smartplant materials how to create a request for...

19
SmartPlant Materials How to Create a Request for Quotation Version 2007.1 (6.2.3) January 2007 / April 2007 DMAR1-PE-200086A-UPDATED

Upload: trantuyen

Post on 10-Jun-2018

237 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: SmartPlant Materials How to Create a Request for Quotationspmat.hec.co.kr/marian_webentry/Pdfs/BP-C1-MSCM-How-to-create... · SmartPlant Materials How to Create a Request for

SmartPlant Materials How to Create a Request for Quotation

Version 2007.1 (6.2.3) January 2007 / April 2007 DMAR1-PE-200086A-UPDATED

Page 2: SmartPlant Materials How to Create a Request for Quotationspmat.hec.co.kr/marian_webentry/Pdfs/BP-C1-MSCM-How-to-create... · SmartPlant Materials How to Create a Request for

Copyright Copyright © 2005-2007 Intergraph Corporation. All Rights Reserved.

Including software, file formats, and audiovisual displays; may be used pursuant to applicable software license agreement; contains confidential and proprietary information of Intergraph and/or third parties which is protected by copyright law, trade secret law, and international treaty, and may not be provided or otherwise made available without proper authorization.

Restricted Rights Legend Use, duplication, or disclosure by the government is subject to restrictions as set forth below. For civilian agencies: This was developed at private expense and is “restricted computer software” submitted with restricted rights in accordance with subparagraphs (a) through (d) of the Commercial Computer Software - Restricted Rights clause at 52.227-19 of the Federal Acquisition Regulations (“FAR”) and its successors, and is unpublished and all rights are reserved under the copyright laws of the United States. For units of the Department of Defense (“DoD”): This is “commercial computer software” as defined at DFARS 252.227-7014 and the rights of the Government are as specified at DFARS 227.7202-3.

Unpublished – rights reserved under the copyright laws of the United States.

Intergraph Corporation Huntsville, Alabama 35894-0001

Warranties and Liabilities All warranties given by Intergraph Corporation about equipment or software are set forth in your purchase contract, and nothing stated in, or implied by, this document or its contents shall be considered or deemed a modification or amendment of such warranties. Intergraph believes the information in this publication is accurate as of its publication date.

The information and the software discussed in this document are subject to change without notice and are subject to applicable technical product descriptions. Intergraph Corporation is not responsible for any error that may appear in this document.

The software discussed in this document is furnished under a license and may be used or copied only in accordance with the terms of this license.

No responsibility is assumed by Intergraph for the use or reliability of software on equipment that is not supplied by Intergraph or its affiliated companies. THE USER OF THE SOFTWARE IS EXPECTED TO MAKE THE FINAL EVALUATION AS TO THE USEFULNESS OF THE SOFTWARE IN HIS OWN ENVIRONMENT.

Intergraph is not responsible for the accuracy of delivered data including, but not limited to, catalog, reference and symbol data. Users should verify for themselves that the data is accurate and suitable for their project work.

Trademarks Intergraph, the Intergraph logo, PDS, SmartPlant, SmartSketch, FrameWorks, INtools, MARIAN, ISOGEN, and IntelliShip are registered trademarks and SupportModeler and SupportManager are trademarks of Intergraph Corporation. Microsoft and Windows are registered trademarks of Microsoft Corporation. Other brands and product names are trademarks of their respective owners.

Page 3: SmartPlant Materials How to Create a Request for Quotationspmat.hec.co.kr/marian_webentry/Pdfs/BP-C1-MSCM-How-to-create... · SmartPlant Materials How to Create a Request for

Table of Contents

Table of Contents Preface .................................................................................................................................4

Overview .............................................................................................................................5

Creating request for quotation .........................................................................................6 Target Role ......................................................................................................................... 6 Session Goal ....................................................................................................................... 6 Workflow Prerequisites ...................................................................................................... 6 Budget Hours: Concept Transfer to Users .......................................................................... 6

Detailed workflows.............................................................................................................7 Start Inquiry Cycle .............................................................................................................. 9 Prepare RFQ ..................................................................................................................... 12

SmartPlant Materials How to Create a Request for Quotation 3

Page 4: SmartPlant Materials How to Create a Request for Quotationspmat.hec.co.kr/marian_webentry/Pdfs/BP-C1-MSCM-How-to-create... · SmartPlant Materials How to Create a Request for

Preface

Preface This document is a user’s guide for SmartPlant® Materials 6.2.

It describes the processes to create a request for quotation.

Send documentation comments or suggestions to [email protected].

4 SmartPlant Materials How to Create a Request for Quotation

Page 5: SmartPlant Materials How to Create a Request for Quotationspmat.hec.co.kr/marian_webentry/Pdfs/BP-C1-MSCM-How-to-create... · SmartPlant Materials How to Create a Request for

Overview

Overview This document describes how to create a request for quotations.

How to create requests for How to create requests for quotationquotation

Requisition forinquiry only

Requisition forpurchase

Assign bidders,create RFQ

Receive bids,evaluate and choose supplier

Create Blanket order

Assign bidders,create RFQ

Receive bids,evaluate and choose supplier

Create Requisitionfor purchase

Assign bidders,create RFQ

Receive bids,evaluate and choose supplier

Receive bids,evaluate and choose supplier

Create PO

Assign blanketorder Create PO

Create PO

Create PO

Assign bidders,create RFQ

Create Inquiry

Create Inquiry

As the above workflow shows, the creation of a request for quotations (RFQ) is a part of several different workflows ending in the creation of purchase orders.

The request for quotation is always based on a so-called inquiry. In SmartPlant Materials, an inquiry is defined as a company internal object, not sent to bidders or clients. The inquiry is therefore an intermediate step for the preparation of RFQs. With the creation of an inquiry, the so-called bidding cycle is started.

The above workflow also shows that in all different workflow scenarios the steps for the RFQ creation are identical. This document will show the RFQ creation process based on a PR.

SmartPlant Materials How to Create a Request for Quotation 5

Page 6: SmartPlant Materials How to Create a Request for Quotationspmat.hec.co.kr/marian_webentry/Pdfs/BP-C1-MSCM-How-to-create... · SmartPlant Materials How to Create a Request for

Creating a Request for Quotation

Creating a Request for Quotation The goal of this document is to explain the specific tasks and best practices for creating requests for quotation.

Target Role The target audience for this document is home-office-based procurement super users and buyers.

Session Goal This session will enable users to understand the processes for creating requests for quotation.

Workflow Prerequisites This document assumes that the SmartPlant Materials introduction and overview and the “How to use the requisition workload screen” sessions have been completed.

Budget Hours: Concept Transfer to Users It will take between six to eight hours to train users in this workflow.

6 SmartPlant Materials How to Create a Request for Quotation

Page 7: SmartPlant Materials How to Create a Request for Quotationspmat.hec.co.kr/marian_webentry/Pdfs/BP-C1-MSCM-How-to-create... · SmartPlant Materials How to Create a Request for

Detailed Workflows

Detailed Workflows The requisition workload screen is the starting point for all inquiry and purchasing workflows.

The general handling and significance for the purchasing workflows is described in the document named C1-MSCM-How-to-use-requisition-workload_6.1.1.6-1A.doc.

On the requisition workload screen, all the ERs that have been released to procurement by the engineering departments are available.

• Navigate to the “Buyer” field, and use the List of Values (LOV) to select the name of the buyer that should be the responsible person for this requisition. Only those users who have been assigned the “Buyer” privilege will appear in this list. Requisitions with supplements higher than 0 will be automatically assigned to the buyer with supplement 0. The procurement manager (these are the users with the “ASSIGN BUYER” privilege) may change the buyer manually.

SmartPlant Materials How to Create a Request for Quotation 7

Page 8: SmartPlant Materials How to Create a Request for Quotationspmat.hec.co.kr/marian_webentry/Pdfs/BP-C1-MSCM-How-to-create... · SmartPlant Materials How to Create a Request for

Detailed Workflows

• Once the record is saved, the “Proc Acknow” field will automatically be filled in with the date to show that a person in the procurement department has assigned the requisition to a buyer. Due to this action, the engineering department will not be able to delete this requisition.

• The “Inquiry Cycle” button and the “Order Cycle” button (only if a PR was used) will become active, allowing the user to start the process of inquiry creation.

The requisition used in this document as an example contains six centrifugal pumps with six different TAG numbers and different attributes describing the properties.

8 SmartPlant Materials How to Create a Request for Quotation

Page 9: SmartPlant Materials How to Create a Request for Quotationspmat.hec.co.kr/marian_webentry/Pdfs/BP-C1-MSCM-How-to-create... · SmartPlant Materials How to Create a Request for

Detailed Workflows

Start the Inquiry Cycle To create RFQs, the inquiry cycle must be started. This is done by clicking the “Start Inquiry Cycle” button.

The “Start Inquiry Cycle” button is only enabled if the requisition:

• Has not already been inquired completely.

• Has not been purchased.

• Has a buyer assigned to the requisition.

After you click the “Continue” button, SmartPlant Materials asks the following

Selecting Yes opens P.30.11, which is the Core Workflow Screen for the handling of inquiries and their dependent RFQs.

SmartPlant Materials How to Create a Request for Quotation 9

Page 10: SmartPlant Materials How to Create a Request for Quotationspmat.hec.co.kr/marian_webentry/Pdfs/BP-C1-MSCM-How-to-create... · SmartPlant Materials How to Create a Request for

Detailed Workflows

This screen is a Core Workflow screen, and the following screen shot is shown as an example for an adjusted screen layout on the user interface level:

The first screen of P.30.11 informs the user about the status of the inquiry and about the most important fields.

10 SmartPlant Materials How to Create a Request for Quotation

Page 11: SmartPlant Materials How to Create a Request for Quotationspmat.hec.co.kr/marian_webentry/Pdfs/BP-C1-MSCM-How-to-create... · SmartPlant Materials How to Create a Request for

Detailed Workflows

The screen offers three important buttons used in the following workflows:

Prepare RFQ: The Prepare RFQ button opens a screen that provides all the needed functions to prepare the RFQ data.

Commercial Evaluation: The Commercial Evaluation button opens a screen that provides all the functions for maintaining bids, evaluating them, and awarding (selecting) bidders and line items.

This button is only valid after the RFQ preparation is finalized, which means the inquiry is approved.

Technical Evaluation: The Technical Evaluation button opens a screen that offers all the functions for executing the technical evaluation.

This button is only valid after the RFQ preparation is finalized, which means the inquiry is approved.

The inquiry number is by default always taken over from the requisition, which was the basis for the creation. The number can be changed here manually.

The default currency for the inquiry can also be set in the “Currency” field using the LOV menu.

SmartPlant Materials How to Create a Request for Quotation 11

Page 12: SmartPlant Materials How to Create a Request for Quotationspmat.hec.co.kr/marian_webentry/Pdfs/BP-C1-MSCM-How-to-create... · SmartPlant Materials How to Create a Request for

Detailed Workflows

Prepare RFQ After you click the “Prepare RFQ” button, SmartPlant Materials opens P.30.21 Prepare RFQ, which is also a so-called Core Workflow Screen.

Here are short explanations to all the sub screens available on screen P.30.21:

Inquiry: Here the inquiry can be approved. This is possible if at least one bidder is assigned. The approval creates RFQ records in the database for each bidder and takes over the sum of all available and required information from the attached requisitions and from P.30.21. If the ZP_SUPAPRV project default is set to ‘Y’, then the “Supplier Approved” check box must be checked in order to click the “Approve” button successfully.

12 SmartPlant Materials How to Create a Request for Quotation

Page 13: SmartPlant Materials How to Create a Request for Quotationspmat.hec.co.kr/marian_webentry/Pdfs/BP-C1-MSCM-How-to-create... · SmartPlant Materials How to Create a Request for

Detailed Workflows

Material Groups:

The “Material Groups” sub screen can be used to assign material groups to the inquiry. The assigned material groups work on the “Bidders” sub screen as a filter. In this example only, bidders that are assigned to the CP101 material group can be assigned to the inquiry.

Requisitions:

On the “Requisitions” sub screen, all requisitions and their line items are shown. These requisitions are attached to the actual inquiry.

It is possible here to attach additional requisitions to the inquiry using the LOV in the “Engineering Requisition” field. This LOV offers all not completely inquired requisitions available on the requisition workload screen.

SmartPlant Materials How to Create a Request for Quotation 13

Page 14: SmartPlant Materials How to Create a Request for Quotationspmat.hec.co.kr/marian_webentry/Pdfs/BP-C1-MSCM-How-to-create... · SmartPlant Materials How to Create a Request for

Detailed Workflows

It is also possible to split a requisition into several inquiries. Although it is not recommended to split requisitions manually into several inquiries (the split can be more easily done via the automated functions of the MTO job) during real project execution, it can be necessary to manually split requisitions. To do this, simply uncheck the “Assigned” check box for those line items that should be eliminated from the actual inquiry. Unchecking of line items make the requisition with these line items available for the creation of new inquiries, or for the assignment to other inquiries as described above.

Tech. Eval. Checklists:

The Technical Evaluation checklists can be generated as setup data dependent on the material group or by manual insert.

14 SmartPlant Materials How to Create a Request for Quotation

Page 15: SmartPlant Materials How to Create a Request for Quotationspmat.hec.co.kr/marian_webentry/Pdfs/BP-C1-MSCM-How-to-create... · SmartPlant Materials How to Create a Request for

Detailed Workflows

If the TE checklists are assigned to a material group, during the selection on the “Material Groups” sub screen, they are populated automatically.

Bidders: On the “Bidders” sub screen, bidders can be assigned to the inquiry. The bidders can only be assigned by selection via LOV; the LOV offers the project or general suppliers list according to the ‘ZP_PROJSUP’ project default. For further details regarding project suppliers, please refer to the “How to maintain suppliers” document.

An additional restriction to the available suppliers list is given by the assignment of material groups to the inquiry. If at least one material group is assigned to the inquiry, suppliers can only be selected if they are assigned to the appropriate material group.

SmartPlant Materials How to Create a Request for Quotation 15

Page 16: SmartPlant Materials How to Create a Request for Quotationspmat.hec.co.kr/marian_webentry/Pdfs/BP-C1-MSCM-How-to-create... · SmartPlant Materials How to Create a Request for

Detailed Workflows

Commercial Evaluation: The preparation of the commercial evaluation is done based on the setup previously created on P.10.41 Comm Eval Cklsts. Similar to the technical evaluation checklists, the task is to define keywords for commercial evaluation tasks that the buyer must perform during the commercial evaluation.

If the “default“ check box is checked, the record is copied automatically to each new created inquiry.

It is possible to create new evaluation checklists here by inserting a new seq number, saving, and then double-clicking the “Seq” field. This action opens A.10.41.

Exchange rates: The exchange rates functionality allows you to differentiate exchange rates for each inquiry, which allows you to react to many special market conditions. Although there

16 SmartPlant Materials How to Create a Request for Quotation

Page 17: SmartPlant Materials How to Create a Request for Quotationspmat.hec.co.kr/marian_webentry/Pdfs/BP-C1-MSCM-How-to-create... · SmartPlant Materials How to Create a Request for

Detailed Workflows

is a project-wide currency converting factor provided on the A.10.13 Unit to Unit Conversion screen , it is also very important to allow different converting rules inside one project for each inquiry to reflect different possible negotiation situations.

Attachments: The “Attachments” sub screen shows all the documents attached to the inquiry or copied from the requisition, including attached documents, attached VDRs, and attached text and terms.

Other costs: The “Other Costs” sub screen allows you to assign other cost items to the inquiry.

SmartPlant Materials How to Create a Request for Quotation 17

Page 18: SmartPlant Materials How to Create a Request for Quotationspmat.hec.co.kr/marian_webentry/Pdfs/BP-C1-MSCM-How-to-create... · SmartPlant Materials How to Create a Request for

Detailed Workflows

Orders: The “Orders” sub screen shows a cross reference to orders that have been created from the actual inquiry. No data can be inserted here.

Approve inquiry: After all the data on the P.30.21 screen is assigned to the inquiry, the inquiry can be approved. This means SmartPlant Materials creates for each assigned bidder one RFQ with exactly the same data defined by the inquiry. The inquiry approval is done on the “Inquiry” sub screen.

The ZP_SUPAPRV project default is used to remind the buyer of the client approval. If this is required, the project default must be set to ‘Y’. In this case, the approval can only be done after the ‘Supplier Approved’ check box is checked.

18 SmartPlant Materials How to Create a Request for Quotation

Page 19: SmartPlant Materials How to Create a Request for Quotationspmat.hec.co.kr/marian_webentry/Pdfs/BP-C1-MSCM-How-to-create... · SmartPlant Materials How to Create a Request for

Detailed Workflows

SmartPlant Materials How to Create a Request for Quotation 19

Clicking the ‘Approve’ button starts the approval procedure. After the approval, the inquiry can be unapproved at any time. Due to the fact that the approval creates the RFQs, the unapproval deletes the RFQs. This means all possible work that has already been done on an RFQ will be lost.