Short information about Aktobe regionRepublic of Kazakhstan

Page 2: Short information about Aktobe region Republic of Kazakhstan

Description

Russian Federation143,5 million

Uzbekistan

30,2 million Turkmnistan

5,2 million

Kazakhstan17 million

China1,4 billion

Mongolia2,8 million

India1,3 billion

Belarus9,5 million

Iran77,4 million

Pakistan182,1 million

Turkey74,9 million

LianyungangLianyungang

Saint PetersburgSaint Petersburg

АктобеАктобе

Kyrgyzstan

5,7 million

Location of the Republic of Kazakhstan

Internation highway Western Europe-Western China that passes through Aktobe

Symbols

Within 2 000 km

Page 3: Short information about Aktobe region Republic of Kazakhstan

Territory - 300.6 thousand m2 km, 11% of the entire territory of the Republic of Kazakhstan.

Population - 822.7 thousand people, including urban - 61.7%, rural - 38.3%.

About 500 industrial enterprises

The volume of industrial production in 2013 - 8.6 billion $ (average annual growth - 4.6%)

Summary of the Aktobe region

Page 4: Short information about Aktobe region Republic of Kazakhstan

Industrial production in 2013 and the share (%) within the Republic of Kazakhstan

Raw material

Raw material Units VolumeShare (%) of the region in Kazakhstan

Chrome ore

Thousand tons

3255,0 100%

Chrome concentrate

4193,2 100%

Ferroalloys 377,2 22,1%

Copper ore 5105,1 12,4%

Copper concentrate

355,1 5,1%

Oil 8339,6 10,2%

Natural gas Million m3 4140,0 19,1

Page 5: Short information about Aktobe region Republic of Kazakhstan

Deposit Content

Reservesthousand tons Scope of application

АВС1 С2

Chrome oreGeophysical Cr2O3 - 46,7% 84

Manufacturing of cast iron with increased strength, heat – acid resistance, production of refractories, production of chrome salts and other

Zapadnaya Cr2O3 - 46,7% 2 062 3 236

- Cr2O3 - 39,6% 53 

Sarsaiskoe Cr2O3 - 47,4% 200

Nickel - cobalt ore

BudenovskoeNi - 0,45%, Co - 0,04%

off-balance sheet - 4 460 20,1

1691

Nickel - iron and steel, energy, chemical and petrochemical industry and otherCobalt - heat-resistant, magnetic, superhard, corrosion-resistant and other alloys and coatings, in engineering and medicine, resistant paints and enamels, ceramics, glass and other

OktyabrskoeNi - 0,47%, Co - 0,03%

off-balance sheet - 16 210

76,9 4108

Available deposits of Aktobe region

Page 6: Short information about Aktobe region Republic of Kazakhstan

Deposit Content

Reservesthousand tons Scope of application

АВС1 С2

Titanium and zirconium ores

Kumkol

Average contentТiO2 - 15,61 г/т

ZrO2 - 2,37г/т

27 61243165,5

 

Titan - aviation and rocket engineering, shipbuilding, chemical and food industry and otherZircon - in the foundry as foundry sand and refractory ceramics and other

Kirov and bituminous rocks

Dongeleksor 4 478 1 147Pavements and other

Akshoky 12 645 1 803

Asbestos

Bugetsay788,568,20

13,20,8

Fireproof textiles, filter, heat insulation, fire-resistant paints, fillers for plastics and asbestos cement and other

Feldspar

Promezhutochnoe 32,0 12,0Raw material for ceramics. In the glass, abrasive and electrical industries and other

Available deposits of Aktobe region

Page 7: Short information about Aktobe region Republic of Kazakhstan

Deposit Content

Reservesthousand tons Scope of application

АВС1 С2

Phosphate ore

Bogdanovskoe Р2О5 – 11,68%80 513

9 404

24 642

2 878

Phosphate rock - to fertilize the soil and otherKoktobinskoe Р2О5 -

47 664

4 671

80 283

7 868

Isetskoe Р2О5 – 14,1%.  92 683

13 068

Gold

SarlybaiAverage content of

gold - 24,92 g/t

13,0

324

15,0 285

The price of gold in Sberbank of Russiaon 03/24/2015:Buy - 2080.00 rubles. for 1 gramFor Sale - 2300.00 rubles. for 1 gramPogranichnoe

Average content of gold - 7,25 g/t

4,0 29

14,4 134,5

Brown coal

Yaisanskoe

Ash - 20-32%volatile content - 50%, calorific value of the

dry mass - 4,8 thousand. kcal / kg.

96 306  

Fuel oil, char and thermal coal. Ash content shall not exceed:40% - for coal combustion37% - for layer25% - for briquetting

Available deposits of Aktobe region

Page 8: Short information about Aktobe region Republic of Kazakhstan

Company Product

«Aktobe Copper Company»(ZAO «Russian Copper Company»)

Copper

«Aktobe KazakhOil» LLP (JSC «Caspian Investment Resources Ltd» - JV «Lukoil Overseas» and Sinopec)

Oil and gas

«Jubilee» LLP («SUN Group») Gold

«SNPC Aktobemunaigas» JSC («China National Petroleum Corporation» (CNPC))

Oil and gas

«Batis Potassium» LLP («SINO-AGRIHoldingLimited»)Potassium salts

Ada Oil LLP Oil and gas

"Voskhod-Oriel» LLC («YILDIRIMGROUP») Chrome

«KazCopper» LLP («VI Megatech») Cathode copper

«Chilisai Chemicals» LLP («SunkarResourcesPlc») Mineral fertilizers

«Nitrohim» LLP («Pari-SA») Explosives

«Total» company Oil and gas

Operating foreign companies in KazakhstanOperating foreign companies in Kazakhstan

Page 9: Short information about Aktobe region Republic of Kazakhstan

Government measures to support investors in the competence of City Hall of Aktobe region

1Obtaining subsoil use rights on the deposits

(general minerals)

2PPP - Concessions ("build-transfer-operate")

Reimbursement of operating expenses. Compensation of investment costs. Management remuneration concession object.

3Co-financing of the project by the National Investment Company

JSC "SEC" Aktobe "- (preferential leasing or equity participation up to 49% of the share capital)

4 Benefits for loans and leasing

5 Providing land plot with infrastructure in industrial zones

6Support through the "Investors Service Center" on the principle of "one window" (permits, meetings,

free provision of temporary office, and others.)

7 Targeted training of personnel for the investment project

Page 10: Short information about Aktobe region Republic of Kazakhstan

Investment projects in Aktobe region for potential investors, creditors,

strategic partners.

Page 11: Short information about Aktobe region Republic of Kazakhstan

Electric Steel Melting Shop

Project initiator: LLP “ARBZ”Participants of the project: LLP "ARBZ" (the main consumer)Short description of a new product: Steel Billets of necessary cross sectionsSources of raw materials: scrap metal (JSC "Kazakhstan Temir Joly"), hot briquetted iron.Demand market: up to 400 000 tons - LLP "ARBZ" - for the production of rails and bars. ExportEstimated annual production: 533 000 tons / yearProject location: Aktobe, KazakhstanTotal project cost: 280 million. $Type of necessary investments: credit / leasing, equity participationThe estimated project implementation period: 2015-2018 yearsCurrent project status: The development of project feasibility study.The social impact of the project: 400 jobs will be created

1

Page 12: Short information about Aktobe region Republic of Kazakhstan

Complex mineral fertilizers

Project Initiator: LLP «Chilisai Chemical»The shareholders of the project initiator: Sunkar Resources Plc (Virgin Islands)Short description of a new product: Complexwater-soluble nitrogen-phosphorus fertilizers:- Diammonium phosphate (DAP)- Monoammonium phosphate (IAF)Sources of raw materials: Phosphorite deposits in ownership of LLP «Chilisai Chemical»Demand market:60% - domestic market40% - exportEstimated annual production: 1.6 million. tons / yearProject location: “Mugalzhar” DistrictTotal project cost: 600 million. $Type of necessary investments: -The estimated project implementation period: Stage I in 2017 - 830 000 tons;Stage II in 2020 - 830 000 tons.Current Status: Development of the project feasibility study.Searching for investors. Currently negotiation process with potential investors.The social impact of the project: 1 000 jobs will be created

Центр Обслуживания Инвесторов: 8(7132)-55-13-00 (215), 8701-52-42-555, e-mail: [email protected]

Page 13: Short information about Aktobe region Republic of Kazakhstan

Titanium and zirconium ores

Project initiator: LLP “Expo engineering"Brief description of the new product: 1) ilmenite, 2) rutile 3) zirconSources of raw materials: "Shokash" deposit of titanium and zirconium ores (Stocks - 10.3 million tons)Demand Demand market: the domestic market, exports Planned annual production: 0.7 million m3 ore / yearProject location: “Martuk” District(110 km. from Aktobe region)Total project cost: 40 million $The estimated project implementation period: 2017Social impact of the project: about 400 jobs will be created

3

Page 14: Short information about Aktobe region Republic of Kazakhstan

Mining and metallurgical complex

Project Initiator: LLP «Aktobe steel production»Shareholders of the initiator of the project:90.1% - Residents of the Republic of Kazakhstan9.9% - JSC NC "SEC" Aktobe"Short description of a new product: Production of concentrate from phosphorus iron ore to produce cast iron.Sources of raw materials: mining rights on deposit of "Kokbulakskoe"Demand market: China, Russia, EuropeEstimated annual production: 8.0 million tons of concentrate (Equivalent – 900 mln. $)The total project cost – 161 mln. $Funding structure: 30% - own funds, 70% - borrowedType of necessary investments: credit / leasing. Possible equity participation.The estimated project implementation period: June 2015 - December 2018Social impact of the project: about 900 jobs will be created

4

Page 15: Short information about Aktobe region Republic of Kazakhstan

Nickel plant

Project initiator: LLP "GRK" Zheti Kazyna "The shareholders of the project initiator: LLP "Polymetal" and not legal entities of Republic of KazakhstanProspective participants in the project:LLP "Badamshinsky nickel plant"Co-investor -Murad-MI Holding (Azerbaijan)Short description of a new product:Metal oxide concentrates - nickel, cobalt.Sources of raw materials: North “Rozhdestvenskoe” and South Shirpakainskoe deposits. Deposit of silicate nickel-cobalt ores.With an average grade of nickel in ore 0.75%, stocks of pure metal nickel are 90 000 tons.Demand market: China, Russia, EuropeEstimated annual production:nickel oxide concentrate - 3054 tons / year.cobalt oxide concentrate - 123 tons / year.Project location: north of the village “Badamsha”.Total project cost: 166.0 million $Type the necessary investment: equity, loan.Funding structure: Kazakhstan (50%), Azerbaijan (50%)The estimated project implementation period: Building Mining Processing Plant - II quarter of 2016 - End of the 1st quarter of 2018.The social impact of the project: 150 jobs will be created Current project status: calculation of the deposit reserves are complete. Analyzed to determine the chemical composition of the ore. Design documentation is developed.

Defined and proven technology. Entered into a preliminary agreement with the consumers of the final product and equipment suppliers. Purchased land for construction of the plant. In April it is expected signing an agreement with a new investor (Azerbaijan, UAE).Considering the issue of the extension of the subsoil use contract.

5

Page 16: Short information about Aktobe region Republic of Kazakhstan

Mining and Processing Plant

Project initiator: LLP “Aktobe-Temir-VS” The shareholders of the project initiator: Gemini Mining BV - Virgin IslandsShort description of a new product: Iron ConcentrateSources of raw materials: 120 million tons of ore is confirmed by the audit. Mining rights availableDemand market: Domestic market (50%), exports (50%)Estimated annual production: 1.0 million tons of iron concentrate.Project location: “Kargaly” DistrictTotal project cost: 133.0 million $Type the necessary investment: equity, loan.Funding structure: 20% own 80% of the loan.The estimated project implementation period: 2018-2019Current project status: 1 500 samples of “Velihovskoe South” ore deposit were sent to the laboratory of LLP «SGS Vostok Limited" Chita city, for technological research on the recoverability of mineral components. Report on enrichment obtained. Contract with a consulting company was signed, which explores the world market and provides forecast prices for titanium-vanadium concentrate (TCE) by 2030. Based on the report of enrichment and report on the study of world prices for TCE, Technical feasibility study will be prepared

6

Page 17: Short information about Aktobe region Republic of Kazakhstan

Nitric acidProject initiator: LLP "KazTsKUB" Nitrohim"(Currently "Nitrohim" company produces industrial explosives)The shareholders of the project initiator: LLP Paris CA-KAZ (Switzerland)Prospective participants in the project: JSC "Chemoprojekt Nitrogen" (Czech Republic) - co-investment, design, turnkey construction.Brief description of the new product: nitric acid (used in the production of fertilizers, synthetic dyes, explosives, nitrovarnishes, plastics, pharmaceuticals and other synthetic substances).Demand market: Chemical industry of Kazakhstan, Export - 50%Estimated annual production: 480 thousand tons / year (600 tons / hour)Project location: “Alga” district Total project cost: 60 million $Type of necessary investments: credit / leasing, equity participation, off-take contractFunding structure: own funds - 15% loan - 85%.The estimated project implementation period: 2015-2019Current status of the project: Development of technical specifications and Technical feasibility study. Signed a memorandum on a joint project implementation with JSC "Chemoprojekt Nitrogen" (Czech Republic).The social impact of the project: 70 jobs will be created

7

Page 18: Short information about Aktobe region Republic of Kazakhstan

Ammonium nitrate

Project initiator: LLP "KazTsKUB" Nitrohim. "(Currently "Nitrohim" company produces industrial explosives)The shareholders of the project initiator: LLP Paris CA-KAZ (Switzerland)Prospective participants of the project: 1) JSC "Chemoprojekt Nitrogen" (Czech Republic) - co-investment, of NIIK - design, 2) "SAFIHEM Projects Group" (Czech Republic) - design and supply of equipment.Product description: Ammonium nitrate (used in the production of industrial explosives and for agricultural purposes).Sources of raw materials: Raw own production (nitric acid, natural gas).Demand market: Mining, Agricultural companies of RK, export up to 50%Estimated annual production: up to 500 thousand tons per year.Project location: “Alga” districtTotal project cost: 48 million. $Type of necessary investments: credit / leasing, equity participation, off-take contract.Funding structure: 15% - own funds, 85% - loan / leaseThe estimated project implementation period: 2015-2019

8

Page 19: Short information about Aktobe region Republic of Kazakhstan

Yellow waterproof and porous ammonium nitrateProject initiator: LLP "KazTsKUB" Nitrohim. "(Currently "Nitrohim" company produces industrial explosives)The shareholders of the project initiator: LLP Paris CA-KAZ (Switzerland)Prospective participants in the project: "Scientific Research and Design Institute of Urea" - design Dzerzhinsk, Russia - designing yellow nitrateProduct description: "The yellow waterproof" and "porous" ammonium nitrate (the main raw material for all kinds of industrial explosives).Demand market: Kazakhstan mining industry, exports.Estimated annual production: 25 thousand tons per year (equivalent to - 1,6 bln. / Year)Project location: “Alga” district (80 km to the city of Aktobe)Total project cost: 32.4 million. $Type of the necessary investments - credit / leasing, equity participation, off-take contract.Funding structure: 15% - own funds, 85% - loan / leasing.The estimated project implementation period: 2017The current status of the project: feasibility studyThe social impact of the project: 60 jobs

9

Page 20: Short information about Aktobe region Republic of Kazakhstan

Automation and expansion of the brand ammonite 6GV

Project initiator: LLP "KazTsKUB" Nitrohim. "(Currently "Nitrohim" company produces industrial explosives)The shareholders of the project initiator: LLP KhiminvestProspective participants in the project: «Quadra Engenharia Sustentável» (Portugal) (research, development, design and monitoring of the installation and commissioning works)Product description: Ammonite brand 6GV (purchase of automated packaging lines of the final products - Ammonite 6 ЖВ. Which will increase production of ammonite 6 ЖВ by 24,5%. As a result, the level of labor will decrease by 35%, improving the industrial safety and working conditions). Ammonal 6 ЖВ (with aluminum powder).Demand market: Mining companiesEstimated annual production: Performance of the machine is determined by consumer and can optionally be raised up to 625 kg per hour, or up to 5 000 tons per yearLocation: Alga district (80 km to Aktobe city)Total project cost: 22 mln. $Type of required investments: not necessary, off-take contractSocial impact: 40 jobs will be created.

Page 21: Short information about Aktobe region Republic of Kazakhstan

Detonators, waveguides

Project initiator: LLP "KazTsKUB" Nitrohim"(Currently "Nitrohim" company produces industrial explosives)The shareholders of the project initiator: LLP Paris CA-KAZ (Switzerland)Prospective participants in the project: «Quadra Engenharia Sustentável» (Portugal) (research, development, design and monitoring of the installation and commissioning works)Product description: boosters, non-electric detonators and waveguides, detonating cord, and other pyrotechnic mixture.Demand market: mining, geophysical and other companiesEstimated annual production: 10 million. Sets (initiating devices)Location: Alga district (80 km to Aktobe city)Total cost: 25,0 mln. $Social impact: about 30 jobs will be created

Page 22: Short information about Aktobe region Republic of Kazakhstan

Emulsion explosives

Project initiator: LLP "KazTsKUB" Nitrohim"(Currently "Nitrohim" company produces industrial explosives)The shareholders of the project initiator: LLP Paris CA-KAZ (Switzerland)Prospective participants in the project: «Quadra Engenharia Sustentável» (Portugal) (research, development, design and monitoring of the installation and commissioning works)Product description: Emulsion explosives (fail-safe, accurate and efficient means of initiating, produced on the basis of the latest technological solutions and patents in this area). Replaces TNT (safer version of explosives).Source of raw material: ammonium nitrate (own).Demand market: Mining companiesEstimated annual production: 25 000 tonsLocation: Alga district (80 km to Aktobe city)Total cost: 12,0 mln. $Current status of the project: Development of working documentation, designing, obtaining permits, manufacturing and supply of main equipment.Social impact: about 30 jobs will be created

Page 23: Short information about Aktobe region Republic of Kazakhstan

Construction mixtures

Project initiator: "OksiBild" LLP The shareholders of the project initiator: "OksiBild" LLP Prospective participants in the project: "OksiBild" LLP Product description: Dry construction mixtures from gypsumDemand market: Republic of KazakhstanLocation: Aktobe regionTotal cost: 4.5 billion tengeEstimated period of project implementation: 2016Social impact of the project: about 100 jobs will be created

Page 24: Short information about Aktobe region Republic of Kazakhstan

Wind power with the capacity of 100 MW

Project Initiator: LLP «SB Capital»The shareholders of the project initiator: LLP «Eurofinsa KZ»Short description of a new product: conversion of the wind energy into electrical energyDemand market: 100% - internal marketEstimated annual production: 247.5 million. KWh / yearProject location: “Kargalinsy” districtTotal project cost: 243 million. $Type of necessary investments: loan / leaseThe estimated project implementation period: 2015-2017The current status of the project:Obtained permission to conduct exploration work without state land acquisition. Carried out a detailed survey of the site by foreign engineers. Agreed upon scheme of power distribution with system operators – “KEGOK”. The research obtained - on wind potential on the place of prospective wind farm construction using the 10-year data from weather satellites and meteorological data. Reservation of the land plot is planned, in order to install Meteo Masts for accurate determination of suitable land. The social impact of the project: 5 jobs will be createdExisting government support: Long-term tariff for 15 years, 0.102 $ / 1 kWh.

10

Page 25: Short information about Aktobe region Republic of Kazakhstan

Expansion of production of copper cathode

Project Initiator: LLP «KazCopper»The shareholders of the project initiator: US Megatech Inc. (United Kingdom)Short description of a new product: an increase in the volume of production of cathode copper content of 99.9% from 5 000 tons to 10 000 tonsSources of raw materials:Oxide ore (actually m / r)Sulfuric acid (Kazzink)Thinner SHELLSOL D90 (Shell Chemicals Europe BV)Extractant LIX-984N (BASF SE (Germany))Guar Guarfloc 66 (BASF Central Asia LLP)Other reagents (Kazakhstan)Demand market: EuropeEstimated annual production: 10 000 tonsProject location: “Aytekebiysky” district, deposit - “Benkala”Total project cost: 20 million $Type of necessary investments: credit / leasing, equity participation, off-take contractThe estimated project implementation period: 2015-2017 yearsCurrent status of the project: Searching for investors, project documentation is prepared. Project capacity - about 7 000 tons. Manufactured volume in 2014 was about 2 000 tons.

11

Page 26: Short information about Aktobe region Republic of Kazakhstan

Hotel

Project initiator: LLP "Dastan" (1991)Brief Description of Project: 4 starsServices - restaurant, gym, conference hall and SPAEstimated annual production: 32 000 bedsProject location: AktobeTotal project cost: 20 million $Funding structure: Borrowings - 70%Own funds - 30%Type of investment needed: credit, equity, long-term lease.The estimated project implementation period: 2015-2017 Design - 6 months.Construction - 15 months.Engineering and commissioning - 6 months.The current status of the project: the design stage.The social impact of the project: 90 jobs will be created

12

Page 27: Short information about Aktobe region Republic of Kazakhstan

Wet enrichment of kaolin factory Project Initiator: JSC "Koktas-Aktobe"The shareholders of the project initiator: residents of the Republic of KazakhstanShort description of a new product: kaolinSources of raw materials: own deposit of kaolin (more than 50 million tons)Demand market: ExportEstimated annual production: 50 thousand tons / yearProject location: planned in “Kandyagash” districtTotal project cost: 10 million $Type of required Investing: credit / leasing, equity participation, off-take contractThe estimated project implementation period: 2018Current Status: Construction project of the plant is developed. Searching for investors. Have the right of subsoil use. Kaolin clays without prior enrichment practically unused. Therefore it is necessary to build the processing plant - 20 million euro. The social impact of the project: 183 jobs will be created

Центр Обслуживания Инвесторов: 8(7132)-55-13-00 (215), 8701-52-42-555, e-mail: [email protected]

Page 28: Short information about Aktobe region Republic of Kazakhstan

Production of glass containers

Project Initiator: City hall of Aktobe regionProspective participants in the project: -Short description of a new product:bottles (0.5 litter, 0.7 litter) jars (0.5 litter, 1 litter, 3 litter).Sources of raw materials: Mugalzhar deposit of quartz sand, more than 600 million tons. Deposit dumps of nickel-cobalt ores with high quartz content.Estimated annual production: 91.8 thousand tons per year(300 tons of glass per day)Project location: Industrial Zone (20 minutes from the city center)Total project cost: 100 million $Type of necessary investments: credit / leasing, equity participation, off-take contractThe estimated project implementation period: 2015-2018The current status of the project: Improving the technology with SkloStroj company (Czech Republic). Searching for investors.The social impact of the project: up to 200 jobs.Funding structure:own funds - 30%;Debt financing - 70%

14

Page 29: Short information about Aktobe region Republic of Kazakhstan

Roadside service

Project Initiator: City hall of Aktobe regionThe essence of the project: roadside services "A", "B", "C“ categories, along the highway "Western Europe - Western China"Demand market: up to 10 thousand cars / dayThe total cost of the project: from 1.0 to 3.0 million $Required investments: 100% of the project costProject location: along the highway section that belongs to Aktobe region (629 km):from Martuk District to Chromtau district -5 objects (category A or B);Irgiz district - 4 objects (category B or C).Categories:Category A - hotel, restaurant / cafe, 24 hour bar, shop, warm public toilets, gas station, paved parking lot, car maintenance station, tourist office, medical centerCategory B - motel, restaurant / cafe, shop, warm public toilets, public showers, gas station, paved parking lot, car maintenance station, tourist information point, medical centerCategory C - shops, public food station, warm public toilets, public showers, gas station, paved parking lot, workshop or overpass

Центр Обслуживания Инвесторов: 8(7132)-55-13-00 (215), 8701-52-42-555, e-mail: [email protected]

Page 30: Short information about Aktobe region Republic of Kazakhstan

Promising projects for investors

# Required products Raw materials, infrastructure, marketing

1 Soda ashAvailability of raw materials (salt, limestone). There are major consumers of soda ash – up to 200 000 tons / year.

2 The use of technical sulfur oilAvailability of raw materials - up to 200 thousand tons of sulfur from oil companies

3 High activity lime Limestone deposits available. High demand in the region.

4 Methanol High demand from oil and gas companies and in the region in general

5 Electricity (processing of brown coal)More than 2.5 billion tons of coal in deposits. Calorific value - 7000 kcal / kg, ash content - 21% to 38%.

6 Fruits and vegetablesLand plot with infrastructure for construction of up to 50 hectares of greenhouses is available. Constant rising demand for the product in the region. Developed sales network.

7 Vegetable - and fruit storageOpportunity to get the infrastructure at the expense of the state. The lack of modern storage facilities.

Page 31: Short information about Aktobe region Republic of Kazakhstan

10 priority areas of agricultural products:•milk processing•meat processing,•grain processing•processing of fruits and vegetables•fish processing•production of oil and fat products•confectionery production•production of sugar•primary processing of hides of farm animals•primary processing of wool

Also highlighted the priority projects of processing industries to be funded on a priority basis. According to the list, priorities identified for the Aktobe region:

•milk processing•meat processing,•grain processing•processing of fruits and vegetables•fish processing•confectionery production•primary processing of of hides of farm animals•primary processing of wool

Promising projects for investors

Page 32: Short information about Aktobe region Republic of Kazakhstan

Proposed place for accommodation of you business

Page 33: Short information about Aktobe region Republic of Kazakhstan

Variants of placement

Industrial zone “Aktobe” to host your business

Symbols

- Border

- Large businesses - 92.0 hectares

- Small businesses – 65,4 hectares

- Automobile road

- Railways

Page 34: Short information about Aktobe region Republic of Kazakhstan

General information aboutindustrial zone «Aktobe»

Location Industrial Zone Aktobe. 20 minutes from the city center

Total area 200 hectares.

Available area 165 hectares

Infrastructure at the expense of the state (up to the property line of the participant

of industrial zone)

Gas pipeline 480 000 м3 / day

Water 4 500 м3 / day

Sewerage 200 м3 / day

Power lines 100 MW

Railways, automobile roads yes

Fiber-optic communication 5 telephone lines with Internet connection

Period of construction the infrastructure August 2014 – December 2015

Page 35: Short information about Aktobe region Republic of Kazakhstan

Industrial zone «Aktobe»Operating conditions as participant of Industrial zone "Aktobe"

Registration conditions as a participant of Industrial zone "Aktobe"1. The use of modern technologies and equipment to ensure high productivity and environmental requirements;2. Competitiveness of products / services;3. Export-oriented or import-substitution;4. Absence of a similar production in the region;5. Good experience and reputation of the project company;6. CAPEX of project - not less than 1.0 million. $ / 1 ha. land.

Operating conditions as participant of Industrial zone "Aktobe" Fee for external infrastructure: – Connection - free –Used resources – depending on metering devices -Service - under the agreement with the management company Prior putting the project into operation (no more than 3 years): - Land rent - free - Land tax - $ 607/1 ha. / Year After entering the project into operation: -Land lease up to 49 years - $ 4140/1 ha. / a year - Purchase of land - cadastral value (≈ 71 000 $ / 1 ha.)

Priority activities:1. Oil and gas processing;2. Petroleum Engineering;

3. Oil and gas service;4. Mining and metallurgical complex;

5. Chemical industry;6. Production of construction materials;

7. Warehouses.

Page 36: Short information about Aktobe region Republic of Kazakhstan

Not working companies for sale or joint production

Page 37: Short information about Aktobe region Republic of Kazakhstan

Ceramic tiles

Company: JSC "Ceramics"Products that can be produced at the plant: Ceramic tilesLand: 13.7 hectaresProduction area: Industrial premises - 0,13 ha warehouses - 37 500 m2

Infrastructure: railroad branch with access to road and ramps, gas, electricity, sewerage and water supplySources of raw materials: Owner of the depositProject location: Khromtau (95 km from the city of Aktobe)Demand market: Kazakhstan and Russia (have direct access to Russia on roads and railways) Possible annual production:1.0 million m2 of ceramic tilesThe main suppliers of the equipment:Italian firm «SACMI», «SMAC».Proposal for the investor: the full sale of the enterprise

Центр Обслуживания Инвесторов: 8(7132)-55-13-00 (215), 8701-52-42-555, e-mail: [email protected]

Page 38: Short information about Aktobe region Republic of Kazakhstan

Cellular concrete blocks

Company: JSC "AktobeStroyIndustriya"(Built in 2005, operation stopped since 2010)Products that can be produced at the plant: Cellular concrete blocksLand: 8.8 haInfrastructure: railroad branch with access to roads and ramps, gas, electricity, sewerage, water supplyProject location: Aktobe, near Industrial Zone (20 minutes from the city center)Demand market:60% - West Kazakhstan40% - Russian FederationPossible annual production: 170 000 m3 of AACShareholders of the company:JSC "Investment Fund of Kazakhstan" - 48%JSC "Aktobestroyindustriya" - 52%Major equipment suppliers - «MASA - HENKE» (Germany)Total project cost: 30 million $

Центр Обслуживания Инвесторов: 8(7132)-55-13-00 (215), 8701-52-42-555, e-mail: [email protected]

Page 39: Short information about Aktobe region Republic of Kazakhstan

Company: the group of companies «RIFMA Group»Products that can be produced: Premises can be used for a full-featured FMCG-hypermarket or supermarket type on the 1st floor and shopping area. Conversion of the building is possible. Equipped production facilities allow to place fish, meat, culinary, pastry shops, as well as semi-finished products and a bakery shop.Land plot: 0,5 haProduction areas: area - 4500 m2. Production facilities - 800 m2. Warehouses - 800 m2.Infrastructure: Parking - 70 cars, gas, electricity, sewerage, water supply, telephone and Internet.Location: Central part of the cityDemand market: local populationMajor equipment suppliers: Modern-Expo (shelving and cash register equipment), Iceberg (refrigeration)Offer for investors: 1. Selling fully equipped buildings FMCG hypermarket with atotal area of 6 492 m2 (working since 2009)2. Long-term rental3. Financing the current assets of hyper markets «Olzha» - 800million tenge

Hypermarket

Центр Обслуживания Инвесторов: 8(7132)-55-13-00 (215), 8701-52-42-555, e-mail: [email protected]

Page 40: Short information about Aktobe region Republic of Kazakhstan

Company: "Ak Runo"Products that can be produced at the plant:Land: Long-term lease of land of 7 hectares.Completeness of the facility: Finished Buildings (7 thousand m2)Encumbrances (mortgage): NoProduction areas: 7 thousand m2.The presence of industrial infrastructure: railway siding, gas, electricity, sewerage, water supplyProject location: Aktobe, near Industrial zone (20 minutes from the city center)The main suppliers of equipment: Absence of the equipmentOffer for investors: Cooperation in different kinds of mutually beneficial ways: rent, joint venture, equity

Industrial premises

Центр Обслуживания Инвесторов: 8(7132)-55-13-00 (215), 8701-52-42-555, e-mail: [email protected]

Company Name: JSC "NC" SEC "Aktobe"Land: 0.56 hectaresProduction area: additional workshop with metal-cutting equipment, 6 inoperative crane blocks. Production area - 4500 m2. WarehouseThe presence of industrial infrastructure: Absence of the infrastructureProject location: AktobeOffer for investors: lease of land and production facilities

Page 41: Short information about Aktobe region Republic of Kazakhstan

Knitwear

Company: "Eden"Products that can be produced at the plant: Knitwear (T-shirts, sports suits, hosiery and underwear etc)Land: 3.5 hectaresProduction area: the size of a brick building 149 m by 24 m area of 17 thousand m2, in operation since 1966, in satisfactory condition.Infrastructure: railway branch is missing, medium pressure gas in the territory of the production premises, electricity and sewerage urban water in sufficient quantitiesSources of raw materials: raw material (yarn) must be purchased outside of the Republic of Kazakhstan.Project location: AktobeFunding structure: long-term lease or joint productionDemand market: the domestic marketMajor equipment suppliers: Spain, Czech Republic, Japan, USA

Центр Обслуживания Инвесторов: 8(7132)-55-13-00 (215), 8701-52-42-555, e-mail: [email protected]

Page 42: Short information about Aktobe region Republic of Kazakhstan

Pipe production

Company: CC GRP Technology LLCName - LLP "Hobas Pipes Kazakhstan"Products that can be produced at the plant: Multifunctional pipe diameter 30-140 cm and fittings made of fiberglass reinforced polyester (CC GRP - Centrifugal cast glassfiber reinforced polyster, technology - HOBAS Engeeniring Austria).Innovation, uniqueness of the company: The plant produces pipes from DN 200 to DN 1400 mm, with a nominal working pressure PN from 1 to 25 atmospheres and stiffness SN 5000 to 1 000 000 N / m.Lifetime production exceeds 50 years of age (90 years)The design capacity of production: 120 km of pipes of different diameters in the year.Availability of equipment: The owner of the equipment - JSC "Hobas Pipes Kazakhstan."Basic equipment: feeder with 2 interchangeable trunks (A11 and A21). Since 2010, the plant is not operating.Land: 2 land plots with total area of 3.1932 ha (2.4899 ha and 0.7033 ha), a form of ownership - privateCompleteness of the facility in%: 100%Production Area: 753.2 sqm 7

The presence of industrial infrastructure: · Communication - centralized (city), individual heating gas, PBX, fire alarms, video surveillance, computer network.The industrial complex has all the necessary infrastructure, including transport (access to roads and railways).The territory is fenced and pavedSources of raw materials: polyester resin, reinforcement of chopped glass fibers, silica sand and calcium carbonate (milled crystalline marble).Encumbrances (mortgage): NOOffer for investor: Full saleNote: The plant is disconnected from all communications (except electricity).

Page 43: Short information about Aktobe region Republic of Kazakhstan

Contact information

Investors Service CenterPhone.: +77015242555, +7 7132 551300 (215)