TECHNO-COMMERCIAL PROPOSAL FOR 450 KLD EFFLUENT TREATMENT PLANT Following are the few salient features of our offer: 1. Our offer is for – Design, Detailed engineering, submission of detailed arch. General arrangement drawings, Civil Construction, Supply of Electro mechanical Units & Equipments, Erection and Commissioning. 2. Our technical proposal consists of Physical, Chemical and biological treatment process to treat 450 KLD of effluent. 3. Proposed biological treatment is anaerobic followed by aerobic system i.e., UASB and ASP. We proposed anaerobic system followed by BT and ASP to minimize Power consumption. 4. We considered standby arrangements for pumps, blower’s etc. to ensure continuous and smooth plant operation. 5. For disinfection of treated Effluent we proposed Chlorination system. 6. At the time of detailed engineering, based on site conditions, location, technology and other parameters there may be small changes/modifications in the process, sizes & volumes of civil units, change of capacities or drives of electro mechanical equipments etc. for the betterment of treatment process. 7. Following are the assumptions we have considered while preparing the offer and any change may affect civil costing: Inlet to first unit is by gravity at NGL-0.00 or by pump Water, electricity, access road for heavy vehicle available to proposed ETP site. Soil Bearing Capacity is not less than 25 Tons/M2 Soil type is not black cotton or loose. Water table is below 30 meters. No bailing of water is required while excavation or no pile foundation required while construction. Soil type is not rocky or very hard and blasting not required. Suitable place is available for extra excavated soil for disposal near 50 meters lead.

Upload: bsridhar

Post on 15-Jul-2016

51 views

Category:

Documents


14 download

DESCRIPTION

Techno-commercial proposal for Starch Industry in India

TRANSCRIPT

Page 1: Starch Industry Effluent Treatment Plant

TECHNO-COMMERCIAL PROPOSAL FOR 450 KLD EFFLUENT TREATMENT PLANT

Following are the few salient features of our offer:

1. Our offer is for – Design, Detailed engineering, submission of detailed arch. General

arrangement drawings, Civil Construction, Supply of Electro mechanical Units &

Equipments, Erection and Commissioning.

2. Our technical proposal consists of Physical, Chemical and biological treatment process to

treat 450 KLD of effluent.

3. Proposed biological treatment is anaerobic followed by aerobic system i.e., UASB and ASP.

We proposed anaerobic system followed by BT and ASP to minimize Power consumption.

4. We considered standby arrangements for pumps, blower’s etc. to ensure continuous and

smooth plant operation.

5. For disinfection of treated Effluent we proposed Chlorination system.

6. At the time of detailed engineering, based on site conditions, location, technology and

other parameters there may be small changes/modifications in the process, sizes &

volumes of civil units, change of capacities or drives of electro mechanical equipments etc.

for the betterment of treatment process.

7. Following are the assumptions we have considered while preparing the offer and any

change may affect civil costing:

• Inlet to first unit is by gravity at NGL-0.00 or by pump

• Water, electricity, access road for heavy vehicle available to proposed ETP site.

• Soil Bearing Capacity is not less than 25 Tons/M2

• Soil type is not black cotton or loose. Water table is below 30 meters. No bailing of

water is required while excavation or no pile foundation required while construction.

• Soil type is not rocky or very hard and blasting not required.

• Suitable place is available for extra excavated soil for disposal near 50 meters lead.

Page 2: Starch Industry Effluent Treatment Plant

2

TECHNICAL OFFER FOR

EFFLUENT TREATMENT PLANT

OF 450 KLD CAPACITY

Page 3: Starch Industry Effluent Treatment Plant

3

SECTION -I

1.0. DESIGN DATA

I) FLOW : 450 m3/day.

II) SOURCE OF EFFLUENT : Effluent from Process & Washings

III) TREATMENT PLANT : 19 M3 / Hr.

CAPACITY

IV) RAW EFFLUENT CHARACTERISTICS :

Parameter

Unit

Value

pH - 4

TSS mg/lt. 10500

COD mg /lt. 33500

BOD mg /lt. 20350

TDS mg /lt. 27500

Oil & Grease mg /lt. 15

V) TREATED EFFLUENT CHARACTERISTICS :

Parameter

Unit

Value

pH -- 7.0 to 8.0

Suspended Solids mg/lt. < 30

COD mg /lt. < 250^

BOD 3 days at 27 0

C mg /lt. < 100

TDS mg /lt. < 2100^^

Oil & Grease mg /lt. < 10

^Inorganic TDS may interfere in the value of COD

^^If Inorganic TDS is < 2100 ppm in raw effluent.

VI) DESIGN OF ETP PROCESS

Proposed Effluent Treatment Plant will treat 450,000 liters per day waste water by

Physical, Chemical and Biological process.

Scheme for biological treatment is anaerobic treatment followed by aerobic treatment.

Page 4: Starch Industry Effluent Treatment Plant

4

SECTION -II

2.0. CONCEPT OF UNIT OPERATIONS

I) CONCEPT FOR ETP

a. Good quality of treated water.

b. Under any circumstances stringent pollution control norms are met.

c. No threat for disposal.

d. To keep the environment clean & free from contamination.

e. In future, it is pre- requisite for ISO 14001 Certification / other appreciation’s.

f. Minimal electricity consumption, less chemical consumption with low

Operation & maintenance cost and less space.

g. Save the mother earth for future generations and fulfill social obligations.

II) PROCESS DESIGN

The process design involves Physical, Chemical and Biological processes.

PHYSICAL AND CHEMICAL PROCESS

Screening, Collection, Equalization, Neutralization, Clarification, Drying.

BIOLOGICAL PROCESS

Converting organic pollutant into harmless by-products with the help of Anaerobic and

Aerobic Microorganisms.

Flow sheet is enclosed for ready reference.

PROPOSED TREATMENT PROCESS SCHEME

Effluent coming from the factory shall be first screened through bar screen chamber.

Over from screen chamber collected in Oil & Scum removal tank. Mechanically Oil &

Scum shall be scraped from Oil & Scum removal tank. By gravity effluent over flow is

collected in Collection cum Equalisation Tank. Floating mixer shall be provided at

equalisation tank for mixing of effluents. From this unit effluent is transferred to Buffer

tank by pump. At Buffer tank suitable chemical solutions are added to neutralise the

effluent. From buffer tank effluent is sent to UASB by pumping. At buffer tank floating

mixer shall be provided for mixing.

Page 5: Starch Industry Effluent Treatment Plant

5

BIOLOGICAL TREATMENT

UASB SYSTEM

From buffer tank effluent shall be pumped to Up flow Anaerobic Sludge Blanket Digester

(UASB). Major part of organic load shall be removed here. The anaerobic organisms will

degrade the high concentrated organic matter present in the effluent. In this digester

bacterial granules will be formed which is used as a medium for attachment of

microorganisms, which will in turn convert the complex organic matter into simple

compounds like methane gas, CO2 & H2O. On top of the digester-Gas Liquid Solid

separation system shall be provided.

Gas separately collected in Gas Holder and send to Boiler as a fuel. Excess gas will be

flared with Gas flare system. Necessary safety devises and instrumentation shall be

provided for UASB reactor. The overflow from UASB is sent to the Bio- tower-I.

BIO- TOWERS

Bio tower-I, II have designed as a roughening tower for organic matter reduction from

the influent. Bio tower is constructed with civil columns and beam supports. Bio tower

is filled with PVC structured Bio fill media. The overflow effluent from the UASB, is fed

to the top of the bio tower-I by gravity. At bio tower-I recirculation pumps are

provided to recirculate the effluent from bottom sump to top of the tower to maintain

the surface overflow rate required for the media. The media attached micro-organisms

will degrade the organic matter as BOD in the effluent. One part of the effluent from

recycling feed line is collected at the top of the Bio tower-II. Recycling pumps are also

provided at BT-II for recirculation and also transfer effluent to next unit i.e., Aeration

Tank. Excess biomass on the Bio-tower plastic media is automatically removed due to

the recirculation flow.

ASP SYSTEM

Activated Sludge Process comprises of Aeration tank followed by Secondary Clarifier,

which are, proposed to meet the requirements. In aeration tank organic load as BOD will

be degraded with the help of cultivated microbial culture. Constant Mixed Liquor

Suspended Solids (MLSS) will be maintained in aeration tank in definite proportions by

recycling the bio sludge trapped by the secondary clarifier. At aeration tank air is

supplied from air blower to supply oxygen for the microorganisms.

Page 6: Starch Industry Effluent Treatment Plant

6

Recycling of bio-sludge from secondary clarifier will be done by non-clog, centrifugal,

semi open type continuous duty & suitable capacity sludge re circulation pump. The

overflow from secondary clarifier is collected in chlorine contact tank.

CHLORINE CONTACT TANK

In chlorine contact tank chlorine dosing system is provided to disinfect the harmful

pathogens present in water. Disinfected water from this unit is transferred to Dual

media filter by pumping.

DUAL MEDIA FILTER

As pre-treatment unit Dual Media filter (DMF) is provided before Activated Carbon

Filter. The effluent is pumped to DMF to remove suspended particles, turbidity. DMF is

in MS-EP construction with top and bottom dished ends. Operation of the DMF is

Manual.

ACTIVATED CARBON FILTER

Activated carbon filter shall be provided for reduction of Odor, smell & removal of

chlorine. ACF will have activated carbon granules and water will be passed through this

media. Odor and color will be trapped in the media.

SLUDGE TREATMENT

Excess sludge from Secondary clarifier shall be collected on Sludge Drying Beds for

sludge dewatering manually. Dewatered and dried sludge cakes shall be used as good

manure or for secured land filling.

Page 7: Starch Industry Effluent Treatment Plant

7

SECTION -III

3.0. UNITS & EQUIPMENTS

3.1. CIVIL UNITS

Sr.

No.

Particulars

Quantity

1. Bar Screen Chamber One No

2. Oil & scum Removal Tank One No.

3. Equalization Tank One No.

4. Buffer Tank One No.

5. UASB One No.

6. Bio Tower Two Nos.

7. Aeration Tank One No.

8. Secondary Clarifier One No.

9. Chlorine Contact Tank One No.

10. Sludge Drying Bed Six Nos.

11. Panel room One No.

12. Foundations for Mechanical units/equipments Lot

13. Railing, Ladders, Cable Trenches, Earth pits, Puddle pipes &

miscellaneous Jobs

Lot

3.2. MECHANICAL UNITS / EQUIPMENTS

Sr.

No.

Particulars

Quantity

1. Bar Screen One No.

2. Oil & scum Scraper Mechanism One No.

3. ET - Effluent Transfer Pump (1W+1Sb) Two Nos.

4. Floating Mixer Two Nos.

5. Chemical Dosing System Two Nos.

6. UASB Feed Pump (1W+1Sb) Two Nos.

7. GLS system One Lot.

8. UASB Feed Distribution Grid One Lot.

9. Bio-fill media Lot.

10. BT Distribution Grid One No.

11. BT Recycling Pump (2W+2Sb) Four Nos.

12. Air Blower (2W+1Sb) Three Nos.

Page 8: Starch Industry Effluent Treatment Plant

8

13. Air Diffusers and Grid One Lot.

14. Secondary Clarifier Mechanism One No.

15. Bio-sludge Recycling Pump (1W+1Sb) Two Nos.

16. Chlorine Dosing System One No.

17. Filter Feed Pump ( 1W+1Sb) Two Nos.

18. Dual Media Filter One No.

19. Activated Carbon Filter One No.

3.3. PIPING & FITTINGS

Sr.No.

Particulars

Quantity

1. Interconnecting Piping between all proposed ETP

units within battery limits with all necessary Valves &

other fittings.

Lot

3.4. ELECTRICAL WORKS

Sr.No.

Particulars

Quantity

1 MCC Panel board One No.

2 Electrical cabling from panel to units of ETP Lot

3 ETP earthing Lot

3.5. INSTRUMENTATION & SAFETY DEVICES

Sr.No.

Particulars

Quantity

1. Pressure Gauges Lot

2. Liquid Flow Meter One No.

3. Flame Arrester Two Nos.

4. Moisture Trap Two Nos.

5. Pressure Relief Valve Two Nos.

6. Gas Flare Stack One No.

Page 9: Starch Industry Effluent Treatment Plant

9

3.6. OPTIONAL UNITS/EQUIPMENTS

Sr.No.

Particulars

Quantity

1. Gas Holder One No.

2. Gas flow Meter One No.

3. Gas Blower (1W+1Sb) Two Nos.

Page 10: Starch Industry Effluent Treatment Plant

10

SECTION -IV

4.0. TECHNICAL SPECIFICATIONS FOR UNITS & EQUIPMENTS

4.1. CIVIL UNITS / WORKS

1. BAR SCREEN CHAMBER

Type : Rectangular

MOC : RCC M30

Volume : 0.60 M3

Quantity : One No.

2. OIL & SCUM REMOVAL TANK

Type : Rectangular

MOC : RCC M30

Volume : 12 M3

Quantity : One No.

3. COLLECTION & EQUALISATION TANK

Type : Rectangular / Square

MOC : RCC M30

Volume : 150 M3

Quantity : One No.

4. BUFFER TANK

Type : Rectangular / Square

MOC : RCC M30

Volume : 36 M3

Quantity : One No.

5. UASB REACTOR

Type : Circular

MOC : RCC M30

Volume : 1510 M3

Quantity : One No.

6. BIO-TOWERS

Type : Rectangular / Square

MOC : RCC M30

Area : 36 M2

Quantity : Two Nos.

Page 11: Starch Industry Effluent Treatment Plant

11

7. AERATION TANK

Type : Rectangular / Square

Volume : 810 M3

MOC : RCC M30

Quantity : One No

8. SECONDARY CLARIFIER

Type : Circular

MOC : RCC M30

Volume : 90 M3

Quantity : One No.

9. CHLORINE CONTACT TANK

Type : Rectangular

MOC : RCC M30

Volume : 45 M3

Quantity : One No.

10. SLUDGE DRYING BEDS

Type : Square

MOC : BBM

Area : 30 M2

Quantity : Six Nos

11. MCC PANEL ROOM

Type : Square / Rectangular

Area : 20 M2

MOC : BBM

Quantity : One No.

12. FOUNDATIONS FOR ELECTROMECHANICAL UNITS

Type : Rectangular/Square/Circular

Quantity : Lot

13. PUDDLE PIPES, LADDERS, RAILING, MANHOLES, EARTH PITS, PIPING SUPPORTS &

CABLE TRENCHES ETC.

MOC : Ladders-MS, Railing-MS/GI, Puddle Pipes –

MS/uPVC

Painting : As required

Quantity : Lot

Page 12: Starch Industry Effluent Treatment Plant

12

4.2. MECHANICAL UNITS

1. BAR SCREEN

Type : Manual

MOC : SS304

Size : Suitable to Civil Unit

Quantity : One No.

Application : Screening of floatable solids

Location : Screen Chamber

2. OIL & SCUM REMOVAL MECHANISM

Type : Semi Automatic & Scraping type

Rated Power : 0.5 HP

Quantity : One No.

Motorized trolley with four wheels anti friction bearing, travel to & fro on MS rails.

Having electrical limit switches on either side. Neoprene rubber skimmer plate.

Control panel consist of air break reversing contractors, timer etc. Push button cable,

flexible cable, drive consist of gear/ motor.

3. ET - EFFLUENT TRANSFER PUMP

Type : Centrifugal, Self priming

MOC : SS Internals with CI body

Capacity : 19 M3/Hr

Head : 10 Meters

Drive : 3.0 HP

Quantity : 2Nos (1 W + 1 S )

Application : For Effluent transfer to Buffer Tank

Location : At Equalization Tank

4. FLOATING MIXER

Type of mixer : Slow speed

Drive : 5 HP & 2 HP

MOC : SS

Quantity : Two Nos.

Application : For mixing

Location : At Equalization Tank &Buffer Tank

5. CHEMICAL DOSING SYSTEM

Type of tank : Cylindrical Vertical

MOC of tank : HDPE

Tank Capacity : 200 Liters

Page 13: Starch Industry Effluent Treatment Plant

13

Pump capacity : 0 to 30 LPH

MOC of pump internals : PP/SS

Quantity : Two Nos.

Application : For Neutralization

Location : Near Buffer Tank

6. UASB FEED PUMP

Type : Centrifugal, Self priming

MOC : SS Internals with CI body

Capacity : 19 M3/Hr

Head : 12 Meters

Drive : 3.0 HP

Quantity : 2Nos (1 W + 1 S )

Application : Effluent Feed to UASB

Location : At UASB Reactor

7. GLS SYSTEM

Application : Gas Liquid, Solids separation

Location : UASB Reactor top

MOC : MS-FRP/MS-PU coating

Quantity : One Lot

8. UASB FEED DISTRIBUTION GRID

Type : Perforated, Piping distribution for effluent

MOC : uPVC

Quantity : One Lot

9. BIO FILLS

Location : Medium for Bacterial attachment due to

contact time of bacteria & effluent increases.

MOC : PVC

Specific Surface Area : 93 M2 / M

3

Void Ratio ( M2 / M

3 ) More than 97 %

Thickness 0.6 mm & 0.3 mm

Standard Dimensions 1200x 600 x 600 mm

Max. width of support 100 / 50 mm

Dry weight 20 kg / m3

Quantity Lot

10. BIO-TOWERS DISTRIBUTION GRID

Type : Perforated, Piping distribution for effluent

MOC : uPVC

Page 14: Starch Industry Effluent Treatment Plant

14

Quantity : One Lot

11. BIO TOWERS RECYCLING PUMP

Type : Self priming , Centrifugal, non-clog, Semi-open

impeller

Capacity : 54 M3/Hr X 10 M Head

Drive : 5.0 HP (each) motor, 3 phase, 2900 rpm,

TEFC class ‘F’ insulation with IPP 55

protection, weather proof.

MOC : CI

Accessories : Fabricated MS base-plate, coupling guard ,

foundation bolts etc.

Quantity : Four Nos ( 2 W + 2 Sb)

12. AIR BLOWERS

Type : Twin lobe, Roots

Media Handled : Air

Air Flow : 450 M3/hr.

Delivery Pressure : 0.45 kg/cm2

Duty : Continuous

Cooling : Air Cooled

Motor HP : 15

Accessories : All accessories as per requirement

Quantity : Three Nos.(2W+1Sb)

Application : Providing air

Location : Near Aeration Tank

13. AIR DIFFUSERS & GRID

Type : Fine membrane type air diffuser

MOC : EPDM

Size : 67mm OD x 2000 mm length

Air flow-Max. : 16 M3/Hr.

Quantity : Lot

Application : Transferring the Oxygen to water in fine

bubbles.

Grid MOC : uPVC

Location : At Aeration Tank

14. SECONDARY CLARIFIER MECHANISM

Application : To scrap the settled sludge at the bottom of

clarifier & to collect sludge in center chamber.

Location : At Secondary Clarifier.

Page 15: Starch Industry Effluent Treatment Plant

15

Size : Suitable to civil unit.

Access Bridge : The full span structural bridge with 1000 mm

width at center & 5 mm thick chequered plate

up to full length, with hand railing.

Motor : 0.5 H.P

Drive : Centre drive

Gear Box & Motor : Elicon /Crompton /Siemens

Scraping : MS – epoxy painted the center pipe having

two scraper arms with neoprene rubber

squeegees. The floor is scraped twice in

revaluation to collect sludge at the center.

Turn buckles to be provided with central shaft

for adjustment of scrapper slope.

Feed well

: MS-epoxy painted feed well, supported from

the bridge, with baffle plate.

Painting : All wetted parts will have one coat of epoxy

primer & two coats of epoxy paints. Above

water parts will have two coats of synthetic

enamel paint.

Quantity : One no.

15. BIO SLUDGE RECYCLING PUMP

Type : Self priming , Centrifugal, non-clog, Semi-open

impeller

Capacity : 19 M3/Hr X 10 M Head

Drive : 3.0 HP (each) motor, 3 phase, 2900 rpm,

TEFC class ‘F’ insulation with IPP 55

protection, weather proof.

MOC : CI

Accessories : Fabricated MS base-plate, coupling guard ,

foundation bolts etc.

Quantity : Two Nos ( 1 W + 1 Sb)

16. CHLORINE DOSING SYSTEM

Type of tank : Cylindrical, Vertical

MOC of tank : HDPE

Tank Capacity : 200 Liters

Quantity : One No.

Pump capacity : 0 to 10 LPH

MOC of pump : PP/SS

Quantity : One No.

Application : For Disinfection

Location : Near Chlorine Contact Tank

Page 16: Starch Industry Effluent Treatment Plant

16

17. FILTER FEED PUMP

Type : Monoblock, Centrifugal

MOC : CI

Capacity : 22.5 M3/Hr

Head : 30 Meters

Drive : 5.0 HP

Quantity : 2 Nos (1 W + 1 S )

Application : Feed to Dual Media Filter

Location : Chlorine Contact Tank

18. DUAL MEDIA FILTER

Type : Vertical ,Cylindrical

MOC : MSEP

Feed Flow : 22.5 M3/Hr.

Size : Suitable

Media : Sand, Pebbles, Gravel, Anthracite

Quantity : One No.

Application : Removal of SS

Location : After Chlorine Contact Tank

19. ACTIVATED CARBON FILTER

Type : Vertical ,Cylindrical

MOC : MSEP

Feed Flow : 22.5 M3/Hr.

Size : Suitable

Media : Carbon

Quantity : One No.

Application : Removal of odor/color

Location : After DMF

4.3. PIPING & FITTNGS

1. INTER CONNECTING PIPING & FITTINGS

MOC : MS-C class – Pressure Lines / Above Water

Lines

uPVC-10Kg Pressure for Gravity Lines / Air Lines

/ Below Water Lines.

Painting : External protection for MS piping

Size : As required

Fittings : As required

Valves : Diaphragm/Butterfly

Quantity : Lot

Page 17: Starch Industry Effluent Treatment Plant

17

4.4. ELECTRICAL WORKS

1. MCC PANEL

Type : Compartmental

MOC : 14 swg / 16 swg CRCA sheet

Painting : Painting and surface coating as required.

Size : As per design

Mounting : Floor mounting, cable entry at bottom/top with

back access

Incomer with : Ammeter, Volt meter, Digital type energy

meter

Quantity : One No.

2. ELECTRICAL CABLING

Type : Armored

MOC : Copper/Al

Size : As per design-suitable capacity

Quantity : One lot

3. EARTHING

Type : Wire/flat

MOC : GI wire/Flat,CU Plate

Quantity : One Lot

4.5. INSTRUMENTATION & SAFETY DEVICES

1. PRESSURE GAUGE

Location : Delivery side of pump

Application : Measure pressure of liquid

Make : Wika / H-Guru

Type : Dial /Bourdan

Dial Size : Suitable

Range : 0 to 4 kg / cm2

Quantity : Lot

2. LIQUID FLOW METER

Type : Electromagnetic

Application : To measure the flow

Page 18: Starch Industry Effluent Treatment Plant

18

Flow range : 0 to 20 M3/Hr

Qty. : One No.

3. FLAME ARRESTOR

Quantity : Two Nos.

Application : To arrest flames

Location : Gas pipeline

Size : Suitable as per design

MOC : MS/SS

4. MOISTURE TRAP

Quantity : Two Nos.

Application : To trap the moisture

Location : Gas pipeline

MOC : MS epoxy

Size : Suitable as per design

Drain valve : To be provided

Process medium : Biogas

5. PRESSURE RELIEF VALVE

Quantity : Two Nos

Application : To relieve pressure

Location : Top of the Digester

Size : Suitable

MOC : CI

6. GAS FLARE STACK

Quantity : One No.

Application : To flare the biogas

Location : At one corner of ETP plant

MOC : MS-EP Basin with MS – C and SS pipe as flare

Size : Suitable as per design

Ignition System : Manual

Page 19: Starch Industry Effluent Treatment Plant

19

4.6. OPTIONAL UNITS/ EQUIPMENTS

1. GAS HOLDER

Quantity : One No.

Size : Suitable

Application : To store the gas

Location : Near Digester

MOC : MS & RCC

2. GAS FLOW METER

Quantity : One No.

Flow : 200 M3/Hr.

Location : Feed to Boiler

3. GAS BLOWERS

Quantity : Two Nos. (1W+1Sb)

Medium Handled : Biogas

Gas Flow : 200 M3/hr.

Duty : Continuous

Page 20: Starch Industry Effluent Treatment Plant

20

SECTION -V

5.0. ELECTRICAL LOAD LIST

SR.NO. UNIT / EQUIPMENT QTY. WORKING LOAD

HP

STAND BY LOAD

HP

1. Oil & Scum Mechanism One No. 0.5

2. ET - Effluent Transfer Pump Two Nos. 3.0 3.0

3. Floating Mixer-ET One No. 5.0

4. Floating Mixer-BT One No. 2.0

5. Chemical Dosing System Two Nos. 1.0

6. UASB Feed Pump Two Nos. 3.0 3.0

7. BT Recycling Pump Four Nos. 10.0 10.0

8. Air Blower Three Nos. 30 15

9. SC Mechanism One No. 0.5

10. Bio-sludge Recycling Pump Two Nos. 3.0 3.0

11. Chlorine Dosing System One No. 0.5

12. Filter Feed Pump Two Nos. 5.0 5.0

Total Working Load HP 63.5 HP ( 47.63 KW)

Page 21: Starch Industry Effluent Treatment Plant

21

SECTION -VI

6.0 PERFORMANCE ON THE BASIS OF BOD

6.1. RAW EFFLUENT CHARACTERISTICS

PARAMETER UNIT VALUE

BOD Mg/lt. 20500

6.2. TREATED EFFLUENT CHARACTERISTICS

PARAMETER UNIT VALUE

BOD Mg/lt. < 100

6.3. STAGE WISE REDUCTION OF BOD

S. No. Treatment System BOD

% Reduction Mg/Lt.

Outlet

1 Raw Effluent -- 20500

a UASB Treatment

85 3075

b Aerobic Treatment

BT System

70 923

c Aerobic Treatment

ASP System

95 47

d Tertiary system - <30

Page 22: Starch Industry Effluent Treatment Plant

22

SECTION -VII

7.0. LIST OF STANDARD MAKES

UNIT/ EQUIPMENT

MAKES

Fabricated items SAI

Air Diffusers Rehau ,Germany / SSI-USA/Nipon

Air Blower Everest /Kay/KPT/Usha

Motors Crompton/Siemens/Kirloskar

Effluent Pumps Johnson /Kirloskar

Dosing System SR Metering / E-Dose/Positive Metering

Piping uPVC- Supreme/Finolex/MS-Zindal/TATA

Biofills Cool deck / MM Aqua/ Equivalent

Panel Components Siemens / L & T/Schneider/Equivalent

Cables Fine cab/Polycab

Pressure Gauges H Guru/Waree

Level Switches Techtrol/Fisher

Flow meter Forbes Marshall /E & H

Valves Intervalve/ Omkar/BDK/Equivalent

Page 23: Starch Industry Effluent Treatment Plant

23

SECTION -VIII

8.0. SCHEDULE OF EXCLUSIONS

• Plant/Area Lighting.

• Unloading of the equipments at your factory and transportation to the ETP Site/ Area.

• All consumable oil, grease, chemicals for testing and commissioning.

• Charging of electric panel. Wiring, lighting and other fixtures in panel room./sheds

• All apparatus, chemicals, materials and other necessary equipment required for

laboratory for analysis.

• Arrangements to bring the influent up to the battery limits of the treatment plant as

well as the treated effluent from the treatment plant to the final discharge.

• Water, electricity and other utilities at one centre point of ETP for Erection, Fabrication,

Testing and Commissioning.

• Water pipeline arrangement for dosing systems

• Skilled or unskilled Manpower, Tools & tackles, Operators, Chemicals, Oil & grease,

Nutrients and bacterial culture (cow dung) etc. required at the time of testing &

commissioning.

• Approach Roads, Internal Roads, Green belt development, Plant lighting, Security cabin,

Boundary walls, Fencing, Gate and other infrastructure facilities inside and outside the

ETP area

• Unloading, Safe Storage for our equipments

• Instrument air /Compressed air

• All utilities / consumables like chemicals, spares, steam, power, water as required to ETP

as per process requirement to be arranged to battery limit of the units/equipments

Page 24: Starch Industry Effluent Treatment Plant

24

• All civil related works, tanks, foundations, cable trenches, piping support pedestals,

earth pits, earthing, Structural Design & drgs etc.(If civil construction work excluded

from our scope)

• Any change in flow & characteristics of effluent.

• Any supply which is not specifically mentioned as part of our offer.

Page 25: Starch Industry Effluent Treatment Plant

25

SECTION - IX

9.0 TERMINATION POINTS

• Inlet to First Unit Bar Screen Chamber

• Outlet from Last Unit-ACF

• Sludge from Sludge Drying Beds

• Power supply & charging our supplied ETP panel

Page 26: Starch Industry Effluent Treatment Plant

26

SECTION -X

10.0. PROJECT SCHEDULE -BAR CHART

Specific Confirmation on project execution schedule.

Time period provided to execute the proposed ETP is 150 days. This ETP project involves

different types of engineering activities with civil, mechanical and electrical works etc.

PROJECT EXECUTION PLAN

WORK OF ETP

TIME PERIOD

Site survey ,design drawings, approval etc. 30 Days

Civil Works

90 Days

Mechanical units/ equipments Delivery at

site

Erection of ETP

30 Days

Total –ETP Ready to commission

150 Days

Page 27: Starch Industry Effluent Treatment Plant

27

SECTION -XI

11.0. PRICE, TERMS & CONDITIONS

PRICE : Price for Design, Detailed Engineering, Construction, Supply,

Erection, Testing & Commissioning of 450KLD Effluent Treatment

Plant as per the scope and specifications mentioned in our offer

on turnkey basis shall be:

- Civil Works : Rs.1,33,75,000/-

- Electro-mechanical Supplies : Rs. 1,36,85,000/-

- Service Jobs : Rs. 7,50,000/-

P&F : @ 2%

FREIGHT : Extra to be paid by client at actual

TAXES : VAT and Service tax extra as applicable at the time of billing.

INSURANCE : 0.5%

PAYMENT : 30 % as advance along with Purchase Order

10 % against drawings approval

55 % and applicable taxes against profarma invoice on prorata

basis for Electro-mechanical equipments and against RA bills for

Civil works- as per submitted billing schedule.

5% after commissioning of ETP or 60 days from the last date of

major supply at site.

DELIVERY : The delivery period will be 150 days time from the date of

receipt of Purchase Order along with advance and clear site to

start work.

VALIDITYOF : 30 days.

OFFER

WARRANTY : Mechanical:

Page 28: Starch Industry Effluent Treatment Plant

28

12 Months from the date of testing or 15 months from the date of

last major supply at site whichever is earlier for any

manufacturing defects. Defect will be rectified. Not applicable for

normal wear and tear.

Process:

12 Months from the date of process commissioning

ERECTION & :

COMMISSIONING Suitable lodging, boarding and local conveyance to our engineers

to be provided for two persons.

FORCE MAJEURE : As applicable

EXTRA WORK : Any work not included as a part of our offer or scope shall be

deemed extra. Such works can be done by SEEPL with extra cost

with mutual agreement & understanding.

GENERAL : Any condition not specifically included could be discussed

and mutually agreed upon.

GENERAL TERMS AND CONDITIONS:

DELAY IN COMPLETION:

If the completion work is delayed beyond the contractual value date for reasons under your

control as listed out hereunder but not limited to them, we shall be entitled to suitable

readjustment in the period of completion by mutual consent and the contract will stand

amended to that extent.

a) Delay in approval of drawings/ specifications beyond a period of 7 days

from the date of submission by us.

b) Delay in inspection beyond the appointed date or delay in approval of

test certificates, whenever required, beyond a period of 7 days from the

date of submission by us.

c) Delay in release of dispatch clearance or hold up of work due to your

specific instructions or lack of instruction.

d) Delay in release of advance or progress payments due to us beyond 7

days from the date of bill submission.

e) Delay in arranging manpower, power, effluent, analysis, and water etc as

and when required.

f) Delay attributable to force Majeure conditions, more particularly detailed

under appropriate clause hereunder.

Page 29: Starch Industry Effluent Treatment Plant

29

ERECTION &COMMISSIONING:

It will be the responsibility of the purchaser to make all the arrangements and provide all

facilities and materials for carrying out erection and pre-commissioning test, before the date of

readiness for such tests as intimated by us. In the event of delay on the part of purchaser in

making these arrangements including operators, water, power, effluent, analysis as per design

basis and consequent delay in erection or commissioning of equipment/ system, the purchaser

will release all such payment, which could have been due to us on erection/commissioning of

equipment/system. Any delay from client for arranging required facilities/materials more than

four weeks from the last major equipment supplied to site, client ahs to release all dues

against erection and commissioning to us.

OPERATING PERSONNEL

The purchaser will ensure that his operating personnel is made available before pre

commissioning to enable them witness all commissioning test and satisfy themselves about all

guarantee parameters.

ORDER CANCELLATION

The purchaser cannot cancel the purchase order without taking written consent from the

Supplier/contractor. For any reason order is cancelled by purchaser advance will be forfeited

and if there is any losses arises due to procurement or work progress at site suitable

compensation to be done by Purchaser.

PAYMENTS

The purchaser will ensure that payments released as per purchase order. Any delay is payments

against submitted bills or work progress Purchaser has to pay @18% interest on unsettled bill

amount on daily calculation basis.

DELAY

For any reason attributed to the Purchaser project delays more than three months from the

date of completion as per the purchase order, mainly due to delay in civil works or delay in

giving clearance for supplies or location finalization etc. Purchaser should amend and

compensate @ 1% increment on Total Price of the Purchase Order for every one month delay

to compensate the price escalations and overheads .

ACCEPTANCE OF THE TREATMENT PLANT

In case the plant is not commissioned after the supply within a period of 30 days due to the

non-availability of Effluent or any other reason. Whatsoever, the plant will be deemed as

successfully commissioned.

Page 30: Starch Industry Effluent Treatment Plant

30

WAREHOUSING CHARGES

Should dispatches be delayed on our purchaser’s instructions or any other reason attributable

to purchaser, warehousing expenses shall be payable by the purchaser @ 2% of the

consignment value per month of part thereof.

EXCESS MATERIAL

Since we shall be sending to site a number of items in spare for smooth and uninterrupted

construction, erection and commissioning, such items which remain unused, will be our

property and will be removed by us as and when required.

PRICE BASIS & ESCALATIONS

Our commercial offer is based on present (the date of offer) market rate pricing for Steel,

Cement, Sand, Metal, Labor rates, Piping and electricals, Diesel etc. For any reason major

fluctuations or changes on any particular or total items change of price may impact the project.

Our price will be firm for the committed delivery period however any change due to the delay

of the project attributed to you to be compensating suitably with mutual understanding.

Any changes/amendments related to all taxes, duties and statutory requirements etc. area

applicable at actual at the time of billing.

Our technical offer and commercial offer with all terms, conditions etc should be part of the

Purchase order.