit was completed in December 2012. This audit consisted of a

physical inspection of all storage areas including laboratory, workshop, drum store and warehouse

areas followed by desk top review of all documents including approval and inventory management

forms and associated databases. This resulted in an audit report detailing all actions carried out to

correct findings including updated databases for new SDSs, assigned list I and II substance and

carcinogenic classifications as well as F Gas status.

A summary of this is presented in table 4.1.7.

Table 0.7 EMP Report-Objective 7

Objective 5: Environmental Awareness

Target Key Action(s) Timeframe Progress Status

6.1 Conduct an Annual Environmental Awareness Week

Conduct a second Annual Environmental Awareness Week to address various

environmental topics of concern.

Conduct an Annual Environmental Awareness Week

EHS week was conducted in November 2012

Complete

Objective 5: In-house analysis

Target Key Action(s) Timeframe Progress Status

7.1 Manage and

control List I and II Substances and Carcinogens through Chemical Management System

Retrospective

evaluation of all chemicals on site.

Populate

database with findings of evaluations.

Manage and

control List I and II Substances and Carcinogens through Chemical Management System

Hazardous Material

Inventory Audit completed in Dec 2012.

Complete

Page 29: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

28 28 Takeda Ireland Limited Annual Environmental Report 2012

4.2. Environmental Management Programme Proposal 2013

To identify our significant environmental aspects TILGC‟s register of environmental aspects and

impacts for the site was reviewed. This register is reviewed on an annual basis with a view to

including the most significant into the EMP. The aspects which were found to be significant have

been addressed in the EMP proposal for 2013.

Table 4.2.1 presents the Environmental Management Programme Proposal for 2013. It defines the

responsibilities, resources and timetables for delivery of TILGC‟s environmental objectives.

Page 30: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

29

29 Takeda Ireland Limited Annual Environmental Report 2012

Table 4.2.1 EMP Proposal 2013

Objective Target Key Action(s) Timeframe Person(s) Responsible Financial Resource

1.0 Energy Usage/CO2 generation

Gain ISO 5001 accreditation Achieve a 5% reduction in kWh/eKg below 2012 actual

Gain accreditation to ISO 50001

Implement Phase 3 of Metering

Installation

Remove AHU-01 HEPA Filters

Complete load reduction project on HTF

skid

Widen Boiler Pressure Bands

Turn off AHU-01 and AHU-03 out of

hours

December 2013

Environmental Engineer (EE)/Maintenance Engineer (ME)

Engineering and Environmental Budget

2.0

Waste Reduce the volume of bulk liquid waste and solid waste sent off site for disposal

Complete Construction of the New

Waste Water Treatment Plant.

December 2013

Project Engineer (PE) Engineering Budget

Installation of new hazardous waste

compound.

December 2013

Project Engineer (PE) Engineering Budget

3.0 Emissions to Atmosphere

To improve reliability of the VOC system

Complete feasibility study into alternative technologies for treating waste gas.

December 2013

Project Engineer (PE) Engineering Budget

4.0 Water Improve current surface water system

Review current design

Re-design taking previous environmental incidents into considering

Seek approval for new design from EPA

and SDCC

Construct new system.

December 2013

Project Engineer (PE) Engineering Budget

6.0 Environmental Awareness

Conduct an Annual Environmental Awareness Week

Conduct an EHS Awareness week

addressing environmental topics of concern.

December 2013

Environmental Committee Environmental Budget

7.0 Site Beautification Improve site appearance and increase biodiversity

Landscape unused area adjacent to the

main production building and wastewater treatment plant

Planting of additional trees around the

site.

December 2013

Project Engineer (PE) Engineering Budget

Page 31: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

30

30 Takeda Ireland Limited Annual Environmental Report 2012

4.3. European Pollution Transfer and Release (EPRTR)

The electronic version of the EPRTR for 2012 is presented in Appendix 4.

Page 32: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

31

31 Takeda Ireland Limited Annual Environmental Report 2012

5. LICENCE SPECIFIC REPORTS

5.1. Bund Integrity Testing

In compliance with condition 5.2.1 of the IPPCL TILGC submitted a bund integrity assessment

report to the Agency on the 18th of July 2007.

This assessment report identified the bunds present on site, the design philosophy behind the

sizing and construction of these bunds and demonstrated how they were compliant with the EPA‟s

guidance note on “Storage and Transfer of Materials for Scheduled Activities”.

Details of all integrity tests previously carried out on the bunds and a schedule (table 5.1.1) for

future testing was also included in the report.

Table 5.1.1 Bund Integrity Testing Schedule

TILGC

Code Bund Name

Test Date Result

Re-Test Date

Month Year Month Year

P1-B1 Solvent Tank October 2012 Pass October 2015

P1-B4 HCl Tank October 2012 Pass October 2015

P1-B8 Caustic (NaOH) Tank October 2012 Pass October 2015

P1-B11 HTF Tank October 2012 Pass October 2015

In compliance with the schedule presented in table 5.1.1, a bund integrity test was conducted on

the Solvent Tanks, HCL Tank, Caustic Tank and HTF Tank in 2012. These tests were conducted in

accordance with reference to BS 8007:1987 “Design of concrete structures for retaining aqueous

liquids” and deemed to have passed in accordance with the criteria set out in this standard.

During 2011, a structural assessment was conducted by external contractors on the Solvent Tank,

the HCl Tank and the Caustic Tank. This report concluded that chemically resistant liner‟s are

required in all 3 bunds. This work will be performed in August 2012. All bunds tests were

conducted after this work was complete.

5.2. Tank and Pipeline Testing and Inspection

In accordance with condition 9.4.5 of the IPPCL, TILGC is required to undertake a programme of

testing and inspection of active underground pipes at least every three years.

In 2009 a programme for the testing and inspection of underground tanks and pipes was

established. In accordance with this schedule testing and inspection of underground tanks and pipe

was conducted in November 2012.

Page 33: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

32 32 Takeda Ireland Limited Annual Environmental Report 2012

CCTV surveying of the surface, foul and process drains was carried out as well as pressure testing

of the process drains. Some minor maintenance issues were identified which do not have a

negative impact on soil or groundwater protection; remedial work will be addressed and completed

as part of the maintenance programme for 2013. Repeat testing will be carried out on all repaired

drains. All test and survey reports are maintained on file for inspection. A programme for the

testing and inspection of underground tanks and pipe is due again in 2015.

5.3. Noise Monitoring

In accordance with condition 8.1 of the IPPCL a noise monitoring survey was carried out on the

27th of October 2012. This survey was carried out by an independent consultant and was

conducted in accordance with the Agency‟s Environmental Noise Survey Document. The results

obtained are presented in Table 5.3.1.

Table 5.3.1 Noise Monitoring Results

Monitoring Location

Time LAeq,15 min dB(A)

LA90,15 min dB(A)

LA10,15 min dB(A)

LAmax,15

min dB(A)

Daytime

MP-NS-01 See Note 1 10:55-13:32 50 45 53 66

MP-NS-02 See Note 1 11:16-14:23 51 45 54 71

MP-NS-03 See Note 1 11:34-14:41 49 43 50 71

MP-NS-04 See Note 2 10:38-13:58 59 43 63 77

Night-time

MP-NS-01 See Note 1 23:43-01:35 45 43 46 57

MP-NS-02 See Note 3 00:22-00:53 47 43 49 63

MP-NS-03 See Note 3 00:04-01:13 46 43 49 55

MP-NS-04 See Note 2 23:23-01:54 48 43 48 68

Note 1: The reported indicated that measured values were within IPPCL limits.

Note 2: Traffic noise from the nearby road was identified as the biggest component of noise from this location with

an average of 8HGV‟s and 17 cars passing during each monitoring period

Note 3: The main source of noise at these locations was identified to be a radio which had been left on overnight in

the adjacent scaffolding yard.

The report indicates there were no audible noises from the site at most of the noise locations.

Almost all of the sources of noise were due to external construction, passing traffic and aircraft.

In summary, both traffic and the contribution from a neighbouring facility play an important role in

determining the noise climate in the area around the facility and therefore it is not possible to

identify the single contribution of Takeda Ireland Limited to noise levels. The noise report

concluded that the noise activities at Takeda Ireland Ltd. can be considered compliant with the

licence requirements.

Page 34: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

33 Takeda Ireland Limited Annual Environmental Report 2012

5.4. Residuals Management Plan/Environmental Liabilities Risk Assessment

IPPCL Condition 14.2.1 requires that a fully detailed costed plan for the decommissioning or

closure of the site shall be prepared. Accordingly TILGC submitted a closure plan to the Agency on

the 23rd Oct 2007 based on the EPA‟s „Guidance on Environmental Liabilities, Risk Assessment,

Residual Management Plans and Financial Provision (2006)‟. The total cost of the plan is estimated

at €225,000, with Takeda Ireland Limited (TILGC) acting as company guarantor. The addition of

an administration building, including workshop, may result in some additional cleaning, waste

disposal and maintenance costs however this will not be significant and hence amendments to the

plan are not proposed at this point.

TILGC is a category 2 facility and as such is required to complete an Environmental Liabilities Risk

Assessment (ELRA). This was conducted in 2010 and an updated version was conducted by an

independent consultant in 2011. There have been no significant changes to the plant since the

completion of this report.

Page 35: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

34 34 Takeda Ireland Limited Annual Environmental Report 2012

APPENDIX 1: SURFACE WATER EMISSIONS

Page 36: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

35 Takeda Ireland Limited Annual Environmental Report 2012

Takeda Ireland Limited (Grange Castle)

IPPCL Continuous Monitoring Report

IPPCL number P0693-01

Year: 2012

Monitoring Point EP-WS-01 EP-WS-01

Tag Number AI-1781-02 AI-1781-03

Parameter pH TOC

Unit N/A ppm

Licence Limit N/A N/A

Month Max Min Max

January 8.2 7.2 3.9

February 8.1 7.3 6.2

March 9.0 7.2 5.7

April 9.0 7.1 7.4

May 9.7 6.9 6.7

June 9.4 7.0 5.5

July 9.2 7.2 3.4

August 8.9 6.8 12.2

September 8.1 6.4 3.6

October 8.4 6.8 5.2

November 8.6 6.8 3.9

December 8.2 7.1 3.6

Page 37: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

36 36 Takeda Ireland Limited Annual Environmental Report 2012

APPENDIX 2:

EPRTR

Page 38: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

37 Takeda Ireland Limited Annual Environmental Report 2012

| PRTR# : P0693 | Facility Name : Takeda Ireland Limited | Filename :

P0693_2012.xls | Return Year : 2012 |

Guidance to completing the PRTR workbook

Version 1.1.16

REFERENCE YEAR 2012

1. FACILITY IDENTIFICATION

Parent Company Name Takeda Ireland Limited

Facility Name Takeda Ireland Limited

PRTR Identification Number P0693

Licence Number P0693-01

Waste or IPPC Classes of Activity

No. class_name

5.6

The manufacture of pesticides, pharmaceuticals or veterinary

products and their intermediates, not included in paragraphs 5.12

to 5.17.

5.6

The manufacture of pesticides, pharmaceuticals or veterinary

products and their intermediates, not included in paragraphs 5.12

to 5.17.

Address 1 Grange Castle Business Park

Address 2 Nangor Road

Address 3 Dublin 22

Address 4

Dublin

Country Ireland

Coordinates of Location -6.44960 53.3282

River Basin District IEEA

NACE Code 2120

Main Economic Activity Manufacture of pharmaceutical preparations

AER Returns Contact Name Aileen Newman

AER Returns Contact Email Address [email protected]

AER Returns Contact Position EHS Engineer

AER Returns Contact Telephone Number 01-4672453

AER Returns Contact Mobile Phone Number 01-4672556

AER Returns Contact Fax Number 01-4672401

Production Volume 0.0

Production Volume Units

Number of Installations 0

Number of Operating Hours in Year 0

Number of Employees 60

User Feedback/Comments

Web Address

2. PRTR CLASS ACTIVITIES

Activity Number Activity Name

50.1 General

4(e)

Installations using a chemical or biological process for the

production on an industrial scale of basic pharmaceutical products

3. SOLVENTS REGULATIONS (S.I. No. 543 of 2002)

Is it applicable? No

Have you been granted an exemption ? No

If applicable which activity class applies (as per

Schedule 2 of the regulations) ?

Is the reduction scheme compliance route being

used ?

4. WASTE IMPORTED/ACCEPTED ONTO SITE Guidance on waste imported/accepted onto site

Do you import/accept waste onto your site for on-

site treatment (either recovery or disposal

activities) ? No

This question is only applicable if you are an IPPC or Quarry site

AER Returns Workbook

Page 39: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

38

38 Takeda Ireland Limited Annual Environmental Report 2012

4.1 RELEASES TO AIR Link to previous years emissions data | PRTR# : P0693 | Facility Name : Takeda Ireland Limited | Filename : P0693_2012.xls | Return Year : 2012 | 26/3/2013 09:40

8 10 18 18 26 28 6 6 6

SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS

Please enter all quantities in this section in KGs

QUANTITY

Boiler

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year

03 Carbon dioxide (CO2) C SSC 2307641.285 0.0 0.0 0.0

08 Nitrogen oxides (NOx/NO2) C SSC 4231.464 0.0 0.0 0.0

86 Particulate matter (PM10) E ESTIMATE 6.223 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION B : REMAINING PRTR POLLUTANTS

Please enter all quantities in this section in KGs

QUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year

0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION C : REMAINING POLLUTANT EMISSIONS (As required in your Licence)

Please enter all quantities in this section in KGs

QUANTITY

MP-P1-02

Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year

230 TA Luft organic substances class 1 M ALT ISO 9487:1991 0.4 0.4 0.0 0.0

231 TA Luft organic substances class 2 M ALT ISO 9487:1991 1.3 0.0 0.0 0.0

232 TA Luft organic substances class 3 M ALT ISO 9487:1991 2.6 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

RELEASES TO AIR

METHOD

POLLUTANT METHOD

Method Used

Method Used

RELEASES TO AIR

POLLUTANT METHOD

Method Used

POLLUTANT

RELEASES TO AIR

ADD NEW ROW DELETE ROW *

ADD NEW ROW DELETE ROW *

ADD NEW ROW DELETE ROW *

ADD EMISSION POINT

ADD EMISSION POINT

ADD EMISSION POINT

Page 40: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

39

39 Takeda Ireland Limited Annual Environmental Report 2012

4.3 RELEASES TO WASTEWATER OR SEWER Link to previous years emissions data | PRTR# : P0693 | Facility Name : Takeda Ireland Limited | Filename : P0693_2012.xls | Return Year : 2012 |26/3/2013 09:40

8 11 19 27 6 6 6 6

SECTION A : PRTR POLLUTANTS

Please enter all quantities in this section in KGs

QUANTITY

MP-WW-01

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year

79 Chlorides (as Cl) C OTH

Calculation based on

volume of HCL consumed

in 2009 0.002 0.002 0.0 0.0

12 Total nitrogen M OTH APHA 4500F (1998) 3.874 0.0 0.0 0.0

76 Total organic carbon (TOC) (as total C or COD/3) M OTH

Hach DR/2400 Oxygen

Demand, Chemical:

Reactor Digestion Method 538.33 0.0 0.0 0.0

13 Total phosphorus M OTH APHA 4500-PE (1998) 75.746 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION B : REMAINING POLLUTANT EMISSIONS (as required in your Licence)

Please enter all quantities in this section in KGs

QUANTITY

MP-WW-01

Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year

238 Ammonia (as N) M OTH APHA 4500F (1998) 4.0 4.0 0.0 0.0

303 BOD M OTH APHA 5210 (1998) 595.0 0.0 0.0 0.0

306 COD M OTH APHA 5220 (1998) 1615.0 0.0 0.0 0.0

308 Detergents (as MBAS) M OTH APHA 5540 C (1998) 2.0 0.0 0.0 0.0

314 Fats, Oils and Greases M OTH APHA 5220B (1998) 24.0 0.0 0.0 0.0

330 Organic solvents M OTH USEPA 8260B 0.0 0.0 0.0 0.0

331 Organohalogens M OTH USEPA 8260B 1.0 0.0 0.0 0.0

343 Sulphate M OTH APHA 4500E (1998) 713.0 0.0 0.0 0.0

240 Suspended Solids M OTH APHA 2540 (1998) 204.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

OFFSITE TRANSFER OF POLLUTANTS DESTINED FOR WASTE-WATER TREATMENT OR SEWER

OFFSITE TRANSFER OF POLLUTANTS DESTINED FOR WASTE-WATER TREATMENT OR SEWER

Method Used

Method Used

POLLUTANT METHOD

POLLUTANT METHOD

ADD NEW ROW

ADD NEW ROW

DELETE ROW *

DELETE ROW *

ADD EMISSION POINT

ADD EMISSION POINT

Page 41: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

40

Takeda Ireland Limited Annual Environmental Report 2012 40

Quantity

(Tonnes per

Year)

Haz Waste : Name and

Licence/Permit No of Next

Destination Facility

Non Haz Waste: Name and

Licence/Permit No of

Recover/Disposer

Haz Waste : Address of Next

Destination Facility

Non Haz Waste: Address of

Recover/Disposer

Name and License / Permit No.

and Address of Final Recoverer /

Disposer (HAZARDOUS WASTE

ONLY)

Actual Address of Final

Destination i.e. Final Recovery /

Disposal Site (HAZARDOUS

WASTE ONLY)

Transfer Destination

European Waste

Code Hazardous Description of Waste

Waste

Treatment

Operation M/C/E Method Used

Location of

Treatment

To Other Countries 07 05 01 Yes 1046.76

aqueous washing liquids and mother

liquors D10 M Weighed Abroad

Veolia Environmental

Services,W-0050-02 Corrin,Fermoy,Cork,.,Ireland

Ellesmere Port

,BS5193IE,Clearway

Limited,Bridges

Road,Ellesmere Port

,CH654EQ,United Kingdom

Bridges Road,Ellesmere

Port,Sourt Wirral Chesire

,CH64EQ,United Kingdom

Within the Country 07 05 04 Yes 247.0

other organic solvents, washing liquids and

mother liquors R2 M Weighed Offsite in Ireland

Veolia Environmental

Services,W-0050-02 Corrin,Fermoy,Cork,.,Ireland

Veolia Environmental

Services,W-0050-

02,Corrin,Fermoy,Cork,.,Irel

and

Corrin

,Fermoy,Cork,.,Ireland

To Other Countries 07 05 04 Yes 1.06

other organic solvents, washing liquids and

mother liquors D10 M Weighed Abroad

Veolia Environmental

Services,W-0050-02 Corrin,Fermoy,Cork,.,Ireland

Ellesmere Port

,BS5193IE,Clearway

Limited,Bridges

Road,Ellesmere Port

,CH654EQ,United Kingdom

Bridges Road,Ellesmere

Port,Sourt Wirral Chesire

,CH64EQ,United Kingdom

To Other Countries 07 05 13 Yes 7.3

solid wastes containing dangerous

substances D10 M Weighed Abroad

Veolia Environmental

Services,W-0050-02 Corrin,Fermoy,Cork,.,Ireland

Ellesmere Port

,BS5193IE,Clearway

Limited,Bridges

Road,Ellesmere Port

,CH654EQ,United Kingdom

Bridges Road,Ellesmere

Port,Sourt Wirral Chesire

,CH64EQ,United Kingdom

Within the Country 13 08 99 Yes 0.11 wastes not otherwise specified R13 M Weighed Offsite in Ireland

Veolia Environmental

Services,W-0050-02 Corrin,Fermoy,Cork,.,Ireland

Veolia Environmental

Services,W-0050-

02,Corrin,Fermoy,Cork,.,Irel

and

Corrin

,Fermoy,Cork,.,Ireland

Within the Country 15 01 10 Yes 2.34

packaging containing residues of or

contaminated by dangerous substances R13 M Weighed Offsite in Ireland

Veolia Environmental

Services,W-0050-02 Corrin,Fermoy,Cork,.,Ireland

Veolia Environmental

Services,W-0050-

02,Corrin,Fermoy,Cork,.,Irel

and

Corrin

,Fermoy,Cork,.,Ireland

To Other Countries 15 01 10 Yes 0.39

packaging containing residues of or

contaminated by dangerous substances R13 M Weighed Abroad

Veolia Environmental

Services,W-0050-02 Corrin,Fermoy,Cork,.,Ireland

Ellesmere Port

,BS5193IE,Clearway

Limited,Bridges

Road,Ellesmere Port

,CH654EQ,United Kingdom

Bridges Road,Ellesmere

Port,Sourt Wirral Chesire

,CH64EQ,United Kingdom

To Other Countries 15 02 02 Yes 0.5

absorbents, filter materials (including oil

filters not otherwise specified), wiping

cloths, protective clothing contaminated by

dangerous substances R13 M Weighed Abroad

Veolia Environmental

Services,W-0050-02 Corrin,Fermoy,Cork,.,Ireland

Ellesmere Port

,BS5193IE,Clearway

Limited,Bridges

Road,Ellesmere Port

,CH654EQ,United Kingdom

Bridges Road,Ellesmere

Port,Sourt Wirral Chesire

,CH64EQ,United Kingdom

To Other Countries 16 05 07 Yes 0.04

discarded inorganic chemicals consisting

of or containing dangerous substances D10 M Weighed Abroad

Veolia Environmental

Services,W-0050-02 Corrin,Fermoy,Cork,.,Ireland

Sava Sava,1-

DE25541,Osterweute,.,Brun

sbuttel

,A5lG00508,Germany

Osterweute,.,Brunsbuttel

,A5lG00508,Germany

To Other Countries 16 05 07 Yes 0.03

discarded inorganic chemicals consisting

of or containing dangerous substances D10 M Weighed Abroad

Veolia Environmental

Services,W-0050-02 Corrin,Fermoy,Cork,.,Ireland

Ellesmere Port

,BS5193IE,Clearway

Limited,Bridges

Road,Ellesmere Port

,CH654EQ,United Kingdom

Bridges Road,Ellesmere

Port,Sourt Wirral Chesire

,CH64EQ,United Kingdom

To Other Countries 16 05 08 Yes 0.18

discarded organic chemicals consisting of

or containing dangerous substances D10 M Weighed Abroad

Veolia Environmental

Services,W-0050-02 Corrin,Fermoy,Cork,.,Ireland

Sava Sava,1-

DE25541,Osterweute,.,Brun

sbuttel

,A5lG00508,Germany

Osterweute,.,Brunsbuttel

,A5lG00508,Germany

Method Used

Page 42: Takeda Ireland Limited Annual Environmental Report … · 2 Takeda Ireland Limited Annual Environmental Report 2012 2 EXECUTIVE SUMMARY This Annual Environmental Report

41

Takeda Ireland Limited Annual Environmental Report 2012 41

Quantity

(Tonnes per

Year)

Haz Waste : Name and Licence/Permit No

of Next Destination Facility Non

Haz Waste: Name and Licence/Permit No of

Recover/Disposer

Haz Waste : Address of Next

Destination Facility

Non Haz Waste: Address of

Recover/Disposer

Name and License / Permit No. and

Address of Final Recoverer /

Disposer (HAZARDOUS WASTE

ONLY)

Actual Address of Final

Destination i.e. Final

Recovery / Disposal

Site (HAZARDOUS

WASTE ONLY)

Transfer Destination European Waste Code Hazardous Description of Waste

Waste

Treatment

Operation M/C/E Method Used Location of Treatment

Within the Country 19 08 05 No 1.98

sludges from treatment of

urban waste water D1 M Weighed Offsite in Ireland Whiteriver Landfill Site,WO060-03

Whiteriver ,Gunstown

Townland,Dunleer,Co.

Louth,Ireland

Within the Country 20 01 01 No 5.79 paper and cardboard R3 M Weighed Offsite in Ireland

Greyhound Recycling and

Recovery,W0095-02

Crag Avenue,Clondalkin

Industrial Estate,Dublin

22,.,Ireland

Within the Country 20 01 01 No 5.385 paper and cardboard R3 C Volume CalculationOffsite in Ireland

Rehab Recycling,WFP-DS-10-0008-

03

Unit 77,Broomhill Rd.,Tallaght

Industrial Estate,D24,Ireland

Within the Country 20 01 02 No 2.3 glass R5 C Volume CalculationOffsite in Ireland

Rehab Glassco,WFP-KE-08-0357-

01

Unit 4 Oberstown Business

Park,Carragh

Road,Naas,Kildare,Ireland

Within the Country 20 01 08 No 3.62

biodegradable kitchen and

canteen waste R3 M Weighed Offsite in Ireland

Greyhound Recycling and

Recovery,W0095-02

Crag Avenue,Clondalkin

Industrial Estate,Dublin

22,.,Ireland

Within the Country 20 01 21 Yes 0.47

fluorescent tubes and

other mercury-containing

waste R5 M Weighed Offsite in Ireland

Irish Lamp Recycling ,WFP-KE-08-

0348-01

Irish Lamp Recycling Co.

Limited ,Kilkenny

Road,Athy,Co. Kildare,Ireland

Irish Lamp Recycling ,WFP-

KE-08-0348-01,Irish Lamp

Recycling Co. Limited

,Kilkenny Road ,Athy ,Co

Kildare,Ireland

Kilkenny Road

,Athy ,Co

Kildare,.,Ireland

Within the Country 20 01 35 Yes 0.18

discarded electrical and

electronic equipment

other than those

mentioned in 20 01 21

and and 20 01 23

containing hazardous

components R4 M Weighed Offsite in Ireland

Rehab Recycling ,WFP-DS-10-0008-

03

Unit 77 ,Broomhill Rd.,Tallaght

Industrial Estate,D24,Ireland

Rehab Recycling ,WFP-DS-10-

0008-03,Rehab Recycling WFP-

DS-10-0008-03,Unit

77,Broomhill Rd.,Tallaght

Industrial Estate D24,Ireland

Unit 77,Broomhill

Rd.,Tallaght

Industrial

Estate,D24,Ireland

Within the Country 20 01 38 No 2.92

wood other than that

mentioned in 20 01 37 R5 M Weighed Offsite in Ireland

Greyhound Recycling and

Recovery,W0095-02

Crag Avenue,Clondalkin

Industrial Estate,Dublin

22,.,Ireland

Within the Country 20 01 40 No 1.08 metals R5 M Weighed Offsite in Ireland

Greyhound Recycling and

Recovery,W0095-02

Crag Avenue,Clondalkin

Industrial Estate,Dublin

22,.,Ireland

Within the Country 20 03 99 No 18.59

municipal wastes not

otherwise specified R13 M Weighed Offsite in Ireland

Greyhound Recycling and

Recovery,W0095-02

Crag Avenue,Clondalkin

Industrial Estate,Dublin

22,.,Ireland

Within the Country 20 03 03 No 37.99 street-cleaning residues D8 C Volume CalculationOffsite in Ireland

Ringsend Wastewater Treatment

Plant,D0034-01

Dublin City

Council,Environmental &

Engineering Department,Civic

Offices Wood Quay,Dublin

8,Ireland

Within the Country 13 05 08 Yes 1.5

mixtures of wastes from

grit chambers and

oil/water separators D9 M Weighed Offsite in Ireland

McBreens Environmental ,WCP-MH-

08-367-01

Rilta Environmental Limited

Block 402 Grant's Drive

,Greenogue Business

Park,Rathcoole,Dublin,Ireland

Rilta Environmental

Limited,W0192-03,Block 402

Grant‟s Drive,Greenogue

Business

Park,Rathcoole,Co.Dublin,Irelan

Block 402 Grant‟s

Drive,Greenogue

Business

Park,Rathcoole,Co.

Dublin,Ireland

Method Used