Part 5: Managing Environmental IssuesDespite the recent focus on shale gas exploration in the UK and elsewhere in Europe, there is currently no unified regulatory regime that specifically covers exploration, development and exploitation of shale gas.
As yet, although there has been no commercial production of shale gas and just a few pilot production tests in the UK, significant concerns have been raised by campaign groups, protestors and others about the potential public health and environmental impacts of fracking for shale gas.
At a time when the Government is supporting the drive for shale gas and many oil and gas companies are looking to participate in this industry in the UK, it is important for participants in this market to ensure that public opinion relating to the environmental integrity of extraction of unconventional hydrocarbons is considered carefully and concerns addressed wherever possible.
Management of key environmental concerns is essential for the sector’s development. A range of issues will need to be considered including contamination of surface and groundwaters, potential stress on water supplies, soil quality and fugitive emissions. Whilst some of these can be mitigated by careful selection, a full understanding of the fragmented regulatory regime covering these issues is necessary to appropriately address the issues.
Members of the oil and gas industry who are investing in shale gas and bidding for the 14th Licensing Round in the UK are currently having discussions with Government about changing the Environmental Impact Assessment (EIA) framework so that EIAs are not necessary for each well that is drilled during shale gas exploration, development and production. Industry is driving the agenda to streamline this process in the UK, in the same way as standard rules permits were introduced for waste management, to reduce the cost of regulatory compliance.
At the time of writing, further changes have been proposed to the Infrastructure Bill that would, if enacted into legislation, mean that there would be more detailed assessments and checks of the environmental issues to be addressed as part of the consenting regime for hydraulic fracturing consents. The suggested conditions cover areas such as environmental impacts (see below), arrangements for independent inspections of the well integrity, monitoring of methane levels in groundwater prior to fracturing and of methane emissions to air, provisions relating to groundwater and environmental protection areas, review of the impact of components of hydraulic fracturing fluid and potential restoration conditions in relation to development.
Part 5 of the Toolkit provides an overview of the key environmental legislation relevant to the exploration, development and exploitation of shale gas. We have set out the types of environmental permits that could be necessary (depending on site and project-specific factors) and the implications of the Registration,Evaluation and Authorisation of Chemicals (REACH), water usage and wastewater disposal for the shale gas industry.
www.pinsentmasons.com/shale1
2
Shale Gas Toolkit | Shale Gas Toolkit: Part 5
Managing Legal RisksIn addition to understanding the environmental concerns that might arise on projects, appropriate risk management should also involve:• Risk management of environmental issues through appropriate drafting on acquisition of sites for shale gas activities, or in relation to
access arrangements
• Guidance for companies on EIA procedures and processes (which are covered in Part 3 of our Toolkit and below)
• Legal review of appointment documents for environmental consultants to consider the suitability of liability management and in particular limitations, to shale gas related work
• Consideration of legal issues associated with water management plans and water re-use proposals, particularly in view of the plethora of water legislation
• Liaison with regulatory authorities in relation to environmental issues, particularly in relation to waste or waste water management
• Advice on potential and threatened nuisance claims by neighbours relating to environmental issues, or threatened prosecution by the relevant environment agency (i.e. Environment Agency, Natural Resources Wales or the Scottish Environmental Protection Agency (SEPA)) if future incidents occur.
Cuadrilla’s recent experience shows that the interface between the various types of consents required is also of great importance when developing project strategy. A favourable outcome by the environmental regulators may not necessarily yield the same result from planning authorities, and visa versa.
The Legal RegimeAs we have already mentioned, there is currently no unified regulatory regime that specifically covers exploration, development and exploitation of shale gas in the EU, partly as the existing legislation was not designed with shale gas in mind.
Participants in the shale gas industry in the UK will need to give careful consideration to a number of areas of environmental laws that we believe must be approached with an eye for detail and underpinned by robust consenting, mitigation and management strategies (as noted above).
Both general and specific pieces of EU and UK environmental legislation apply to shale gas activities from planning until cessation. The key laws and regulations that are relevant from an environmental perspective cover Strategic Environmental Assessment (SEA), Environmental Impact Assessment (EIA) and planning, underground risk assessment, well integrity, integrated and consistent requirements in terms of baseline and operational monitoring, capture of methane emissions and disclosure of fracturing fluid composition on a well by well basis.
Overview of Fracking ProcessShale gas extraction generally leads to a larger environmental footprint compared to conventional gas development. This is due to the fact that it requires a more intensive well stimulation technique, it mainly takes place on-shore and will cover much wider areas. In addition, as productivity of shale gas wells is generally lower than conventional wells, more wells will need to be drilled.
In the current state of technological development, shale gas extraction requires the combined use of high volume hydraulic fracturing and directional (especially horizontal) drilling.
Hydraulic fracturing or “fracking” is a process by which fracturing fluid – a mixture consisting typically of water, sand and chemical additives (generally between 0.5% and 2% of the total fracturing fluid) is injected under high pressure to break the rock, open and enlarge fractures to enable the hydrocarbons to flow into the well.
So far, experience in Europe has been focussed on low volume hydraulic fracturing in some conventional and tight gas reservoirs, mostly in vertical wells, constituting only a small part of past EU oil and gas operations.
Drawing on the North American experience where the high volume fracturing has been broadly used, operators are now testing this practice further in the EU. However, at the time of writing Part 5 of this Toolkit, there has been no commercial production of shale gas and just a few pilot production tests in the UK.
75033
Environmental PermitsThe Environmental Permit is likely to be the key environmental consent required for each individual stage (or phase) of shale gas development in England and Wales.
An Environmental Permit could be required if fracking activities are deemed by regulatory authorities to include:
• A groundwater activity, such as discharge of fracking fluid into wells
• A mining waste activity, for example, storage of flowback fluid
• An installation under the Industrial Emissions Directive
• An activity requiring a Radioactive Substances Act consent (which is likely to be the case wherever oil and gas is produced).
Additional consents may be required from the Environment Agency if shale gas development results in:
• An activity requiring a Groundwater investigation consent
• An activity requiring a water abstraction licence – typically, abstraction of more than 20m3 per day
• An activity requiring a flood defence consent if the development takes place near river or sea flood defences
A coal authority consent under the Coal Industry Act 1994 may also be necessary if the operation will intersect coal seams or coal mine workings.
The Environment Agency strongly advises that operators and developers discuss the requirements of all relevant permissions with the Agency at the pre-application stage and ‘twin-track’ the planning and environmental consent applications.
In Scotland, the above activities will require similar consents from SEPA.
Environmental Permit: Cuadrilla Case StudyOn 16 January 2015, the Environment Agency granted an environmental permit to Cuadrilla Bowland Limited for the exploration stage of their shale gas operations in Lancashire.
The permit provides the required consent for various exploration activities including:• Injection of fracking fluid into wells via injection boreholes
• Extraction of flowback fluid (up to 3000m3)
• Flaring of limited amounts of waste gas
• Storage of extracted flowback fluid.
Conscious of the heightened public concern in relation to the environmental impacts of shale gas development, the Environment Agency completed a rigorous seven month assessment of Cuadrilla’s application. The normal four week consultation period was extended to eight weeks and the Environment Agency requested several pieces of additional information from Cuadrilla. Notably, these requests related to the composition of friction reducer, Cuadrilla’s waste management plan and proposed measures for the limitation of noise from flaring.
Shale gas developers should be mindful of the extended timescales for obtaining environmental permits and the approach to public consultation should be given particular consideration. It is, however, hoped that with improved knowledge of the specific characteristics of shale gas development and industry standards, turnaround times for granting these permits will decrease.
Environmental Impact Assessment (EIA)As set out in more detail in Part 3 of our Toolkit, the answer to the question of whether any given phase of a shale gas project will require an EIA will depend on the nature, size and location of the operations and whether they will have a significant effect on the environment. Amendments were tabled to the Infrastructure Bill in August 2014 that would have meant that EIAs would have been required for all shale gas activity at all sites. However, those amendments were not officially moved forward.
Part 5 of this toolkit has been published after MPs voted against an amendment to the Infrastructure Bill that would have resulted in an outright ban on shale gas activity in England and Wales. However, MPs did vote on stronger checks and thirteen conditions that would be relevant to shale gas development in England and Wales which will now be scrutinised further as part of the Bill process. The amendments tabled to the Bill would mean, if enacted, that no hydraulic fracturing could take place unless an EIA of a development had been carried out, a consideration of cumulative impacts by Mineral Planning Authorities (MPAs) and community benefits provided. Also, no fracking would take place in groundwater areas, source protection zones and protected areas as noted above.
Shale Gas Toolkit | Shale Gas Toolkit: Part 5
Current market thinking from environmental consultants involved in the 14th Licensing Round is that it is unlikely in the short to medium term for a MPA (or in Scotland, a local authority) to approve of fracking development without an EIA. It is anticipated that this will continue to be the case until better information is collected that demonstrates significant effects are unlikely to be triggered by fracking activity.
In practice, a screening opinion can be obtained from a MPA on whether or not an EIA is required. Operators should however be aware that there could be non-legal reasons that trigger an EIA, such as the desire for an operator to be “open” about the potential environmental impacts of a proposed project. In addition, if market practice is for operators to obtain an EIA for each well to be fracked, other operators are likely to be guided by this when they make their applications for new activities.
Given the lack of track record of UK examples for hydraulic fracturing, it is considered current best practice to undertake an EIA on any proposed well development involving hydraulic fracturing even where it may be debated whether an EIA is required or not.
The current market practice in relation to EIAs is likely to lead to huge costs for operators that win bids for PEDLs in the 14th Licensing Round in the UK, due to the level of detail and volume of information required for an EIA under the current legislative framework. We understand that a rough estimate of the costs per EIA per well for operators is £150,000 – £200,000.
Registration, Evaluation and Authorisation of Chemicals (REACH) RegulationsIn addition to each site being scrutinised by the Environment Agencies (the Environment Agency, Natural Resources Wales and SEPA) and the Health and Safety Executive, the Agency will require details of the substances that constitute the fracking fluid and will only grant an environmental permit if they are satisfied that there are no risks to the environment, particularly to groundwater.
The REACH Regulations govern the chemicals that can be used in fracking fluid and registration under REACH may be required in the EU for substances to be used in fracking fluid. Our experience from working with manufacturing companies is that there are significant costs associated with such registrations and companies facing potential registration of chemicals have in many instances looked carefully to see if they can use alternative chemicals that have been registered by others.
In addition, companies may be tempted to adopt business models used in the US, but need to be aware that some chemicals used for fracking by US companies are banned in the EU.
We understand that the disclosure of chemicals that will used in fracking fluid is a matter of significant concern to operators involved in this market, as the constituents of fracking fluid used by different operators has been a closely guarded secret in the US. Careful guidance will no doubt be needed by participants in the shale gas industry on environmental confidentiality issues, particularly in relation to fracking fluid.
Water usage and disposal of waste waterConcerns have been expressed about the quantities of water used in fracking and the disposal of waste water that results from the process. The water used may of course be obtained from licensed suppliers, but if directly abstracted by the operators, will require a Water Abstraction Licence from the Environment Agency or Natural Resources Wales in England and Wales. Licences will only be given where the relevant Agency is satisfied that a sustainable supply is obtainable.
4
75035
Equally, disposal of waste water is subject to scrutiny by the Environment Agency in England and Natural Resources Wales in Wales and will require a permit. The waste water from operations in Lancashire has been found to contain low levels of radioactivity. A case-specific radiological assessment is required in support of any application for a permit for the disposal of radioactive waste. The Environment Agency and Natural Resources Wales will critically review any such assessment and will only issue a permit if satisfied.
In Scotland the carrying out of various activities including abstraction and disposal that are likely to have a significant adverse effect on the water environment require a water use licence from the SEPA.
With the regulators’ focus on waste management, there could be potential opportunities for waste water management contractors in the sector who are able to develop innovative storage, treatment and transporting techniques.
Noise, Traffic, Impacts on HealthA major concern for regulatory authorities is the potential impact of normal operations in terms of noise, traffic and impacts on health. This will be dealt with under the planning regime and by the Health and Safety Executive in the UK. All proposals for oil and gas exploration require planning permission from the relevant MPA and issues associated with this are picked up in Part 3 of our Toolkit on planning.
Impact on 14th Licencing RoundIn preparation for the 14th Licensing Round in the UK, during which bids were submitted by the end of October 2014 for Petroleum Exploration and Development Licences (PEDLs), the companies considering participation in the emerging UK shale gas market worked very closely with geologists, hydrogeologists and others to understand the site-specific characteristics which indicate whether shale gas is located in the licensing areas covered by the Round. Likely environmental issues in each location were also important factors in determining the viability of the sites.
Recent DevelopmentsCommission RecommendationIndustry best practice is being shaped by a European Commission Recommendation on the minimum principles for the exploration and production of hydrocarbons (such as shale gas) using high-volume hydraulic fracturing (Commission Recommendation (2014/70/EU), OJ L 39/72. 08.02.2014 8 February 2014). Notably, this is a voluntary mechanism at present.
The Recommendation provides guidance on the minimum principles which Member States and shale gas developers should be following to address and manage the key environmental concerns associated with the exploration, development and exploitation of shale gas and drilling of wells and fracking that form part of that process.
These include encouraging developers to undertake various site specific environmental assessments, baseline reporting, ensuring that wells are appropriately designed and that release of gases in to the atmosphere is limited.
Member States are to ensure that companies apply Best Available Techniques (BAT) to manage environmental risks appropriately. This is a requirement of many environmental permits.
Compliance with BAT has led to considerable costs for industrial operators in other sectors, for example in the chemicals industry, so operators should be very careful to feed into the Commission process for drafting BAT documents.
The Environmental Industries Commission is currently seeking input from industry stakeholders on BAT for onshore oil and gas exploration, with the findings expected at the end of March 2015.
Status of the RecommendationThe Recommendation is non-binding, but will be followed 18 months after publication by a review by the Commission of the extent to which it has been effective in implementing the principles set out in the Recommendation.
As the Recommendation was published on 8 February 2014, the Review should have taken place by the end of July 2015.
Failure by Member States to implement the various elements of the Recommendation could lead to legislative changes down the line.
The
Shal
e Gas
Ext
ract
ion
Proc
ess,
from
iden
tifica
tion
of a
pot
entia
l dev
elop
men
t are
a to
the
full
com
mer
cial
exp
loita
tion
of th
at a
rea,
con
tain
s man
y st
ages
and
can
last
ove
r 30
year
s. A
t eac
h st
age
Dev
elop
ers m
ust m
eet a
num
ber o
f reg
ulat
ory
requ
irem
ents
that
are
set
out i
n th
e tim
elin
e be
low
.
SEIS
MIC
ITY:
this
issu
e ha
s the
pot
entia
l to
be a
stu
mbl
ing
bloc
k to
pro
pose
d or
com
men
ced
oper
atio
ns a
nd is
som
ethi
ng to
whi
ch D
evel
oper
s m
ust g
ive
cons
ider
able
thou
ght.
Dev
elop
ers
mus
t ass
ess t
he ri
sk o
f act
ivat
ing
faul
ts in
the
prop
osed
lice
nce
area
and
al
so m
onito
r bac
kgro
und
seis
mic
ity b
efor
e fr
acki
ng o
pera
tions
com
men
ce. R
eal t
ime
seis
mic
mon
itorin
g w
ill a
lso
be n
eces
sary
dur
ing
oper
atio
ns a
nd o
pera
tions
will
nee
d to
be
paus
ed o
r hal
ted
whe
re s
eism
icity
pas
ses
a ce
rtai
n le
vel.
Acr
onym
sPE
DL
– Pe
trol
eum
Exp
lora
tion
& D
evel
opm
ent L
icen
ceC
A –
Coa
l Aut
horit
yD
ECC
– D
epar
tmen
t for
Env
ironm
ent &
C
limat
e C
hang
eEA
– E
nviro
nmen
t Age
ncy
EIA
– E
nviro
nmen
t Im
pact
Ass
essm
ent
EP –
Env
ironm
enta
l Per
mit
HSE
– H
ealt
h &
Saf
ety
Exec
utiv
eLP
A –
Loc
al P
anni
ng A
utho
rity
MPA
– M
iner
als
Plan
ning
Aut
horit
yN
ORM
– N
atur
ally
Occ
urin
g Ra
dioa
ctiv
e M
ater
ials
PED
L –
Petr
oleu
m E
xplo
ratio
n &
Dev
elop
men
t Lic
ence
PP –
Pla
nnin
g Pe
rmis
sion
PPA
– P
lann
ing
Perf
orm
ance
Agr
eem
ent
REA
CH
– R
egis
trat
ion,
Eva
luat
ion,
Aut
horis
atio
n an
d Re
stric
tion
of C
hem
ical
sW
AL
– W
ater
Abs
trac
tion
Lice
nce
Oth
er R
equi
rem
ents
:• P
EDL
Exte
nsio
n fo
r fu
ll co
mm
erci
al e
xplo
itatio
n• P
P fro
m M
PA fo
r dril
ling
of in
itial
PR
OD
UCT
ION
wel
ls as
any
as
soci
ated
wor
ks a
nd si
te u
pgra
des
• Pos
sibl
e Se
ctio
n 10
6 pl
anni
ng
oblig
atio
ns li
nked
to P
P • P
PAs
if ap
prop
riate
• Aga
in, o
nce
PP g
rant
ed th
e D
evel
oper
mus
t rep
eat t
he
proc
ess o
f not
ifyin
g th
e EA
an
d H
SE p
rior t
o dr
illin
g be
fore
D
ECC
giv
e th
e ul
timat
e gr
een
light
to c
omm
ence
ope
ratio
ns.
Oth
er R
equi
rem
ents
:• P
P fro
m M
PA fo
r lar
ge
scal
e co
mm
erci
al d
rillin
g of
PR
OD
UCT
ION
wel
ls a
nd a
ny
asso
ciat
ed w
orks
or s
ite u
pgra
des
(i.e.
con
stru
ctio
n of
larg
e sc
ale
prod
uctio
n in
fras
truc
ture
)• P
ossi
ble
Sect
ion
106
plan
ning
ob
ligat
ions
link
ed to
PP
• PPA
s if
appr
opria
te• A
gain
, onc
e PP
gra
nted
the
Dev
elop
er m
ust r
epea
t the
pr
oces
s of n
otify
ing
the
EA a
nd
HSE
prio
r to
drill
ing
befo
re b
eing
th
e gr
een
light
by
DEC
C.
Oth
er R
equi
rem
ents
:• P
P fr
om M
PA (L
PA in
Sco
tland
) for
dr
illin
g EX
PLO
RATO
RY w
ells
, cha
nge
of u
se in
land
and
any
ass
ocia
ted
wor
ks• C
A C
ON
SEN
T to
dril
l thr
ough
coa
l se
ems w
here
nec
essa
ry• W
ell E
xam
inat
ion
Sche
me
impl
emen
ted
to c
onfir
m w
ell d
esig
ned
and
cons
truc
ted
in a
ccor
danc
e w
ith
indu
stry
• Not
ify E
A o
f int
entio
n to
dril
l• N
otify
HSE
of w
ell d
esig
n an
d op
erat
ions
21
days
prio
r to
drill
ing
• HSE
Con
sent
whe
re si
gnifi
cant
al
tera
tion
of w
ell n
eede
d• F
rack
ing
Plan
to a
ddre
ss th
e ris
k of
se
ism
icity
subm
itted
to D
ECC
• F
rack
ing
cons
ent f
rom
DEC
C.
1 –
3 Ye
ars
Oth
er R
equi
rem
ents
:• P
EDL
Exte
nsio
n• P
P fr
om M
PA fo
r dril
ling
of
APP
RAIS
AL
wel
ls a
nd a
ny
asso
ciat
ed w
orks
and
upg
rade
s (e
.g. d
rillin
g pl
atfo
rms)
• Sec
tion
106
pla
nnin
g ob
ligat
ions
link
ed to
PP
• PPA
s if
appr
opria
te• O
nce
PP g
rant
ed th
e D
evel
oper
m
ust r
epea
t the
pro
cess
of
notif
ying
the
EA a
nd H
SE o
f dr
illin
g be
fore
bei
ng th
e gr
een
light
by
DEC
C• A
dditi
onal
ly H
SE C
onse
nt
wou
ld b
e ne
cess
ary
whe
re
the
Dev
elop
er w
ishe
d to
si
gnifi
cant
ly a
lter e
xist
ing
wel
ls.
1 –
2 Ye
ars
2 –
3 Ye
ars
Ove
r 20
Year
s
Oth
er R
equi
rem
ents
:• P
P fr
om M
PA (i
f fur
ther
co
nsen
t re
quire
d fo
r cha
nges
to
the
deve
lopm
ent
stra
tegy
fr
om th
at c
onse
nted
in P
P fo
r st
age
5)• R
ehab
ilita
tion
of a
rea
in
acco
rdan
ce w
ith P
P co
nditi
ons
• Wel
l Aba
ndon
men
t in
acco
rdan
ce w
ith H
SE st
anda
rds
• Aft
erca
re o
f the
site
in
acco
rdan
ce w
ith P
P co
nditi
ons.
Aba
ndon
men
tW
ell p
lugg
ed a
nd s
urro
undi
ng
area
reha
bilit
ated
in a
ccor
danc
e w
ith p
resc
ribed
sta
ndar
ds.
Expl
orat
ion
Onc
e PE
DL
secu
red,
Dev
elop
er
iden
tifie
s lo
cati
ons
wit
hin
licen
ce a
rea
wit
h hi
ghes
t po
tent
ial f
or s
hale
gas
an
d ex
plor
ator
y dr
illin
g un
dert
aken
.
App
rais
alD
rilli
ng o
f wel
ls t
o as
sess
co
mm
erci
al v
iabi
lity
of g
as
prod
ucti
on. G
as p
rodu
ced
at t
his
stag
e ca
n be
use
d fo
r sm
all-
scal
e co
mm
erci
al
elec
tric
ity
gene
rati
on.
Init
ial D
evel
opm
ent
Firs
t pr
oduc
tion
wel
ls
cons
truc
ted
as w
ell a
s ne
cess
ary
infr
astr
uctu
re to
faci
litat
e th
e sa
le o
f sha
le g
as. E
arly
sal
es
reve
nue
gene
rate
d an
d pr
ojec
t ta
ilore
d to
max
imis
e pr
oduc
tion
.
Full
Dev
elop
men
t & P
rodu
ctio
n D
rillin
g of
pro
duct
ion
wel
ls a
cros
s lic
ence
are
a an
d co
nstr
uctio
n of
co
mm
erci
al p
rodu
ctio
n fa
cilit
ies
and
infr
astr
uctu
re fo
r lar
ge
volu
mes
of s
hale
gas
.
Oth
er R
equi
rem
ents
:• P
EDL
to s
earc
h fo
r, an
d ex
trac
t sha
le g
as. (
PED
L mirr
ors s
tage
s –
ther
efor
e PE
DL e
xten
sions
will
be
nece
ssar
y)• P
rope
rty
Righ
ts –
neg
otia
te w
ith L
ando
wne
rs to
pur
chas
e or
sec
ure
right
s (le
ase
or li
cens
e) o
ver l
and
to fa
cilit
ate
the
proc
ess.
Iden
tific
atio
nD
evel
oper
iden
tifies
suita
ble
area
s for
shal
e ga
s exp
lora
tion.
1 –
3 Ye
ars
Envi
ronm
ent R
equi
rem
ents
:• S
ite sp
ecifi
c ch
arac
teris
atio
n an
d as
sess
men
t• B
asel
ine
repo
rtin
g an
d se
ism
icity
.
Envi
ronm
ent R
equi
rem
ents
:•
EPs
– m
itiga
tion
and
cond
ition
s dea
ling
with
pot
entia
l env
ironm
enta
l con
cern
s/ris
ks (i
nclu
ding
: sur
face
and
gr
ound
wat
er a
ctiv
ities
and
dis
char
ges,
in
dust
rial e
mis
sion
s, ra
dioa
ctiv
e su
bsta
nces
, fra
ckin
g flu
id, N
ORM
, was
te
wat
er a
nd st
orag
e)
• Fl
ood
Def
ence
Con
sent
• EIA
– d
epen
ding
upo
n na
ture
, siz
e an
d lo
catio
n of
dev
elop
men
t pr
opos
als,
con
sult
atio
n st
rate
gy to
be
ado
pted
and
like
ly s
igni
fican
t en
viro
nmen
tal e
ffec
ts• W
AL
need
ed w
here
wat
er fo
r fra
ckin
g op
erat
ions
sour
ced
from
gro
undw
ater
/su
rfac
e w
ater
• Site
spe
cific
cha
ract
eris
atio
n an
d as
sess
men
t• B
asel
ine
repo
rtin
g an
d se
ism
icity
.
Envi
ronm
ent R
equi
rem
ents
:• E
Ps –
miti
gatio
n an
d co
nditi
ons
deal
ing
with
site
spec
ific
envi
ronm
enta
l con
cern
s/ris
ks• W
AL
• EIA
– d
epen
ding
upo
n na
ture
, siz
e an
d lo
catio
n of
dev
elop
men
t pr
opos
als a
nd c
onsu
ltatio
n st
rate
gy to
be
adop
ted
and
likel
y si
gnifi
cant
env
ironm
enta
l eff
ects
• Site
spec
ific
char
acte
risat
ion
and
asse
ssm
ent
• Bas
elin
e re
port
ing
and
seism
icity
.
Envi
ronm
ent R
equi
rem
ents
:• E
Ps –
miti
gatio
n an
d co
nditi
ons
deal
ing
with
site
spe
cific
en
viro
nmen
tal c
once
rns/
risks
• WA
L• E
IA• S
ite sp
ecifi
c ch
arac
teris
atio
n an
d as
sess
men
t• B
asel
ine
repo
rtin
g an
d se
ismic
ity.
Envi
ronm
ent R
equi
rem
ents
:• E
Ps –
miti
gatio
n an
d co
nditi
ons
deal
ing
with
site
spe
cific
en
viro
nmen
tal c
once
rns/
risks
• WA
L• E
IA• S
ite sp
ecifi
c ch
arac
teris
atio
n an
d as
sess
men
t• B
asel
ine
repo
rtin
g an
d se
ismic
ity.
Envi
ronm
ent R
equi
rem
ents
:• E
Ps –
miti
gatio
n an
d co
nditi
ons
deal
ing
with
site
spec
ific
envi
ronm
enta
l con
cern
s/ris
ks• P
ossi
ble
EIA
con
nect
ed to
PP
depe
ndin
g on
the
chan
ges t
hat
have
bee
n m
ade.
Shal
e G
as E
xtra
ctio
n Pr
oces
s Tim
elin
e
7503This note does not constitute legal advice. Specific legal advice should be taken before acting on any of the topics covered.
ContactsFor more information please contact:
Georgie MessentPartnerPlanning & EnvironmentEnergy & Infrastructure T: +44 (0)20 7418 8263M: +44 (0)7870 598098E: [email protected]
Emma ReidSolicitorPlanning & EnvironmentEnergy & InfrastructureT: +44 (0)141 567 8693E: [email protected]
Paul RicePartner and Head of Client Relationships Energy and Natural ResourcesPlanning & EnvironmentEnergy & InfrastructureT: +44 (0)20 7490 6282M: +44 (0)7798 617709E: [email protected]
Eluned WatsonAssociatePlanning & EnvironmentEnergy & InfrastructureT: +44 (0)20 7490 9332M: +44 (0)7919 395880E: [email protected]
Bob RuddimanSector HeadEnergy & Natural ResourcesT: +44 (0)1224 377 925M: +44 (0)7767 316970E: [email protected]
7
Claire SwientonSolicitorPlanning & EnvironmentEnergy & InfrastructureT: +44 (0)20 7418 8289M: +44 (0)7468 710896 E: [email protected]
7503www.Out-Law.comwww.pinsentmasons.com
Pinsent Masons LLP is a limited liability partnership registered in England & Wales (registered number: OC333653) authorised and regulated by the Solicitors Regulation Authority and the appropriate regulatory body in the other jurisdictions in which it operates. The word ‘partner’, used in relation to the LLP, refers to a member of the LLP or an employee or consultant of the
LLP or any affiliated firm of equivalent standing. A list of the members of the LLP, and of those non-members who are designated as partners, is displayed at the LLP’s registered office: 30 Crown Place, London EC2A 4ES, United Kingdom. We use ‘Pinsent Masons’ to refer to Pinsent Masons LLP, its subsidiaries and any affiliates which it or its partners operate as separate
businesses for regulatory or other reasons. Reference to ‘Pinsent Masons’ is to Pinsent Masons LLP and/or one or more of those subsidiaries or affiliates as the context requires. © Pinsent Masons LLP 2015.
For a full list of our locations around the globe please visit our websites:
For more information please visit: pinsentmasons.com/shale