slickline basics (with photos)

86
Typical Wireline Rig-up Wireline Unit Stuffing Box Lubricator swab valve master valve Lower Sheave Upper Sheave Springs Slickline No conductor Single strand wire 3/14/2009 1 George E. King Engineering GEKEngineering.com

Upload: pintushetty

Post on 26-Nov-2015

533 views

Category:

Documents


51 download

DESCRIPTION

Slickline basics with photos

TRANSCRIPT

Page 1: Slickline Basics (with photos)

Typical Wireline Rig-up

Wireline Unit

Stuffing Box

Lubricator

swab valve

master valve

Lower Sheave

Upper Sheave

Springs

Slickline•No conductor

•Single strand wire

3/14/2009 1George E. King Engineering

GEKEngineering.com

Page 2: Slickline Basics (with photos)

3/14/2009 2George E. King Engineering

GEKEngineering.com

Page 3: Slickline Basics (with photos)

3/14/2009 3George E. King Engineering

GEKEngineering.com

Page 4: Slickline Basics (with photos)

Wireline Surface Equipment

• Reels and Controls

• BOP

• Lubricators

• Grease (oil) Seals

3/14/2009 4George E. King Engineering

GEKEngineering.com

Page 5: Slickline Basics (with photos)

3/14/2009 5George E. King Engineering

GEKEngineering.com

Page 6: Slickline Basics (with photos)

Wireline BOP

3/14/2009 6George E. King Engineering

GEKEngineering.com

Page 7: Slickline Basics (with photos)

Lubricator Layout and Loading – wireline operations

3/14/2009 7George E. King Engineering

GEKEngineering.com

Page 8: Slickline Basics (with photos)

Lubricator Length

• “Consider the tool string length when sizing the lubricator length. The available length to swallow a tool string is from the top of the swab valve to the bottom of the flowtubes. This length should be the TOTAL tool length, line head to bottom nose, plus 3 extra feet.”

3/14/2009 8George E. King Engineering

GEKEngineering.com

Page 9: Slickline Basics (with photos)

Stuffing Box – the Main Seal on the Wire

• Braided Line – Grease Injector

• Slick Line - Rubber elements with and without oil injection capacity. A hydraulic oil is usually used for sealing and lubrication of the wire.

3/14/2009 9George E. King Engineering

GEKEngineering.com

Page 10: Slickline Basics (with photos)

Schematic of a Grease Injector for Braided Line

Rubber Elements

Flow Tubes

Grease Injection

3/14/2009 10George E. King Engineering

GEKEngineering.com

Page 11: Slickline Basics (with photos)

Braided Line Grease Injector

– Blowing grease in the air? - the rubber is worn out. – Loosing grease in the well? -flow tubes too big/worn,

braided line worn. Either way, too much clearance.– Number of tubes depends on the pressure. Bottom flow

tube must be close to diameter of braided line.– If grease use is high (over 10 lb/day) operator may be

pumping too much grease - more than needed.– Greases comes in different viscosities, formulated for

pressure and temperature combinations .– If hanging gauges in well on braided cable during a job,

do not pump grease - just tighten rubbers.– Some greases thicken and/or emulsify with well or

injected fluids. Formation damage can be severe.3/14/2009 11

George E. King Engineering GEKEngineering.com

Page 12: Slickline Basics (with photos)

Wireline Fishing/Jarring Best Practices

• Maximum fishing time of 45 minutes to 1 hour before reheading wire – move the fatigue point (fatigue caused by continual working over the shieves during jarring) – usually cut off 100 ft.

• Work to 50% of max load.

• Use of 0.125 and braided wire considered?

3/14/2009 12George E. King Engineering

GEKEngineering.com

Page 13: Slickline Basics (with photos)

3/14/2009 13George E. King Engineering

GEKEngineering.com

Page 14: Slickline Basics (with photos)

Some Wire Types

• Bright Steel – most widely used, not for H2S or CO2

• AISI 304 – H2S service

• AISI 316 - H2S service

3/14/2009 14George E. King Engineering

GEKEngineering.com

Page 15: Slickline Basics (with photos)

Wire Limits (Bright Steel) (estimates only)

Wire Size Minimum Tensile Strength MaximumWork Level

0.072” 972 lb. 500 to 600 lb. ?

0.082” 1239 lb. 850 lb. ?

0.092” 1547 lb. 1000 lb. ?

0.108” 2436 1400 lb. ?

0.125” 3200 1800 lb. ?

Minimum tensile is 75% of rated break strength.

Data for “bright plow steel wire”

3/14/2009 15George E. King Engineering

GEKEngineering.com

Page 16: Slickline Basics (with photos)

Wire Limits - AISI 304 (estimates only)

Wire Size Minimum Tensile Strength MaximumWork Level

0.082” 1280 lb. 850 lb. ?

0.092” 1582 lb. 1000 lb. ?

0.105” 2070 lb. 1400 lb. ?

Minimum tensile is 75% of rated break strength.

3/14/2009 16George E. King Engineering

GEKEngineering.com

Page 17: Slickline Basics (with photos)

Wireline breaks involve fatigue, physical damage to the wire, corrosion and other factors.

3/14/2009 17George E. King Engineering

GEKEngineering.com

Page 18: Slickline Basics (with photos)

Nominal Weight of Wire

Wire Size Wt per 1000 ft of wire

0.072 14 lb

0.082 18 lb

0.092 22.6 lb

0.108 31 lb

0.125 44 lb

3/14/2009 18George E. King Engineering

GEKEngineering.com

Page 19: Slickline Basics (with photos)

Selecting Wireline

• What devices have to be pulled (weights, loads)?

• What impact forces are needed?• What are the tubing sizes?

– Small tubing – smaller wire, easier to work and recover.

• Corrosion potential?• Local preferences?

3/14/2009 19George E. King Engineering

GEKEngineering.com

Page 20: Slickline Basics (with photos)

Braided line – stronger (2800 to 3500 lb working strength, but less “feel” when fishing and slower line speed.

Watch abrasion of steel by braided wire.

Harder to get a seal in stuffing box/grease injector

3/14/2009 20George E. King Engineering

GEKEngineering.com

Page 21: Slickline Basics (with photos)

Wireline Operations

• Common workovers with wireline– liquid and fill tags

– gauge running and retrieval

– gas lift valve replacement

– sleeve shifting

– plug and packer setting

– bailer runs

3/14/2009 21George E. King Engineering

GEKEngineering.com

Page 22: Slickline Basics (with photos)

Wireline Operations

• Advantages - speed, cost, footprint, “feel”• Disadvantages

– low wire strength– lack of rotation– lack of circulation

• Problems– lack of experienced operator– poorly maintained units– impatience– poor well records

3/14/2009 22George E. King Engineering

GEKEngineering.com

Page 23: Slickline Basics (with photos)

Common Problems with Wireline

• Wire breaks– Fatigue (work hardening failure)

– corrosion (H2S, CO2, acids)

– load failure

• Damage to well equipment and coatings from wire abrasion

3/14/2009 23George E. King Engineering

GEKEngineering.com

Page 24: Slickline Basics (with photos)

Slick Line Torsion Tester - Twist testing has eliminated wire breakage in many areas.

3/14/2009 24George E. King Engineering

GEKEngineering.com

Page 25: Slickline Basics (with photos)

3/14/2009 25George E. King Engineering

GEKEngineering.com

Page 26: Slickline Basics (with photos)

Wire Fatigue – Number of turns to break wire

• Wire Size New Min turns to break– 0.072 29

– 0.082 26

– 0.092 23

– 0.108 20

– 0.125 22 18

3/14/2009 26George E. King Engineering

GEKEngineering.com

Page 27: Slickline Basics (with photos)

Look at the type of break

• Smooth – no problem

• Jagged – embrittlement possible, even if the turn count is within minimum tolerance, put new wire on the unit.– Corrosion by H2S and CO2

– Fatigue mixed with embrittlement

3/14/2009 27George E. King Engineering

GEKEngineering.com

Page 28: Slickline Basics (with photos)

Wireline Fatigue

• Limit the wireline crews to 50 - 60 jar cycles prior to POOH and cut of +/- 50m wire

3/14/2009 28George E. King Engineering

GEKEngineering.com

Page 29: Slickline Basics (with photos)

Some Very Basic Learnings

• About “90%” of success is in the operator selection.• Wire line breaks can be almost totally eliminated by

torsion testing of wire and limiting jarring times.• When wire breaks, always expect a little wire above

the rope socket.• When possible, run a fishing tool that has a release.• H2S wells can be wireline nightmares

3/14/2009 29George E. King Engineering

GEKEngineering.com

Page 30: Slickline Basics (with photos)

Wireline Equipment Checks

• 1. Measure and record data for all equipment that goes in the hole.– diameters of every component

– tool body lengths

– thread patterns of each component

– Tapers, shoulders, unusual equipment

– compressed and extended jar lengths

3/14/2009 30George E. King Engineering

GEKEngineering.com

Page 31: Slickline Basics (with photos)

Wireline Equipment Checks

• 2. Wire history– size, material

– use history

– corrosion treatment

– torsion testing (turns before breaking)

– jarring time in one spot (working continuously over the shieve or pulley thins and fatigues wire)

3/14/2009 31George E. King Engineering

GEKEngineering.com

Page 32: Slickline Basics (with photos)

Wireline Equipment Checks

• 3. Equipment– working condition

– support for loads

– lubricator pressure limit

– seal equipment capability and backup

– seal equipment sizing

3/14/2009 32George E. King Engineering

GEKEngineering.com

Page 33: Slickline Basics (with photos)

0.125” Wireline

• extra pulling cap. advantage, w/stubborn SSSV's

• need 16" shieves and winch, tools etc., to match

• more muscle required to make the rope socket

• when fishing, it tends to come out in 2-10' lengths.

• consider use of sidewall cutters, box off wire if break

• main hurdle is education of the operators

• extra weight when deep cancels out extra pulling cap.

• less "feel", less accelaration when jarring

3/14/2009 33George E. King Engineering

GEKEngineering.com

Page 34: Slickline Basics (with photos)

Wireline Basic Equipment

• Rope Socket

• Jars

• Tools

• Wireline torsion testers

3/14/2009 34George E. King Engineering

GEKEngineering.com

Page 35: Slickline Basics (with photos)

3/14/2009 35George E. King Engineering

GEKEngineering.com

Page 36: Slickline Basics (with photos)

3/14/2009 36George E. King Engineering

GEKEngineering.com

Page 37: Slickline Basics (with photos)

3/14/2009 37George E. King Engineering

GEKEngineering.com

Page 38: Slickline Basics (with photos)

There are many different types of rope rockets.

The number of turns in the wire influences breaking strength.

If wire breaks prematurely during rope sock makeup , do a torsion test.

3/14/2009 38George E. King Engineering

GEKEngineering.com

Page 39: Slickline Basics (with photos)

3/14/2009 39George E. King Engineering

GEKEngineering.com

Page 40: Slickline Basics (with photos)

Wire Cutter Problems in Deviated Wells

• When the tool string is stuck, the most common approach is to cut the wire as close to the BHA as possible with a drop-type cutter.

• In high angle wells there is potential for a traditional wire cutter not to get to bottom.

• Need for a releasable rope socket?

3/14/2009 40George E. King Engineering

GEKEngineering.com

Page 41: Slickline Basics (with photos)

Junk in the bottom of a well

3/14/2009 41George E. King Engineering

GEKEngineering.com

Page 42: Slickline Basics (with photos)

Jars

• Mechanical or spang jars – old design, but very effective– Mostly for near vertical wells, but have been used

in deviated sections (losese effectiveness as deviation increases)

• Hydraulic jars– Much slower acting– Less (?) affected by deviation – still requires a tight

wire above the jar.

3/14/2009 42George E. King Engineering

GEKEngineering.com

Page 43: Slickline Basics (with photos)

3/14/2009 43George E. King Engineering

GEKEngineering.com

Page 44: Slickline Basics (with photos)

Fishing neck must be in good shape with sharp shoulders. Also, look for any damage to threads.

3/14/2009 44George E. King Engineering

GEKEngineering.com

Page 45: Slickline Basics (with photos)

Hydraulic Jars•Hydraulic Jars – initial problems.

- Problematic operation in gas & hot wells.- Minimal impact forces due to short stroke length.

• Spring Jars were developed with longer stroke leading togreater impact forces.

- Fixed spring value - jar had to be disassembled to change.- Typically only 3 different values of spring available.

•Adjustable Upstroke Jar (PAJ) (Petroline- Weatherford)• - Longer stroke leading to greater impact forces.

- Jar setting can be changed across a wide range and without disassembly.- Disc spring stack design a highly efficient stored energy medium.

3/14/2009 45George E. King Engineering

GEKEngineering.com

Page 46: Slickline Basics (with photos)

Tools

• Basic Tool String Design

• Running Tools

• Fishing Tools

3/14/2009 46George E. King Engineering

GEKEngineering.com

Page 47: Slickline Basics (with photos)

Pulling Weight Into the Well – The Problems

• Long lubricators required

• Rig up height increased

• Added friction in deviated wells from longer weight stem

• Less wireline load capacity

3/14/2009 47George E. King Engineering

GEKEngineering.com

Page 48: Slickline Basics (with photos)

3/14/2009 48George E. King Engineering

GEKEngineering.com

Page 49: Slickline Basics (with photos)

3/14/2009 49George E. King Engineering

GEKEngineering.com

Page 50: Slickline Basics (with photos)

Tools

• Stem

• Knuckles

• Various Tools

3/14/2009 50George E. King Engineering

GEKEngineering.com

Page 51: Slickline Basics (with photos)

3/14/2009 51George E. King Engineering

GEKEngineering.com

Page 52: Slickline Basics (with photos)

3/14/2009 52George E. King Engineering

GEKEngineering.com

Page 53: Slickline Basics (with photos)

3/14/2009 53George E. King Engineering

GEKEngineering.com

Page 54: Slickline Basics (with photos)

Gauge ring cutters

Problems in highly deviated wells -sticking

3/14/2009 54George E. King Engineering

GEKEngineering.com

Page 55: Slickline Basics (with photos)

Dimension should closely follow id of tube - this allows check for partial collapse and prevents material from getting on top of tool string.

Camco3/14/2009 55

George E. King Engineering GEKEngineering.com

Page 56: Slickline Basics (with photos)

CT Fishing Survey ToolsTools and devices which help determine fish type andorientation

Lead impression blocks:Provide information on profile and orientation of the fishExperience required to interpret recovered impression

Downhole cameras transmit images/video to surface:Clean wellbore fluid requiredTemperature/time limitationsHigh cost of service

3/14/2009 56George E. King Engineering

GEKEngineering.com

Page 57: Slickline Basics (with photos)

Set down once and retrieve. Multiple set downs only confuse the imprint.

Also known as a “confusion block” - generally for good reason.

3/14/2009 57George E. King Engineering

GEKEngineering.com

Page 58: Slickline Basics (with photos)

3/14/2009 58George E. King Engineering

GEKEngineering.com

Page 59: Slickline Basics (with photos)

Lead Impression Block Interpretation

Offset and incomplete impression

Fish lying on side of wellbore

3/14/2009 59George E. King Engineering

GEKEngineering.com

Page 60: Slickline Basics (with photos)

3/14/2009 60George E. King Engineering

GEKEngineering.com

Page 61: Slickline Basics (with photos)

Some lead impression blocks may be made in various shapes for assistance in describing shapes or locations of fish.

3/14/2009 61George E. King Engineering

GEKEngineering.com

Page 62: Slickline Basics (with photos)

Impression Block Best Practices

• Run a near drift block

• Set down one time and POOH

• Keep a file of paper cut-outs of pipe body diameters, connection diameters, tool connections, etc., that might look up. Helps to match the cut-out to the shape of the impression.

3/14/2009 62George E. King Engineering

GEKEngineering.com

Page 63: Slickline Basics (with photos)

Downhole video much better than impression blocks for real information

3/14/2009 63George E. King Engineering

GEKEngineering.com

Page 64: Slickline Basics (with photos)

3/14/2009 64George E. King Engineering

GEKEngineering.com

Page 65: Slickline Basics (with photos)

One type of running tool

3/14/2009 65George E. King Engineering

GEKEngineering.com

Page 66: Slickline Basics (with photos)

3/14/2009 66George E. King Engineering

GEKEngineering.com

Page 67: Slickline Basics (with photos)

JD Pulling Tools – note sharp shoulders and clean tool bodies

3/14/2009 67George E. King Engineering

GEKEngineering.com

Page 68: Slickline Basics (with photos)

JD Pulling tool – commonly run just below the jar in the BHA.

JD tools are used for external fishing necks.

3/14/2009 68George E. King Engineering

GEKEngineering.com

Page 69: Slickline Basics (with photos)

The tops of fishing necks are usually tapered to assist the fishing tool in locating and attaching.

Note sharp shoulders

Note the extended body of the neck – this allows some extension above the top of debris that may settle on top of the plug.

3/14/2009 69George E. King Engineering

GEKEngineering.com

Page 70: Slickline Basics (with photos)

Outside fishing neck with flow through capacity.

3/14/2009 70George E. King Engineering

GEKEngineering.com

Page 71: Slickline Basics (with photos)

One problem with inside fishing necks is that debris may prevent the prong from entering and latching.

3/14/2009 71George E. King Engineering

GEKEngineering.com

Page 72: Slickline Basics (with photos)

Inside fishing neck for a GS running tool

3/14/2009 72George E. King Engineering

GEKEngineering.com

Page 73: Slickline Basics (with photos)

Fish Type and Dimensions

•Many fishing tools only catch on limited size range(OD or ID)•When dimensions of fish are known:–Prepare accurate fishing diagram–Prepare wellbore or completion diagram

•Factors influencing selection of tools/techniques:–Fish stuck/free–Fill or junk on top of fish–Fish material properties

• e.g. small ferrous objects retrieved by magnetic devices

3/14/2009 73George E. King Engineering

GEKEngineering.com

Page 74: Slickline Basics (with photos)

Fishing Diagram - Fishing Neck Detail

4.250 in.3.500 in.

2.000 in. 1.500 in.

3.750 in.

2.313 in.2.000 in.1.813 in.

Depth to top of fish 3455.50 ft

Wellbore tubularFish OD and length information

are presented in a general fishing diagram

3/14/2009 74George E. King Engineering

GEKEngineering.com

Page 75: Slickline Basics (with photos)

3/14/2009 75George E. King Engineering

GEKEngineering.com

Page 76: Slickline Basics (with photos)

The top of a gas lift valve, bent over in the wellbore.

DHV Inc.

3/14/2009 76George E. King Engineering

GEKEngineering.com

Page 77: Slickline Basics (with photos)

Wellbore and Completion Geometry

•Minimum tubular or restriction size–Determines maximum OD of CT/toolstring which can be used

•When assessing drift clearances–Consider removal of fill

•Pressure differential may exist across the fish–Can force toolstring up or down wellbore

•When determining overpull available at fish–Consider wellbore geometry

3/14/2009 77George E. King Engineering

GEKEngineering.com

Page 78: Slickline Basics (with photos)

3/14/2009 78George E. King Engineering

GEKEngineering.com

Page 79: Slickline Basics (with photos)

Bailer BottomFlapper in the bottom of the bailer tube.

3/14/2009 79George E. King Engineering

GEKEngineering.com

Page 80: Slickline Basics (with photos)

Tools for running and retrieving gas lift valves – note: maximum length of tools and valve or dummy must fit into the tool body. Latching too long a valve can stick assembly.

Detent finger on tool body – indexes tool and orients for running and retrieval.

3/14/2009 80George E. King Engineering

GEKEngineering.com

Page 81: Slickline Basics (with photos)

Tubing End Locator - Problem

• “Upon RIH with the tool, we encountered high pick-upweights and were unable to enter the liner and the 7" sectionwhere the finger should open up. In this scenario we beganto POOH with the pin unsheared. Since the spring was forcingthe finger out, it would act as a hook on anynipples/restrictions encountered while pulling out of hole.However, because of the smaller ID, the finger would beunable to push out more than approx 45 degrees and hencethe shear pin would never see any force - the pivot pin wouldsee all the stress.”

3/14/2009 81George E. King Engineering

GEKEngineering.com

Page 82: Slickline Basics (with photos)

End of Tubing Locator. Arm is spring loaded and tucked into the tubing with end pointing upward. At end of tubing, the arm is deployed by the spring. It cannot swing into the slot in the body until it shears the pin.

It is normal to pin with a small pin, perhaps even steel – but watch the profiles and unusual diameter changes.

3/14/2009 82George E. King Engineering

GEKEngineering.com

Page 83: Slickline Basics (with photos)

High Angle Wells

• Rollers– Used for getting wireline assemblies into deviated

wells.

– Most needed for heavy tool strings

– Can increase application of wireline into wells to over 80 degrees.

• Friction Reduction– Chemical additives reduce friction by 30%

3/14/2009 83George E. King Engineering

GEKEngineering.com

Page 84: Slickline Basics (with photos)

Roller stem used in higher deviation wells. Watch problems with deposits such as scale, paraffins, and asphatenes.

3/14/2009 84George E. King Engineering

GEKEngineering.com

Page 85: Slickline Basics (with photos)

3/14/2009 85George E. King Engineering

GEKEngineering.com

Page 86: Slickline Basics (with photos)

Wireline Checklist – a few pointers

1. Check pipe connection connection and pressure rating of lubricator and BOP

2. Check mandrel profiles and other tools to be run for correct OD, profile type and function.

3. Check pressure equalization features on all pulling and retrieving tools

4. Check that running, pulling and fishing tools have the correct latch mechanism for the tool being run or retrieved.

5. Check wireline unit for proper function (engine, clutch and line)

6. Check wire with twist test for fatigue

7. Have emergency plan for handling breaks and leaks.

3/14/2009 86George E. King Engineering

GEKEngineering.com