  • South Sudan Oil & Power 2018

    SOUTH SUDAN ELECTRIC POWER DEVELOPMENT

    Presented by

    Eng. Jacob Manyuon Deng (MSc, REng, MIAEE, MSSEC) Acting Director General of Planning and Projects, South Sudan Electricity Corporation and Part-time Lecturer, University of Juba

  • OUTLINE OF PRESENTATION

    South Sudan Oil & Power / SOUTH SUDAN ELECTRIC POWER DEVELOPMENT Eng. Jacob Manyuon Deng (MSc, REng, MIAEE, MSSEC), Acting Director General of Planning and Projects, South Sudan Electricity Corporation and Part-time Lecturer, University of Juba

    Overview of power sector in South Sudan Electric power sector plans:

    Candidate/Priority projects (Grand Fula, Rapids & 400kV TL) Status of South Sudan power sector:

    Challenges facing the sector Opportunities in the power sector Conclusion Recommendations

    Generation National Grid Regional Interconnection

    JPDSREP Ezra Power Plant Bor Power Station

  • South Sudan’s population is

    12,323,419 (NBS, 2018)

    Only 1.05% of the population has

    access to grid electricity

    and population growth rate is

    2.73% (NBS)

    The population below the poverty line is about

    50.6% (NBS)

    The GDP is 2.9 billion USD

    (NBS 2016)

    and GDP per capita is 237.44 USD

    (2016)

    17% is urban 83%

    is rural and uses

    kerosene charcoal firewood

    for cooking

    BASIC FACTS

    South Sudan Oil & Power / SOUTH SUDAN ELECTRIC POWER DEVELOPMENT Eng. Jacob Manyuon Deng (MSc, REng, MIAEE, MSSEC), Acting Director General of Planning and Projects, South Sudan Electricity Corporation and Part-time Lecturer, University of Juba

  • BASIC FACTS

    Hydro potential is huge

    (over 2,500 MW), mostly

    Equatorial region

    Per capita energy consumption

    ranges between 1 and 10 kWh compared to

    80kWh in the

    sub-Saharan African countries

    The solar potential is about

    436 W/m²/year.

    Wind power density in the southern regions

    range in the 285 – 380 W/m²

    interval

    South Sudan Oil & Power / SOUTH SUDAN ELECTRIC POWER DEVELOPMENT Eng. Jacob Manyuon Deng (MSc, REng, MIAEE, MSSEC), Acting Director General of Planning and Projects, South Sudan Electricity Corporation and Part-time Lecturer, University of Juba

  • PLANNED HYDRO POWER GENERATION

    Depicted here are estimated Average Energy (GWh)

    Firm Energy (GWh), Investment cost & cost per kWh

    South Sudan Oil & Power / SOUTH SUDAN ELECTRIC POWER DEVELOPMENT Eng. Jacob Manyuon Deng (MSc, REng, MIAEE, MSSEC), Acting Director General of Planning and Projects, South Sudan Electricity Corporation and Part-time Lecturer, University of Juba

  • PLANNED THERMAL POWER GENERATION

    250 MW Paloch thermal

    power plant

    to boost the current 42 MW power capacity

    and transmit power from Upper Nile

    250 – 300 MW Tharjath thermal

    power plant

    to supply oil field at former Unity state

    areas and transmit to Bahr el Ghazal

    Completion of

    100 MW Ezra power plant

    in Juba

    South Sudan Oil & Power / SOUTH SUDAN ELECTRIC POWER DEVELOPMENT Eng. Jacob Manyuon Deng (MSc, REng, MIAEE, MSSEC), Acting Director General of Planning and Projects, South Sudan Electricity Corporation and Part-time Lecturer, University of Juba

  • PROPOSED NATIONAL GRID

    Previous 10 States

    National grid by 2040

    No adequate load in states

    Transmits power across states of South Sudan

    Promote regional interconnection

    Attract industries

    Proposed South Sudan Power Grid

    South Sudan Oil & Power / SOUTH SUDAN ELECTRIC POWER DEVELOPMENT Eng. Jacob Manyuon Deng (MSc, REng, MIAEE, MSSEC), Acting Director General of Planning and Projects, South Sudan Electricity Corporation and Part-time Lecturer, University of Juba

  • PLANNED REGIONAL INTERCONNECTION

    320 km, 220 kV Renk to Malakal

    transmission line. This line, which is an extension of a

    line from Sudan, was contracted out

    382 km, 400 kV Olwiyo (Uganda) to Juba (South Sudan)

    transmission line. $1.5 million was committed by AfDB to finance

    feasibility studies for South Sudan section (Juba – Nimule).

    Uganda shall confirm funding for their section.

    South Sudan Oil & Power / SOUTH SUDAN ELECTRIC POWER DEVELOPMENT Eng. Jacob Manyuon Deng (MSc, REng, MIAEE, MSSEC), Acting Director General of Planning and Projects, South Sudan Electricity Corporation and Part-time Lecturer, University of Juba

  • CANDIDATE/PRIORITY PROJECTS

    40 MW Fula Rapids (circle in red ) is ready for investment

    Investment cost estimates at $170 million

    FS are were done by Norfund with finances from Norwegian Government

    Construction to take 2 1/2 years

    Final phase can produce approx. 120MW

    Distance from Juba along the main road is 170km

    Could be alternative to Grand Fula

    40 MW Fula Rapids

    A

    South Sudan Oil & Power / SOUTH SUDAN ELECTRIC POWER DEVELOPMENT Eng. Jacob Manyuon Deng (MSc, REng, MIAEE, MSSEC), Acting Director General of Planning and Projects, South Sudan Electricity Corporation and Part-time Lecturer, University of Juba

  • CANDIDATE/PRIORITY PROJECTS

    890 – 1080 MW Grand Fula remains prority in electricity sector

    FS are complete and ready for investments

    Once its developed, it will reduce high cost of fuel

    Enough power for domestic consumption and power trade through with estimated huge investment cost of $1.5 billion

    890 – 1080 MW Grand Fula

    B

    South Sudan Oil & Power / SOUTH SUDAN ELECTRIC POWER DEVELOPMENT Eng. Jacob Manyuon Deng (MSc, REng, MIAEE, MSSEC), Acting Director General of Planning and Projects, South Sudan Electricity Corporation and Part-time Lecturer, University of Juba

  • CANDIDATE/PRIORITY PROJECTS CONT’

    As South Sudan develops its hydro potential, this line is important

    Need to implement concurrently with Fula

    Holds regional importance. import and export of power to East Africa Power Pool

    Will form part of South Sudan national grid

    The Ministry sees great importance to develop this line

    382 km, 400 kV Uganda South Sudan Transmission line

    C

    South Sudan Oil & Power / SOUTH SUDAN ELECTRIC POWER DEVELOPMENT Eng. Jacob Manyuon Deng (MSc, REng, MIAEE, MSSEC), Acting Director General of Planning and Projects, South Sudan Electricity Corporation and Part-time Lecturer, University of Juba

  • Installed Capacity 131.4 MW

    Private sector 63 MW

    4.5 MW operational in Juba

    Average tariff $0.42 c/kWh. Very high compared to the region (subsidized)

    Generation cost $0.7 c/kWh

    No operation in other states

    Ezra to increase to 31 MW by Nov. 2018

    INSTALLED CAPACITY

    South Sudan Electricity Installed Capacity

    South Sudan Oil & Power / SOUTH SUDAN ELECTRIC POWER DEVELOPMENT Eng. Jacob Manyuon Deng (MSc, REng, MIAEE, MSSEC), Acting Director General of Planning and Projects, South Sudan Electricity Corporation and Part-time Lecturer, University of Juba

  • For Previous 10 states, 225 MW

    New states 75 MW

    Total Estimated demand 300 MW

    Expected to increase to1450 MW by 2035

    Demand is higher and increasing

    Growth in demand is estimated at 8.05%

    Industries are expected

    Need to increase generation capacity

    ESTIMATED DEMAND (MW)

    South Sudan current demand estimates

    South Sudan Oil & Power / SOUTH SUDAN ELECTRIC POWER DEVELOPMENT Eng. Jacob Manyuon Deng (MSc, REng, MIAEE, MSSEC), Acting Director General of Planning and Projects, South Sudan Electricity Corporation and Part-time Lecturer, University of Juba

  • Juba Power Distribution System Rehabilitation and Expansion Project (JPDSREP) is ongoing

    Picture demonstrate pole erection in the field

    Cover, 370 km of LV and 150km of MV

    Financed by AfDB

    Second phase; 132kV TL and 132/33/0.433kV substation around Juba

    CURRENT PROJECTS

    South Sudan Oil & Power / SOUTH SUDAN ELECTRIC POWER DEVELOPMENT Eng. Jacob Manyuon Deng (MSc, REng, MIAEE, MSSEC), Acting Director General of Planning and Projects, South Sudan Electricity Corporation and Part-time Lecturer, University of Juba

  • 100 MW Ezra Power Plant through BOOT System

    Implemented in phases, 30 MW, 20 MW etc 21 MW is installed

    Generate power and sell to SSEC

    Transmit through 132kV River crossing to Juba Power Station

    Transmit power to Gumbo/Shrikaat through 33 kV Line

    CURRENT PROJECTS

    South Sudan Oil & Power / SOUTH SUDAN ELECTRIC POWER DEVELOPMENT Eng. Jacob Manyuon Deng (MSc, REng, MIAEE, MSSEC), Acting Director General of Planning and Projects, South Sudan Electricity Corporation and Part-time Lecturer, University of Juba

  • Was difficult to run power stations across the country after 2013 due to economic turbulence

    Energy sector authorities involved provide sector in power generation

    3 MW Bor Power staion was contracted out through PPP

    Pruning of trees on 11 kV line is ongoing

    CURRENT PROJECTS