Part 5: Managing Environmental IssuesDespite the recent focus on shale gas exploration in the UK and elsewhere in Europe, there is currently no unified regulatory regime that specifically covers exploration, development and exploitation of shale gas.

As yet, although there has been no commercial production of shale gas and just a few pilot production tests in the UK, significant concerns have been raised by campaign groups, protestors and others about the potential public health and environmental impacts of fracking for shale gas.

At a time when the Government is supporting the drive for shale gas and many oil and gas companies are looking to participate in this industry in the UK, it is important for participants in this market to ensure that public opinion relating to the environmental integrity of extraction of unconventional hydrocarbons is considered carefully and concerns addressed wherever possible.

Management of key environmental concerns is essential for the sector’s development. A range of issues will need to be considered including contamination of surface and groundwaters, potential stress on water supplies, soil quality and fugitive emissions. Whilst some of these can be mitigated by careful selection, a full understanding of the fragmented regulatory regime covering these issues is necessary to appropriately address the issues.

Members of the oil and gas industry who are investing in shale gas and bidding for the 14th Licensing Round in the UK are currently having discussions with Government about changing the Environmental Impact Assessment (EIA) framework so that EIAs are not necessary for each well that is drilled during shale gas exploration, development and production. Industry is driving the agenda to streamline this process in the UK, in the same way as standard rules permits were introduced for waste management, to reduce the cost of regulatory compliance.

At the time of writing, further changes have been proposed to the Infrastructure Bill that would, if enacted into legislation, mean that there would be more detailed assessments and checks of the environmental issues to be addressed as part of the consenting regime for hydraulic fracturing consents. The suggested conditions cover areas such as environmental impacts (see below), arrangements for independent inspections of the well integrity, monitoring of methane levels in groundwater prior to fracturing and of methane emissions to air, provisions relating to groundwater and environmental protection areas, review of the impact of components of hydraulic fracturing fluid and potential restoration conditions in relation to development.

Part 5 of the Toolkit provides an overview of the key environmental legislation relevant to the exploration, development and exploitation of shale gas. We have set out the types of environmental permits that could be necessary (depending on site and project-specific factors) and the implications of the Registration,Evaluation and Authorisation of Chemicals (REACH), water usage and wastewater disposal for the shale gas industry.

www.pinsentmasons.com/shale1

2

Shale Gas Toolkit | Shale Gas Toolkit: Part 5

Managing Legal RisksIn addition to understanding the environmental concerns that might arise on projects, appropriate risk management should also involve:• Risk management of environmental issues through appropriate drafting on acquisition of sites for shale gas activities, or in relation to

access arrangements

• Guidance for companies on EIA procedures and processes (which are covered in Part 3 of our Toolkit and below)

• Legal review of appointment documents for environmental consultants to consider the suitability of liability management and in particular limitations, to shale gas related work

• Consideration of legal issues associated with water management plans and water re-use proposals, particularly in view of the plethora of water legislation

• Liaison with regulatory authorities in relation to environmental issues, particularly in relation to waste or waste water management

• Advice on potential and threatened nuisance claims by neighbours relating to environmental issues, or threatened prosecution by the relevant environment agency (i.e. Environment Agency, Natural Resources Wales or the Scottish Environmental Protection Agency (SEPA)) if future incidents occur.

Cuadrilla’s recent experience shows that the interface between the various types of consents required is also of great importance when developing project strategy. A favourable outcome by the environmental regulators may not necessarily yield the same result from planning authorities, and visa versa.

The Legal RegimeAs we have already mentioned, there is currently no unified regulatory regime that specifically covers exploration, development and exploitation of shale gas in the EU, partly as the existing legislation was not designed with shale gas in mind.

Participants in the shale gas industry in the UK will need to give careful consideration to a number of areas of environmental laws that we believe must be approached with an eye for detail and underpinned by robust consenting, mitigation and management strategies (as noted above).

Both general and specific pieces of EU and UK environmental legislation apply to shale gas activities from planning until cessation. The key laws and regulations that are relevant from an environmental perspective cover Strategic Environmental Assessment (SEA), Environmental Impact Assessment (EIA) and planning, underground risk assessment, well integrity, integrated and consistent requirements in terms of baseline and operational monitoring, capture of methane emissions and disclosure of fracturing fluid composition on a well by well basis.

Overview of Fracking ProcessShale gas extraction generally leads to a larger environmental footprint compared to conventional gas development. This is due to the fact that it requires a more intensive well stimulation technique, it mainly takes place on-shore and will cover much wider areas. In addition, as productivity of shale gas wells is generally lower than conventional wells, more wells will need to be drilled.

In the current state of technological development, shale gas extraction requires the combined use of high volume hydraulic fracturing and directional (especially horizontal) drilling.

Hydraulic fracturing or “fracking” is a process by which fracturing fluid – a mixture consisting typically of water, sand and chemical additives (generally between 0.5% and 2% of the total fracturing fluid) is injected under high pressure to break the rock, open and enlarge fractures to enable the hydrocarbons to flow into the well.

So far, experience in Europe has been focussed on low volume hydraulic fracturing in some conventional and tight gas reservoirs, mostly in vertical wells, constituting only a small part of past EU oil and gas operations.

Drawing on the North American experience where the high volume fracturing has been broadly used, operators are now testing this practice further in the EU. However, at the time of writing Part 5 of this Toolkit, there has been no commercial production of shale gas and just a few pilot production tests in the UK.

75033

Environmental PermitsThe Environmental Permit is likely to be the key environmental consent required for each individual stage (or phase) of shale gas development in England and Wales.

An Environmental Permit could be required if fracking activities are deemed by regulatory authorities to include:

• A groundwater activity, such as discharge of fracking fluid into wells

• A mining waste activity, for example, storage of flowback fluid

• An installation under the Industrial Emissions Directive

• An activity requiring a Radioactive Substances Act consent (which is likely to be the case wherever oil and gas is produced).

Additional consents may be required from the Environment Agency if shale gas development results in:

• An activity requiring a Groundwater investigation consent

• An activity requiring a water abstraction licence – typically, abstraction of more than 20m3 per day

• An activity requiring a flood defence consent if the development takes place near river or sea flood defences

A coal authority consent under the Coal Industry Act 1994 may also be necessary if the operation will intersect coal seams or coal mine workings.

The Environment Agency strongly advises that operators and developers discuss the requirements of all relevant permissions with the Agency at the pre-application stage and ‘twin-track’ the planning and environmental consent applications.

In Scotland, the above activities will require similar consents from SEPA.

Environmental Permit: Cuadrilla Case StudyOn 16 January 2015, the Environment Agency granted an environmental permit to Cuadrilla Bowland Limited for the exploration stage of their shale gas operations in Lancashire.

The permit provides the required consent for various exploration activities including:• Injection of fracking fluid into wells via injection boreholes

• Extraction of flowback fluid (up to 3000m3)

• Flaring of limited amounts of waste gas

• Storage of extracted flowback fluid.

Conscious of the heightened public concern in relation to the environmental impacts of shale gas development, the Environment Agency completed a rigorous seven month assessment of Cuadrilla’s application. The normal four week consultation period was extended to eight weeks and the Environment Agency requested several pieces of additional information from Cuadrilla. Notably, these requests related to the composition of friction reducer, Cuadrilla’s waste management plan and proposed measures for the limitation of noise from flaring.

Shale gas developers should be mindful of the extended timescales for obtaining environmental permits and the approach to public consultation should be given particular consideration. It is, however, hoped that with improved knowledge of the specific characteristics of shale gas development and industry standards, turnaround times for granting these permits will decrease.

Environmental Impact Assessment (EIA)As set out in more detail in Part 3 of our Toolkit, the answer to the question of whether any given phase of a shale gas project will require an EIA will depend on the nature, size and location of the operations and whether they will have a significant effect on the environment. Amendments were tabled to the Infrastructure Bill in August 2014 that would have meant that EIAs would have been required for all shale gas activity at all sites. However, those amendments were not officially moved forward.

Part 5 of this toolkit has been published after MPs voted against an amendment to the Infrastructure Bill that would have resulted in an outright ban on shale gas activity in England and Wales. However, MPs did vote on stronger checks and thirteen conditions that would be relevant to shale gas development in England and Wales which will now be scrutinised further as part of the Bill process. The amendments tabled to the Bill would mean, if enacted, that no hydraulic fracturing could take place unless an EIA of a development had been carried out, a consideration of cumulative impacts by Mineral Planning Authorities (MPAs) and community benefits provided. Also, no fracking would take place in groundwater areas, source protection zones and protected areas as noted above.

Shale Gas Toolkit | Shale Gas Toolkit: Part 5

Current market thinking from environmental consultants involved in the 14th Licensing Round is that it is unlikely in the short to medium term for a MPA (or in Scotland, a local authority) to approve of fracking development without an EIA. It is anticipated that this will continue to be the case until better information is collected that demonstrates significant effects are unlikely to be triggered by fracking activity.

In practice, a screening opinion can be obtained from a MPA on whether or not an EIA is required. Operators should however be aware that there could be non-legal reasons that trigger an EIA, such as the desire for an operator to be “open” about the potential environmental impacts of a proposed project. In addition, if market practice is for operators to obtain an EIA for each well to be fracked, other operators are likely to be guided by this when they make their applications for new activities.

Given the lack of track record of UK examples for hydraulic fracturing, it is considered current best practice to undertake an EIA on any proposed well development involving hydraulic fracturing even where it may be debated whether an EIA is required or not.

The current market practice in relation to EIAs is likely to lead to huge costs for operators that win bids for PEDLs in the 14th Licensing Round in the UK, due to the level of detail and volume of information required for an EIA under the current legislative framework. We understand that a rough estimate of the costs per EIA per well for operators is £150,000 – £200,000.

Registration, Evaluation and Authorisation of Chemicals (REACH) RegulationsIn addition to each site being scrutinised by the Environment Agencies (the Environment Agency, Natural Resources Wales and SEPA) and the Health and Safety Executive, the Agency will require details of the substances that constitute the fracking fluid and will only grant an environmental permit if they are satisfied that there are no risks to the environment, particularly to groundwater.

The REACH Regulations govern the chemicals that can be used in fracking fluid and registration under REACH may be required in the EU for substances to be used in fracking fluid. Our experience from working with manufacturing companies is that there are significant costs associated with such registrations and companies facing potential registration of chemicals have in many instances looked carefully to see if they can use alternative chemicals that have been registered by others.

In addition, companies may be tempted to adopt business models used in the US, but need to be aware that some chemicals used for fracking by US companies are banned in the EU.

We understand that the disclosure of chemicals that will used in fracking fluid is a matter of significant concern to operators involved in this market, as the constituents of fracking fluid used by different operators has been a closely guarded secret in the US. Careful guidance will no doubt be needed by participants in the shale gas industry on environmental confidentiality issues, particularly in relation to fracking fluid.

Water usage and disposal of waste waterConcerns have been expressed about the quantities of water used in fracking and the disposal of waste water that results from the process. The water used may of course be obtained from licensed suppliers, but if directly abstracted by the operators, will require a Water Abstraction Licence from the Environment Agency or Natural Resources Wales in England and Wales. Licences will only be given where the relevant Agency is satisfied that a sustainable supply is obtainable.

4

75035

Equally, disposal of waste water is subject to scrutiny by the Environment Agency in England and Natural Resources Wales in Wales and will require a permit. The waste water from operations in Lancashire has been found to contain low levels of radioactivity. A case-specific radiological assessment is required in support of any application for a permit for the disposal of radioactive waste. The Environment Agency and Natural Resources Wales will critically review any such assessment and will only issue a permit if satisfied.

In Scotland the carrying out of various activities including abstraction and disposal that are likely to have a significant adverse effect on the water environment require a water use licence from the SEPA.

With the regulators’ focus on waste management, there could be potential opportunities for waste water management contractors in the sector who are able to develop innovative storage, treatment and transporting techniques.

Noise, Traffic, Impacts on HealthA major concern for regulatory authorities is the potential impact of normal operations in terms of noise, traffic and impacts on health. This will be dealt with under the planning regime and by the Health and Safety Executive in the UK. All proposals for oil and gas exploration require planning permission from the relevant MPA and issues associated with this are picked up in Part 3 of our Toolkit on planning.

Impact on 14th Licencing RoundIn preparation for the 14th Licensing Round in the UK, during which bids were submitted by the end of October 2014 for Petroleum Exploration and Development Licences (PEDLs), the companies considering participation in the emerging UK shale gas market worked very closely with geologists, hydrogeologists and others to understand the site-specific characteristics which indicate whether shale gas is located in the licensing areas covered by the Round. Likely environmental issues in each location were also important factors in determining the viability of the sites.

Recent DevelopmentsCommission RecommendationIndustry best practice is being shaped by a European Commission Recommendation on the minimum principles for the exploration and production of hydrocarbons (such as shale gas) using high-volume hydraulic fracturing (Commission Recommendation (2014/70/EU), OJ L 39/72. 08.02.2014 8 February 2014). Notably, this is a voluntary mechanism at present.

The Recommendation provides guidance on the minimum principles which Member States and shale gas developers should be following to address and manage the key environmental concerns associated with the exploration, development and exploitation of shale gas and drilling of wells and fracking that form part of that process.

These include encouraging developers to undertake various site specific environmental assessments, baseline reporting, ensuring that wells are appropriately designed and that release of gases in to the atmosphere is limited.

Member States are to ensure that companies apply Best Available Techniques (BAT) to manage environmental risks appropriately. This is a requirement of many environmental permits.

Compliance with BAT has led to considerable costs for industrial operators in other sectors, for example in the chemicals industry, so operators should be very careful to feed into the Commission process for drafting BAT documents.

The Environmental Industries Commission is currently seeking input from industry stakeholders on BAT for onshore oil and gas exploration, with the findings expected at the end of March 2015.

Status of the RecommendationThe Recommendation is non-binding, but will be followed 18 months after publication by a review by the Commission of the extent to which it has been effective in implementing the principles set out in the Recommendation.

As the Recommendation was published on 8 February 2014, the Review should have taken place by the end of July 2015.

Failure by Member States to implement the various elements of the Recommendation could lead to legislative changes down the line.

The

Shal

e Gas

Ext

ract

ion

Proc

ess,

from

iden

tifica

tion

of a

pot

entia

l dev

elop

men

t are

a to

the

full

com

mer

cial

exp

loita

tion

of th

at a

rea,

con

tain

s man

y st

ages

and

can

last

ove

r 30

year

s. A

t eac

h st

age

Dev

elop

ers m

ust m

eet a

num

ber o

f reg

ulat

ory

requ

irem

ents

that

are

set

out i

n th

e tim

elin

e be

low

.

SEIS

MIC

ITY:

this

issu

e ha

s the

pot

entia

l to

be a

stu

mbl

ing

bloc

k to

pro

pose

d or

com

men

ced

oper

atio

ns a

nd is

som

ethi

ng to

whi

ch D

evel

oper

s m

ust g

ive

cons

ider

able

thou

ght.

Dev

elop

ers

mus

t ass

ess t

he ri

sk o

f act

ivat

ing

faul

ts in

the

prop

osed

lice

nce

area

and

al

so m

onito

r bac

kgro

und

seis

mic

ity b

efor

e fr

acki

ng o

pera

tions

com

men

ce. R

eal t

ime

seis

mic

mon

itorin

g w

ill a

lso

be n

eces

sary

dur

ing

oper

atio

ns a

nd o

pera

tions

will

nee

d to

be

paus

ed o

r hal

ted

whe

re s

eism

icity

pas

ses

a ce

rtai

n le

vel.

Acr

onym

sPE

DL

– Pe

trol

eum

Exp

lora

tion

& D

evel

opm

ent L

icen

ceC

A –

Coa

l Aut

horit

yD

ECC

– D

epar

tmen

t for

Env

ironm

ent &

C

limat

e C

hang

eEA

– E

nviro

nmen

t Age

ncy

EIA

– E

nviro

nmen

t Im

pact

Ass

essm

ent

EP –

Env

ironm

enta

l Per

mit

HSE

– H

ealt

h &

Saf

ety

Exec

utiv

eLP

A –

Loc

al P

anni

ng A

utho

rity

MPA

– M

iner

als

Plan

ning

Aut

horit

yN

ORM

– N

atur

ally

Occ

urin

g Ra

dioa

ctiv

e M

ater

ials

PED

L –

Petr

oleu

m E

xplo

ratio

n &

Dev

elop

men

t Lic

ence

PP –

Pla

nnin

g Pe

rmis

sion

PPA

– P

lann

ing

Perf

orm

ance

Agr

eem

ent

REA

CH

– R

egis

trat

ion,

Eva

luat

ion,

Aut

horis

atio

n an

d Re

stric

tion

of C

hem

ical

sW

AL

– W

ater

Abs

trac

tion

Lice

nce

Oth

er R

equi

rem

ents

:• P

EDL

Exte

nsio

n fo

r fu

ll co

mm

erci

al e

xplo

itatio

n• P

P fro

m M

PA fo

r dril

ling

of in

itial

PR

OD

UCT

ION

wel

ls as

any

as

soci

ated

wor

ks a

nd si

te u

pgra

des

• Pos

sibl

e Se

ctio

n 10

6 pl

anni

ng

oblig

atio

ns li

nked

to P

P • P

PAs

if ap

prop

riate

• Aga

in, o

nce

PP g

rant

ed th

e D

evel

oper

mus

t rep

eat t

he

proc

ess o

f not

ifyin

g th

e EA

an

d H

SE p

rior t

o dr

illin

g be

fore

D

ECC

giv

e th

e ul

timat

e gr

een

light

to c

omm

ence

ope

ratio

ns.

Oth

er R

equi

rem

ents

:• P

P fro

m M

PA fo

r lar

ge

scal

e co

mm

erci

al d

rillin

g of

PR

OD

UCT

ION

wel

ls a

nd a

ny

asso

ciat

ed w

orks

or s

ite u

pgra

des

(i.e.

con

stru

ctio

n of

larg

e sc

ale

prod

uctio

n in

fras

truc

ture

)• P

ossi

ble

Sect

ion

106

plan

ning

ob

ligat

ions

link

ed to

PP

• PPA

s if

appr

opria

te• A

gain

, onc

e PP

gra

nted

the

Dev

elop

er m

ust r

epea

t the

pr

oces

s of n

otify

ing

the

EA a

nd

HSE

prio

r to

drill

ing

befo

re b

eing

th

e gr

een

light

by

DEC

C.

Oth

er R

equi

rem

ents

:• P

P fr

om M

PA (L

PA in

Sco

tland

) for

dr

illin

g EX

PLO

RATO

RY w

ells

, cha

nge

of u

se in

land

and

any

ass

ocia

ted

wor

ks• C

A C

ON

SEN

T to

dril

l thr

ough

coa

l se

ems w

here

nec

essa

ry• W

ell E

xam

inat

ion

Sche

me

impl

emen

ted

to c

onfir

m w

ell d

esig

ned

and

cons

truc

ted

in a

ccor

danc

e w

ith

indu

stry

• Not

ify E

A o

f int

entio

n to

dril

l• N

otify

HSE

of w

ell d

esig

n an

d op

erat

ions

21

days

prio

r to

drill

ing

• HSE

Con

sent

whe

re si

gnifi

cant

al

tera

tion

of w

ell n

eede

d• F

rack

ing

Plan

to a

ddre

ss th

e ris

k of

se

ism

icity

subm

itted

to D

ECC

• F

rack

ing

cons

ent f

rom

DEC

C.

1 –

3 Ye

ars

Oth

er R

equi

rem

ents

:• P

EDL

Exte

nsio

n• P

P fr

om M

PA fo

r dril

ling

of

APP

RAIS

AL

wel

ls a

nd a

ny

asso

ciat

ed w

orks

and

upg

rade

s (e

.g. d

rillin

g pl

atfo

rms)

• Sec

tion

106

pla

nnin

g ob

ligat

ions

link

ed to

PP

• PPA

s if

appr

opria

te• O

nce

PP g

rant

ed th

e D

evel

oper

m

ust r

epea

t the

pro

cess

of

notif

ying

the

EA a

nd H

SE o

f dr

illin

g be

fore

bei

ng th

e gr

een

light

by

DEC

C• A

dditi

onal

ly H

SE C

onse

nt

wou

ld b

e ne

cess

ary

whe

re

the

Dev

elop

er w

ishe

d to

si

gnifi

cant

ly a

lter e

xist

ing

wel

ls.

1 –

2 Ye

ars

2 –

3 Ye

ars

Ove

r 20

Year

s

Oth

er R

equi

rem

ents

:• P

P fr

om M

PA (i

f fur

ther

co

nsen

t re

quire

d fo

r cha

nges

to

the

deve

lopm

ent

stra

tegy

fr

om th

at c

onse

nted

in P

P fo

r st

age

5)• R

ehab

ilita

tion

of a

rea

in

acco

rdan

ce w

ith P

P co

nditi

ons

• Wel

l Aba

ndon

men

t in

acco

rdan

ce w

ith H

SE st

anda

rds

• Aft

erca

re o

f the

site

in

acco

rdan

ce w

ith P

P co

nditi

ons.

Aba

ndon

men

tW

ell p

lugg

ed a

nd s

urro

undi

ng

area

reha

bilit

ated

in a

ccor

danc

e w

ith p

resc

ribed

sta

ndar

ds.

Expl

orat

ion

Onc

e PE

DL

secu

red,

Dev

elop

er

iden

tifie

s lo

cati

ons

wit

hin

licen

ce a

rea

wit

h hi

ghes

t po

tent

ial f

or s

hale

gas

an

d ex

plor

ator

y dr

illin

g un

dert

aken

.

App

rais

alD

rilli

ng o

f wel

ls t

o as

sess

co

mm

erci

al v

iabi

lity

of g

as

prod

ucti

on. G

as p

rodu

ced

at t

his

stag

e ca

n be

use

d fo

r sm

all-

scal

e co

mm

erci

al

elec

tric

ity

gene

rati

on.

Init

ial D

evel

opm

ent

Firs

t pr

oduc

tion

wel

ls

cons

truc

ted

as w

ell a

s ne

cess

ary

infr

astr

uctu

re to

faci

litat

e th

e sa

le o

f sha

le g

as. E

arly

sal

es

reve

nue

gene

rate

d an

d pr

ojec

t ta

ilore

d to

max

imis

e pr

oduc

tion

.

Full

Dev

elop

men

t & P

rodu

ctio

n D

rillin

g of

pro

duct

ion

wel

ls a

cros

s lic

ence

are

a an

d co

nstr

uctio

n of

co

mm

erci

al p

rodu

ctio

n fa

cilit

ies

and

infr

astr

uctu

re fo

r lar

ge

volu

mes

of s

hale

gas

.

Oth

er R

equi

rem

ents

:• P

EDL

to s

earc

h fo

r, an

d ex

trac

t sha

le g

as. (

PED

L mirr

ors s

tage

s –

ther

efor

e PE

DL e

xten

sions

will

be

nece

ssar

y)• P

rope

rty

Righ

ts –

neg

otia

te w

ith L

ando

wne

rs to

pur

chas

e or

sec

ure

right

s (le

ase

or li

cens

e) o

ver l

and

to fa

cilit

ate

the

proc

ess.

Iden

tific

atio

nD

evel

oper

iden

tifies

suita

ble

area

s for

shal

e ga

s exp

lora

tion.

1 –

3 Ye

ars

Envi

ronm

ent R

equi

rem

ents

:• S

ite sp

ecifi

c ch

arac

teris

atio

n an

d as

sess

men

t• B

asel

ine

repo

rtin

g an

d se

ism

icity

.

Envi

ronm

ent R

equi

rem

ents

:•

EPs

– m

itiga

tion

and

cond

ition

s dea

ling

with

pot

entia

l env

ironm

enta

l con

cern

s/ris

ks (i

nclu

ding

: sur

face

and

gr

ound

wat

er a

ctiv

ities

and

dis

char

ges,

in

dust

rial e

mis

sion

s, ra

dioa

ctiv

e su

bsta

nces

, fra

ckin

g flu

id, N

ORM

, was

te

wat

er a

nd st

orag

e)

• Fl

ood

Def

ence

Con

sent

• EIA

– d

epen

ding

upo

n na

ture

, siz

e an

d lo

catio

n of

dev

elop

men

t pr

opos

als,

con

sult

atio

n st

rate

gy to

be

ado

pted

and

like

ly s

igni

fican

t en

viro

nmen

tal e

ffec

ts• W

AL

need

ed w

here

wat

er fo

r fra

ckin

g op

erat

ions

sour

ced

from

gro

undw

ater

/su

rfac

e w

ater

• Site

spe

cific

cha

ract

eris

atio

n an

d as

sess

men

t• B

asel

ine

repo

rtin

g an

d se

ism

icity

.

Envi

ronm

ent R

equi

rem

ents

:• E

Ps –

miti

gatio

n an

d co

nditi

ons

deal

ing

with

site

spec

ific

envi

ronm

enta

l con

cern

s/ris

ks• W

AL

• EIA

– d

epen

ding

upo

n na

ture

, siz

e an

d lo

catio

n of

dev

elop

men

t pr

opos

als a

nd c

onsu

ltatio

n st

rate

gy to

be

adop

ted

and

likel

y si

gnifi

cant

env

ironm

enta

l eff

ects

• Site

spec

ific

char

acte

risat

ion

and

asse

ssm

ent

• Bas

elin

e re

port

ing

and

seism

icity

.

Envi

ronm

ent R

equi

rem

ents

:• E

Ps –

miti

gatio

n an

d co

nditi

ons

deal

ing

with

site

spe

cific

en

viro

nmen

tal c

once

rns/

risks

• WA

L• E

IA• S

ite sp

ecifi

c ch

arac

teris

atio

n an

d as

sess

men

t• B

asel

ine

repo

rtin

g an

d se

ismic

ity.

Envi

ronm

ent R

equi

rem

ents

:• E

Ps –

miti

gatio

n an

d co

nditi

ons

deal

ing

with

site

spe

cific

en

viro

nmen

tal c

once

rns/

risks

• WA

L• E

IA• S

ite sp

ecifi

c ch

arac

teris

atio

n an

d as

sess

men

t• B

asel

ine

repo

rtin

g an

d se

ismic

ity.

Envi

ronm

ent R

equi

rem

ents

:• E

Ps –

miti

gatio

n an

d co

nditi

ons

deal

ing

with

site

spec

ific

envi

ronm

enta

l con

cern

s/ris

ks• P

ossi

ble

EIA

con

nect

ed to

PP

depe

ndin

g on

the

chan

ges t

hat

have

bee

n m

ade.

Shal

e G

as E

xtra

ctio

n Pr

oces

s Tim

elin

e

7503This note does not constitute legal advice. Specific legal advice should be taken before acting on any of the topics covered.

ContactsFor more information please contact:

Georgie MessentPartnerPlanning & EnvironmentEnergy & Infrastructure T: +44 (0)20 7418 8263M: +44 (0)7870 598098E: [email protected]

Emma ReidSolicitorPlanning & EnvironmentEnergy & InfrastructureT: +44 (0)141 567 8693E: [email protected]

Paul RicePartner and Head of Client Relationships Energy and Natural ResourcesPlanning & EnvironmentEnergy & InfrastructureT: +44 (0)20 7490 6282M: +44 (0)7798 617709E: [email protected]

Eluned WatsonAssociatePlanning & EnvironmentEnergy & InfrastructureT: +44 (0)20 7490 9332M: +44 (0)7919 395880E: [email protected]

Bob RuddimanSector HeadEnergy & Natural ResourcesT: +44 (0)1224 377 925M: +44 (0)7767 316970E: [email protected]

7

Claire SwientonSolicitorPlanning & EnvironmentEnergy & InfrastructureT: +44 (0)20 7418 8289M: +44 (0)7468 710896 E: [email protected]

7503www.Out-Law.comwww.pinsentmasons.com

Pinsent Masons LLP is a limited liability partnership registered in England & Wales (registered number: OC333653) authorised and regulated by the Solicitors Regulation Authority and the appropriate regulatory body in the other jurisdictions in which it operates. The word ‘partner’, used in relation to the LLP, refers to a member of the LLP or an employee or consultant of the

LLP or any affiliated firm of equivalent standing. A list of the members of the LLP, and of those non-members who are designated as partners, is displayed at the LLP’s registered office: 30 Crown Place, London EC2A 4ES, United Kingdom. We use ‘Pinsent Masons’ to refer to Pinsent Masons LLP, its subsidiaries and any affiliates which it or its partners operate as separate

businesses for regulatory or other reasons. Reference to ‘Pinsent Masons’ is to Pinsent Masons LLP and/or one or more of those subsidiaries or affiliates as the context requires. © Pinsent Masons LLP 2015.

For a full list of our locations around the globe please visit our websites:

For more information please visit: pinsentmasons.com/shale