structures deliverables for dtac

2
Structures Deliverables: The deliverables, supplied in two hard copies and one digital copy, to include the following: Full technical Project for structures is included in PAC deliverables Further PT deliverables will include further technical specifications and approximate bills of quantity. Special Foundation Works: Technical memorandum Technical Specifications (Caiet de sarcini) Retaining System for the Deep Excavation Technical Specifications (Caiet de sarcini) Bentonitic mud used for the excavation of the slurry walls’ trenches Technical Specifications (Caiet de sarcini) the execution of the slurry walls made of concrete, under the bentonitic mud Technical Specifications (Caiet de sarcini) internal support system of the retaining walls Technical Specifications (Caiet de sarcini) the execution of the ø600mm piles by drilling under the bentonitic mud Technical Specifications (Caiet de sarcini) Conditions to realize the monitoring program Control programme in the determined phases for the Retaining System of the Excavation Bill of quantities Dewatering System: Technical Memorandum Material Quantity list Calculation Note Technical Specifications (Caiet de sarcini) Dewatering Wells Technical Specifications (Caiet de sarcini) Hydraulic Installations Plans: Slurry walls formwork plan – scale 1/200 Execution Phases – scale 1/100 Reinforcement formwork, 1=3.00m, scale 1/50; 1/20; 1/10 Retaining Plan Level 1 – scale 1/200 Retaining Plan Level 2 – scale 1/200 Retaining Plan Level 3 – scale 1/200 Location Plan – scale 1/1000 Situation Plan – scale 1/500 Dewatering Well Section of the inferior aquifer piezometer Section of the superior aquifer piezometer Dewatering evacuation – scale 1/1000 Dewatering Well. Electrical Installations Section of Dewatering Well Substructure & Superstructure Foundation: Concrete Casting Formwork Foundation Mat plan; height - 12.22m – I (buildings B+C) Characteristic Sections for Foundation Mat – I (buildings B+C)

Upload: andreea-baciu

Post on 08-Nov-2014

16 views

Category:

Documents


2 download

DESCRIPTION

structure deliverables for dtac

TRANSCRIPT

Page 1: Structures Deliverables for DTAC

Structures Deliverables:The deliverables, supplied in two hard copies and one digital copy, to include the following:

Full technical Project for structures is included in PAC deliverablesFurther PT deliverables will include further technical specifications and approximate bills of quantity.

Special Foundation Works: Technical memorandum Technical Specifications (Caiet de sarcini) Retaining System for the Deep Excavation Technical Specifications (Caiet de sarcini) Bentonitic mud used for the excavation of the slurry

walls’ trenches Technical Specifications (Caiet de sarcini) the execution of the slurry walls made of concrete,

under the bentonitic mud Technical Specifications (Caiet de sarcini) internal support system of the retaining walls Technical Specifications (Caiet de sarcini) the execution of the ø600mm piles by drilling under the

bentonitic mud Technical Specifications (Caiet de sarcini) Conditions to realize the monitoring program Control programme in the determined phases for the Retaining System of the Excavation Bill of quantities

Dewatering System: Technical Memorandum Material Quantity list Calculation Note Technical Specifications (Caiet de sarcini) Dewatering Wells Technical Specifications (Caiet de sarcini) Hydraulic Installations

Plans: Slurry walls formwork plan – scale 1/200 Execution Phases – scale 1/100 Reinforcement formwork, 1=3.00m, scale 1/50; 1/20; 1/10 Retaining Plan Level 1 – scale 1/200 Retaining Plan Level 2 – scale 1/200 Retaining Plan Level 3 – scale 1/200 Location Plan – scale 1/1000 Situation Plan – scale 1/500 Dewatering Well Section of the inferior aquifer piezometer Section of the superior aquifer piezometer Dewatering evacuation – scale 1/1000 Dewatering Well. Electrical Installations Section of Dewatering Well

Substructure & Superstructure

Foundation: Concrete Casting Formwork Foundation Mat plan; height - 12.22m – I (buildings B+C) Characteristic Sections for Foundation Mat – I (buildings B+C)

Substructure: Concrete Casting Formwork plan over Basement 4 height -9.30m – I (buildings B+C) Concrete Casting Formwork plan over Basement 3 height -6.50m – I (buildings B+C) Concrete Casting Formwork plan over Basement 2 height -3.70m – I (buildings B+C) Concrete Casting Formwork plan over Basement 1 height -0.65m – I (buildings B+C) Casing and Reinforcing Stiffening Beams Casing Plan Staircase S.01 axis 2/X-V – Building B Casing Plan Staircase S.04 axis 2/P-Q – Building B Casing Plan Staircase S.02 axis 10/X-V and Staircase S.03 axis 14/X-V – Building C Casing Plan Staircase S.05 axis 10/P-Q and Staircase S.06 axis 14/P-Q – Building C

Page 2: Structures Deliverables for DTAC

Superstructure: Concrete Casting Formwork plan over Ground floor height +3,35m – Building B Concrete Casting Formwork plan over 1st floor height +6,80m – Building B Concrete Casting Formwork plan over current floor - 2nd floor...7th floor – Building B Concrete Casting Formwork plan over 8th floor height +30,95m – Building B Concrete Casting Formwork plan over technical floor height +34,25 m – Building B Casing Plan Staircase S.01 axis 2/X-V – Building B Casing Plan Staircase S.04 axis 2/P-Q – Building B