Spokane River Project License Implementation

Spokane River Forum

Speed Fitzhugh

FERC Project No. 2545

March 26, 2013

Page 2: Spokane River Project License Implementation Spokane River Forum Speed Fitzhugh FERC Project No. 2545 March 26, 2013

Fisheries

Idaho• Post Falls HED down-ramping rate • Post Falls HED minimum flow evaluation (temp &

flow)• St. Maries catch-out pond• North Fork CDA River conservation easement• Marble Creek splash dam

Page 3: Spokane River Project License Implementation Spokane River Forum Speed Fitzhugh FERC Project No. 2545 March 26, 2013

Fisheries

Washington• Upper Falls 3-year baseline assessment on

resident fish• Monroe Street to Nine Mile trout spawning habitat

evaluation• Rainbow trout stocking in Upper Falls and Plese

Flats• Lake Spokane creel survey and rainbow trout

stocking program

Page 4: Spokane River Project License Implementation Spokane River Forum Speed Fitzhugh FERC Project No. 2545 March 26, 2013

Water QualityIdaho• Cooperate with IDEQ and Coeur d’Alene Tribe to complete

water quality monitoring in Coeur d’Alene Lake• Cooperate with IDEQ and the Spokane River Association to

complete water quality monitoring in the upper Spokane River

• Post Falls HED TDG monitoring

Page 5: Spokane River Project License Implementation Spokane River Forum Speed Fitzhugh FERC Project No. 2545 March 26, 2013

Washington• Lake Spokane DO Water Quality Attainment Plan to reduce

phosphorus• Long Lake Dam Tailrace TDG reduction• Long Lake Dam Tailrace DO improvements

Water Quality

Page 6: Spokane River Project License Implementation Spokane River Forum Speed Fitzhugh FERC Project No. 2545 March 26, 2013

Aeration Manifold

Aeration Bubbles

Page 7: Spokane River Project License Implementation Spokane River Forum Speed Fitzhugh FERC Project No. 2545 March 26, 2013

Erosion

Idaho • Medimont Project – approximately 4,000 linear feet

• Shadowy St. Joe River Project - approximately 7,000 linear

feet

Page 8: Spokane River Project License Implementation Spokane River Forum Speed Fitzhugh FERC Project No. 2545 March 26, 2013

Erosion

Coeur d’Alene Indian Reservation• Completed Erosion Control Inventory and Assessment

• 10 year Erosion Control Implementation Plan

Page 9: Spokane River Project License Implementation Spokane River Forum Speed Fitzhugh FERC Project No. 2545 March 26, 2013

Wetlands

Idaho Wetland and Riparian Habitat Protection Plan• Shadowy St. Joe Project - approximately 128 acres

Lake Spokane Wetland Plan • Little Spokane Wetland Property – approximately 50 acres

of wetlands with 59 acres of associated uplands

Page 10: Spokane River Project License Implementation Spokane River Forum Speed Fitzhugh FERC Project No. 2545 March 26, 2013

Wetlands

Coeur d’Alene Indian Reservation • Hangman Creek Property - approximately 500 acres of

wetlands and 156 acres of associated uplands• Currently developing wetland plans

Page 11: Spokane River Project License Implementation Spokane River Forum Speed Fitzhugh FERC Project No. 2545 March 26, 2013

Aquatic Weeds

• Coeur d’Alene Lake Aquatic Weed Management Plan for Tribal and non-tribal waters • Lake Spokane/Nine Mile Aquatic Weed

Management Program

Page 12: Spokane River Project License Implementation Spokane River Forum Speed Fitzhugh FERC Project No. 2545 March 26, 2013

Bald Eagles

Second year of annual monitoring of known nests • Nineteen nests in 19 territories

Surveyed for new nests• Nine new nests

Documented eagle usage in Project area• Four new alternative nests• Five new nests in territories

Page 13: Spokane River Project License Implementation Spokane River Forum Speed Fitzhugh FERC Project No. 2545 March 26, 2013

Recreation Management Plan

Amended in 2013• Higgins Point

• Nine Mile Recreation

Area

• Loff’s Bay/St. Maries

• Trailer Park Wave

• Huntington Park

• Chatcolet Boat Ramp

Page 14: Spokane River Project License Implementation Spokane River Forum Speed Fitzhugh FERC Project No. 2545 March 26, 2013

Washington State Parks Recreation and Land

Management Agreement

Nine Mile and Lake Spokane• Consistent management• Ensures continued public

access of WSP, WDNR, and Avista properties• Cost effective for all

parties

Page 15: Spokane River Project License Implementation Spokane River Forum Speed Fitzhugh FERC Project No. 2545 March 26, 2013

Land Use and Occupancy

Land Management• Fuel reduction

• Encroachments

• Noxious weed control

• Conservation

• Public/Private Recreation

Page 16: Spokane River Project License Implementation Spokane River Forum Speed Fitzhugh FERC Project No. 2545 March 26, 2013

Cultural Resource Programs(Idaho, Washington, and BIA 4(e) Condition No. 6)

• Post Falls HPMP• Washington HPMP• Coeur d’Alene Reservation CRMP

Page 17: Spokane River Project License Implementation Spokane River Forum Speed Fitzhugh FERC Project No. 2545 March 26, 2013