tactical marine solutions ltd
DESCRIPTION
Tactical Marine Solutions Ltd. Arctic Energy Summit 2013 Near Arctic Markets. Dermot Loughnane Tactical Marine Solutions Ltd. Introduction. Development database State of Play Hurdles to Overcome Projects Questions. Development Database. TMS development database Coverage Currency - PowerPoint PPT PresentationTRANSCRIPT
A Marine Management Companywww.tactmarine.com
Tactical Marine Solutions Ltd.
2Applied Knowledge
Arctic Energy Summit 2013Near Arctic Markets
Dermot LoughnaneTactical Marine Solutions Ltd.
3Applied Knowledge
Introduction
• Development database• State of Play• Hurdles to Overcome• Projects• Questions
Development Database
• TMS development database– Coverage– Currency• Newsfeeds• Media departments• Industry groups
4
5Applied Knowledge
Projects in Development
6Applied Knowledge
Canadian/American Arctic
State of Play
• Oil and Gas– Time for a time out• Mining– Softly, softly catches the monkey– Greenland still going ahead
7
Hurdles to overcome
• Oil and Gas– perception and fracking• Mining– Pricing
9Applied Knowledge
Baffinland/Mary River
• Development– Mine
• Type– Iron ore
• Name– Mary River
• Area– Qikiqtaaluk/Baffin
• Shipping– Suezmax export, resupply, July/October
• Status– Benefits agreement signed, construction announced
• Commencement– 2015?
• Source– Company/company site
• Initial mining, trucking and shipping of 3.5m tonnes• Goal to eventually increase to 18m tonnes• Supramax, Panamax and post Panamax
10Applied Knowledge
Oceanic/Hopes Advance
• Development– Mine
• Type– Iron ore
• Name– Hopes Advance
• Area– Ungava Bay/N Quebec
• Shipping– Year round/transhipment/Capesize
• Status– Pre-feasibility/shipping optimisation
• Commencement– 2017?
• Source– Company/company site
• 1.36b tonnes of p&p iron ore• Product optimisation study completed• Shipping optimisation study completed
11Applied Knowledge
Westar/CSCC
• Development– Mine
• Type– Coal
• Name
• Area– Qikiqtaaluk/Baffin
• Shipping– Unknown
• Status– Early development
• Commencement– Not found
• Source– http://www.weststarresources.com/s/NunavutCoal.asp
• A very long shot given the shipping required and the commodity being shipped.
12Applied Knowledge
Advanced Ex./Roche Bay
• Development– Mine
• Type– Iron ore
• Name– Roche Bay
• Area– Qikiqtaaluk/Baffin
• Shipping– Arctic Class 3 Panamax export– 8-9 month window– Transhipment options
• Status– Signed agreement with Logistec on shipping
• Commencement– Not found
• Source– Company– www.advanced-exploration.com
• LNG power on site?
13Applied Knowledge
Canadian Royalties/Nunavik Nickel
• Development– Mine
• Type– Nickel
• Name– Nunavik Nickel
• Area– Nunavik
• Shipping– Signed contract with Fednav for new version of Umiak
• Status– Signed agreement with Inuit 2009– Building camp onsite
• Commencement
• Source– http://www.canadianroyalties.com/
• Taken over by Jilin Jien Nickel Industry Co. Ltd. in 2010• Toronto private business bank Forbes and Manhattan
took control of the project July 19
14Applied Knowledge
MMG/Izok Corridor Project
• Development– Mine
• Type– Lead/zinc/copper
• Name– Izok Lake
• Area– Kitikmeot
• Shipping– Panamax export, resupply– Open water/shoulder scenario
• Status– New feasibility review
• Commencement– Not found
• Source– Company/web
• Will now be Izok, High Lake and Hood river• 650,000 tonnes per year of concentrate• The Company initiated a definitive feasibility study in 2012 which is expected
to take 18-24 months and represents an investment of over US$50 million
15Applied Knowledge
MMG/Izok Lake
16Applied Knowledge
Coronation Gulf PortsProject Owner(s) Commodity Status Hackett River XStrata Zinc Canada Zinc, Silver,
Copper, Lead Prefeasibility Study initiated in September, 2012; Submission of DEIS scheduled for Q3, 2013.
Back River Sabina Gold & Silver Corp.
Gold Plans to file DEIS by end of 2013.
Updating Back River resource calculation
ULU & Lupin Elgin Mining Inc. Gold Elgin plans to complete updated preliminary economic assessment in 2013. Mine’s water licence up to date.
17Applied Knowledge
TMAC/Doris/Hope Bay
• Development– Mine
• Type– Gold
• Name– Doris/Hope Bay
• Area– Kitikmeot
• Shipping– Resupply likely
• Status– Recently purchased
• Commencement– Unknown
• Source– Google
• Only purchased lately from Newmont Mining, private company• Newmont requests NIRB to confirm transfer of Project
Certificate to TMAC on February 4, 2013.
18Applied Knowledge
ASRC/Coal
• Development– Mine
• Type– Coal
• Name
• Area– Pt Lay/Pt Hope
• Shipping– Export
• Status– “ASRC seeks a development company to explore and develop its
coal deposits located on its lands in the western Arctic.”• Commencement
– Unknown• Source
– http://www.asrc.com/Lands/Pages/Coal.aspx
• 2 billion tons of ultra low sulfur coal within 6 miles of tidewater
19Applied Knowledge
Shell/Chukchi
• Development– O&G
• Type– Petroleum
• Name– Burger
• Area– Chukchi
• Shipping– Too early to tell
• Status– Initial top hole work - no recent well completion.
• Commencement– Unknown
• Source– Company
• “Royal Dutch Shell plc (“Shell”) today announced it will pause its exploration drilling activity for 2013 in Alaska’s Beaufort and Chukchi Seas to prepare equipment and plans for a resumption of activity at a later stage”
20Applied Knowledge
Shell/Beaufort
• Development– O&G
• Type– Petroleum
• Name– Sivullik
• Area– US Beaufort
• Shipping– Unknown
• Status– Paused,initial top hole drilling - no recent well completion
• Commencement– Unknown
• Source– Company
• “Royal Dutch Shell plc (“Shell”) today announced it will pause its exploration drilling activity for 2013 in Alaska’s Beaufort and Chukchi Seas to prepare equipment and plans for a resumption of activity at a later stage”
21Applied Knowledge
Statoil/Chukchi
• Development– O&G
• Type– Petroleum
• Name– Amundsen
• Area– Chukchi
• Shipping
• Status– Seismic and seabed surveys completed
• Commencement– Not before 2015
• Source– Company
• Seismic complete - recently announced delay until 2015 for any drilling
22Applied Knowledge
Conoco Phillips/Chukchi
• Development– O&G
• Type– Petroleum
• Name– Devils Paw
• Area– Chukchi
• Shipping
• Status– Paused until after 2014
• Commencement
• Source– Company
• “Waiting for the regulatory environment to gain some clarity”
23Applied Knowledge
Conoco Phillips/Beaufort
• Development– O&G
• Type– Petroleum
• Name– Amauligak
• Area– Canadian Beaufort
• Shipping– Likely to be high ice class tankers
• Status– Midst of first 3 year study
• Commencement– 15+ years
• Source– Company
• Largest oil discovery in the Canadian Arctic (235 mmbbl and 1.6 tcf)
• 35% owned by Chevron (non-operating)
24Applied Knowledge
Conoco Phillips/Beaufort
25Applied Knowledge
Imperial Oil/BP/Beaufort
• Development– O&G
• Type– Petroleum
• Name– Ajurak/Pokak
• Area– Canadian Beaufort
• Shipping
• Status– Applied to commence drilling
• Commencement– 2020?
• Source– Preliminary information package– Google and interviews
• 175 kms NW of Tuktoyaktuk• 1500 metres deep
26Applied Knowledge
Chevron/Beaufort
• Development– O&G
• Type– Petroleum
• Name– EL-481
• Area– Canadian Beaufort
• Shipping– Likely to be high ice class tankers
• Status– 3D seismic acquired in 2012
• Commencement– 20+ years
• Source– Company and interviews
• Statoil farmed in 2011, now 40%
27Applied Knowledge
Greenland
28Applied Knowledge
NAN/Maniitsoq
• Development– Mine
• Type– Nickel
• Name– Imiak
• Area– SW Greenland
• Shipping– Export and resupply likely
• Status– Ongoing feasibility
• Commencement– Unknown
• Source– www.northamericannickel.com/projects/greenland/maniitsoq/
default.aspx
• On September 12 2013, the Company announced a new discovery with drill hole MQ-13-029.
29Applied Knowledge
GME/Kvanefjeld
• Development– Mine
• Type– Rare earths (uranium)
• Name– Kvanefjeld
• Area– SW Greenland
• Shipping– Export and resupply likely
• Status– Waiting for gov’t decision
• Commencement– Unknown
• Source– www.ggg.gl/projects/kvanefjeld-rees-uranium-zinc/feasibility-
program/
• Project overall resource inventory: 956 Mt• Largest repository of rare earths outside of China
30Applied Knowledge
Ironbark/Citronen
• Development– Mine
• Type– Zinc and lead
• Name– Citronen
• Area– NE Greenland
• Shipping– Ice class tug and barge
• Status– Feasibility and shipping study completed
• Commencement– Unknown
• Source– Company and website
• Annual production anticipated of 250,000 tonnes of zinc concentrate and 30,000 tonnes of lead concentrate
• Citronen Project's Feasibility Report was completed in April 2013, very positive 32% ROI
31Applied Knowledge
Shell/Greenland Oil
• Shell– 2012 Program
• 3D seismic acquisition• Shallow coring
– 2013 Program• Decision pending
32Applied Knowledge
Cairn/Greenland Oil
• Cairn Energy– Drilling to recommence in
summer 2014
33Applied Knowledge
Contact Us
Tactical Marine Solutions Ltd.4906 Alamida CrescentVictoria, B.C. V8T 2C1 Canada
Phone: +1 (250) 388-7882+61 (2) 8014-7216
Fax: +1 (604) 909-4675Email: [email protected]: www.tactmarine.com