Steel Manufacturing Industry& Schneider Electric Company introduction
Selected referencesSelected references - Iron Making - Energy Management
April 2012
Index
Schneider Electric at a glanceSchneider Electric at a glance
Schneider Electric in Mining, Minerals and Metals
Schneider Electric in Steel Manufacturing
Selected Schneider Electric References – Iron Making
Selected Schneider Electric References – Energy Management
Schneider Electric - Industry Business - K. Lachmann - Date 2
Schneider Electric – the global specialist in energy managementin energy management
Balanced geographies – FY 2011sales
billion € sales (last twelve months) North
America23%
WesternEurope
32%
of sales in new economies(last twelve months)
23% Asia Pacific
27%Rest of World18%
people in 100+ countries Diversified end markets – FY 2011 sales
of sales devoted to R&D
Utilities & Infrastructure 24%Industrial & machines 22%Data centres 16%
Non-residential buildings 29%
Schneider Electric - Industry Business - K. Lachmann - Date 3
of sales devoted to R&DResidential 9%
Our Business driver: to help customers to deal with their major Concernsto deal with their major Concerns
●How to increase the safety of my personnel?●How to increase the safety of my personnel?●How to comply with sustainable development (environmental impact)?(environmental impact)?●How to maximize my output and its benefits (revenues and margin)?(revenues and margin)?●How to optimize my capital expenditure?●How to optimize my operational expenditures?●How to optimize my operational expenditures?“…Energy is critical to my production but
I need to reduce my CO footprint ”
Schneider Electric - Industry Business - K. Lachmann - Date 4
I need to reduce my CO2 footprint …
Our Unique Value Propositions
● Global presence International● Global presence, Internationalnetworking capabilities, Local mind-set
A Comprehensive Production &●A Comprehensive Production & Energy Optimization Offer dedicated to Mining, Minerals and MetalsCustomersCustomers
● Best in Class products, Solutionsd Services bi d iand Services combined in an
Integrated Architecture
P j t & S i
Schneider Electric - Industry Business - K. Lachmann - Date 5
●Worldwide Project & Servicecapabilities
Our Projects and Services Capabilities
● 4 Global Projects and Engineering ● 600+ contracts 1 to 50 M€● 4 Global Projects and Engineering CentersBeijing (China), Grenoble (France) Mumbai (India), Nashville (USA)
● 600+ contracts, 1 to 50 M€ (2011)
●Potential engineering study capacity 500 000+ ho rs/ ear
● 10+ System Integration Centers close to you
500.000+ hours/year
● 50+ years experience in &Australia, Brazil, Canada, China, France,
Gulf, India, Indonesia, Mexico, Spain, Turkey, USA, etc.
Projects & Engineering
● Local and Regional Project & Services Organization in 100+ countries
Schneider Electric - Industry Business - K. Lachmann - Date 6
Index
Schneider Electric at a glanceSchneider Electric at a glance
Schneider Electric in Mining, Minerals and Metals
Schneider Electric in Steel Manufacturing
Selected Schneider Electric References – Iron Making
Selected Schneider Electric References – Energy Management
Schneider Electric - Industry Business - K. Lachmann - Date 7
Mining, Minerals and Metals in Schneider Electric14 Global Strategic Customers4 Major Segments
Mining
Steel
Cement
Aluminium
Multiple National Strategic CustomersA Gl b l T f 250 l
SteelAluminium
Multiple National Strategic CustomersA Global Team of 250+ peopleMarketing, Sales and Business Support Experts
4 Global Projects and Engineering CentersChina, France, India, USA
10+ Automation System Integration Centers Multiple Local Projects and Services OrganizationSchneider Electric is present in over 100 countries.
Schneider Electric - Industry Business - K. Lachmann - Date 8
Only some are displayed
50+ years of experience in Projects and Engineering
Mining, Minerals and Metals Sales 2011: ~500M€
Laiwu SteelChina
ArcelorMittal (210KT)France
Electrical Distribution and ProcessChinaEnergy Management System
7M€
Electrical Distribution and Process Control System for Continuous
Annealing (w/ Ansaldo)7M€
VotorantimBrazil
Five (5) Cement PlantsMV-LV Electrical Distribution and
SNIM / SNC Lavalin (GuelbII)Mauritania
Movable Substations, Process Control System and WaterMV LV Electrical Distribution and
Process Control System24M€
Control System and Water Management System
20M€
Cliff Natural ResourcesCliff Natural Resources (Bloom Lake II)
CanadaElectrical Distribution and Process
Control System for Mine
Vale (Vargem Grande)Brazil
Movable Substations and Process Control System
19M€
Schneider Electric - Industry Business - K. Lachmann - Date 9
Control System for Mine3.5M€ 19M€
Index
Schneider Electric at a glanceSchneider Electric at a glance
Schneider Electric in Mining, Minerals and Metals
Schneider Electric in Steel Manufacturing
Selected Schneider Electric References – Iron Making
Selected Schneider Electric References – Energy Management
Schneider Electric - Industry Business - K. Lachmann - Date 10
Steel Manufacturing
Finished Product
Production Resources
Assets
BilletsSlabsCoils
OthersAssetsPeople
Raw MaterialENERGYOth
Others…
Revenue
Others…
Cost
Our Goal: To Help our Customers
To Produce More with Less…
Our Goal: To Help our Customers…
Schneider Electric - Industry Business - K. Lachmann - Date 11
Grow in a Sustainable Way…
Steel Manufacturing
Finished Product
Production Resources
Assets
BilletsSlabsCoils
OthersAssetsPeople
Raw MaterialENERGYOth
Others…
Revenue
Others…
CostAny Optimization of
the Overall Steel Production Process
ill O ti i
Our Mission: To Help Customers
By: Optimizing The Overall Steel
Production Process
will Optimize the Production
Resources
Schneider Electric - Industry Business - K. Lachmann - Date 12
To Help Customers to Optimize Their
Production Resources
Steel Manufacturing Optimization
BusinessBusinessThe Profiting from the Steel Business
OperationThe Running of a Steel PlantThe Running of a Steel Plant
ProductionThe Making of Steel
(Facilities and Process)
Schneider Electric - Industry Business - K. Lachmann - Date 13
Steel Manufacturing Optimization
Business MinimizeBusinessThe Profiting from the Steel Business
Minimize Production
Resource Cost n
OperationThe Running of a Steel Plant
X =Minimized Production Resource m
izat
ion
The Running of a Steel Plant
Optimize Production
Cost Per Ton O
ptim
ProductionThe Making of Steel(Facilities and Process)
Resource Consumption
Schneider Electric - Industry Business - K. Lachmann - Date 14
LifecyclePrefeasibility Upgrade
Our Presence in Steel: 150+ M€ Sales (2011)
DOUBLE efficiency and save US$3 million annually!
The state-of-the art automation technology facilitates energyThe state of the art automation technology facilitates energy management across our enterprise and has provided us with a professional and efficient diagnostics helps us optimise our energy efficiency.”
Mr. Wenyi Wang, Project Manager, LY SteelMr. Wenyi Wang, Project Manager, LY Steel
Process Automation for Break-Through SteelmakingProcess Automation for Break Through Steelmaking
Schneider Electric responsible for Basic Engineering (Process Automation / Energy Distribution) of ULCOS pilot blast furnace with Top Gas Recycling.
Schneider Electric - Industry Business - K. Lachmann - Date 15
with Top Gas Recycling.
Index
Schneider Electric at a glanceSchneider Electric at a glance
Schneider Electric in Mining, Minerals and Metals
Schneider Electric in Steel Manufacturing
Selected Schneider Electric References – Iron Making
Selected Schneider Electric References – Energy Management
Schneider Electric - Industry Business - K. Lachmann - Date 16
Blast Furnace Process Automation
OS12REPORT PRINTALARM PRINT
Vijeo Citect Clients (OS)OS1
Vijeo Citect Web Server
intranet
Office LANEthernet Vijeo Citect WEB client
Ethernet TCP/IP 100Mbit/sI/O SERVER1(redundant)
EngineeringStation
U it P
Vijeo Citect Web Server
Industrial Ethernet 100Mbit/s
Unity Pro
Schneider Electric - Industry Business - K. Lachmann - Date 17
Raw Material BodyTOP Coaling & InjectionHot Stave Circulating Water
“Blast Furnace #7” Novolipetsk Iron and Steel Corporation (NLMK) Russiaand Steel Corporation (NLMK),
●Production Capacity: 3.4 million tonne/year p y y● free-standing furnace ● modern refractory and cooling solutions● advanced air supply system for cold air blasting. ● up-to-date charge make up solution, p g p ,● bell-less top charging, ● pulverized coal injection, ● reliable hydraulic equipment at the foundry, ● multiple process data recorders p p● a top notch automation system ● Sachem expert system
●General contractor Stroitelno-montazhniy Trest NLMK LLC (NLMK’sGeneral contractor Stroitelno montazhniy Trest NLMK LLC (NLMK s Construction and Assembly Unit)
●Metallurgical equipment manufacturer PAUL WURTH
Schneider Electric - Industry Business - K. Lachmann - Date 19
●Hot testing August 2011
“Blast Furnace #7” Novolipetsk Iron and Steel Corporation (NLMK) Russiaand Steel Corporation (NLMK),
●Schneider Electric: main supplier of automation systems and low●Schneider Electric: main supplier of automation systems and low voltage equipment for the production complex
●Scope of Supply (extract)S p S pp y ( )>50 PLC Quantum Hot Standby >30 PLC Quantum, Premium, M340 > 70 000 SCADA tags Vijeo Citect >110 Licenses >180 Control cabinets >400 Control panels
250 IMCC>250 IMCC >75 VSD >15 LV Substation etc
Schneider Electric - Industry Business - K. Lachmann - Date 20
etc.
Techint Ternium Siderar Revamping Blast Furnace 1Revamping Blast Furnace 1
Automation scope• Charging operation • Funace operationp• Stoves & Blast• Gas Cleaning• Fuel oil• Slag granulation (INBA)• Slag granulation (INBA)• …..
Schneider Electric - Industry Business - K. Lachmann - Date 21
Techint Ternium Siderar Revamping Blast Furnace 1Revamping Blast Furnace 1
●Automation scope●Automation scope●Unity Pro platform with Modicon Quantum HSBY and Modicon Premium
configurations●Ethernet, RIO and MB+ networks●Ethernet, RIO and MB networks ● 90+ drops
●Benefits of this solution●Benefits of this solution●Process improvement with higher performance pf plc scan time ● Integration of Terniums programming standard●Easy troubleshooting for the maintenance people thanks to advanced●Easy troubleshooting for the maintenance people thanks to advanced
diagnostic tools● Increased reliability reducing the time required to operate the supervision of
the system
Schneider Electric - Industry Business - K. Lachmann - Date 22
y
Gerdau SABlast Furnace + Sinter + CokeBlast Furnace + Sinter + Coke
●Customer profile
Brazil
●Customer profile●Gerdau Group is the largest producer
of long steel in the Americas, ●Mills in Brazil, Argentina, Canada,●Mills in Brazil, Argentina, Canada,
Chile, Colombia, the United States, Peru, Uruguay.
●Holds 40% stake in the Spanish company Sidenor. Currently,
●Gerdau has an installed capacity of 19.1 million metric tons of steel per yearsteel per year.
Schneider Electric - Industry Business - K. Lachmann - Date 23
Gerdau SABlast Furnace + Sinter + CokeBlast Furnace + Sinter + Coke
Project scope
Brazil
Project scope
●Expansion the Acominas steel plant to raise production capcity from 3 to 6 million metric tons in two phases
● First phase: ● To raise capacity from 3 to 4.5 mtpa (duplication of reduction area) ● Three packages: Blast Furnace, Coke Plant and Sinter Plant. ● Scope of supply includes mechanical, electrical, instrumentation and automation
items.
●Packages awarded to chinese OEM’s ● CISDI: Blast Furnace● ACRE: Coke Plant
Schneider Electric - Industry Business - K. Lachmann - Date 24
● CIE: Sinter Plant
Gerdau SABlast Furnace + Sinter + CokeBlast Furnace + Sinter + Coke
● The challenge
Brazil
● The challenge● Internat. coordination of Schneider Electric subsidiaries,
and three different OEMs for different systems● Provide local support for the OEMs and implement local
t ifi ti t d d d fcustomer specifications, standards and preferences● End User preference for Modicon Quantum PLC’s
thanks to previous experience with technical solution and support
● The solution● Local presence in Brazil: automation technical support, training● Supply chain coordination in China: Gerdau Acominas local team, Schneider Electrics
l l t i t t d l b ild t klocal system integrator and panel builders network ● Key values for End User and OEM’s:
●international cooperation, ●local support and warranty,
Schneider Electric - Industry Business - K. Lachmann - Date 25
●local support and warranty,●spares availability.
Gerdau Acominas – Blast FurnaceCentral Control
Room
Stockhouse BF Proper BF Top Hot Stove Gas Cleaning Indirect Water To Level 3Servers
PCI
PCIPCIRoom
Schneider Electric - Industry Business - K. Lachmann - Date 26Stockhouse Room BF Proper Room Top Room HS Room Direct Water Room
Circulation Water RoomTRT RoomBF Proper Room
Gerdau SABlast Furnace + Sinter + CokeBlast Furnace + Sinter + Coke
Customer benefits
Brazil
Customer benefits
●OEMs confidence to work with Schneider Electric solutions thanks to the partnership between the end user and Schneider Electric Brazil andthe partnership between the end user and Schneider Electric Brazil and Schneider Eletric China
O t h f A t ti LV d MV k●One stop shop for Automation, LV and MV packages
●The international coordination was key to satisfy the local customer requirements and preferences
Schneider Electric - Industry Business - K. Lachmann - Date 27
EKO-Stahl GmbH EisenhüttenstadtGermanyGermany
●Blast furnace 5A and Sinterplant●Blast furnace 5A and Sinterplant
●Schneider Electric Process Automation20 it M di Q t l t● 20+ units Modicon Quantum plc system
●Vijeo Citect redundant Scada system●Decentralized I/O
C i ti●Communication●Modbus+ ●Ethernet TCP/ IP Communication
/O● ~20.000 I/O points
●Electrical Distribution
Schneider Electric - Industry Business - K. Lachmann - Date 28
EKO-Stahl GmbH EisenhüttenstadtGermanyGermany
Blast furnace 5ABlast furnace 5A
Schneider Electric - Industry Business - K. Lachmann - Date 29
EKO-Stahl GmbH EisenhüttenstadtGermanyGermany
PCI (Pulverized Coal Injection)PCI (Pulverized Coal Injection)
Schneider Electric - Industry Business - K. Lachmann - Date 30
Bhushan Power & Steel Limited, Rengali – Blast Furnace + Sinter + CokeRengali Blast Furnace + Sinter + Coke
●Customer profile
India
●Customer profile●A fully integrated 1.5 Million TPA Steel making Company with turnover of
INR3873 Crores (USD 950 Million) and 7 World Class ISO 9000 Certified State of the Art Plants at Chandigarh, Derabassi, Kolkata and Orissa in gIndia
Schneider Electric - Industry Business - K. Lachmann - Date 31
Bhushan Power & Steel Limited, Rengali – Blast Furnace + Sinter + CokeRengali Blast Furnace + Sinter + Coke
●Customer challenges:
India
●Customer challenges: ●Completion of System Engineering, Panel designing, Panel manufacturing
and Dispatch Based on Mecon Technical Specifications ●Providing necessary support for equipments coming from SSIT for Blast●Providing necessary support for equipments coming from SSIT for Blast
Furnace of capacity 1004m3, Sinter Plant of capacity 104m2, Raw Material Handling Plant, Coke Oven of 0.45MT Capacity
●Completion of job based on availability of site
●Project scope:●Design, Engineering, Manufacturing, Supply, Erection, Testing andDesign, Engineering, Manufacturing, Supply, Erection, Testing and
Commissioning ●Programmable Logic Controllers (PLC) & Supervisory Controls and Data
Acquisition (SCADA) system, for Raw Material Handling, Coal Preparation.
Schneider Electric - Industry Business - K. Lachmann - Date 32
Coke Screening, BF Ventilation, ESP & SMS Ventilation Systems.
Bhushan Power & Steel Limited, Rengali – Blast Furnace + Sinter + CokeRengali Blast Furnace + Sinter + Coke
Schneider Electric Solution:
India
Schneider Electric Solution:
●Modicon Quantum Hot Standby PLC System with RIO nodes
●Vijeo Citect SCADA for overall process Control & Monitoring
●Historical data & various process related reports. Archiving of upto 6 Months period
●Fiber Optic networking & Data Communication in the entire Steel Plant.
Schneider Electric - Industry Business - K. Lachmann - Date 33
Bhushan Power & Steel Limited, Rengali – Blast Furnace + Sinter + Coke
BF Main Control Room Blower Control Room PCI Room STOCK Control Room
Rengali Blast Furnace + Sinter + CokeIndia
COKE SCREEN & QUENCHING AREA
COAL PREPARATION
AREAESP C t l (PLC i id Si t Pl t) RMHPESP Control (PLC inside Sinter Plant)
SSIT Scope
BF COOLING WATER
Schneider Electric - Industry Business - K. Lachmann - Date 34
Gas Cleaning Control Room
Sinter PLC System
SSIT ScopeLocal Source
Bhushan Power & Steel Limited, Rengali – Blast Furnace + Sinter + CokeRengali Blast Furnace + Sinter + Coke
Customer Benefits
India
Customer Benefits
●Modicon PLCs are the most reliable PLC equipment for industrial automationautomation.
●No failures in the continuous site operations.●Quantum PLC running under Dusty Environment
●Vijeo Citect SCADA helps in logging of various process related events & alarms. Historical trends for analyzing various process parameters
●The overall steel plant’s data available on the network.
Schneider Electric - Industry Business - K. Lachmann - Date 35
Techint Ternium Siderar Revamping Blast Furnace 1Revamping Blast Furnace 1
●Customer profile
Argentina
●Customer profile●Manufacturer of flat and long steel products●Production centers in Argentina, Mexico,
Colombia, Guatemala and the United States ●One of the leading steel companies in Latin
America and largest argentinian steel company hot rolled, cold rolled, hot dip galvanized, electro-galvanized, prepainted and tinplate steel g , p p psheet products
Project objective●Project objective ●Expand production capacity to reach 4 mtpa● Improve iron quality for easier processing in downstream
facilities
Schneider Electric - Industry Business - K. Lachmann - Date 36
facilities
Cosipa – Blast Furnace UpgradeB il
●Companhia Siderúrgica Paulista (Cosipa) is a member company of the
Brazil
●Companhia Siderúrgica Paulista (Cosipa) is a member company of the Usiminas System, Latin America’s biggest flat steel complex
●Producer of uncoated flat steels●Producer of uncoated flat steels for a wide variety of industries
Schneider Electric - Industry Business - K. Lachmann - Date 37
Cosipa – Blast Furnace UpgradeB il
Migration of Blast Furnace #1
Brazil
Migration of Blast Furnace #1
●Existing automation system●Entirely based on 584 Modicon controllers●Entirely based on 584 Modicon controllers●Close to critical status for maintenance and
spares parts / components availability
●Challenge●Modernizing the system during the blast furnace regular maintenance●A safe modernization procedure●A safe modernization procedure
– Critical equipment importance for the whole plant – No acceptance of delays
Schneider Electric - Industry Business - K. Lachmann - Date 38
Cosipa – Blast Furnace UpgradeB il
Schneider Electric Solution – a Smooth and Safe upgrade path
Brazil
Schneider Electric Solution – a Smooth and Safe upgrade path
●Hardware●New powerful Modicon Quantum automation platform●New powerful Modicon Quantum automation platform●Keep the existing I/O systems (200 Series - Controller 584), to reduce re-
wiring system, save time●Preserves past investment through Modicon Quantums system with●Preserves past investment through Modicon Quantums system with
possibility to mix additional racks with the modern I/O modules
●Software●Software●Re-use existing software - a simple operation to upload and download for
the new CPUs●Upload procedure from the old controller to the new platform allowed to pre-
Schneider Electric - Industry Business - K. Lachmann - Date 39
Upload procedure from the old controller to the new platform allowed to pretest all the variables and software prior to comission
Cosipa – Blast Furnace UpgradeB il
REDE COSIPAPCI
ETHERNETNOTE BOOK
MANUTENÇÃO
Brazil
PROCESSOSERVIDOR PROCESSO SUPERVISÃO
Ç
REDE MODBUS PLUS
MODICON
QUANTUMREDUNDANTE
PC MANUTENÇÃO
MODICONTSX QUANTUM
REGENERADORES CARREGAMENTOO
CARREGAMENTOS
MÓDULOS DE E/SCONTROLADOR 584
Schneider Electric - Industry Business - K. Lachmann - Date 40
NORTE SUL
Variáveis Analógicas do Regenerador
(Phase 1)
Cosipa – Blast Furnace UpgradeB il
Migration of Blast Furnace #1 – Step 2
Brazil
Migration of Blast Furnace #1 Step 2
●Upgrade of I/O system during regular maintenance period
●Schneider Electric Solution ●Re-use and migration of previous software ●Support of current CPUs (from the first upgrade) with simple upgrade easily●Support of current CPUs (from the first upgrade) with simple upgrade easily
migrated to new versions (if required) and support of any additional modules (networks)
●Benefits:●Migration in a record time according to the user requirements (during the
scheduled maintenance period)●A safe migration strategy with a stepwise approach●Open doors for immediate benefits: Ethernet communications new software
Schneider Electric - Industry Business - K. Lachmann - Date 41
●Open doors for immediate benefits: Ethernet communications, new software functionalities
Shagang Group Blast Furnace 5800m3Blast Furnace 5800m China
Schneider Electric - Industry Business - K. Lachmann - Date 42
Durgapur Steel Plant - Blast Furnace # 4, Stove Automation ProjectStove Automation Project
●The customer:
India
●The customer:●Situated at a distance of 158 km from Calcutta ●With the successful commissioning of the
modernized units, DSP is all set to producemodernized units, DSP is all set to produce ●2.088 million tones of hot metal, ●1.8 million tones of crude steel ●1 586 million tones of saleable steel annually●1.586 million tones of saleable steel annually
●1200MT/Day Blast Furnace
Schneider Electric - Industry Business - K. Lachmann - Date 43
Durgapur Steel Plant - Blast Furnace # 4, Stove Automation ProjectStove Automation Project
●Customer challenges:
India
●Customer challenges: ●Delivery and installation of the equipment within the shortest possible time
with Zero defect●Commissioning of the system within the Capital Repair period of the Blast●Commissioning of the system within the Capital Repair period of the Blast
Furnace ( 45 days)●Heating of the Stoves with efficient Techno economics, possible due to
monitoring and controlling features of PLC and SCADA●Good interfacing with operation personnel for incorporation of required
monitoring & control features as per the process requirement●Various, Critical PID Loop controls for the entire process, integrated &
t ll d b i lcontrolled by a single processor
Schneider Electric - Industry Business - K. Lachmann - Date 44
Durgapur Steel Plant - Blast Furnace # 4, Stove Automation ProjectStove Automation Project
●Project scope:
India
●Project scope:●Design, Engineering, Manufacturing, Supply, Erection, Testing and
Commissioning of Programmable Logic Controllers (PLC) & Supervisory Controls and Data Acquisition (SCADA) system, for achieving Blast Furnace q ( ) y g#4 Stove Automation
●Project requirements:j q● This is a 1200MT/Day Blast Furnace● The failure rate of the running TOSDIC DCS has increased and therefore
M/s. DSP was looking for an alternative automation system● A DCS equivalent solution
Schneider Electric - Industry Business - K. Lachmann - Date 45
Durgapur Steel Plant - Blast Furnace # 4, Stove Automation ProjectStove Automation Project
Schneider Electric Solution
India
Schneider Electric Solution
●Stove Automation achieved by the following equipments:●Quantum Hot Standby PLC System with RIO nodes●Quantum Hot Standby PLC System with RIO nodes●Standby Premium PLC system (13Nos.) for various PID Control Loops●Magelis TSD for Control & Monitoring of these Premium PLC●Citect SCADA for overall process Control & Monitoring●Citect SCADA for overall process Control & Monitoring● Flow, Temperature and Pressure parameters from field being monitored and
trended continuously. Historical data & various process related reports. Archiving of up to 6 Months period
●System Redundancy at every level
Schneider Electric - Industry Business - K. Lachmann - Date 46
Durgapur Steel Plant - Blast Furnace # 4, Stove Automation ProjectStove Automation Project
India
Ethernet Switch TCP/IP 10/100Mbps
Stand Alone Premium
Primary
Secondary
Stand Alone Premium CPU 1 to 8 on EthernetXBT-G 1 to 8
on Ethernet
y
Schneider Electric - Industry Business - K. Lachmann - Date 47
Durgapur Steel Plant - Blast Furnace # 4, Stove Automation Project
India
Stove Automation Project
Schneider Electric - Industry Business - K. Lachmann - Date 48
Durgapur Steel Plant - Blast Furnace # 4, Stove Automation Project
India
Stove Automation Project
Schneider Electric - Industry Business - K. Lachmann - Date 49
Durgapur Steel Plant - Blast Furnace # 4, Stove Automation ProjectStove Automation Project
India
Schneider Electric - Industry Business - K. Lachmann - Date 50
Durgapur Steel Plant - Blast Furnace # 4, Stove Automation ProjectStove Automation Project
Customer Benefits
India
Customer Benefits
●Modicon Quantum / Premium PLCs are the most reliable PLC equipment for industrial automation. q p●No failures in the continuous site operations of over a year.●Quantum / Premium PLC running under high Ambient Temperature & Dusty
Environment.●Citect SCADA helps in logging of various process related events &
alarms. Historical trends for analyzing various process parameters.●Various critical control elements for the process, integrated to a single p , g g
Quantum System, thus reducing the Operational & Maintenance downtime.
Schneider Electric - Industry Business - K. Lachmann - Date 51
JSW, Toranagallu BOF Converter Upgrade IndiaBOF Converter Upgrade
●The customer:
India
●The customer:● JSW Steel Ltd. is among the largest Indian Steel Companies ● today with capacity of 7.8 MT ● most modern eco friendly steel plants● most modern, eco-friendly steel plants
with the latest technologies for both upstream & downstream processes
●The Challenges:●Replace Honeywell TDS 3000 DCS System●Replace Honeywell TDS 3000 DCS System
Schneider Electric - Industry Business - K. Lachmann - Date 52
JSW, Toranagallu BOF Converter Upgrade India
SERVER A SERVER B SERVER C SERVER D BMCS ENGG GCP ENGG CONV ENGG BOF Converter Upgrade India
ETH SW 1 ETH SW 2
ks
CONVERTER PLC GCP PLC BMCS/FACS PLC
Uni
ty F
ast L
inije
o C
itect
with
TOTAL 5 DROPS TOTAL 10 DROPS TOTAL 3 DROPS
tum
Uni
ty &
Vi
Schneider Electric - Industry Business - K. Lachmann - Date 53TYPE DI DO AI AO RTD TOTALTOTAL 2080 1152 280 104 64 3680
Qua
nt
Gas Cleaning and Cooling PlantIndiaIndia
Schneider Electric - Industry Business - K. Lachmann - Date 55
Bulk Material Charging SystemIndiaIndia
Schneider Electric - Industry Business - K. Lachmann - Date 56
Blast Furnace Cooling & Slag Handling
Schneider Electric - Industry Business - K. Lachmann - Date 57
Bhushan Power & SteelBlast Furnace Cooling & Slag HandlingBlast Furnace Cooling & Slag Handling
●The customer:
India
●The customer:●A fully integrated 1.5 Million TPA Steel making Company with turnover of
INR3873 Crores (USD 950 Million) and 7 World Class ISO 9000 Certified State of the Art Plants at Chandigarh, Derabassi, Kolkata and Orissa in gIndia
Schneider Electric - Industry Business - K. Lachmann - Date 58
Bhushan Power & SteelBlast Furnace Cooling & Slag HandlingBlast Furnace Cooling & Slag Handling India
Schneider Electric - Industry Business - K. Lachmann - Date 59
Automation reference list (extract)
●Blast furnaces●Blast furnaces
●Sinter plants
Schneider Electric - Industry Business - K. Lachmann - Date 65
Process automation references
Extract steel reference list (revision 2009, China)
●Application area●Application area●Sinterplant●Blast Furnace
●Process automation ●Modicon plc
and/or
Schneider Electric - Industry Business - K. Lachmann - Date 66
●Vijeo Citect Scada
DSP-SAIL - Oxygen Plant
●The customer:
India
●The customer:●Situated at a distance of 158 km from Calcutta ●With the successful commissioning of the modernized units, DSP is all set
to produce 2.088 million tones of hot metal, 1.8 million tones of crude steelto produce 2.088 million tones of hot metal, 1.8 million tones of crude steel and 1.586 million tones of saleable steel annually
●Challenge●Upgrading 80 MOD30 standalone controller to Quantum Unity HSBYUpgrading 80 MOD30 standalone controller to Quantum Unity HSBY
●Solution●Vijeo Citect SCADA Servers with Unity Fast Links● Configuring 60 PIDs & 15 Manual Loaders● Configuring 60 PIDs. & 15 Manual Loaders
Schneider Electric - Industry Business - K. Lachmann - Date 68
DSP-SAIL - Oxygen PlantIndia
Automation ArchitectureArchitecture
Schneider Electric - Industry Business - K. Lachmann - Date 69
TYPE DI DO AI AO TOTALTOTAL 192 288 368 136 984
DSP-SAIL - Oxygen PlantIndia
ExampleOperatorOperatorScreen
Schneider Electric - Industry Business - K. Lachmann - Date 70
DSP-SAIL - Oxygen PlantIndia
ExampleOperatorOperatorScreen
Schneider Electric - Industry Business - K. Lachmann - Date 71
Bayi Iron & Steel Co., Ltd Oxygen PlantOxygen Plant
●Customer Profile●Customer Profile●Subsidiary of Baosteel Group with steel capacity of 7 mtpa● Fully integrated from mining, ore dressing, sintering, coking, iron-making,
steel-making to steel rolling ●Manufacturer of long products, flat products and tubular products
●Project scope●Control of Air Separation Plant (40000Nm3/h)
●Automation scopeU it P l tf ith M di Q t d Q t HSBY●Unity Pro platform with Modicon Quantum and Quantum HSBY configurations
●Ethernet-network, redundant fiber rings●Vijeo Citect Scada, Client/Server, redundant servers
Schneider Electric - Industry Business - K. Lachmann - Date 72
Vijeo Citect Scada, Client/Server, redundant servers●Engineering Tool Unity Application Generator
Bayi Iron & Steel Co., Ltd Oxygen PlantOxygen Plant
Crude Argon
ExampleOperatorOperatorScreen
Schneider Electric - Industry Business - K. Lachmann - Date 73
Bayi Iron & Steel Co., Ltd Oxygen PlantOxygen Plant
Main Tower System
ExampleOperatorOperatorScreen
Schneider Electric - Industry Business - K. Lachmann - Date 74
Bayi Iron & Steel Co., Ltd Oxygen PlantOxygen Plant
Liquid Oxygen Tank
ExampleOperatorOperatorScreen
Schneider Electric - Industry Business - K. Lachmann - Date 75
Bayi Iron & Steel Co., Ltd Oxygen PlantOxygen PlantPrecooling of Air Oxygen Turbocompressor
Recycled water Molecular Sieves
Schneider Electric - Industry Business - K. Lachmann - Date 76
Bhushan Power & Steel
●The customer:
India
●The customer:●A fully integrated 1.5 Million TPA Steel making Company with turnover of
INR3873 Crores (USD 950 Million) and 7 World Class ISO 9000 Certified State of the Art Plants at Chandigarh, Derabassi, Kolkata and Orissa in gIndia
Schneider Electric - Industry Business - K. Lachmann - Date 78
Bhushan Power & SteelRaw Material Preparation PlantRaw Material Preparation Plant India
Schneider Electric - Industry Business - K. Lachmann - Date 79
Bhushan Power & SteelRaw Material Preparation PlantRaw Material Preparation Plant India
ExampleOperatorOperatorScreen
Schneider Electric - Industry Business - K. Lachmann - Date 83
Index
Schneider Electric at a glanceSchneider Electric at a glance
Schneider Electric in Mining, Minerals and Metals
Schneider Electric in Steel Manufacturing
Selected Schneider Electric References – Iron Making
Selected Schneider Electric References – Energy Management
Schneider Electric - Industry Business - K. Lachmann - Date 84
TangSteel: Energy Management SystemExecuted by Project and Services Schneider Electric ChinaExecuted by Project and Services Schneider Electric China
●Customer profile●Customer profile● One of top 10 iron & steel sites in China ● Production capacity: 18M tons per year● 22 energy types
●Customer Challenge ● Regulation compliance ● Reporting mandate● Competitive cost pressures
●Schneider Electric Solution
Key production equipment:• coking (6)
( )●Schneider Electric Solution● Energy audit● Power monitoring● Energy Management System
• sintering (4)• blast furnace (4)• converter (7)• refining furnace (6)• casting (10)
Schneider Electric - Industry Business - K. Lachmann - Date 86
Energy Management System● Platform for the future
casting (10)• heating furnace (10)• rolling (9)
TangSteel: Energy Management SystemLevel 3 functionsLevel 3 functions
Schneider Electric - Industry Business - K. Lachmann - Date 87
TangSteel: Energy Management SystemOverview of project scopeOverview of project scope
● 22 types of W.A.G.E.Syp●Measurement management (power meter)
● Hierarchy (enterprise, plant and sector)● Duration (hours, day, week, month and year)● Categories
Measuring Management● Categories
●Data acquisition (PLC, networking equipment and SCADA)● Areas● Different energy system● Existing measurement database ERP
ManagementData
AcquisitionMonitoring & ● Existing measurement, database, ERP
●Monitoring and control (SCADA)● Information management (Ampla)
● Hierarchy (enterprise, plant and sector) ● Duration (shift day week month and year)
Control Information
Management● Duration (shift, day, week, month and year), ● Every energy usage efficiency
●Energy decision making (Ampla)● KPI & the performance target
M t t i t
Decision Making
Schneider Electric - Industry Business - K. Lachmann - Date 88
● Management report point
TangSteel: Energy Management SystemProject ArchitectureProject Architecture
●20 operator clientsp●Servers including
Ampla, storage etc. ●80 k points data●80 k points data
integration●Backbone network
link to 10 areaslink to 10 areas●10 set redundant
I/O servers●70 sets M340●70 sets M340●1800 sets power
meters
Schneider Electric - Industry Business - K. Lachmann - Date 89
TangSteel: Energy Management SystemIn real lifeIn real life
Schneider Electric - Industry Business - K. Lachmann - Date 90
TangSteel: Energy Management SystemCustomer BenefitsCustomer Benefits
●One open and integrated Energy Management System (EMS)●One open and integrated Energy Management System (EMS) connected energy production to business system (SAP)
●Establish one consistent energy management process based on new●Establish one consistent energy management process based on new EMS system
●Satisfy key management needs with below system capability●Satisfy key management needs with below system capability●Analyze Energy Consumption by Process Segments or Work Center● Identify Key Energy Events with Production Context
Identify Key Energy Consumption Equipments● Identify Key Energy Consumption Equipments●Allocate Energy Cost to Process Segments with real energy data●Energy Cost Variance according to unit price change
E C t l i f h b t h d ti
Schneider Electric - Industry Business - K. Lachmann - Date 91
●Energy Cost analysis for each batch production
Make the most of your energy
Schneider ElectricSchneider ElectricKlaus LACHMANNSteel Solutions Director