ENGINEERS OF FLOW STACKER CRANES

Upload: dinhkhanh

Post on 16-Apr-2018

297 views

Category:

Documents


9 download

TRANSCRIPT

Page 1: STACKER CRANES - ltwusa.com · ENGINEERS OF FLOW STACKER CRANES STACKER CRANES - OVERVIEW Manual aisle-bound stacker stackercrane Manual -changing crane Automatic bound stacker

ENGINEERS OF FLOW

STACKER CRANES

Page 2: STACKER CRANES - ltwusa.com · ENGINEERS OF FLOW STACKER CRANES STACKER CRANES - OVERVIEW Manual aisle-bound stacker stackercrane Manual -changing crane Automatic bound stacker

ENGINEERS OF FLOW

• Installation height up to 45 m,

Payload up to 8,500 kg

• Temperaturerange – 30 °C to + 60 °C

• Handling of pallets, cases and specialized

handling

• Load handling device for every application

• Continuous control conception

• Energy efficient system control

• Approved and derailment-guarded

aisle-changing system

• Production according to ropeway

standards

FACTS

STACKER CRANES

Page 3: STACKER CRANES - ltwusa.com · ENGINEERS OF FLOW STACKER CRANES STACKER CRANES - OVERVIEW Manual aisle-bound stacker stackercrane Manual -changing crane Automatic bound stacker

ENGINEERS OF FLOW

STACKER CRANES

STACKER CRANES - OVERVIEW

Manual aisle-bound

stacker crane Manual aisle-changing

stacker crane

Automatic aisle-bound

stacker crane

Automatic aisle-changing

stacker crane

Page 4: STACKER CRANES - ltwusa.com · ENGINEERS OF FLOW STACKER CRANES STACKER CRANES - OVERVIEW Manual aisle-bound stacker stackercrane Manual -changing crane Automatic bound stacker

ENGINEERS OF FLOW

Speed

Driving max. 200 m/min Lifting max. 60 m/min

Acceleration

Driving max. 0.50 m/s2 Lifting max. 0.50 m/s2

Installation height max. 35 m Payload max. 2.5 t

Approach dimension

Bottom min. 500 mm Top min. 1,500 mm

(incl. goods height 1,250 mm)

MANUAL AISLE-BOUND

STACKER CRANES

Page 5: STACKER CRANES - ltwusa.com · ENGINEERS OF FLOW STACKER CRANES STACKER CRANES - OVERVIEW Manual aisle-bound stacker stackercrane Manual -changing crane Automatic bound stacker

ENGINEERS OF FLOW

Speed

Driving max. 180 m/min Lifting max. 60 m/min

Acceleration

Driving max. 0.5 m/s2 Lifting max. 0.5 m/s2

Installation height max. 35 m Payload max. 2.5 t

Approach dimension

Bottom min. 600 mm Top min. 1,600 mm

(incl. goods height 1,200 mm)

MANUAL AISLE-CHANGING

STACKER CRANES

Page 6: STACKER CRANES - ltwusa.com · ENGINEERS OF FLOW STACKER CRANES STACKER CRANES - OVERVIEW Manual aisle-bound stacker stackercrane Manual -changing crane Automatic bound stacker

ENGINEERS OF FLOW

Speed

Driving max. 300 m/min Lifting max. 100 m/min

Acceleration

Driving max. 1.2 m/s2 Lifting max. 1.0 m/s2

Installation height max. 45 m Payload max. 7 t

Approach dimension

Bottom min. 350 mm Top min. 1,500 mm

(incl. goods height 1,150 mm)

AUTOMATIC AISLE-BOUND

STACKER CRANES

Page 7: STACKER CRANES - ltwusa.com · ENGINEERS OF FLOW STACKER CRANES STACKER CRANES - OVERVIEW Manual aisle-bound stacker stackercrane Manual -changing crane Automatic bound stacker

ENGINEERS OF FLOW

Speed

Driving max. 200 m/min Lifting max. 100 m/min

Acceleration

Driving max. 0.7 m/s2 Lifting max. 1.0 m/s2

Installation height max. 40 m Payload max. 5 t

Approach dimension

Bottom min. 500 mm Top min. 1,600 mm

(incl. goods height 1,150 mm)

AUTOMATIC AISLE-CHANGING

STACKER CRANES

Page 8: STACKER CRANES - ltwusa.com · ENGINEERS OF FLOW STACKER CRANES STACKER CRANES - OVERVIEW Manual aisle-bound stacker stackercrane Manual -changing crane Automatic bound stacker

ENGINEERS OF FLOW

• Current entry for stacker cranes

via busbar system

• Buffer stops at the end of the aisle

• Top guard rail as L-profile

• Rail fastening system Gantrex

(Gantry connector block, adhesive anchor)

• Plastic component for silencing

• Fixing distance ≤ 1 m

RAIL SYSTEM S41

INCLUDING FASTENING

STACKER CRANES AISLE-BOUND

Page 9: STACKER CRANES - ltwusa.com · ENGINEERS OF FLOW STACKER CRANES STACKER CRANES - OVERVIEW Manual aisle-bound stacker stackercrane Manual -changing crane Automatic bound stacker

ENGINEERS OF FLOW

• Current entry for stacker cranes

via busbar system

• Top guard rail as U-profile

• Rail fastening with adhesive anchor

and shrink-free filling material

• Fixing distance ≤ 1 m

(U-Profile is fully casted)

• Derailment-guarded aisle-changing system

RAIL SYSTEM U-PROFILE

INCLUDING FASTENING

STACKER CRANES AISLE-CHANGING

Page 10: STACKER CRANES - ltwusa.com · ENGINEERS OF FLOW STACKER CRANES STACKER CRANES - OVERVIEW Manual aisle-bound stacker stackercrane Manual -changing crane Automatic bound stacker

ENGINEERS OF FLOW

• High level of flexibility in rail guidance

• Maintenance-free system

• No dead time until points are ready for use

• No complex construction –

no monitoring element

• Derailment-guarded system

• Boundless driving and lifting action during

aisle change

AISLE-CHANGING SYSTEM

STACKER CRANES AISLE-CHANGING

Page 11: STACKER CRANES - ltwusa.com · ENGINEERS OF FLOW STACKER CRANES STACKER CRANES - OVERVIEW Manual aisle-bound stacker stackercrane Manual -changing crane Automatic bound stacker

ENGINEERS OF FLOW

• Well-proven control

• Modular control structure

• Robust and dirt tolerant

• Error-proof and maintenance-free

• Very long product life cycle

• Remote maintenance

SIEMENS SIMATIC S7

STACKER CRANES CONTROL

Page 12: STACKER CRANES - ltwusa.com · ENGINEERS OF FLOW STACKER CRANES STACKER CRANES - OVERVIEW Manual aisle-bound stacker stackercrane Manual -changing crane Automatic bound stacker

ENGINEERS OF FLOW

• Type Siemens KTP, multilingual

Key Touch Panel

Key Touch Panel for cold storage

Touch Panel (optional)

• Serves as operating status displays

• Error indication in clear words

• Error acknowledgement

DISPLAY ELEMENTS

STACKER CRANES CONTROL

Page 13: STACKER CRANES - ltwusa.com · ENGINEERS OF FLOW STACKER CRANES STACKER CRANES - OVERVIEW Manual aisle-bound stacker stackercrane Manual -changing crane Automatic bound stacker

ENGINEERS OF FLOW

• Absolute distance measurement

• Operating temperature – 30 to + 60 °C

• Robust construction

• Low-end assembly

• Insensitive to contamination

• Easy replacement of the components

BAR CODE DISTANCE

MEASUREMENT

STACKER CRANES CONTROL

Page 14: STACKER CRANES - ltwusa.com · ENGINEERS OF FLOW STACKER CRANES STACKER CRANES - OVERVIEW Manual aisle-bound stacker stackercrane Manual -changing crane Automatic bound stacker

ENGINEERS OF FLOW

• Manual operation (seat, sit-stand chair)

CONTROL UNIT MANUAL

STACKER CRANES CONTROL

Page 15: STACKER CRANES - ltwusa.com · ENGINEERS OF FLOW STACKER CRANES STACKER CRANES - OVERVIEW Manual aisle-bound stacker stackercrane Manual -changing crane Automatic bound stacker

ENGINEERS OF FLOW

• Operation at control cabinet and on the

lifting unit

• Suitable for all temperatures

CONTROL UNIT AUTOMATIC

STACKER CRANES CONTROL

Page 16: STACKER CRANES - ltwusa.com · ENGINEERS OF FLOW STACKER CRANES STACKER CRANES - OVERVIEW Manual aisle-bound stacker stackercrane Manual -changing crane Automatic bound stacker

ENGINEERS OF FLOW

• Control Siemens S 7

Safety control

• Bus system Profinet DP

• Operation panel Siemens Key Touch Panel

• Distance

measurement Barcode positioning system

• Operation Joy stick

CONTROL CONCEPT

STACKER CRANES MANUAL

Page 17: STACKER CRANES - ltwusa.com · ENGINEERS OF FLOW STACKER CRANES STACKER CRANES - OVERVIEW Manual aisle-bound stacker stackercrane Manual -changing crane Automatic bound stacker

ENGINEERS OF FLOW

• Control Siemens S 7

Safety control

• Bus system Profinet DP

• Communication Network connection

TCP/IP

• Operation panel Siemens TP with

fully graphical display

• Distance

measurement Barcode positioning system

• Operation Automatic mode

CONTROL CONCEPT

STACKER CRANES AUTOMATIC

Page 18: STACKER CRANES - ltwusa.com · ENGINEERS OF FLOW STACKER CRANES STACKER CRANES - OVERVIEW Manual aisle-bound stacker stackercrane Manual -changing crane Automatic bound stacker

ENGINEERS OF FLOW

• Telescopic fork

• Rotary fork

• LTW shuttle

• Conveying elements

• Order picking equipment

• Customised equipment

CONSTRUCTIONS

LOAD HANDLING DEVICES

Page 19: STACKER CRANES - ltwusa.com · ENGINEERS OF FLOW STACKER CRANES STACKER CRANES - OVERVIEW Manual aisle-bound stacker stackercrane Manual -changing crane Automatic bound stacker

ENGINEERS OF FLOW

• Automotive cabin for maintenance and

reparation purposes on the stacker crane

• Enhancement of comfort and ease of work

without losing any approach dimension

• Possibility of expanding existing

installations

• Control: wireless remote control

SCOTTY

STACKER CRANE CABIN