shoper 9 pos re-installation | tally shopper | tally chennai | tally.net services
DESCRIPTION
For more information about this link. Please visit http://www.tallyspot.com (or) contuct +91-9025294445Ideal spot for a obtain Tally 9 ERP and download free Tally.ERP 9 versions. Up-grade Tally Accounting Software & .NET Subscription, Advanced Web Interface Accounting Software for Asia & Most ERP Software Products. Import data from tally & Data Connectivity to Tally.ERP 9 Import.TRANSCRIPT
© Tally Solutions Pvt. Ltd. All Rights Reserved
Shoper 9 POS Re-installation
© Tally Solutions Pvt. Ltd. All Rights Reserved 2
When is re-installation required?When is re-installation required?
Planned
You are changing the hardware such as Hard disk or Mother Board
You are moving Shoper 9 from one system to another
You are changing the Operating System
Unplanned
The system has crashed
© Tally Solutions Pvt. Ltd. All Rights Reserved 3
Resources for re-installationResources for re-installationContents of tool kit for Single Store
Latest Shoper 9 Setup CD or latest setup files from the website
Latest Shoper 9 LiveUpdate tool
MS-SQL Express (recommended) setup (if you are not using
Shoper 9 CD, download from website)
SQL Server 2005, if available with the client use it
MSDE, if you are using it (not recommended for Shoper 9)
Necessary files for Barcode, Business and Bill templates, if any
Shoper 9 POS Installation and Setup document
© Tally Solutions Pvt. Ltd. All Rights Reserved 4
Resources for re-installationResources for re-installation
Contents of tool kit for Chain Store
Latest Shoper 9 Setup CD or latest setup files from the website
Latest Shoper 9 LiveUpdate tool
MS-SQL Express (recommended) setup (if you are not using
Shoper 9 CD, download from website)
SQL Server 2005, if available with the client use it
MSDE, if you are using it (not recommended for Shoper 9)
Necessary chain specific custom installer along with Business and Bill
templates, if any
Shoper 9 POS Installation and Setup document
© Tally Solutions Pvt. Ltd. All Rights Reserved 5
Planned re-installationPlanned re-installationTake the backup of Application and Security databases
Take the backup of Secondary database, if any
Collect all the exes and ini files, if customisations are present
Make a note of the database server name, user names, passwords, Shoper company codes along with the system name (computer name)
Backup the necessary files for Customisation, Shoper Barcode, Business and Bill templates, if any
Make a note of the Terminal Id’s and descriptions
Surrender Shoper 9 LicenseOn Shoper 9 splash screen, click Manage License > Surrender License
© Tally Solutions Pvt. Ltd. All Rights Reserved 6
Unplanned re-installationUnplanned re-installation
Surrender Shoper 9 License using Control Centre
Go to http://www.tallysolutions.com
Log in using Tally.NET User ID and Password
Go to License and Configuration > List of Licenses > Action >
Surrender
In case of Single Store Collect the recent backup from external storage device
In case of Chain StoreGet the complete mode replication file from the chain’s head office. This is to ensure that you have the latest synchronised data from HO
© Tally Solutions Pvt. Ltd. All Rights Reserved 7
Before re-installationBefore re-installation
Ensure that SQL/ MSDE is installed
In case of Server installation and if MSDE is used then go to MSDE > Tools > Server and Network Utility and ensure that TCP/IP and Named pipes protocols is enabled
Copy all the database backups into a temporary folder which can be utilised during the re-installation process
Copy the latest customised templates, barcode script files, Business and Bill templates, if any
© Tally Solutions Pvt. Ltd. All Rights Reserved 8
Different types of re-installationDifferent types of re-installation
Standalone – for a single user of Shoper 9 POS
Server – for a multi user of Shoper 9 POS were you have Server and one or more nodes
Client – you have two options:
Full Client – the nodes will have all the required files in the node application folder
Connectivity components – the server will have all the required files and the nodes use the files from the server
© Tally Solutions Pvt. Ltd. All Rights Reserved 9
Care to be taken during re-installationCare to be taken during re-installation
In server re-installation, ensure that the Shoper Application folder is shared with Full Control
During node re-installation, use the same terminal Ids provided earlier for each node
© Tally Solutions Pvt. Ltd. All Rights Reserved 10
Re-installation process of Shoper 9 POS
© Tally Solutions Pvt. Ltd. All Rights Reserved 11
Recovering data in case of a system crashRecovering data in case of a system crashFor Single Store
Install Shoper 9 using appropriate business template along with the assigned company code
Collect the recent backup from the Backup folder or from external storage device
Restore the same using Housekeep > Restore option
© Tally Solutions Pvt. Ltd. All Rights Reserved 12
Recovering data in case of a system crashRecovering data in case of a system crashFor Chain Store
Install Shoper 9 using appropriate business templates along with assigned company code
Get the complete mode replication file from the chain’s Head office
Copy the complete mode replication file in ASTIn folder
Import using Housekeeping > Data Import > Import from AST
OR
Copy the complete mode replication file in In folder and do Manual Sync
© Tally Solutions Pvt. Ltd. All Rights Reserved 13
Re-activating Shoper 9 License
© Tally Solutions Pvt. Ltd. All Rights Reserved 14
Reactivating Shoper 9 LicenseReactivating Shoper 9 LicenseEnsure you have an active internet connection
Run Shoper 9 POS
On Shoper 9 splash screen click Manage License
© Tally Solutions Pvt. Ltd. All Rights Reserved 15
Reactivating Shoper 9 LicenseReactivating Shoper 9 LicenseThe Manage License screen with License Operation options is displayed
Select Re-Activate LicenseClick Continue
© Tally Solutions Pvt. Ltd. All Rights Reserved 16
Reactivating Shoper 9 LicenseReactivating Shoper 9 LicenseThe Reactivate license screen is displayed
Select If you wish to reactivate a site
Click Continue
© Tally Solutions Pvt. Ltd. All Rights Reserved 17
Reactivating Shoper 9 LicenseReactivating Shoper 9 LicenseThe Reactivate Site License screen is displayed
Enter Account IDSite IDE-Mail ID of Site AdministratorPassword
Click SubmitThe Unlock Key will be mailed to the E-Mail ID of Site Administrator
© Tally Solutions Pvt. Ltd. All Rights Reserved 18
Reactivating Shoper 9 LicenseReactivating Shoper 9 LicenseThe Sample e-mail is displayed as shown.
© Tally Solutions Pvt. Ltd. All Rights Reserved 19
Reactivating Shoper 9 LicenseReactivating Shoper 9 LicenseThe Manage License screen now displays the options Unlock License
and Reset License
Select Unlock License
Click Continue
© Tally Solutions Pvt. Ltd. All Rights Reserved 20
Reactivating Shoper 9 LicenseReactivating Shoper 9 LicenseThe Unlock License screen is displayed.
Enter the Unlock Key received by e-mail
Click Submit to activate the Shoper 9 License
An activation successful message is displayed
Click OK to return to Manage License screen
© Tally Solutions Pvt. Ltd. All Rights Reserved 21
Reactivating Shoper 9 LicenseReactivating Shoper 9 LicenseThe Manage License now displays the options Update License, Surrender License and Reset License
Close Manage License screenClose Shoper 9 POS splash screen
© Tally Solutions Pvt. Ltd. All Rights Reserved 22
Checks after completion of re-installationChecks after completion of re-installation
Ensure that all the databases are restored (Such as Security, Application, Secondary Database)
If any customised ini and exe files exist, copy them into the application folder
Collect the latest Custom LiveUpdate and latest Custom Patches
from the Chain’s Head Office
If any bill templates and barcode files exist, copy them to the respective folders
Take the backup and check all the transactions for Day End, Day Begin and other transactions then restore the backup
© Tally Solutions Pvt. Ltd. All Rights Reserved 23
Checks – If you are not a Primary PartnerChecks – If you are not a Primary Partner
Contact Primary Partner and discuss before starting the assignment
Keep the Primary Partner informed about the progress of the assignment
On completion inform the primary partner about the completion and take a sign off
© Tally Solutions Pvt. Ltd. All Rights Reserved 24
Checks – If re-installation is assigned by TIPLChecks – If re-installation is assigned by TIPL
Follow the instructions provided in the TIPL mail
Carry all latest documents available at the Partner Portal
If you have any issues contact the concerned person mentioned in the mail
If you are doing the re-installation for the first time, contact TIPL and get trained
© Tally Solutions Pvt. Ltd. All Rights Reserved 25
Shoper 9 Installation Documents
© Tally Solutions Pvt. Ltd. All Rights Reserved 26
Where to find Shoper installation documents?Where to find Shoper installation documents?For reference documents Go to http://www.tallysolutions.com
Click Download
© Tally Solutions Pvt. Ltd. All Rights Reserved 27
Where to find Shoper installation documents?Where to find Shoper installation documents?Click Shoper 9
Click Download Shoper 9
© Tally Solutions Pvt. Ltd. All Rights Reserved 28
Where to find Shoper installation documents?Where to find Shoper installation documents?Select Shoper 9 Series A Release 1.0 Installation Guide for installation and re-installation process document
© Tally Solutions Pvt. Ltd. All Rights Reserved 29
Points discussed Points discussed
Re-installation Scenarios
Resources for re-installation
Planned and unplanned re-installation
Steps to be followed before formatting the system
Care to be taken before re-installation
Re-installation process of Shoper 9 POS
Recovering data in case of system crash
Reactivating Shoper 9 Licenses
Checks after completion of re-installation
Checks – If you are not a Primary Partner
Checks – If re-installation is assigned by TIPL
Availability of Shoper installation documents
© Tally Solutions Pvt. Ltd. All Rights Reserved 30
Thank You