spokane river hydroelectric project ferc project no. 2545
DESCRIPTION
Spokane River Hydroelectric Project FERC Project No. 2545. Recreation Plan. Avista Water Access Projects. Trailer Park Wave Access Nine Mile Dam non-motorized Take-Out site Long Lake Dam non-motorized Put-in site Lake Spokane Boat-in-Only campsite development. Trailer Park Wave Access. - PowerPoint PPT PresentationTRANSCRIPT
Spokane River Hydroelectric ProjectFERC Project No. 2545
Recreation Plan
• Trailer Park Wave Access• Nine Mile Dam non-motorized Take-Out site• Long Lake Dam non-motorized Put-in site• Lake Spokane Boat-in-Only campsite development
Avista Water Access Projects
Trailer Park Wave Access• Play wave feature on the north shore of the Spokane River
• Class II rapid
• 3,300cfs to 5,000cfs
• Public access challenge
Trailer Park Wave
Trailer Park Wave• 2011 Feasibility assessment
• 2012 Property purchase
• 2013-2015 Site development
Nine Mile Dam Take -Out
Nine Mile Dam Take-out• Property owned by WSPRC
• 2015 Site development
Lake Spokane Boat-in-Only Campsites
Lake Spokane Boat-in-Only Campsites• 2014 Site development
• Washington State Parks management
Long Lake Dam Put-in• Constructed in 2012• Renovated facilities
Lake Spokane Management• Cooperatively Managed by Washington State Parks• DNR Lake Spokane Campground