sit presentation amira -final

21
STUDENT INDUSTRIAL TRAINING (SIT) PRESENTATION NAME & ID: NUR AMIRA BTE MOHD RUBA’AI (16793) DEPARTMENT: PROJECT & TURNAROUND (PTA) SUPERVISOR: EN SHAFIQ BIN MOKHTAR 1

Upload: hakeym-larh

Post on 17-Jan-2016

91 views

Category:

Documents


1 download

DESCRIPTION

Sample of UTP SIT Slide

TRANSCRIPT

Page 1: Sit Presentation Amira -Final

1

STUDENT INDUSTRIAL TRAINING (SIT)PRESENTATION

NAME & ID: NUR AMIRA BTE MOHD RUBA’AI (16793)DEPARTMENT: PROJECT & TURNAROUND (PTA)SUPERVISOR: EN SHAFIQ BIN MOKHTAR

Page 2: Sit Presentation Amira -Final

2

CONTENT

AUGUST 13,2014

OBJECTIVE

INTRODUCTION

COMPANY OVERVIEW

THE SIT EXPERIENCES

CONCLUSION

Page 3: Sit Presentation Amira -Final

3

To give an overview of main projects undertaken during internship period in SRC & events participatedTo reflect challenges and skills acquired during internship periodTo establish close relationship between the industry and UTPTo reflect on upcoming projects for SIP

AUGUST 13, 2014

OBJECTIVE

Page 4: Sit Presentation Amira -Final

4AUGUST 13,2014

SIT PERIOD 19TH MAY 2014 – 23RD DECEMBER 2014

HOST COMPANY Shell Refining Company (FOM) Berhad Port Dickson

DEPARTMENT / SECTION Engineering-Project & Turnaround

HC SUPERVISOR EN SHAFIQ BIN MOKHTAR Senior Engineer- Project & Turnaround

INTRODUCTION

Page 5: Sit Presentation Amira -Final

5AUGUST 13, 2014

Learning Goals

To understand the function and working conditions of an oil and gas organization

To explore a possibility for my future career

To learn organizing a project in details

To enhance my communication skills

To build network

Page 6: Sit Presentation Amira -Final

6AUGUST 13, 2014

1960Formerly known as Shell Refining Company (FOM) Port Dickson

125 kilo barrels per day (kbd) of crude processed

VisionTop Performing & Most admired Refinery in Asia

Mission To continuously deliver shareholder value by manufacturing and supplying oil products and service that satisfy the needs of our customer

COMPANY OVERVIEW

Page 7: Sit Presentation Amira -Final

7AUGUST 13,2014

UPSTREAM

DOWNSTREAM

PROJECTS & TECHNOLOGY

CORE BUSINESS

Page 8: Sit Presentation Amira -Final

8

Oil Movement & Jetty

Complex 1

Complex 2

Long Residue Catalytic Cracking Unit ( LRCCU)

HIJAU

AUGUST 13,2014

SRCPD process unit

PROCESS UNIT 1 (PU 1) PROCESS UNIT 2 (PU 2)

Page 9: Sit Presentation Amira -Final

9

MAIN PROJECTS

DAILY ROUTINE WORK

FUTURE PROJECTS

HSSE & CX EVENTS

THE SIT EXPERIENCES AT SRCPD

AUGUST 13,2014

TRAINING INVOLVEMENT

Page 10: Sit Presentation Amira -Final

10AUGUST 13,2014

HANDLING CABIN

CLEARANCE PROJECT

Challenges:

1. Required to plan, schedule and

understand of refining working

practices.

2. Carried the responsibility of

planning and execute works within

timeframe.

Skills/Experiences Gained:

1. Valuable communication skills

2. Initiatives on finding resource and

information by discussing with

experienced team (e.g. senior

engineer)

3. Analytical skill

MAIN PROJECTS

Page 11: Sit Presentation Amira -Final

April 21, 2023 11

UPDATING EQUIPMENT

DATABASE OF TA

Challenges:

1. Required to identify and categorized

scope of work on each equipment’s

code.

2. Learned to read and interpret

technical drawings e.g. Process

Engineering Flow Scheme

(PEFS)

Skills/Experiences Gained:

1. Read and interpret PEFS

2. Ability to recognize equipment

tagging

3. Master in Microsoft Excel

DAILY ROUTINE WORK

Page 12: Sit Presentation Amira -Final

12AUGUST 13,2014

2011 MTA DATABASE

Page 13: Sit Presentation Amira -Final

April 21, 2023 13

RESULTS

Page 14: Sit Presentation Amira -Final

14AUGUST 13, 2014

ATTACH TO ROTATING EQUIPMENT

DEPARTMENT

T-1109 INSPECTION

PRESENTATION TASK

DAILY ROUTINE WORKS

Page 15: Sit Presentation Amira -Final

15AUGUST 13,2014

HSSE Induction Training Stand Down

Training

TRAINING involvement

Page 16: Sit Presentation Amira -Final

16

ENVIRONMENT FUN RUN

CAR WASH CHARITY

LUNCH EVENT WITH UNDERPRIVILEDGED

KIDS

SHELL SAFETY DAY 2014

Hsse & cx EVENTS

Page 17: Sit Presentation Amira -Final

17AUGUST 13,2014

OPERATION FIRE WATER

PUMP SYSTEM

TURNAROUND DATABASE

1) To study feasibility of Fire Water Pump system requirement during TA for cleaning service

2) To propose additional utility source to mitigate insufficient water capacity

3) Prepare complete document i.e. checklist for next Turnaround

1) As a visual management tools for turnaround’s equipment scope history

2) Identify & segregate plant equipment

3) To know equipment’s history

OBJECTIVE

OBJECTIVE

FUTURE PROJECTS

Page 18: Sit Presentation Amira -Final

18AUGUST 13, 2014

Achieved the objectives and learning goals during internship

Experienced the real working environment of the industry

Relate the theoretical with practical applications

Able to explore career interest upon graduation

CONCLUSIONS

Page 19: Sit Presentation Amira -Final

AUGUST 13,2014

Q & A SESSIONS

20

Page 20: Sit Presentation Amira -Final

THANK YOU

AUGUST 13,2014 21

Page 21: Sit Presentation Amira -Final

22