STANDARD OPERATING PROCEDURE PRESSURE VESSEL INSPECTION FOR MIGAS RE-CERTIFICATION Area/Dept.: North Area Production / Production Facility/Section: Attaka Field Rev. Number Rev. Date Description Prepared by Setyo BU MIQA Specialist Reviewed by Suhartono MI & QA Supv Approved by ______________ MI & QA Supt. 0 Septembe r 5, 2007 New Issue Whole Document Partial Chevron Kalimantan Operation Operational Excellence Management System Document ID SOP-MIQA-ATTK- 001 Page 1 of 4 1 GENERAL DESCRIPTION This procedure will explain the steps to inspect the Pressure Vessel for re- certification. 2 HES NOTICE Some possibility of personal injury may occur before and during activities. The inspectors has injury possibilities to i.e. finger pinch, back injury and falling down. 3 PROCEDURAL STEPS Action Number Action Remark (who & when) I. Preparation 1 Check all PPE to be worn, all equipment to be used have been calibrated properly, batteries in full capacity, work sheets and conduct daily tool box meeting. 2 Obtain Safety Work Permit to Production Control Room and approved by HOM/HOP & Field

Upload: iksan-adityo-mulyo

Post on 27-Dec-2015

18 views

Category:

Documents


0 download

DESCRIPTION

Sop-miqa-Attk-001_pressure Vessel Inspection for Migas Re-certification (2007)

TRANSCRIPT

STANDARD OPERATING PROCEDURE

PRESSURE VESSEL INSPECTION FOR MIGAS RE-CERTIFICATION

Area/Dept.:

North Area Production / Production

Facility/Section:

Attaka Field

Rev. Numbe

r

Rev. Date

Description Prepared by

Setyo BUMIQA Specialist

Reviewed by

Suhartono MI & QA Supv

Approved by

______________MI & QA Supt.0 Septembe

r 5, 2007

New Issue

Whole Document

Partial

Chevron Kalimantan Operation

OperationalExcellence

ManagementSystem

Document ID

SOP-MIQA-ATTK- 001

Page 1 of 4

1 GENERAL DESCRIPTION

This procedure will explain the steps to inspect the Pressure Vessel for re-certification.

2 HES NOTICE

Some possibility of personal injury may occur before and during activities. The inspectors has injury possibilities to i.e. finger pinch, back injury and falling down.

3 PROCEDURAL STEPS

Action Numbe

rAction

Remark (who & when)

I. Preparation

1Check all PPE to be worn, all equipment to be used have been calibrated properly, batteries in full capacity, work sheets and conduct daily tool box meeting.

2Obtain Safety Work Permit to Production Control Room and approved by HOM/HOP & Field Superintendent, attach the SOP and JSA related.

3 Submit the list of pressure vessels will be inspected to Control Room.

STANDARD OPERATING PROCEDURE

Pressure Vessel Inspection for Migas re-certification

SOP Number

SOP-MIQA-ATTK- 001

Page 2 of 6

Chevron Kalimantan OperationRev. Number

0

Issued

September 2007

Effective

September 2010

4Inspection step and evaluation shall refer to CICO-QP-INS-009 Procedure For Certification and Inspection of Pressure Vessel

STANDARD OPERATING PROCEDURE

Pressure Vessel Inspection for Migas re-certification

SOP Number

SOP-MIQA-ATTK- 001

Page 3 of 6

Chevron Kalimantan OperationRev. Number

0

Issued

September 2007

Effective

September 2010

II. Execution

1The Pressure Vessels to be externally inspected is on stream. Do not operate all production facilities. Inform Control Room when anomalies occured.

2Ensure the scaffolding has been properly installed and approved by Scaffolding Inspector as an access to conduct unreachable inspection position (when required).

3 Do not remove the painting without permissible of Production Operator in charge.

III Completion

1When the inspection of the first pressure vessel completed, inform control room that the inspector will inspect to the next pressure vessel, etc.

STANDARD OPERATING PROCEDURE

Pressure Vessel Inspection for Migas re-certification

SOP Number

SOP-MIQA-ATTK- 001

Page 4 of 6

Chevron Kalimantan OperationRev. Number

0

Issued

September 2007

Effective

September 2010

2 Always keep the work place clean before leaving.

3

Report to Production Control Room when inspection job have been finished for the day, sign off the Safe Work Permit and write a note “Continued” if the job will be continued the next day and “Completed” if the job have been finished.

4. DRAWING/P&ID & DOCUMENT

NO. LOCATION TAG NO DESCRIPTION1 ATTAKA HOTEL PV-WF-1103 Oxygen Scavenger Tank2 ATTAKA HOTEL H-PV-M7 Gas Lift Receiver3 ATTAKA HOTEL H-PV-2 Test Separator4 ATTAKA HOTEL H-PV-M12 Gas Launcher5 ATTAKA HOTEL V-1106H Air Receiver6 ATTAKA HOTEL H-PV-4 Gas Lift KOD7 ATTAKA HOTEL H-PV-TK1 Sump Tank8 ATTAKA HOTEL H-PV-M6 Gas Lift Receiver9 ATTAKA HOTEL H-PV-M11 Gas Receiver

10 ATTAKA HOTEL H-PV-M10 Oil Pig Receiver11 ATTAKA HOTEL ATH-PV-AD-1A Air Dryer12 ATTAKA HOTEL H-PV-1 Gross Separator13 ATTAKA HOTEL V-115 H Vent Gas Scrubber14 ATTAKA HOTEL ATH-PV-AD-1B Air Dryer15 ATTAKA CP F-1450-1B HT. Cartridge Filter16 ATTAKA CP E-1450-1 Glycol Exchanger17 ATTAKA CP V-1102 2nd Stg Compr In. Scrubber18 ATTAKA CP H-1450-3 Still Column & Reflux Coil19 ATTAKA CP VS-1450-1 Glycol Contactor20 ATTAKA CP F-1450-2A Activated Carbon Filter21 ATTAKA CP F-1450-2B Activated Carbon Filter22 ATTAKA CP H-1450-1 Glycol Reboiler Heater23 ATTAKA CP H-1450-2 Glycol Rebolier24 ATTAKA CP VS-88 Knock Out Drum25 ATTAKA CP V-1103 2nd Stg Compr. KOD26 ATTAKA CP CP-PV-M3 Gas Lift Receiver27 ATTAKA CP CP-PV-M2 Gas Pig Launcher28 ATTAKA CP V-1105 Lift Gas Compr. KOD29 ATTAKA CP VS-1450-2 Gas Scrubber30 ATTAKA CP V-1101 Recycling Separator31 ATTAKA CP ATT-L-STA-2 Gas Launcher32 ATTAKA CP V-121 Knock Out Drum33 ATTAKA CP V-120 Knock Out Drum34 ATTAKA CP VS-1450-3 Glycol Flush Drum35 ATTAKA CP F-1450-1A HT. Cartridge Filter

STANDARD OPERATING PROCEDURE

Pressure Vessel Inspection for Migas re-certification STANDARD OPERATING PROCEDURE

Pressure Vessel Inspection for Migas re-certificationRepair ¾” valve for flushing oil boot of V-

1101A

SOP Number

SOP-MIQA-ATTK- 001SOP Number

SOP-.002/PV/STNATK/

STNPROCPMIQA.07047

Page 6 of 6Page 6 of 6

Chevron Kalimantan OperationChevron Kalimantan Operation

Rev. Number

0Rev. Number

0

Issued

September 2007Issued

JulySept. 2007

Chevron Kalimantan OperationEffective

July 2010

5. TECHNICAL DATA

CONTROL INFORMATION

Description Date

Revision No

Date Notes

6 ASSOCIATED DOCUMENTS

CICo-QP-009 PROCEDURE FOR CERTIFICATION & INSPECTION OF PRESSURE VESSEL