Summer Internship Program
ByMurali G
Reg No. – 1313036Under the guidance of
Prof. Gautam Sutar04/28/2023 ITC-PPB 1
SUPPLY CHAIN INITIATIVES FOR INCREASING GROSS CONTRIBUTION IN CARTON LINE.
AT M/S. ITC LTD – PACKAGING AND PRINTING DIVISION
04/28/2023 ITC-PPB 2
Supply Chain initiatives for increasing Gross
Contribution in Carton and Flexibles lines
04/28/2023 ITC-PPB 3
Supply Chain Management
• “Supply Chain management deals with the control of materials, information, and financial flows in a network consisting of suppliers, manufacturers, distributors, and customers”.
• It covers the management of flow of goods from point of origin to point of consumption
Supply chain•Storage and movement of materials•Work in progress inventory•Finished goods inventory•Supply to end customers
04/28/2023 ITC-PPB 4
Gross Contribution• Gross contribution is the difference between a
company’s turnover and its variable expenses.• GC is directly affected by the variable costs spent
in production. In ITC-PPB, the major variable cost occurs in:
• Raw materials• Consumables• Transportation or shipment• power
Variable costs
04/28/2023 ITC-PPB 5
Processes in ITC-PPB, Haridwar
ITC-PPB
Carton Flexibles ITD Blown film
04/28/2023 ITC-PPB 6
Carton
04/28/2023 ITC-PPB 7
Carton Line• Process Areas
CTPPrintingUV CoatingValue additionMicroflutingCutting & CreasingFolding & Gluing
04/28/2023 ITC-PPB 8
General Process in Carton line
CTP Printing Lamination
Value AdditionC&CF&G
04/28/2023 ITC-PPB 9
Carton-Machines• CTP
Proteck• Printing - Offset
Mitsubishi – UV & Conventional printing – max speed 16000 sheets/hour
Heidelberg Speedmaster XL 105 – Conventional printing – max speed 18000 sheets/hour
• LaminationSteinmann – max speed 60 m/minBMA Foil master – max speed 8000 sheets/hour
04/28/2023 ITC-PPB 10
Contd…• Offline UV machines
Ultra coat – max speed 6000 sheets/hourGravetech – max speed 8000 sheets/hour
• MicroflutingChampion Microfluting – max speed 100 m/minMeiguang Liner
• Value AdditionNikko - embossing
04/28/2023 ITC-PPB 11
Contd…• Cutting and Creasing
Nova Cut - max speed 8000 sheets/hourExpert Cut - max speed 9000 sheets/hour Spanthera - max speed 9000 sheets/hour
• Folding and GluingHeiber SchroderMedia 45 - max speed 350 m/minFuego - max speed 450 m/minVision fold - max speed 350 m/minExpert Fold - max speed 450 m/min
04/28/2023 ITC-PPB 12
Flexibles
04/28/2023 ITC-PPB 13
Flexibles Line• Process Areas :
PrintingLamination
i. Solvent basedii. Solvent lessiii. Extrusion Coating
SlittingPouching
04/28/2023 ITC-PPB 14
General Process in Flexibles Line
Printing Lamination
Slitting
Pouching
Blown Film
04/28/2023 ITC-PPB 15
Flexibles Line - Machines • Printing – Gravure Printing
Rotomec 1 & 2 – max speed 350 m/min• Lamination
BOBST- Laminator CL660 –max speed 450m/min Nord mechanica super combi 3000 – max speed
400m / min Extrusion coating laminator – max speed 300 m/min
• Slitting Titan slitter – max speed 700m/min
• pouching pouching m/c – max speed 22m/min.
04/28/2023 ITC-PPB 16
Contd...• Blown film
Raw material for lamination (made from granules)
Max speed – 525 to 550 kg/hr.• PEG
Max speed – 150m/min• Hot melt coating
Max speed - 60 to 100 m /min
04/28/2023 ITC-PPB 17
STUDY AREAS
Supply chain
inbound outbound
PlanningRaw
materials
Procurement Cost involved usage
Production
M/c study
Increasing production
rate
Wastage reduction
Study Areas
04/28/2023 ITC-PPB 18
Data Required• Raw Material
Procurement dataCost dataBOM
• Consumables data• Logistics data• Production
Production planning dataWastage per machineOEE
04/28/2023 ITC-PPB 19
Support Required• Internet Connectivity• Relevant Data
04/28/2023 ITC-PPB 20
Schedule
04/28/2023 ITC-PPB 21
Carton
Flexibles
Product-ion
Carton
Flexibles
Planning
Apr 24-25
26-27
28-29
30-May 01
02-03
04-05
06-07
08-09
10-11
12-13
14-15
flexibles carton
Project Schedule
04/28/2023 ITC-PPB 22
Raw Material
Procurement
Costing
Usage
Production
M/c Study
May 16-17
18-19
20-21
22-23
24-25
26-27
28-29
30-31
June 1-2
03-04
05-06
flexibles carton
Project Schedule
04/28/2023 ITC-PPB 23
Production
Prod. rate
Waste
OEE
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
carton Flexibles
June 7-8
09-10
11-12
13-14
15-16
17-18
19-20
21-22
23-24
25-26
27-28
Project Schedule
04/28/2023 ITC-PPB 24
Production planning process- carton
Sales order
New job
PIP Costing Production plan
Registered job
Sales order dump
Material status
Production order
04/28/2023 ITC-PPB 25
Production Planning process - Flexibles
Sales order
Availability
Material people
Process specification
2 ply/3 ply
Slitting Pouching
packing
04/28/2023 ITC-PPB 26
Report
04/28/2023 ITC-PPB 27
Note• Every Monday evening 5:30 meeting
with D.P. Roy sir.• Presentation on every 15 days.