steven carpenter resume (3)

2

Click here to load reader

Upload: steve-carpenter

Post on 18-Jul-2015

44 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Steven Carpenter Resume (3)

STEVEN CARPENTER 2110 Mims Rd. Hephzibah GA 30815~ (706) 836-7257 [email protected]

MANAGEMENT / CONSTRUCTION MANAGEMENT / CONSTRUCTION ENGINEER / FIELD ENGINEER / SPECIALIST ENGINEER / FIELD ENGINEER / SPECIALIST Skilled in Maintenance aspects and New Construction with expertise in multiple areas including the paper, kaolin, polymer, power, nuclear, petro, chemical, food processing, and pharmaceutical industries. Results oriented leader, well able to direct and coordinate the professional success of others and manage time and people according to project and budget constraints. Facilitate between Engineering, Management and Field Personnel in the implementation and successful completion of projects, project management functions including estimating project costs, ordering and receiving, billing, resolving quality control issues, manpower placement skills, and basic weld inspection, also to include all duties of Construction / Field Engineering.

Engineering /Safety Training / Construction / Policies and Procedures / Personnel Management / Entrepreneurial Spirit / Professional Development &Training / Pipefitting / Maintenance Management

PPROFESSIONALROFESSIONAL E EXPERIENCEXPERIENCE Construction Engineer/ Specialist, PARSONS, April-2012- Present

Owner /Operator, S&T Engineering Augusta, GA, 2011 – March-2012Field Engineer, Austin Industries, Augusta, GA, 2010 - 2011Assistant Pipe Superintendant, Turner Industries Grayville, LA, 2009Pipe General Foreman, Bacon, Bedford, KY, 2008Pipe General Foreman, Westcon, Herford, TX, 2007 - 2008Pipe Foreman, TIC, FT. Pierce FL, 2007Pipe Foreman, Titan Contracting, Decatur, Ala, 2006Pipe General Foreman, Lockwood Greene, West Columbia, SC, 2006Construction Superintendant, Ram Construction, Augusta, GA, 2003 – 2005Pipe Foreman, BE&K, Wesley, GA, 2002 - 2003

Management− Enforce policies, manage daily operations, and plan the use of materials and human resources, handle functions

in multiple areas of management, such as personnel, purchasing, or administrative services.− Determine staffing requirements, train new employees, and increase efficiency.− Establish and implement departmental policies, goals, objectives, and procedures, conferring with staff members

in order to properly implement Engineered Projects.− Monitor personnel performance activities to ensure that they follow approved design methods and procedures. − Measure productivity and goal achievement to determine areas needing program improvement.

_ Knowledge of the building of all work packages for all systems and Microsoft word and excel. Piping / Mechanical

− Set up, Monitor and Supervise the Hydrostatic and pneumatic testing of all systems, to include isolation point knowledge and valve placement and displacement,

− Inspected, examined, installed systems, observed, assuring all installations meet Engineering requirements and generated punch list, to include walking all systems down for commissioning.

− Designed, assembled, installed, and maintained pipe systems, pipe supports, and related hydraulic and pneumatic equipment for steam, hot water, heating, cooling, lubricating, sprinkling, and industrial production and processing systems.

− Designer of full scale drawings of pipe systems, supports, and related equipment, following blueprints; measured and marked pipes for cutting and threading.

− Selected pipe sizes and types and related materials, such as supports and hangers, according to engineering specifications.

− Assembled and secured pipes, tubes, fittings, and related equipment, according to Engineering specifications, by welding, brazing, cementing, soldering, and threading joints

ENGINEERING/MECHANICAL Generated work packages, Worked hand and hand with the craft to resolve any issues in the field Maintained All 477 Data sheets for the assembly/disassembly of All Valves on site, Generated Spread Sheet

to track, the completion of all assembly on Valves, as well as worked on all issues with Valves such as gaskets needed, bolts needed and any other items that would prohibit Valves being FINAL ASSEMBLED.

Generated Welding Maps/ QCIR’S, Added and deleted welds anytime needed, Design changes ECT.

Page 2: Steven Carpenter Resume (3)

Revised Weld Maps/QCIR’S, Maintained current revisions in packages, and in the field document stations,

EEDUCATIONDUCATION---------------------------------------------------------------------------------------------------------------------------------------------------------------------------- -- -Construction Supervisor Courses completed: Production, Quality, Scheduling, Tracking, Rigging Safety, First Aid/ -CPR, -Sexual Harassment, Computer Training Microsoft Word / Microsoft Excel/ Very Knowledge in most all programs-NCCER Certification #5995408 (PIPE)-Local 150 Apprenticeship Program 5 Years-High School Diploma (Graduate) - Knowledge in Microsoft Excel, Can Make and generate any kind of Spread Sheet for systems ECT.-Knowledge in Microsoft Word Can produces any kind of document pertaining to scope of work ECT.- Knowledge with the Adobe Pro program also, Program handy with generating symbols and ECT, when producing weld maps and ISO Maps.-Generating Punch List for systems and walking down same and marking up percentage of completion also.-Overseen production coming out of the FAB SHOP to assure the proper Dimensions and Configurations.- Knowledge in CAD 3-D Construction Program’s

DOE-ON-SITE TRAINING WITH PARSONS: ITAR1&2, FCPA, CONFINE SPACE ENTRY, SWPF OVERVIEW COARSE FOR COMISSIONING, DCN PRODUCTION, FCN PRODUCTION, CRFI PRODUCTION, NCR PRODUCTION