STANDARD OPERATING PROCEDURE
PRESSURE VESSEL INSPECTION FOR MIGAS RE-CERTIFICATION
Area/Dept.:
North Area Production / Production
Facility/Section:
Attaka Field
Rev. Numbe
r
Rev. Date
Description Prepared by
Setyo BUMIQA Specialist
Reviewed by
Suhartono MI & QA Supv
Approved by
______________MI & QA Supt.0 Septembe
r 5, 2007
New Issue
Whole Document
Partial
Chevron Kalimantan Operation
OperationalExcellence
ManagementSystem
Document ID
SOP-MIQA-ATTK- 001
Page 1 of 4
1 GENERAL DESCRIPTION
This procedure will explain the steps to inspect the Pressure Vessel for re-certification.
2 HES NOTICE
Some possibility of personal injury may occur before and during activities. The inspectors has injury possibilities to i.e. finger pinch, back injury and falling down.
3 PROCEDURAL STEPS
Action Numbe
rAction
Remark (who & when)
I. Preparation
1Check all PPE to be worn, all equipment to be used have been calibrated properly, batteries in full capacity, work sheets and conduct daily tool box meeting.
2Obtain Safety Work Permit to Production Control Room and approved by HOM/HOP & Field Superintendent, attach the SOP and JSA related.
3 Submit the list of pressure vessels will be inspected to Control Room.
STANDARD OPERATING PROCEDURE
Pressure Vessel Inspection for Migas re-certification
SOP Number
SOP-MIQA-ATTK- 001
Page 2 of 6
Chevron Kalimantan OperationRev. Number
0
Issued
September 2007
Effective
September 2010
4Inspection step and evaluation shall refer to CICO-QP-INS-009 Procedure For Certification and Inspection of Pressure Vessel
STANDARD OPERATING PROCEDURE
Pressure Vessel Inspection for Migas re-certification
SOP Number
SOP-MIQA-ATTK- 001
Page 3 of 6
Chevron Kalimantan OperationRev. Number
0
Issued
September 2007
Effective
September 2010
II. Execution
1The Pressure Vessels to be externally inspected is on stream. Do not operate all production facilities. Inform Control Room when anomalies occured.
2Ensure the scaffolding has been properly installed and approved by Scaffolding Inspector as an access to conduct unreachable inspection position (when required).
3 Do not remove the painting without permissible of Production Operator in charge.
III Completion
1When the inspection of the first pressure vessel completed, inform control room that the inspector will inspect to the next pressure vessel, etc.
STANDARD OPERATING PROCEDURE
Pressure Vessel Inspection for Migas re-certification
SOP Number
SOP-MIQA-ATTK- 001
Page 4 of 6
Chevron Kalimantan OperationRev. Number
0
Issued
September 2007
Effective
September 2010
2 Always keep the work place clean before leaving.
3
Report to Production Control Room when inspection job have been finished for the day, sign off the Safe Work Permit and write a note “Continued” if the job will be continued the next day and “Completed” if the job have been finished.
4. DRAWING/P&ID & DOCUMENT
NO. LOCATION TAG NO DESCRIPTION1 ATTAKA HOTEL PV-WF-1103 Oxygen Scavenger Tank2 ATTAKA HOTEL H-PV-M7 Gas Lift Receiver3 ATTAKA HOTEL H-PV-2 Test Separator4 ATTAKA HOTEL H-PV-M12 Gas Launcher5 ATTAKA HOTEL V-1106H Air Receiver6 ATTAKA HOTEL H-PV-4 Gas Lift KOD7 ATTAKA HOTEL H-PV-TK1 Sump Tank8 ATTAKA HOTEL H-PV-M6 Gas Lift Receiver9 ATTAKA HOTEL H-PV-M11 Gas Receiver
10 ATTAKA HOTEL H-PV-M10 Oil Pig Receiver11 ATTAKA HOTEL ATH-PV-AD-1A Air Dryer12 ATTAKA HOTEL H-PV-1 Gross Separator13 ATTAKA HOTEL V-115 H Vent Gas Scrubber14 ATTAKA HOTEL ATH-PV-AD-1B Air Dryer15 ATTAKA CP F-1450-1B HT. Cartridge Filter16 ATTAKA CP E-1450-1 Glycol Exchanger17 ATTAKA CP V-1102 2nd Stg Compr In. Scrubber18 ATTAKA CP H-1450-3 Still Column & Reflux Coil19 ATTAKA CP VS-1450-1 Glycol Contactor20 ATTAKA CP F-1450-2A Activated Carbon Filter21 ATTAKA CP F-1450-2B Activated Carbon Filter22 ATTAKA CP H-1450-1 Glycol Reboiler Heater23 ATTAKA CP H-1450-2 Glycol Rebolier24 ATTAKA CP VS-88 Knock Out Drum25 ATTAKA CP V-1103 2nd Stg Compr. KOD26 ATTAKA CP CP-PV-M3 Gas Lift Receiver27 ATTAKA CP CP-PV-M2 Gas Pig Launcher28 ATTAKA CP V-1105 Lift Gas Compr. KOD29 ATTAKA CP VS-1450-2 Gas Scrubber30 ATTAKA CP V-1101 Recycling Separator31 ATTAKA CP ATT-L-STA-2 Gas Launcher32 ATTAKA CP V-121 Knock Out Drum33 ATTAKA CP V-120 Knock Out Drum34 ATTAKA CP VS-1450-3 Glycol Flush Drum35 ATTAKA CP F-1450-1A HT. Cartridge Filter
STANDARD OPERATING PROCEDURE
Pressure Vessel Inspection for Migas re-certification STANDARD OPERATING PROCEDURE
Pressure Vessel Inspection for Migas re-certificationRepair ¾” valve for flushing oil boot of V-
1101A
SOP Number
SOP-MIQA-ATTK- 001SOP Number
SOP-.002/PV/STNATK/
STNPROCPMIQA.07047
Page 6 of 6Page 6 of 6
Chevron Kalimantan OperationChevron Kalimantan Operation
Rev. Number
0Rev. Number
0
Issued
September 2007Issued
JulySept. 2007
Chevron Kalimantan OperationEffective
July 2010
5. TECHNICAL DATA
CONTROL INFORMATION
Description Date
Revision No
Date Notes
6 ASSOCIATED DOCUMENTS
CICo-QP-009 PROCEDURE FOR CERTIFICATION & INSPECTION OF PRESSURE VESSEL