Site Commissioning Procedure Security Level 2012-08-07 HUAWEI Page1, Total25 1. Connecting the Web LCT to the IDU Connecting the Web LCT to the IDU properly is a prerequisite for future data configuration and for other commissioning items. Prerequisite The equipment must be powered on. Tools, Equipment, and Materials Web LCT Procedure 1.1 Start the laptop and log in to the operating system. 1.2 Set the IP address of the laptop. The IP address of the laptop should meet the following requirements: The IP address of the laptop and the IP address of the NE should be in the same network segment (the default network segment is 129.9.0.0), and the IP address of the laptop is different from the IP address of the NE. The subnet mask of the IP address of the laptop should be the same as the subnet mask of the IP address of the NE (the default subnet mask is 255.255.0.0). The default gateway is null. 1.3 Use a network cable to connect the Ethernet port of the laptop to the NMS/COM port on the system control, switching, and timing board. CAUTION:

Upload: syed-muhammad-danish

Post on 23-Nov-2015

167 views

Category:

Documents


10 download

DESCRIPTION

Its all about site commisioning process

TRANSCRIPT

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page1, Total25

    1. Connecting the Web LCT to the IDU

    Connecting the Web LCT to the IDU properly is a prerequisite for future dataconfiguration and for other commissioning items.

    Prerequisite

    The equipment must be powered on.

    Tools, Equipment, and Materials

    Web LCT

    Procedure

    1.1 Start the laptop and log in to the operating system.

    1.2 Set the IP address of the laptop.

    The IP address of the laptop should meet the following requirements:

    The IP address of the laptop and the IP address of the NE should be in thesame network segment (the default network segment is 129.9.0.0), and the IPaddress of the laptop is different from the IP address of the NE.

    The subnet mask of the IP address of the laptop should be the same as thesubnet mask of the IP address of the NE (the default subnet mask is255.255.0.0).

    The default gateway is null.

    1.3 Use a network cable to connect the Ethernet port of the laptop to the NMS/COMport on the system control, switching, and timing board.

    CAUTION:

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page2, Total25

    Ensure that the network cable is properly connected to the Ethernet port of thelaptop and the NMS/COM port on the system control, switching, and timing board.Otherwise, the equipment or test tool may be damaged.

    NOTE:

    The NMS/COM port on the system control, switching, and timing board is a self-adaptive port for crossover cables and straight through cables. Thus, a straightthrough cable can also be used to make the connection. For the wire sequences ofcrossover cables and straight through cables, see Network Cable in the OptiX RTN980 Radio Transmission System IDU Hardware Description.In this case, the indicators at the Ethernet port and the NMS/COM port are on(green). If the operating system on the laptop allows the prompt for localconnections, the prompt that the network has been connected is displayed. If theoperating system displays the prompt indicating the collision of IP addresses,change the IP address.

    1.4 Optional: Set the IE to the default browser.

    1.5 Optional: Set the security level of the IE to medium or lower.

    1.6 Optional: Disable the interception function for pop-up windows.

    NOTE:

    If the other plug-ins also intercept pop-up windows, disable the interceptionfunction.

    1.7 Optional: Set the options of the IE.

    a. Run the IE.

    b. Choose Tool > Internet Options in the tool bar of the IE.

    c. On the Common tab, click Settings in the Internet Temporaries box.

    d. In Check for newer versions of stored pages, click Every visit to thepage, and then click OK.

    e. Click OK.

    1.8 On desktop, double-click the Start Web LCT icon.

    The system displays the USER LOGIN window of the Web LCT.

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page3, Total25

    1.9 Enter the values of User Name and Password, and then click Login.

    User Name: admin

    Password: admin

    If the entered user name and the password are both correct, the NE List page isdisplayed in the IE.

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page4, Total25

    2 Creating NEs

    2.1 Using the Search Method

    The Web LCT can find all NEs that communicate with a specific gateway NE by using the IPaddress of the gateway NE, the IP address range of the gateway NE, or the NSAPaddresses. In addition, the Web LCT can create the NEs that are found in batches. Comparedwith the method of manually creating NEs, this method is faster and more reliable.

    Prerequisites

    The communication between the NMS and the NE must be normal.

    The NE user must have the authority of Operation Level or higher.

    Tools, Equipment, and Materials

    Web LCT

    Procedure

    2.1.1 In NE List, click NE Search.Then, the Search NE dialog box is displayed.

    2.1.2 Select the search mode.

    2.1.3 Optional: If Search Mode is set to Search NE, you need to set the networksegment.

    a. Click Manage Domain.The Manage Domain Search dialog box is displayed.

    b. Optional: Click Add, and set Domain and Domain Address to add anetwork segment.

    c. Optional: Select an existing network segment, and click Modify to modifythe network segment.

    d. Optional: Select an existing network segment, and click Delete to delete thenetwork segment.

    NOTE:

    During initial configuration, Domain is 129.9.255.255 by default. After the gateway NE IP

    address of the searched NE is changed, you need to change the value of Domain. The

    default network segment cannot be modified and deleted.

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page5, Total25

    2.1.4 Click Search.

    2.1.5 After the Web LCT finds the NEs to be managed, click End Search.

    2.1.6 Select the NE that needs to be added and click Add NE.A dialog box is displayed, indicating that the NE is added successfully.

    2.1.7 Click OK.A new NE is already added to the NE list.

    2.1.8 Click Cancel.

    2.2Using the Manual Method

    You can only create NEs one by one by using the manual method. The manual method,unlike the search method, does not allow creating NEs in batches.

    Prerequisites

    You must be an NM user with NE operator authority or higher.

    The communication between the NMS and the NE to be created must be normal.

    If the NE to be created is a non-gateway NE, the gateway NE to which the NE to becreated belongs must be created.

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page6, Total25

    Procedure

    2.2.1 In the Physical ViewPhysical Root, right-click New > NE.The Create NE dialog box is displayed.

    2.2.2 Choose RTN Series > OptiX RTN 980 from the Object Tree.

    2.2.3 Enter the following information: ID, Extended ID, Name, and Remarks.

    2.2.4 Set Gateway Type for the NE.

    If... Then...

    The Gateway Type parameter is set

    to Gateway

    Proceed to the next step.

    The Gateway Type parameter is set

    to Non-Gateway

    Select the gateway to which the NE

    belongs, and go to 2.2.6.

    2.2.5 Specify the protocol and IP address that the NE uses.

    If... Then...

    If the Protocol parameter is set to IP Enter the IP Address of the NE.

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page7, Total25

    2.2.6

    2.2.7 Specify NE User and Password.

    The default user name is root and the default password is password.

    2.2.8 Click OK.

    2.2.9 Click the Main Topology.The icon of the NE is displayed at the cursor position.

    3 Logging In to an NE

    After an NE is created, you need to log in to the NE before managing the NE.

    Prerequisites

    You must be an NM user with NE operator authority or higher.

    The NEs to be managed must be created in the NE List.

    Tools, Equipment, and Materials

    U2000

    Procedure

    3.1 In the NE List, select the target NE and click NE Login.

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page8, Total25

    TIP:

    You can select more than one NE at one time.

    The NE Login dialog box is displayed.

    3.2 Enter User Name and Password. Then, click OK.

    The default User Name is lct.

    The default Password of user lct is password.

    Login Status of the NE in the NE List changes to Logged In. Alarm Status of the NE is

    changed from Unknown to the current alarm status of the NE.

    3.3 Click NE Explorer.The NE Explorer is displayed.

    TIP:

    To quickly start the NE Explorer, double-click the NE to be managed in the NE list.

    TIP:

    Check the legend to learn the specific meanings of different colors andsymbols in the slot layout diagram.

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page9, Total25

    Click to fold/unfold the legend.

    4 Changing the NE ID

    Modify the NE ID according to the engineering planning to guarantee that each NE ID isunique. Modifying the NE ID does not interrupt services.

    Prerequisite

    The NE user must have the authority of Operation Level or higher.

    Tools, Equipment, and Materials

    Web LCT

    Procedure

    4.1 In the NE Explorer, select the NE from the Object Tree and choose Configuration >NE Attribute from the Function Tree.

    4.2 Click Modify NE ID.The Modify NE ID dialog box is displayed.

    4.3 Specify New ID and New Extended ID.

    4.4 Click OK.A dialog box is displayed for confirmation, click OK.

    5 Changing the NE Name

    To better identify the NE in the Main Topology, name the NE according to the NEgeographical location or the device connected to the NE.

    Prerequisite

    The NE user must have the authority of Operation Level or higher.

    Tools, Equipment, and Materials

    Web LCT

    Procedure

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page10, Total25

    5.1 In the NE Explorer, select the NE from the Object Tree and then chooseConfiguration > NE Attribute from the Function Tree.

    5.2 Enter the name of the NE in Name.

    NOTE:

    The name of an NE cannot contain any space or Chinese characters.

    5.3 Click Apply.

    6 Setting NE Communication Parameters

    The communication parameters of an NE include the IP address of the NE, the gateway IPaddress, and the subnet mask.

    Prerequisite

    The NE user must have the authority of Operation Level or higher.

    Tools, Equipment, and Materials

    Web LCT

    Procedure

    6.1 Select the NE from the Object Tree in the NE Explorer. Choose Communication >Communication Parameters from the Function Tree.

    6.2 Configure the communication parameters of the NE.

    6.3 Click Apply.

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page11, Total25

    NOTE:

    When you configure multiple parameters, click Apply respectively.

    7 Configuring the Logical Board

    If the logical board corresponding to the physical board is not added in the slot layout, add thelogical board in the slot layout. If the physical board is inconsistent with the logical board inthe slot layout, delete the inconsistent logical board and add the correct logical board.

    Prerequisites

    The NE user must have the authority of Operation Level or higher.

    All the boards must be installed correctly.

    Tools, Equipment, and Materials

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page12, Total25

    Web LCT

    Procedure

    7.1 Click the Slot Layout tab and click Add Physical Boards.

    Based on the slot layout, the NE automatically configures the logical boards that arerequired but still not be configured for certain physical boards.

    7.2 Optional: On the slot to which the board is to be added, right-click, and then selectAdd XXX. XXX is the name of the board to be added.

    7.3 Optional: On the slot to which the board is to be deleted, right-click, and then selectDelete.

    a. A dialog box is displayed for confirmation, click OK.

    b. A dialog box is displayed again for confirmation, click OK.

    NOTE:

    Before deleting the board, delete the data, such as the service, clock, orderwire, and

    protection, on the board.

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page13, Total25

    8 Configuring the IF/ODU Information of a Radio Link

    By configuring the IF/ODU information of a radio link, you can configure the IF/ODUinformation that is frequently used by the SDH/PDH radio link based on each radio link.

    Prerequisites

    The NE user must have the authority of Operation Level or higher.

    The IF boards and the ODUs to which the IF boards are connected must be added onthe Slot Layout.

    Tools, Equipment, and Materials

    Web LCT

    Precautions

    In 1+1 HSB/SD protection mode, one protection group corresponds to one radio link.In this case, you need configure only the IF/ODU information of the main device.

    In 1+1 FD protection mode, one protection group corresponds to one radio link. Inthis case, you need configure the IF/ODU information of the active device and the ODUinformation of the standby device.

    In the case of one XPIC radio link, one XPIC workgroup corresponds to two radiolinks. The IF/ODU information of the two radio links in different polarization directionsshould be separately configured.

    In the case of N+1 radio links, one N+1 protection group corresponds to N+1 radiolinks and the IF/ODU information of the N+1 radio links should be configuredrespectively.

    Procedure

    8.1 In the NE Explorer, select the NE and then choose Configuration > LinkConfiguration from the Function Tree.

    8.2 Click the IF/ODU Configuration tab.

    8.3 lick an IF board icon or ODU icon.Then, the system displays the IF/ODU information of the radio link to which the IF

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page14, Total25

    board or ODU to which the IF board is connected belongs.

    8.4 Configure the corresponding IF information of the radio link.

    8.5 Click Apply.

    8.6 Configure the corresponding ODU information of the radio link.

    8.7 Click Apply.

    9 Creating an XPIC Protection Group

    If you configure two XPIC radio links after binding the two radio links as an XPIC workgroup,the parameter settings including the channel bandwidth, transmit frequency, transmit power,and ATPC attribute are ensured to be the same for the two radio links.

    Prerequisites

    You must be an NM user with NE operator authority or higher.

    The corresponding XPIC IF boards and the ODUs connected to the XPIC IF boardsare added to the NE Panel.

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page15, Total25

    Tools, Equipment, and Materials

    U2000

    Procedure

    9.1 Select the NE from the Object Tree in the NE Explorer. Choose Configuration >Link Configuration from the Function Tree.

    9.2 Click the XPIC tab.

    9.3 Click New.The Create XPIC Protection Group dialog box is displayed.

    9.4 Configure the parameters for the XPIC protection group.

    9.5 Click OK.

    10 Setting the AM Attributes of the XPIC Hybrid Radio Link

    After the XPIC protection group is created, you need to configure the AM attributes of theXPIC Integrated IP radio link according to the planned values.

    Prerequisites

    You must be an NM user with NE operator authority or higher.

    The XPIC protection group must be created.

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page16, Total25

    Tools, Equipment, and Materials

    U2000

    Background Information

    The XPIC IF boards, IFX2 and ISX2, support Integrated IP radio, and the AM attributes canbe configured.

    Procedure

    10.1 Select the NE from the Object Tree in the NE Explorer. Choose Configuration >Link Configuration from the Function Tree.

    10.2 Click the XPIC tab.

    10.3 Click the Hybrid/AM Configuration tab.

    10.4 Configure the AM attributes of the XPIC Hybrid radio link.

    10.5 Click Apply.

    11 Localizing the NE Time

    When the daylight saving time (DST) is used in the area where the NE is located, you need tolocalize the NE time to synchronize the NE time with the local time.

    Prerequisite

    You must be an NM user with NE operator authority or higher.

    Tools, Equipment, and Materials

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page17, Total25

    U2000

    Procedure

    11.1 Choose Configuration > NE Batch Configuration > NE Time LocalizationManagement from the Main Menu.

    11.2 Select the NE for time localization management from the Object Tree, and then click

    .

    11.3 Click the Time Zone drop-down list, and then set the time zone of the NE.

    12 Synchronizing NE Time

    Adjust the NE time so that the NE time remains synchronized with the time on the NMS. Inthis manner, the NMS can accurately record the time when an alarm, a performance event, oran abnormal event occurs.

    Prerequisites

    The basic data of NEs on the entire network must be configured.

    Time setting on the Web LCT must be correct.

    You must be an NM user with NE maintainer authority or higher.

    Tools, Equipment, and Materials

    Web LCT

    Procedure

    12.1 In the NE Explorer, select the NE and then choose Configuration > NE TimeSynchronization from the Function Tree.

    12.2 Right-click the NE whose time needs to be synchronized and choose Synchronizewith NM Time from the shortcut menu.

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page18, Total25

    13 Configuring the Performance Monitoring Status of NEs

    By default, the performance monitoring of NEs is enabled. You can disable or enable thisfunction manually and set the period of the performance monitoring of NEs manually.

    Prerequisite

    You must be an NM user with NE operator authority or higher.

    Tools, Equipment, and Materials

    U2000

    Procedure

    13.1 In the NE Explorer, select the NE from the Object Tree, and then choosePerformance > NE Performance Monitoring Time from the Function Tree.

    13.2 Configure the parameters of the performance monitoring of NEs.

    a. Select 15-Minute or 24-Hour.

    b. Select Enabled or Disabled in Set 15-Minute Monitoring or Set 24-HourMonitoring.

    c. Set the start time and end time of the performance monitoring of NEs.

    NOTE:

    Generally, both Set 15-Minute Monitoring and Set 24-HourMonitoring are enabled.

    You can specify the start time of the performance monitoringfunction, only after selecting Enabled in the Set 15-Minute Monitoring orSet 24-Hour Monitoring area.

    You can specify the end time of the performance monitoring function,only after selecting Enabled and then selecting To in the Set 15-MinuteMonitoring or Set 24-Hour Monitoring area.

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page19, Total25

    d. Click Apply, and then close the dialog box that is displayed.

    14 Checking Alarms

    By checking the alarms generated by the equipment, you can check whether the equipment isworking properly.

    Prerequisites

    The equipment must be connected to the Web LCT.

    Data configuration must be complete.

    Tools, Equipment, and Materials

    Web LCT

    Procedure

    14.1 In the NE Explorer, select an NE from the Object Tree, and then click in the

    toolbar.

    14.2 Click the Browse Current Alarms tab.

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page20, Total25

    15 Configuring the Enable Status of the Inband DCN Function

    on Ports

    The network management information can be transmitted over a link by the inband DCN onlywhen the inband DCN function is enabled on the ports at both ends of the link.

    Prerequisite

    You must be an NM user with NE administrator authority or higher.

    Tools, Equipment, and Materials

    U2000

    Procedure

    15.1 Select the NE from the Object Tree in the NE Explorer. Choose Communication >DCN Management from the Function Tree.

    15.2 Click the Port Settings tab.

    15.3 Select FE/GE.

    15.4 Configure the enable status of the inband DCN function on ports.

    15.5 Click Apply.

    15.6 Select IF.

    15.7 Configure the enable status of the inband DCN function on ports.

    15.8 Click Apply.

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page21, Total25

    16 Aligning Dual-Polarized Antennas

    When you align dual-polarized antennas, align the main lobe of the antenna signals byadjusting the azimuth and elevation of the antennas at both ends. You also need to adjust thefeed booms of the antennas so that the cross-polarization discrimination (XPD) meets thespecified requirements.

    Prerequisites

    The site commissioning of the radio equipment at both ends of the radio link must becomplete.

    The weather must be suitable for outdoor work. There should be no rain, snow or fogbetween stations.

    The on-site conditions must meet the requirements for the antenna to operate at ahigh altitude and the personnel required to commission the antenna must be trained towork at high altitudes.

    The ATPC function must be disabled (the default status on the NE is Disabled).

    The AM function must be disabled (the default status on the NE is Disabled).

    Tools, Equipment, and Materials

    Adjustable wrench

    Telescope, interphone, socket-head wrench

    Multimeter (with a BNC connecter prepared at one end for future tests), and north-stabilized indicator.

    Procedure

    16.1 Check the installation modes of the ODUs at both ends of the radio link.

    If... Then...

    The ODUs are directly

    installed onto an OMT

    Adjust the antenna as a single-polarized antenna. For

    the detailed operations, see Aligning the Single-

    Polarized Antennas.

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page22, Total25

    The ODUs are installed

    separately from the

    antenna

    Proceed to the next step.

    16.2 Power off the vertically polarized ODUs at both ends of the radio link, power on thehorizontally polarized ODUs at both ends of the radio link, and thus ensure that theantennas transmit horizontally polarized signals.

    16.3 Adjust the azimuth angle and elevation angle of the antennas at both ends byreferring to Aligning the Single-Polarized Antennas, and ensure that the main lobe ofthe horizontally polarized signals is aligned with the antenna.

    16.4 Measure the RSL (P1) of the horizontally polarized signals at the local end.

    a. Use a multimeter to measure the signal level on the RSSI port of thehorizontally polarized ODU.

    b. Calculate the RSL (P1) of the horizontally polarized received signals byreferring to the curve diagram in the ODU box.

    16.5 Adjust the feed boom at the local end, and ensure that the RSL of the verticallypolarized signals reaches the lower threshold (P2).

    a. Power on the vertically polarized ODU at the local end.

    b. Use a multimeter to measure the signal level on the RSSI port of thevertically polarized ODU.

    c. Calculate the RSL (P2) of the vertically polarized signals by referring to thecurve diagram in the ODU box.

    d. Calculate the XPD1 (XPD1 = P1 - P2).

    If... Then...

    The calculated XPD1 (XPD1 = P1 - P2) should be less than

    30 dB.

    Proceed to the next

    step.

    The calculated XPD1 (XPD1 = P1 - P2) should not be less

    than 30 dB.

    Perform 6.

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page23, Total25

    e. Release the holder of the feed boom to some extent, and turn the feed boomslightly until the signal level reaches the lower threshold. The calculated XPD1(XPD1 = P1 - P2) should not be less than 30 dB.

    16.6 Record the angle (D1) of the current feed boom.

    16.7 Power off the horizontally polarized ODUs at both ends of the radio link, power on thevertically polarized ODUs at both ends of the radio link, and thus ensure that theantennas transmit vertically polarized signals.

    16.8 Measure the RSL (P3) of the vertically polarized signals at the local end by referringto 4.

    16.9 Adjust the feed boom at the local end, and ensure that the RSL of the verticallypolarized signals reaches the lower threshold (P4).

    a. Power on the vertically polarized ODU at the local end.

    b. Use a multimeter to measure the signal level on the RSSI port of thevertically polarized ODU.

    c. Calculate the RSL (P4) of the vertically polarized signals by referring to thecurve diagram in the ODU box.

    d. Calculate the XPD2 (XPD2 = P3 - P4).

    If... Then...

    The calculated XPD2 (XPD2 = P3 - P4) should be less than

    30 dB.

    Proceed to the next

    step.

    The calculated XPD2 (XPD2 = P3 - P4) should not be less

    than 30 dB.

    Perform 10.

    e. Release the holder of the feed boom to some extent, and turn the feed boomslightly until the signal level reaches the lower threshold. The calculated XPD2(XPD2 = P3 - P4) should not be less than 30 dB.

    16.10Record the angle (D2) of the current feed boom.

    16.11Adjust the feed boom slightly (ranging from D1 to D2), and ensure that XPD1 andXPD2 are not less than 30 dB.

    NOTE:

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page24, Total25

    If D1 and D2 are the same, you need not adjust the feed boom.

    16.12Tighten all the screws of the antennas.

    NOTE:

    Use the multimeter to measure the received value of RSSI. Avoid any fault in the

    alignment of antennas in the process of tightening the screws.

    17 Checking the Status of Radio Links

    After aligning the antennas, you need to query the status of radio links and determine whetherthe radio links are normal.

    Prerequisite

    Aligning the antennas must be complete.

    Procedure

    17.1 Observe the Link indicator on the IF board.

    a. If the Link indicator on the IF board is on (green), it indicates that the radiolink is normal.

    b. If the Link indicator on the IF board is on (red), check whether the dataconfiguration of the ODU is correct and whether the antennas are aligned.

  • Site Commissioning Procedure Security Level

    2012-08-07 HUAWEI Page25, Total25

    18 Configuring Access Control

    When the equipment is connected to the NMS through an Ethernet service port, you need toconfigure access control.

    Prerequisite

    You must be an NM user with NE operator authority or higher.

    Tools, Equipment, and Materials

    U2000

    Procedure

    18.1 In the NE Explorer, select the NE from the Object Tree and then chooseCommunication > DCN Management from the Function Tree.

    18.2 Click the Access Control tab.

    18.3 Set the parameters for configuring access control.