www.DLR.de Chart 1 SITEF < Information and Match Making Event > Düsseldorf, 24.02.2016 SITEF / SIlicone Fluid Test Facility SITEF - Solar-Era.NET - Information and Match Making Event Düsseldorf, 24.02.2016

Upload: tranhanh

Post on 16-Nov-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

www.DLR.de • Chart 1 SITEF < Information and Match Making Event > Düsseldorf, 24.02.2016

SITEF / SIlicone Fluid Test Facility

SITEF - Solar-Era.NET - Information and Match Making EventDüsseldorf, 24.02.2016

www.DLR.de • Chart 2 < Solar-Era.Net - Information and Match Making Event > Düsseldorf, 24.02.2016 –SITEF- by christoph hilgert

Overview

1. SITEF – Facts and Project Partners

2. Project Application

3. Outlook

- German-Spanish cooperation

- PROMETEO test facility at PSA with HELISOL®

- NEW, more environmental friendly HTF ~ 430°C

- Durability and loop scale applicability of HELISOL®- Comprehensive Lab analysis – degradation

- Functionality parabolic trough collector components at up to 450°C - Receiver Tubes - Rotation and expansion performing assemblies

- Economic benefit of HELISOL®- technical investments / greater energy output

- Safety concept and (permitting process for relevant target markets)

www.DLR.de • Chart 3 < Solar-Era.Net - Information and Match Making Event > Düsseldorf, 24.02.2016 –SITEF- by christoph hilgert

SITEF – Facts

www.DLR.de • Chart 4 < Solar-Era.Net - Information and Match Making Event > Düsseldorf, 24.02.2016 –SITEF- by christoph hilgert

SITEF – Partners

Exploitation

DLR (Coordinator) HTF Lab AnalysisCiemat Operation and Maintenance

PREOMETEO test facility (PSA)Wacker HELISOL® + HTF Lab AnalysisTSK Flagsol Engineering, EPC with HELISOL® Senior Flexonics REPAsTÜV Nord SafetyRWE (associated – pending) Permitting process target markets

www.DLR.de/sf • Chart 5

PROMETEO Facility

www.DLR.de • Chart 6 < Solar-Era.Net - Information and Match Making Event > Düsseldorf, 24.02.2016 –SITEF- by christoph hilgert

Project Application

www.DLR.de • Chart 7 < Solar-Era.Net - Information and Match Making Event > Düsseldorf, 24.02.2016 –SITEF- by christoph hilgert

oder andere Unternehmen (Lizenz)

Verwertungsschiene

Wacker

Schott

Development(Lab‐Scale) Silicone HTF 

Demonstration(Loop‐Scale) HTF and Key Components

Follow ‐ Up

National Full‐

Proposal

SI‐HTF Project SI‐??? 

2014 2015 2016 2017 2018

Era.NetFull‐Prop.

Era.NetFull‐

Proposal

National Full‐

Proposal

Era.NetPre‐Prop.

Era.NetPre‐Prop.

SITEF Project

Nation.Full‐

Proposal

Era.NetPre + Full‐

Proposal

www.DLR.de • Chart 8 SITEF < Information and Match Making Event > Düsseldorf, 24.02.2016

Outlook

- Application Round (Call) 2016

- Hydrogen Monitoring – Countermeasures

- Application Round (Call) 2017

- SITEF follow-up project, using the “Silicone Fluid Test Facility”

- Cualification of componetes / system(s) under realistic conditions

www.DLR.de • Chart 9 SITEF < Information and Match Making Event > Düsseldorf, 24.02.2016

.

DLR, Qualificationchristoph hilgert

[email protected]