standar costing

49
STANDARD COSTING A MANAGERIAL TOOL

Upload: muwachchidatul-ummah

Post on 30-Dec-2014

237 views

Category:

Documents


15 download

DESCRIPTION

akuntansi biaya

TRANSCRIPT

Page 1: Standar Costing

STANDARD COSTING

A MANAGERIAL TOOL

Page 2: Standar Costing

TUJUAN PEMBELAJARAN

MAHASISWA MEMAHAMI MENGAPA STANDAR COST DIPERLUKAN

MAHASISWA MAMPU MENYUSUN STANDAR COST

MAHASISWA MELAKUKAN ANALISIS VARIAN DAN MENGGUNAKAN ANALISIS TERSEBUT UNTUK KEBUTUHAN MANAJERIAL

MAHASISWA MAMPU MELAKUKAN PENJURNALAN MENGGUNAKAN STANDAR COSTING

2

Page 3: Standar Costing

MENGAPA STANDARD COSTING DIPERLUKAN?

Sistem Biaya Standar merupakan alat bantu mananajerial dalam perencanaan dan pengendalian sehingga bisa memudahkan pengukuran kinerjamembandingkan antara realisasi dengan standar ---

Sistem biaya standar merupakan alat untuk menentukan biaya suatu produk

3

Page 4: Standar Costing

KELEMAHAN STANDARD COSTING

Tidak cocok dengan perusahaan yg mengadopsi sistem JIT karena manajer akan melakukan pembelian per paket untuk memperoleh diskon harga yang banyak (utk memperoleh harga aktual yang lebih murah) Padahal JIT tidak menghendaki persediaan yang banyak

4

Page 5: Standar Costing

Direct DirectMaterials Labor Overhead

Actual costing system Actual Actual Actual

Normal costing system Actual Actual Applied

Standard costing system Standard Standard Standard

Manufacturing Costs

5

Page 6: Standar Costing

Bagaimana menyusun standard cost?

UNTUK MERAKIT SEBUAH KOMPUTER

Sparepart apa yg dibutuhkan

Berapa unit spaperpart ygdibutuhkan?

Berapa harga masing2

sparepart?

SpesifikasiKomputer yg bagaimana?

KUALITAS

6

Page 7: Standar Costing

Spec. Price Spec. PriceProcessor Intel Pentium 4 2.66 GHz 1.050.000Rp Intel Pentium 4 3.0E Hyper Tech. 1.300.000Rp

MotherBoard Gigabyte 818565 P 600.000Rp Intel D865 PERL 750.000Rp Hardisk Seagate ATA 40 Gb 7200 rpm 500.000Rp Seagate SATA 80 Gb 7200 rpm 650.000Rp Memory Visipro DDR 256 Mb PC 3200 252.000Rp Visipro DDR 512 Mb PC 3200 312.000Rp

VGA NVDIA VANTA 32 Mb 196.000Rp GeForce 64 Mb 440MX 8x 256.000Rp CDRW Lite-On 52x32x52 275.000Rp ASUS 52x32x52 285.000Rp FDD Panasonic FDD 1.44 Mb 75.000Rp Panasonic FDD 1.44 Mb 75.000Rp

Monitor SAMSUNG 517 '15 800.000Rp Philips 17" 109 PURE FLAT 1.500.000Rp Keyboard Keybord Multimedia 45.000Rp Keybord Multimedia 45.000Rp Mouse Optical Mouse PS/2 + Mouse Pad 45.000Rp Optical Mouse PS/2 Logitech 55.000Rp Casing MENTARI ATX 350w, front USB 175.000Rp Casing SP 350W, 4 fan, front USB 250.000Rp Speaker Speaker Active-TURION 100.000Rp Speaker Simbadda CSTZ500 sub-woofer 175.000Rp

Modem/LAN Ethernet Card D-Link 10/100 560.000Rp Ethernet Card D-Link 10/100 560.000Rp Stavolt Stavolt Motor 500VA KENIKA 156.000Rp Stavolt Motor 500VA KENIKA 156.000Rp Meja Meja Komputer Aztec 101 (90 cm) 75.000Rp Meja Komputer Aztec 1201 (120 cm) 110.000Rp

4.904.000Rp 6.479.000Rp

KOMP TIPE X TIPE Z

HARGA DAN SPESIFIKASI PC

7

Page 8: Standar Costing

PENGGUNAAN BIAYA STANDAR

CONTOH :

PRODUK KERIPIK JAGUNG

Page 9: Standar Costing

Standard Cost Sheet untuk Keripik Jagung

Standard Standard StandardPrice Usage Cost SubtotalDescription

Bahan Baku:Jagung Kuning $0.006 18 oz. $0.108Minyak 0.031 2 oz. 0.062Garam 0.005 1 oz. 0.005Jeruk Limau 0.400 0.01 oz. 0.004Bungkus 0.044 1 bag. 0.044

Total Bahan Baku $0.223

9

Page 10: Standar Costing

Standard Cost Sheet untuk Keripik Jagung

Standard Standard StandardPrice Usage Cost SubtotalDescription

Bahan Baku $0.223Tenaga Kerja Langsung:

Pengawas $7 /jam 0.0070 hr. $0.049Operator Mesin $10 /jam 0.0008 hr. 0.008

Total direct labor 0.057Overhead:

Variable overhead 3.850 0.078 hr. $0.030Fixed overhead 32.050 0.0078 hr. 0.250

Total biaya overhead 0.280Total Biaya Standar per Unit (bungkus) $0.560

10

Page 11: Standar Costing

Pada minggu pertama bulan Maret, diproduksi 100.000 bungkus keripik jagung

Pada minggu pertama bulan Maret, diproduksi 100.000 bungkus keripik jagung

11

Page 12: Standar Costing

PERHITUNGAN STANDAR KUANTITAS

Nama Bahan

Unit Produksi (bungkus) SPB

Satuan SPB

Pemakaian Bahan Satuan

Jagung Kuning 100.000 18 ons 1.800.000 ons

Minyak 2 ons 200.000 ons

Garam 1 ons 100.000 ons

Jeruk Limau 0,01 ons 1.000 ons

Bungkus 1 bungkus 100.000 bungkus

Nama Bahan

Unit Produksi (bungkus)

SUR (per jam)

JKL Standar Satuan

Pengawas 100.000 0,0070 700 jam

Operator Mesin 0,0008 80 jam

KEBUTUHAN BAHAN STANDARuntuk Maret Minggu Pertama

KEBUTUHAN jam kerja STANDAR

untuk Maret Minggu Pertama

12

Page 13: Standar Costing

ANALISIS VARIAN

Penggunaan Standar untuk Kebutuhan Managerial

Page 14: Standar Costing

Varian Total = Varian Harga + Varian Kuantitas

= (AP – SP)AQ + (AQ – SQ)SP

= [(AP x AQ) – (SP x AQ)]

+ [(SP x AQ) – (SP x SQ)]

= (AP x AQ) – (SP x AQ)]

+ (SP x AQ) – (SP x SQ)= (AP x AQ) – (SP x SQ)

RUMUS VARIAN UMUM

14

Page 15: Standar Costing

Variance Analysis: Deskripsi Umum

1. AP x AQ 1. AP x AQ (Actual Quantity (Actual Quantity of Input of Input xx Actual Actual Price)Price)

2. SP x AQ (Actual Quantity of Input x Standard Price)

3. SP x SQ 3. SP x SQ (Standard (Standard Quantity of Input Quantity of Input xx Standard Price) Standard Price)

Price Variance Price Variance (1-2)(1-2)

Budget Variance (1-3)

Usage Usage Variance (2-3)Variance (2-3)

15

Page 16: Standar Costing

Varian yang menguntungkan (v) adalah sebaliknya

Varian yang menguntungkan (v) adalah sebaliknya

Varian tidak menguntungkan (u.v) terjadi pada saat harga aktual atau kuantitas

aktual lebih besar daripada harga/kuantitas

standarnya

Varian tidak menguntungkan (u.v) terjadi pada saat harga aktual atau kuantitas

aktual lebih besar daripada harga/kuantitas

standarnya

16

Page 17: Standar Costing

Cost

Time

$110,000

$100,000

$ 90,000

x

x

x

x

x

x

Untuk menoleransi varians

Batas atas

Batas bawah

standar

17

Page 18: Standar Costing

CONTOH PERHITUNGAN VARIAN

18

Page 19: Standar Costing

Analisis VarianAnalisis Varian: : Bahan Baku dan TKLBahan Baku dan TKLAnalisis VarianAnalisis Varian: : Bahan Baku dan TKLBahan Baku dan TKL

Produksi Aktual 48.500 bungkus kripik jagung

Biaya Aktual-jagung 780.000 ons x $0.0069 = $5.382

Biaya Inspeksi aktual 360 jam x $7,35 = $2.646

Biaya AktualBiaya Aktual Anggaran Anggaran Total VarianceTotal Variance

Corn $5.382,00 $5.238,00 $144,00 U

Inspection labor 2.646,00 2.376,50 269,50 U

19

Page 20: Standar Costing

$558 F$558 F Varian KuantiasVarian Kuantias

$702 U$702 UVarian HargaVarian Harga

$144 U$144 UVarian TotalVarian Total

VARIAN BAHAN BAKU

AQ x AP AQ x AP 780780..000 x 0000 x 0,,0069 0069 $5$5..382382

AQ x SPAQ x SP780780..000 x $.0000 x $.0,,00600060$4$4..680680

SQ x SP873.000 x $0,0060$5.238

20

Page 21: Standar Costing

MPV = (AP – SP)AQ

Material Price VarianceMaterial Price VarianceMaterial Price VarianceMaterial Price Variance

Harga Aktual Harga Aktual per uniper uni

Harga Standar Harga Standar per unitper unit

Kuantitas Kuantitas Aktual yg Aktual yg digunakandigunakan

21

Page 22: Standar Costing

MPV = (AP – SP)AQ

Material Price VarianceMaterial Price VarianceMaterial Price VarianceMaterial Price Variance

= ($0,0069 – $0,0060)780.000

= $0,0009 x 780.000

= $702 U

Percent of SP x SQ = $702/$4.680 = 15%Percent of SP x SQ = $702/$4.680 = 15%

22

Page 23: Standar Costing

Direct Materials Usage VarianceDirect Materials Usage VarianceDirect Materials Usage VarianceDirect Materials Usage Variance

MUV = (AQ – SQ)SP

Kuantitas Kuantitas Aktual Bahan Aktual Bahan yg Digunakanyg Digunakan

Standar Standar kuantitas bahankuantitas bahan

Harga standar Harga standar per unit inputper unit input

23

Page 24: Standar Costing

MUV = (AQ – SQ)SP

Direct Materials Usage VarianceDirect Materials Usage VarianceDirect Materials Usage VarianceDirect Materials Usage Variance

= (780.000 – 873.000)($0,006)

= 93.000 x $0,006

= $558 F

Percent of SQ x SP = $558/$5.238 = 10.7%

24

Page 25: Standar Costing

LRV = (AR – SR)AH

Tarif upah aktual

Tarif upah standar

Jumlah Jam Aktual yg digunakan

Labor Rate VariancesLabor Rate Variances Labor Rate VariancesLabor Rate Variances

25

Page 26: Standar Costing

Labor Rate VariancesLabor Rate Variances Labor Rate VariancesLabor Rate Variances

LRV = (AR – SR)AH = ($7,35 – $7,00)360

= $0,35 x 360

= $126 U

Percent of SR x SH = $126/$2.520 = 5%

26

Page 27: Standar Costing

$269$269,,5 U5 UVarian TotalVarian Total

VARIAN TENAGA KERJA

AH x AR 360 x $735 $2.646

AH x SRAH x SR360 x $7360 x $7$2$2..520520

SH x SRSH x SR339339,,5 x $75 x $7$2$2..376376,,55

$126 U$126 UVarian TarifVarian Tarif

$143,5 UVarian Efisiensi

27

Page 28: Standar Costing

LEV = (AH – SH) SR

Jam aktual yg digunakanJam standar yg

seharusnya digunakan

Tarif standar/jam

Labor Efficiency VariancesLabor Efficiency Variances Labor Efficiency VariancesLabor Efficiency Variances

28

Page 29: Standar Costing

Labor Efficiency VariancesLabor Efficiency Variances Labor Efficiency VariancesLabor Efficiency Variances

LEV = (AH – SH)SR = (360 – 339,5)$7

= 20,5 x $7

= $143,5 U

Percent of SH x SR = $143,5/$2.376,5 = 6%

29

Page 30: Standar Costing

VARIAN BIAYA OVERHEAD VARIABEL

Tarif overhead variabel (standar) $3,85/DLH

Biaya overhead aktual $1.600

Jam kerja aktual 400

Keripik jagung yg diproduksi 48.500

Jam kerja yg diperkenankan utk produksi 378,3a

Applied variable overhead $1.456b

a 0,0078 x 48.500

b $3,85 x 378,3 (dibulatkan)

30

Page 31: Standar Costing

$144 U$144 UVarian TotalVarian Total

$84 U$84 UVarian EfisiensiVarian Efisiensi

$60 U$60 USpending Spending VarianceVariance

Varian Overhead Variabel

VOVO aktual aktual$1$1..600600

Tari Tari VO x VO x Jam Jam AktualAktual$1$1..540540

Tarif VO x Jam Standar$1.456

31

Page 32: Standar Costing

VOSV = (AVOR x AH) – (SVOR x AH)

Variable Overhead Variable Overhead Spending VariancesSpending Variances

Variable Overhead Variable Overhead Spending VariancesSpending Variances

= (AVOR – SVOR)AH

= ($4 – $3,85)400

= $60 U

32

Page 33: Standar Costing

Crunch Chips, Inc.Crunch Chips, Inc.Laporan Kinerja Anggaran FleksibelLaporan Kinerja Anggaran Fleksibel

Untuk Minggu yang berakhir 8Untuk Minggu yang berakhir 8 Maret Maret 20042004

Cost Cost FormulaFormula

Actual Actual CostsCosts BudgetBudget

Spending Spending VarianceVariance

Gas $3,00 $1.190 $1.200 $10 F

Listrik 0,78 385 312 73 U

Air 0,07 25 28 3 F

Biaya Total $3,85 $1,600 $1,540 $60 U

33

Page 34: Standar Costing

VOEV = (AH x SVOR) – (SH x SVOR)

Variable Overhead Variable Overhead EfficiencyEfficiency Variances Variances

Variable Overhead Variable Overhead EfficiencyEfficiency Variances Variances

= (AH – SH)SVOR

= (400 – 378,3)$3,85

= $84 U

34

Page 35: Standar Costing

Crunch Chips, Inc.LAPORAN KINERJA

Untuk minggu yang berakhir 8 Maret 2004

Cost Cost FormulaFormulaaa

Actual Actual CostsCosts BudgetBudget

Spending Spending Variance Variance bb

Gas $3,00 $1.190 $1.200 $10 F

Listrik 0,78 385 312 73 U

Air 0,07 25 28 3 F

Total cost $3,85 $1.600 $1.540 $60 U

Budget Budget untukuntuk Jam Jam Standar Standar cc Varian Varian

Efisiensi Efisiensi dd

$1.135 $65 U

295 17 U

26 2 U

$1.456 $84 U

a per JKL

b biaya aktual – budget utk jam aktual

c rumus biaya x jam standar (378,3 jam)—dibulatkan

d budget utk jam aktual – budget utk jam standar 35

Page 36: Standar Costing

VARIAN OVERHEAD TETAP

36

Page 37: Standar Costing

PEMILIHAN KAPASITAS

KAPASITAS TEORITIS Kapasitas produksi penuh tanpa interupsi (100%)

KAPASITAS PRAKTIS Kapasitas yang memberikan kelonggaran karena perbaikan, istirahat, pemeliharaan (biasanya berkisar 75%)

KAPASITAS AKTUAL YG DIPERKIRAKAN (applied) mengacu pada jumlah output yg diperkirakan (tarif standar x output)

KAPASITAS NORMAL Kapasitas rata-rata dari beberapa periode waktu aktivitas

37

Page 38: Standar Costing

Fixed Overhead Variances

FOH Tetap dianggarkan $749.970

Kapasitas praktis 23.400 direct labor hours

Standar tarif biaya overhead $32,05

Jam kerja yg diperkenankan utk produksi 3.000.000 bungkus kripik jagung: 0.0078 x 3.000.000 = $23.400

Budgeted or Planned Items

Actual Results

Produksi Aktual 2.750.000 bungkus

Biaya overhead aktual $749.000

Jam kerja yg diperkenankan utk produksi aktual 21.450

38

Page 39: Standar Costing

Total Fixed Overhead Variances

FOH Tetap Applied

Standard fixed overhead rate x Standard hours

=

= $32,05 x 21.450

= $687.473 (dibulatkan)

Total fixed overhead variance

$749.000 – $687.473=

= $61.527 underapplied

39

Page 40: Standar Costing

$61$61..527 U527 UVarian TotalVarian Total

$970 F$970 FSpending Spending VarianceVariance

Varian Overhead Tetap

FO Aktual$749.000

FOFO dianggarkan dianggarkan$749$749..970970

Applied FOApplied FO$687$687..473473

$62.497 UVarian

Volume

40

Page 41: Standar Costing

Crunch Chips, Inc.LAPORAN KINERJA

Untuk tahun yg berakhir 2004

Actual Actual CostsCosts

Budgeted Budgeted CostCost VarianceVariance

Penyusutan $530.000 $530.000 $ ----

Gaji 159.370 159.970 600 F

Pajak 50.500 50.000 500 U

Asuransi 9.130 10.000 870 F

Total fixed overhead $749.000 $749.970 $970 F

Fixed Fixed Overhead ItemsOverhead Items

41

Page 42: Standar Costing

Variance Volume

Volume variance = $32,05(23.400 – 21.450)

= ($32,05 x 23.400) – ($32,05 x 21.450)

= $749.970 – $687.473

= FOH Tetap dianggarkan – FOH Tetap applied

= $62.497 U

42

Page 43: Standar Costing

Appendix: Accounting for

Variances

43

Page 44: Standar Costing

Harga aktual jagung $0,0069 per ons dan harga standar $0,0060, dan dibeli

780.000 ons jagung.

Harga aktual jagung $0,0069 per ons dan harga standar $0,0060, dan dibeli

780.000 ons jagung.

The receiving report and the invoice are used to record the receipt of the

merchandise and to control the payment.

Materials Inventory 4 680 00

Materials Price Variance 702 00

Accounts Payable

5 382 00

Material Price VarianceMaterial Price VarianceMaterial Price VarianceMaterial Price Variance44

Page 45: Standar Costing

Selama periode ini 780.000 ons jagung dimasukkan ke produksi. Kuantitas

standar adalah 873.000 ons, dan harga standar adalah $0,006 per ons.

Selama periode ini 780.000 ons jagung dimasukkan ke produksi. Kuantitas

standar adalah 873.000 ons, dan harga standar adalah $0,006 per ons.

The receiving report and the invoice are used to record the receipt of the

merchandise and to control the payment.

Work in Process 5 238 00

Materials Usage Variance 558 00

Materials Inventory 4 680 00

Material Usage VarianceMaterial Usage VarianceMaterial Usage VarianceMaterial Usage Variance45

Page 46: Standar Costing

Selama periode ini, jam inspeksi yang digunakan adalah 360 jam, sedangkan

standar untuk produksi seharusnya adalah 339,5 jam. Tarif aktual adalah $7,35 per jam sedangkan tarif standar $7,00 per jam

Selama periode ini, jam inspeksi yang digunakan adalah 360 jam, sedangkan

standar untuk produksi seharusnya adalah 339,5 jam. Tarif aktual adalah $7,35 per jam sedangkan tarif standar $7,00 per jam

The receiving report and the invoice are used to record the receipt of the

merchandise and to control the payment.

Work in Process 2 376 00

Labor Efficiency Variance 143 50

Labor Rate Variance 126 00

Accrued Payroll

2 646 00

Labor VariancesLabor VariancesLabor VariancesLabor Variances46

Page 47: Standar Costing

Pada akhir periode, varian bahan baku dan tenaga kerja ditutup ke Harga Pokok

Penjualan.

Pada akhir periode, varian bahan baku dan tenaga kerja ditutup ke Harga Pokok

Penjualan.

The receiving report and the invoice are used to record the receipt of the

merchandise and to control the payment.

Cost of Goods Sold 971 50

Material Price Variance 702 00

Labor Efficiency Variance 143 50

Labor Rate Variance 126 00

Closing VariancesClosing VariancesClosing VariancesClosing Variances47

Page 48: Standar Costing

Pada akhir periode, varian bahan baku dan tenaga kerja ditutup ke Harga Pokok Penjualan.

Pada akhir periode, varian bahan baku dan tenaga kerja ditutup ke Harga Pokok Penjualan.

The receiving report and the invoice are used to record the receipt of the

merchandise and to control the payment.

Material Usage Variance 558 00

Cost of Goods Sold 558 00

Closing VariancesClosing VariancesClosing VariancesClosing Variances48

Page 49: Standar Costing

The EndThe EndThe EndThe End

49