    Yorkshire Water

    Bridlington rBWD

    Construction Method Statement

    Issue | 29 October 2012

    This report takes into account the particular

    instructions and requirements of our client.

    It is not intended for and should not be relied

    pon by any third party and no responsibility

    is undertaken to any third party.

    Job number 214709-30

    Ove Arup & Partners Ltd

    Admiral House Rose Wharf

    78 East Street

    Leeds LS9 8EE

    United Kingdom

    ww.arup.com

  • 7/27/2019 Show Kat 765

    2/41

    Yorkshire Water Bridlington rBWDConstruction Method Statement

    | Issue | 29 October 2012

    G:\0 ARUP\0-12 WATER\0-12-08 REPORTS\BRIDLINGTON - BELGRAVE ROAD - CONSTRUCTION METHOD STATEMENT - ISSUE.DOCX

    Page 1

    1 Belgrave Road Pumping StationThis document has been produced in relation to Yorkshire Waters (YW)Bridlington Revised Bathing Water Directive Scheme and specifically theBelgrave Road Pumping Station.

    The information contained within the Construction Method Statement has been

    developed by Morgan Sindall Grontmij, YWs construction contractor, and has

    been complied into this document in response to the requirements of Planning

    Condition 8.

    The following paragraphs indicate each element of the planning condition and the

    relevant appendix containing detailed information:

    (i) Areas on site, designated for the storage of heavy duty plant and

    equipment, including vehicles and car parking facilities for constructionsite operatives and visitors;

    See Appendix A Compound General Arrangements

    (ii)Activities such as earth moving, on site aggregate mixing, crushing,screening, piling etc. and on site storage and transportation of rawmaterial, including timing of works;

    Appendix A contains details of the working areas and works being carriedout in each area.

    Appendix B - Construction Programme details the proposed timing of theworks

    Appendix C contains Method Statements and construction managementinformation including RAMS08 related to Piling works

    (iii)Working practices to include fugitive emissions of dust arising from onsite activities to include for example (but not exclusively) wheel washing;

    See Appendix C which contains the following relevant Morgan Sindall

    Grontmij Method Statements and construction management information:

    G S1 028 Control of Noise, Vibration Dust, Ecology & Archaeology

    G S1 311 Tool Box Talk Dust

    (iv)Working practices for protecting the nearby residential dwellings,including measures to control noise and vibration arising from on siteactivities such as piling, as set out in British Standard 5228 Part 1:1997

    noise and Vibration Control on Construction and Open Sites;

    See Appendix C which contains the following relevant Morgan Sindall

    Grontmij Method Statements and construction management information:

    RAMS05 Control of Noise

    G S1 009 Control of Noise

    G S1 028 Control of Noise, Vibration Dust, Ecology & Archaeology

    G S1 306 Tool Box Talk Noise and Vibration

  • 7/27/2019 Show Kat 765

    3/41

    Yorkshire Water Bridlington rBWDConstruction Method Statement

    | Issue | 29 October 2012

    G:\0 ARUP\0-12 WATER\0-12-08 REPORTS\BRIDLINGTON - BELGRAVE ROAD - CONSTRUCTION METHOD STATEMENT - ISSUE.DOCX

    Page 2

    (v) Details of emergency procedures and pollution response;See RAMS06 Environmental Emergency Control Plan contained within

    Appendix C

    (vi)Areas of storage of fuels and chemicals to ensure fuels from plant do notcause pollution;

    See G S1 111 Chemical and Fuel Storage contained in Appendix C

    (vii)Details of lighting required on site during the construction phase;Each compound location will have defined segregation of plant and

    personnel. Principal compound lighting will be provided by VT1 tower

    lights or similar and task lighting shall be used locally.

    Bulkhead lights may also need to be utilised in the event of dark spots.

    This would be individually assessed when the main compound light are

    operational.

    (viii) Codes of Practice in respect of (i) to (viii) above with which the sitecontractor and the Applicant shall monitor compliance.

    As part of the MGJV Contract Management System, the site managementteam undertake biweekly Environmental Inspections and weekly SafetyInspection.

    In conjunction with these, Safety & Environmental Advisors undertakemonthly S. H. & E. audits respectively and task specific items will behighlighted in the Method Statements and within the Inspection and TestPlans.

    See Appendix C which contains the following relevant Morgan SindallGrontmij Method Statements and construction management information:

    RAMS05 Control of Noise

    RAMS06 Environmental Emergency Control Plan

    RAMS08 Sheet Piling Works

    G S1 009 Control of Noise

    G S1 028 Control of Noise, Vibration Dust, Ecology & Archaeology

    G S1 111 Chemical and Fuel Storage

    G S1 306 Tool Box Talk Noise and Vibration

    G S1 311 Tool Box Talk Dust

  • 7/27/2019 Show Kat 765

    4/41

    Yorkshire Water Bridlington rBWDConstruction Method Statement

    | Issue | 29 October 2012

    G:\0 ARUP\0-12 WATER\0-12-08 REPORTS\BRIDLINGTON - BELGRAVE ROAD - CONSTRUCTION METHOD STATEMENT - ISSUE.DOCX

    Appendix A

    Compound GeneralArrangements

  • 7/27/2019 Show Kat 765

    5/41

  • 7/27/2019 Show Kat 765

    6/41

    Heavy Duty Hoarding

    Vehicular Access Gates

    Pedestrian Access Gates

    Pedestrian Routes On Site

    22/10

    Da

    BR

    Tit

    Da

    22/10

    Notes

    1. All personnel shall use the park &

    ride facility established at South

    Cliff.

    2. Site footpaths will be separated

    from vehicle routes using

    pedestrian fencing.

    3. Area lighting to be provided by

    VT1 tower lights.

    4. Footpaths to be illuminated using

    bulkhead lights

  • 7/27/2019 Show Kat 765

    7/41

    NOTES

    1. All TrafficTraffic Signs

    2. All signs "

    3. All cones

    4. To be rea100197 X100197 X100197 X

    5. In the eveBelgrave Ro

    6. Site accedriveways e

    7. Pedestria

    TYP

    Shaft 6 Compound

    Amendedjunction

    No Entry

    No Entry

    Car Parking along both sidesof South Marine Drive

    suspended where requiredduring construction period

    Road Width of 5.0mmaintained to

    accommodate lifeboat

    Footpath closed andfenced off

    TY

    A

    A

    5 Metres for life boat

    TYPICAL SECTION at A-A(South Marine Drive)

    Red / WhiteBARRIERS

    FENCEPumping Station Compound

    WORKSAREA

    This section of road tobe kept clear for

    construction deliveryvehicle access

    50m

    Nominatedcrossing point

    TemporaryStaircase

    Unloading bay forbuses / taxis

    Nominatedcrossing point

    Nominatedcrossing point

    Temporary public toilets

  • 7/27/2019 Show Kat 765

    8/41

    Yorkshire Water Bridlington rBWDConstruction Method Statement

    | Issue | 29 October 2012

    G:\0 ARUP\0-12 WATER\0-12-08 REPORTS\BRIDLINGTON - BELGRAVE ROAD - CONSTRUCTION METHOD STATEMENT - ISSUE.DOCX

    Appendix B

    Construction Programme

  • 7/27/2019 Show Kat 765

    9/41

    100197 Bridlington rBWD

    Belgrave Programme of Works

    Loaction / Description

    Belgrave Pump Station

    Establish TMA, compound, ramp widening & enabling

    Sheet piling & anchor retaining wall

    Demolish toilet block, excavate and install piling platform

    Guide beam & secant piling to sump

    Props & bulk excavation to sump

    Formwork & reinforced concrete

    Building Structure Toilet block & MCC

    Roof slabs and parrrapets

    Fit out toilet block

    Mechanical & electrical installation

    Testing & commissioning

    Architectural and Landscaping Finishes to PS & Surroundings

    Shaft 6 South Marine Drive

    Consruction of shaft

    Pipe jack shaft 6 to pump station

    Belgrave Long Sea Outfall

    Beach set up, dewatering & drive pit construction

    Piejack in to pumpstation, demobilise from site

    Belgrave CSO

    Excavation of CSO chamber

    Formwork & reinforced concrete

    Backfill, remove sheets, covers & reinstatement

    Mechanical & electrical installation

    System Connection

    Testing & commissioning

    01-Nov 01-Dec 01-Jan 01-Feb 01-Sep 01-Oct 01-Nov01-Jun 01-Jul 01-Aug01-Mar 01-Apr 01-May

    MMon th 11 Mon th 12 Mon th 13M onth 8 M onth 9 M onth 10Month 5 Month 6 Month 7Month 2 Month 3 Month 4Month 1

  • 7/27/2019 Show Kat 765

    10/41

    Yorkshire Water Bridlington rBWDConstruction Method Statement

    | Issue | 29 October 2012

    G:\0 ARUP\0-12 WATER\0-12-08 REPORTS\BRIDLINGTON - BELGRAVE ROAD - CONSTRUCTION METHOD STATEMENT - ISSUE.DOCX

    Appendix C

    Morgan Sindall GrontmijMethod Statements andconstruction managementinformation

  • 7/27/2019 Show Kat 765

    11/41

    Form Ref: F S1 000YW Rev A

    Method Statement Page 1 of 6

    Batch/Site: Bridlington rBWD

    Title: Preliminary Sheet Piling Works

    Batch Contract No &MS No.: 100197/MS/08

    Issue No: Original

    Date: 25/10/12

    Author: P Golding Signature: P Golding Date: 25/10/12

    Preliminary method statement not to be used forconstruction

    Action

    1.0 INTRODUCTION /SCOPE OF WORK

    To facilitate the construction of the new Belgrave Pumping Station, ground levelhas to be reduced to promenade level. The L