Spokane River Hydroelectric Project FERC Project No. 2545

Download Spokane River Hydroelectric Project FERC Project No. 2545

Post on 15-Feb-2016

43 views

Category:

Documents

0 download

Embed Size (px)

DESCRIPTION

Spokane River Hydroelectric Project FERC Project No. 2545. Recreation Plan. Avista Water Access Projects. Trailer Park Wave Access Nine Mile Dam non-motorized Take-Out site Long Lake Dam non-motorized Put-in site Lake Spokane Boat-in-Only campsite development. Trailer Park Wave Access. - PowerPoint PPT Presentation

TRANSCRIPT

PowerPoint Presentation

Spokane River Hydroelectric ProjectFERC Project No. 2545

Recreation Plan

1 Trailer Park Wave Access Nine Mile Dam non-motorized Take-Out site Long Lake Dam non-motorized Put-in site Lake Spokane Boat-in-Only campsite development

Avista Water Access Projects

Trailer Park Wave Access Play wave feature on the north shore of the Spokane River Class II rapid 3,300cfs to 5,000cfs Public access challenge

Trailer Park Wave

Trailer Park Wave2011 Feasibility assessment2012 Property purchase2013-2015 Site development

Nine Mile Dam Take -Out

Nine Mile Dam Take-out

Property owned by WSPRC 2015 Site developmentLake Spokane Boat-in-Only Campsites

Lake Spokane Boat-in-Only Campsites

2014 Site development Washington State Parks management

Long Lake Dam Put-in

Constructed in 2012 Renovated facilities

Lake Spokane Management

Cooperatively Managed by Washington State Parks DNR Lake Spokane CampgroundQuestions?