SAP Status Codes and Descriptions See below for a table containing SAP status codes and what they mean: Status Code Description CRTD Created REL Released MSCP Capacity shortage MSPT Material shortage AVAC Availability control active ESTC Estimated costs PRT Printed PPRT Part printed CNF Confirmed PCNF Partially confirmed CPCK Capacity checked DLV Delivered DLT Deletion indicator PCST Product costed NCMP Not completed PRC Pre-costed ISSD Goods issued NHFD Ntwk header: final delivery GEN1 General list 1 printed GEN2 General list 2 printed GEN3 General list 3 printed GEN4 General list 4 printed OPL1 Activity list 1 printed OPL2 Activity list 2 printed OPL3 Activity list 3 printed OPL4 Activity list 4 printed SFMT Settlement fields maintained SETC Settlement rule created DSEX Date set by external system MLTL Multi-level: Top level MLBL Multi-level: Bottom level MLDI Multi-level: Dummy info record CNC Costs not current SORL Subordinate order released SOPR Subordinate order printed SOCF Subordinate order confirmed UMGP Rescheduled CONI Configuration incomplete PREL Partially released LKD Locked TECO Technically completed CLSD Closed

Upload: fox-six-casablanca

Post on 01-Nov-2014

1.314 views

Category:

Documents


40 download

TRANSCRIPT

Page 1: System Status

SAP Status Codes and Descriptions

See below for a table containing SAP status codes and what they mean:

Status Code Description

CRTD Created

REL Released

MSCP Capacity shortage

MSPT Material shortage

AVAC Availability control active

ESTC Estimated costs

PRT Printed

PPRT Part printed

CNF Confirmed

PCNF Partially confirmed

CPCK Capacity checked

DLV Delivered

DLT Deletion indicator

PCST Product costed

NCMP Not completed

PRC Pre-costed

ISSD Goods issued

NHFD Ntwk header: final delivery

GEN1 General list 1 printed

GEN2 General list 2 printed

GEN3 General list 3 printed

GEN4 General list 4 printed

OPL1 Activity list 1 printed

OPL2 Activity list 2 printed

OPL3 Activity list 3 printed

OPL4 Activity list 4 printed

SFMT Settlement fields maintained

SETC Settlement rule created

DSEX Date set by external system

MLTL Multi-level: Top level

MLBL Multi-level: Bottom level

MLDI Multi-level: Dummy info record

CNC Costs not current

SORL Subordinate order released

SOPR Subordinate order printed

SOCF Subordinate order confirmed

UMGP Rescheduled

CONI Configuration incomplete

PREL Partially released

LKD Locked

TECO Technically completed

CLSD Closed

Page 2: System Status

ORSP Open reservations posted

STND Standard confirmation

MILE Milestone confirmation

MCNF Manually confirmed

ACAS Activity account assignment

MSCP Capacity shortage

RELR Release rejected

VCAL Variances calculated

NDAT Rescheduling (Actl.) required

CSPS Costs posted

PLCS Planned costs

PLLK Planning locked

DDLK Date definition locked

BMLK Budget management locked

AALK Account assignment locked

MDLK Master data locked

APPR Approved

BUDG Budgeted

OSNO Outstanding notification

NOPO Notification postponed

NOPR Notification in process

ORAS Order assigned

NOCO Notification completed

NOPT Notification printed

PDLV Partially delivered

WDFL Withdrawal failed

DLFL Deletion Flag

NOLV Transaction LVMS not permitted

COL1 Component list 1 printed

COL2 Component list 2 printed

COL3 Component list 3 printed

COL4 Component list 4 printed

RESA Results analysis carried out

PRL1 PRT list 1 printed

PRL2 PRT list 2 printed

PRL3 PRT list 3 printed

PRL4 PRT list 4 printed

NBDT Rescheduling required (Basic)

NFDT Rescheduling required (Frcst)

GMCO Goods movement in coll. order

CFCO Confirmation in coll. order

SPCF Sub-operation partially conf.

SCNF Sub-operation finally conf.

ISBD Insufficient budgeting

RVPS Revenue posted

Page 3: System Status

MSPR PRT shortage

RVPL Revenue planned

FNBL Final billing

CRTE Created

AVLB Available

INST Installed

EHIS Entered historically

SETM Settlemt rule created manually

SCNF Summary confirm. carried out

SUST Setup started

SUIR Setup interrupted

SUFN Setup finished

PRST Processing started

PRIR Processing interrupted

PRFN Processing finished

TDST Teardown started

TDIR Teardown interrupted

TDFN Teardown finished

COMO Components for object

PRTO PRTs for object

CSER Error in cost calculation

ASEQ Allocated to superior equipt

DSPT Scheduled

NTUP Dates are not updated

ACTV Active

RACR Rental agreements created

ACLO Active lease-outs

NOLO No lease-outs

RESI Residential Rental Agrmt

COMM Commercial Contract

COPA Comm. provisional agrmnt

CANC Canceled

RTAP Rent adjustments planned

THRD Utilized by third parties

GRLO Used by group with LO

PROP For own use

UNOC Unoccupied

RENT Intended for rent

CRES Created (Standard WBS)

RELS Released (Standard WBS)

CLOS Closed (Standard WBS)

GRFL Goods receipt failed

IFSL Intended for sale

SOLD Sold

PURI Intended for purchase

PURC Purchased

PSLD Partially sold

Page 4: System Status

DEMO Demolition

PDEM Partially demolished

ERUI Economic ruin

PECR Partial economic ruin

POCR Printout of changes required

BTRD Block transaction data

DIVI Division declaration

PDIV Partial division declaration

INMD Inspection made

SECD Security deposit paid out

IFPF Intended for portfolio

PORT In portfolio

TSOS Task Outstanding

TSRL Task Released

TSCO Task Completed

TSSC Task successful

OSTS Outstanding task(s) exist(s)

ATCO All Tasks Completed

NOTI Notification (internal)

NOTE Notification (external)

DEFR Defects Recording

AUC Asset in construction exists

Cost To be costed

Cstd Costed

FUAC Follow-up action completed

ARNB Notif. blocked by archiving

ORD Created from sales order

SHPT Created from shipment doc.

PREP Prepared

REJC Rejected

NPRT PRT not ready for use

CRAB Control Recipe Discarded

ILNC Inspection lot not created

AUSS Scrap determined

ESTO In the warehouse

SLOR Assigned in sales order

EDEL Assigned in delivery note

ESER Assigned in service contract

ECUS At customer site

EINS In Review

ELOK Locked

ETRA In transport

EAUS From warehouse

HUAS Handling Unit Assigned

PIAC Inventory Active

PAOR Insp. completion w/o confirm.

PREQ Plan/specific. required

Page 5: System Status

CHCR Characterist. must be created

SPRQ Quantity posting required

LTIN Long-term inspection

PASG Plan/specification assigned

CCTD Insp. characteristics created

CALC Sample calculated

QLCH Quality level relevant

SKIP Skip lot

PRSI Sample drawing instr. printed

PRII Inspection instruction printed

INSP Inspection active

RREC Results confirmed

DEF Defects were recorded

SSAP Object created

STIC Short-term insp. completed

ICCO All inspections completed

UD Usage decision has been made

SPST Stock posting started

SPCO Stock posting completed

STUP Statistics updated

QLUP Quality level updated

IRUP Quality info record updated

LTCA Lot canceled

ARBL Blocked for Archiving

ARCH Lot archived

REO3 Lot detail data deleted

REO2 Lot sample data deleted

REO1 Charact. + operations deleted

SUB Transmit to subsystem

IRCH Q-info record changed

MCAN Lot marked for cancellation

MSUB Marked for subsystem

MtoO Make-to-order production

NoMP No make-to-order prod.

HCNF Order header confirmed

CPIS Confirmation issued components

NOPR No PRTs

NOCP No material components

NOTR No trigger points

CRCR Control recipe created

NCHK Not checked

NSCH Not scheduled (forecast dates)

SPLT Split

PSPL Partially split

Page 6: System Status

ASGN Assigned

PTAS Partially assigned

PTDS Partially dispatched

ERTR Error creating transfer reqmnt

ITAA Item account assignment

CECR Check ECR

CHKD ECR Checked

ECRA ECR Approved

ECOP ECO to be processed

ECPC ECO partially confirmed

ECCF ECO confirmed

ECCM ECO completed

ECOR ECO released

ECIR Object: insp. req. for ECR

CCO1 Object: change possible

CCO2 Object: change not necessary

CCO3 Object: change not possible

CCOB Object: to be processed

CCOI Object: in preparation

CCOA Object: change completed

CCOF Object: change released

CRFI Control recipe finished

CCPO All objects checked

CCFO All objects released

WCRE Work center until release

SUPF Setup partially finished

PPF Processing partially finished

TDPF Teardown partially finished

BLLS Boycott list

EXLS Export control

CCSL Locked for system changes

CCUL Locked for user changes

ORRQ Order record required

ORAC Order record archived

ORTE Order record terminated

ILAS Inspection lot assigned

ICHA Planned InspCharacs. allocated

QMDA QM data recorded

BREQ Batch assignment required

BASG Batch assigned

VACT Var. activity partial conf.

VACE Var. activity final. conf.

CAPP CAPP calculated

CLAS Complete Classification

CLQM Shortterm Classification

CUGT Copy attribute analysis

Page 7: System Status

FKTF Error when processing function

RCKP Confirmation with personal ID

CTCM Certif.confirmation missing

RAOC RA data in object currency

RAWO RA data w/o object currency

UDRE Usage decision reset

SRPC Secondary resource part confd

SRCF Secondary resource confirmed

VOBJ Subobject exists

ZUOD Assigned

REJT ECR Rejected

ICPL ECO incomplete

PERR ECO: processing errors

CHER Object: errors in change

ILOR Insp.lot cntd in order record

NAVD Not available at request date

CONC Collect. order dates not curr.

FTC2 Control: Embargo

FTC3 Control: Missing master data

FTC4 Control: Permission

TPA Transfer prices for agreements

INAC Object Deactivated

GMPS Goods movement posted

APG Approval granted

APGS Single approval granted

APRC Based on approved recipe

APNG Approval not granted

PIGN Process instructions generated

APRS Approval withdrawn

OPGN Operation generated

GBST Confirmed

GBTS Counterconfirmed

BBGT Accounted

BUGÜ Exercised

BRFL Expired

AKNI Knocked in

AKNO Knocked out

AO01 Availability check error

AO02 Do availability check

AO03 Delivery groups present

MACM Material committed

ASSB Assembly lock

ECOC ECO complete

Page 8: System Status

CCRD Case created

CBLK Case blocked for settlement

SETT Settled

CHKD Tested

FAPP For approval

MCRD Measure created

RBMS Replaced by measure

MSPL Planning for task

REJD Rejected

DEPS Depreciation simulation avail.

NEWQ New quantity calculation

USED Phys. sample no longer exists

STRD Sample was stored

APRV Approved

PROG Progress confirmation (MST)

CROK Certificate receipt confirmed

LBPR Label printed

FMAI FM account assignmt incomplete

BCRQ Order to be handled in batches

BASC Batch assignment complete

SIG1 One dig. signature missing

SIG2 Two dig. signatures missing

SIG3 Three dig. signatures missing

SIG4 Four dig. signatures missing

POAR Part objects archived

APIP Based on approved insp. plan

EOPD Ext. operatn partly delivered

EODL External operation delivered

BRAR Batch record archived

SOAS Sales order assigned

LOLK Lot locked for batch record

SERM SerialNo maintenance required

BNAS Batch not assigned

IREP Under repair

TREP Partially repaired

REPA Repaired

BDRQ Business decision required

BDMD Business decision made

BRRQ Batch record required

NOCH Changes forbidden

CEFF Effectivity parameter copied

MADJ Manual adjustment necessary

Page 9: System Status

RlNe Release in network taken place

QUCR Quotation created

QUAC Quotation accepted

INVD Invoiced

PTBL partially billed

CGFB Confirm./goods mvmnt forbidden

REPR Repairs processing

PCMN Production campaign

PCC Product cost collector used

ITG Inital tagging status

BTG Tag

PTAG Tag printed

ETG Tagged

BUG Untag

EUG Untagged

BTUG Untag Temporarily

ETUG Temporarily Untagged

LBNP Label not printed

RET Return

CNOK Credit limit check invalid

CCOK Credit limit check successful

PAGE Paging occurs

ADVS Advance shipment occurred

CONF Conflict

WCM Work Clearance Management

MANC Mat.availability not checked

CANC Capacity avail.not checked

PRTA PRT availability not checked

DNEW New dummy quantity calculation

UNT Untaggable

EXEC Released for execution

WOCO Work completed

PROC Processing

TENT Temporary entry

TEST Test cycle

BLTC Block technical completion

PTST Test tag printed

VBCR Batch record created

VBAP Batch record approved

VBPA Batch rec. partially approved

VBAR Batch record archived

VBPC Batch rec. partially archived

VBDE Batch rec. contains deviations

Page 10: System Status

VBAW Batch rec.: new version exists

CR Created

CO Conference

LO Locked

RE Released

HUM Handling units assigned

CONX Fix configuration

CHNG Change mode

POST Postscript

HI Historical

AC Active

IC Inactive

OP Created

IP In Process

CL Closed

DE Data Entered

IPEX In Process Outside EH&S

DLEX Deleted Outside EH&S

FINV Further Investigation

REVS Reversed

PO Posted

ACPT Order accepted

ONHO On Hold

EXTS Changed by external system

NMAT No material components

SPLT Split

CSPL Created by splitting

UNCO Ref. object under construction

CRTC From created to tech.completed

ADRJ Automatic deletion rejected

MISM Mismeasurement

NOME No Measurement

PTME Partial Measurement

MERR Measurement Results Recorded

SUPP Supplement

QUOT No material components

QUBP Assigned in quote (bump)

SLBP Assigned in order (bump)

QUVC Assigned in quote (vers. chg.)

SLVC Assigned in order (vers. chg.)

SPTT License split

QADJ Operation Quantities Adjusted

PHEX Physically Exists

Page 11: System Status

WHSE In Warehouse

PLND Planned

LOAD Loaded

UNLD Unloaded

PPCm PPPI complete

LOCK Locked

WGHD Weighed

RESV Reserved for PP

PPGI PPPI reservation for GI post.

PPSC PPPI sequence checked

PSTD Goods Issue Posted

DLTD Deleted

SGPR Visually Checked

APRQ Approval: Required

APOK Approval: OK

APRF Approval: Refused

CMSP CM: Object locked

CANG CM: Created

CBER CM: Baselining allowed

CABG CM: Object closed

CPER CM: Process allowed

CBRE CM: Baseline requested

CBAS Baselined (fixed)

CFVE Released for distribution

DRCT SU for Directly Assigned Costs

NACO No Automatic Confirmation

INIV In Inventory

INVE Physically Inventoried

OWNS Owner Settlement

RRA Relevant to Results Analysis

SEPO Separate Order

ASIM Simulation

AORD Order

AVER Contract

AKUE Notice

AZUR To be settled

GZBE To be confirmed

GZER Counterconfirmation required

AZAE Changed

AZST Reversed

DELD Deleted

EXPD Expired

INIT Initial

AFIX Fixing

FIXD Fixing executed

ROLL Rollover

PREM Premature Settlement

Page 12: System Status

IRAD Interest rate adjustment

NOTG Notice Given

AANG Offer

IP In Process

FR For Release

RLRQ Release Required

RLRJ Release rejected

MKOS Cost Collector Created

EXPL External Conv.of Planned Order

NC Noncritical Change

RE Released

IOPN IS-T: Opened

IINP IS-T: Being processed

ICMP IS-T: Completed

ICLK IS-T: Complete lock

IPLK IS-T: Partial lock

IICA IS-T: Item cancelled

IOIN IS-T: Operations interruption

IINP IS-T: Being processed

IACT IS-T: Active

PROT Operational protection

PWP Work permit printed

VAL Valuated

MOBI Data on Mobile Device

PUSH Push Effected

PACC Push Accepted

PREJ Push Rejected

PEXP Push Maximum Time Expired

PRST Push Reset

PPRJ Push Partially Rejected

SIGA Signature Attached

CMSI Case Marked Suppl. Invoice

XSpr Control recipe created

XSez Control recipe in process

XSgn XStep Generated

IRAE Int. rate adjustment executed

IRAC Int. rate adjustment changed

IRAR Int. Rate Adjustment Reversed

AFWD Maturity of forward

WCDR WEC: Date Adjustment Requested

WCDC WEC: Date Adjustment Completed

WCDP WEC: Date Adjustment Pending

RSRV Reserved

Page 13: System Status

NEWQ New

NOPR In Process

MADJ Completed

EXPR External Processing

QUIT Confirmed

DELF Deletion indicator

ARCH Blocked for Archiving

FLEX Specifications Assigned

EXKU External Processing Customer

1100 Can be archived

1101 Archived

1102 Can be deleted

OREL Released

OCOM Completed

OASS Assigned

OINF Informed

OREJ Rejected

OACC Accepted

OCUS At customer site

BLKE Blocked (Error)

BLKW Blocked (Warning)

CDEN Flagged for Archiving

CGBL Locked

CCOM Do Not Contact

CDEL Marked for deletion

ARCR Can be archived

DelA Archived

DELT Deleted

LOCK Locked

PARC To archive

INAC Inactive

NREL Not Released

Pld Planned

Rqst Requested

App Approved

Rej Rejected

Act Active

Obsl Obsolete

MvtC Reused Order

AM00 Being Created

AM01 In Process

AM02 Released

AM03 Completed

AM04 Locked

AM05 To Be Archived

AM06 Archived

AM07 To Be Approved

Page 14: System Status

AM08 Rejected

AM09 Approved

AM10 Deletion Flag

AM11 Canceled

AM12 Unplanned Audit(s)

AM13 Question List(s) Assigned

AM14 Download Completed

AM15 Confirmed

AM16 Report Created

AM17 Signature Provided

AM18 Outstanding Actions

AM19 Actions Completed

AM20 Completed w. Outstanding Actns

AM21 Created

AM22 Outstanding

AM23 Forced Completion

AM24 Valuation Executed

SDVC Changeable copy to be checked

SDVY Copy checked - OK

SDVN Copy checked - not OK

PLAN Planned

APPL Requested

RELE Released by Material Owner

APPR Approved

LOCK Locked

DELP Flagged for Deletion

DELA Deletion Requested

OBSO Obsolete

REJE Rejected

APLA Planned

AAPP Requested

AAPR Approved

ALOC Locked

AOBS Obsolete

AREJ Rejected

DPLA Planned

DAPP Requested

DREL Released by Material Owner

DAPR Approved

DLOC Locked

DDLP Flagged for Deletion

DDLA Deletion Requested

DOBS Obsolete

DREJ Rejected

EPLA Planned

EAPP Requested

EREL Released by Material Owner

Page 15: System Status

EAPR Approved

ELOC Locked

EDLP Flagged for Deletion

EDLA Deletion Requested

EOBS Obsolete

EREJ Rejected

FPLA Planned

FAPP Requested

FREL Released by Material Owner

FAPR Approved

FLOC Locked

FDLP Flagged for Deletion

FDLA Deletion Requested

FOBS Obsolete

FREJ Rejected

GPLA Planned

GAPP Requested

GAPR Approved

GREJ Rejected

GOBS Obsolete

GLOC Locked

HPLA Planned

HAPP Requested

HAPR Approved

HREJ Rejected

HACT Active

HOBS Obsolete

CNEW In Process

CREL Released

CLOC Locked

CINC Inconsistent

CDIS Distributable

ARCV To Archive

NEW Trial Created

DECL Trial Definition Closed

EXPO Trial Data Exported

PLOR Planned Order Assigned

MRCP Master Recipe Generated

PROR Process Order Assigned

RESU Results Entered/Imported

RECF Results Confirmed

CLOS Trial Closed

JOB Background Processing

CONV Trial Converted

QMCL QM Planning Closed

CHGD Creation of Change Docs Active

FFUE From Follow-Up Entry

Page 16: System Status

FHNC From History New Construction

IHNC In History New Construction

GMDR Initial draft

GMPR Proposal

GMAP Application

GMAW Award

GMCL Closing

GMCX Closed

GMCA Cancelled

Rcp0 In process

Rcp1 Processing Closed

Rcp2 Rejected

Rcp3 Released

Rcp4 Released for Scope

Rcp5 Inactive

Rcp6 Obsolete

SPEC RE:Spec home

CONT RE:Contingency order

RESL RE: Re-Sell to new customer

CSPT Process Order Created by Split

MRGM Process order was merged

MRGS Process order merged an order

RSTR Restart

RWRK Rework Insert

SPL Process Order was Split

SPTM Process Order Split Multiple

NEWO New/In Process

RELO Released

CLOS Completed

DIST Distributable

NEW New

Act Active

REL Released

CHK For Checking

END Completed

NEWR ECR Processible

ACCE ECR Approved

REVI ECR Rejected

CLOR ECR Completed

CREA New IP-Data

CGAT Changed in Revision

CGMN System Status : Change Manual

INPR System Status : Inprocess

CMTD System Status : Completed

DELD Deleted in Revision

Page 17: System Status

HOLD System Status : Hold

CBEX CM: Baseline exploded

CMOB CM: Baseline obsolet

CMBG CM: Background processing

MEBS MEB-Controlled

ORCR Order created by MEB

OCRR Order creation required

TBUS To be Used

MDCI Master Data Creation Initiated

MDCU Master Data Created / Updated

MDFL Master Data Creation Failed

NUSD Not Used

BLFA Set Archive Indicator

DFRD Deferred

COCE Completion Certified

CPCE Completion Partially Certified

MDRQ Meas. Doc. Creation Required

DOCC Document Created

COMP Completed

CACL Cancelled

INPC In Process

XR01 In Process

XR02 Rejected

XR03 Release for Test

XR04 Released

XR05 Obsolete

XR06 Flagged for Archiving

XR07 Archived

XR20 Approved

XR21 Discarded

XR40 Current Signature Process

UPNW Created

UPSV Saved

UPRL Released

UPSD Distributed

UPRC Received

UPAP Approved

UPRJ Rejected

UPER Errors found

UPPO Updated

UPIN Partially Posted

UPSP Partially Sent

UPSE Error Sending Data

INTR In transit

CKIN Checked in

Page 18: System Status

LOST Load started

LOPF Load partly finished

LOCM Load complete

ULST Unload started

ULPF Unload Partly finished

ULCO Unload complete

MVPR Move process

WEPR Weigh process

AVWE Available for weight

AVLO Available for load

AVUL Available for unload

AVMO Available for move

AVCO Available to check-out

WACR WA-PRO: Created

WALO WA-PRO: Locked

WACS WA-PRO: Closed

crea Created

actv Active

lega Legally Active

inac Inactive

calc Calculation Relevant

WADL WA-PRO: To Be Deleted

LRCL Land Register Closed

PRCS Parcel Ceased to Exist

liqi In Liquidation

liqd Liquidated

OFRJ Rejected

RELF Release Forbidden

INIT Initial Status

IBDE Deletion flag

IBIN Deactivate

IB04 Avail.

IB05 Avail.

CRE Service Entry Sheet created

SREL Service Entry Sheet released

CANL Service Entry Sheet cancelled

CCIN new

CCAK Released

CCLO Blocked

CCDL Logically Deleted

CCAR Ready for Archiving

INIT New

DRFT Draft

REVW Review

REWK Rework

IP In Process

OPEN Open

Page 19: System Status

RSLV Resolved

CLSD Closed

REAS Reassessment

VLDT Validated

SBMT Submitted

Test In Process

ATCL Auto Closed

SHIP Shipping taken place

TVER Partial Shipping

KLAU Clinical Order Created

MDIP Basic Med. Doc. in Process

MDCP Basic Med. Doc. Complete

MDTC Basic Med. Doc. to Be Checked

OINA Inactive

OACT Active

DFS Deletion flag set

Asgd Allocated

VNE Value does not exist

VMSG Value missing

VVAK Valid value

VEST Value was estimated

VI Value implausible

VCHG Value entered/changed manually

VREL Value has been released

VLCK Value is locked

VPRO Value is protected

VARC Value was activated

VEPL Value was extrapolated

VINT Value was interpolated

VaCh Val. Manually Chngd Externally

VNVP Version Not In Validity Period

RINA Route Inactive

RACT Route Active

DFLS Deletion Flag Set

DINS Deletion Indicator Set

RIPR Route in Processing

HANG Waste Disposal Order Created

HPLN Waste Disposal Order Planned

HAUS Waste Disposal Order Output

HCOP CO Posting

HLVM Deletion Flag for WDO Header

PANG WDO Item Created

Page 20: System Status

PAUS WDO Item Output

PPZM Positive Confirmation

PNZM Negative Confirmation

PZUR WDO Item Postponed

PABG WDO Item Billed

PLST Debit Memo Request Generated

PBEH Container Transport

PBCH Container Del/Remove/Replace.

HLKZ Deletion Flag for WDO Header