sft in 2013 draft proposal – feedback welcome john harvey

13
SFT in 2013 Draft proposal – Feedback Welcome John Harvey

Upload: nura

Post on 23-Feb-2016

38 views

Category:

Documents


0 download

DESCRIPTION

SFT in 2013 Draft proposal – Feedback Welcome John Harvey. Personnel Changes. 1.1. 2013: Predrag becomes ALICE Computing Coordinator 1.1.2013: Federico Carminati joins SFT 1.3.2013: Sandro Wenzel starts his Fellowship in SFT (COFUND – 3 years) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: SFT in 2013 Draft proposal – Feedback Welcome John Harvey

SFT in 2013Draft proposal – Feedback

Welcome

John Harvey

Page 2: SFT in 2013 Draft proposal – Feedback Welcome John Harvey

Personnel Changes

• 1.1. 2013: Predrag becomes ALICE Computing Coordinator

• 1.1.2013: Federico Carminati joins SFT• 1.3.2013: Sandro Wenzel starts his Fellowship

in SFT (COFUND – 3 years)• Felice, Gabriel and Petya will finish their TECH

studentships during Spring 2013

Page 3: SFT in 2013 Draft proposal – Feedback Welcome John Harvey

Results of TSC November 2012• George LESTARIS, TECH

– starts Jan 1st 2013– Design, development, testing, running of Physics Validation system on the

grid– Supervisor Witek

• Bianca-Cristina CRISTESCU, TECH– Bianca starts July 1st 2013– Support of experiments’ migration to use cling, ensure backward

compatibility in generation of dictionaries– Supervisor Axel

• SFT quota in 2012 is 30 months (we used 34)• SFT quota in 2013 has been increased to 36 months

– N.B. Our allocation in 2013 is 45 months

Page 4: SFT in 2013 Draft proposal – Feedback Welcome John Harvey

News from TSC minutes• Next meetings (NB move in dates):

– 23 Apr 2013, 1 Oct 2013– 28 Jan 2014 and 24 Jun 2014

• Candidates not to be contacted beforehand• Provide example projects beforehand so students can indicate type of work

they are interested in• Application form will be updated (computer section) so students can better

describe ALL their skills• DOCT: contract will initially be for 6 months (~probation), extendable up to a

maximum of 3 years• TECH: Assembly to foster contact between students and better inform them of

full range of activities at CERN– Competition for best video of work done – can be used for outreach– Was organised in the past and will be repeated in 2013

• DOCT: Assembly held each year, mainly organised around posters

Page 5: SFT in 2013 Draft proposal – Feedback Welcome John Harvey

Goals of Group Re-structuring• Until this year the group was organised in 4 teams

– SPI, CernVM, Simulation and ROOT– some group members work on projects directly for the experiments.

• Goals of new structure:– take account of personnel changes, strengthen teams low in effort– R&D work on concurrency established as a baseline activity – all group members should have opportunities to contribute to

development project work – Continue to look for synergies between projects– All group members are invited to share in common cross-project activities

e.g. • developing expertise in techniques and tool• becoming contact persons with the experiments • etc.

– Continue to seek ways of interacting with our clients through regular contacts

Page 6: SFT in 2013 Draft proposal – Feedback Welcome John Harvey

PH-SFTSe

rvic

esSF

TWeb

Tool

sC+

+ St

anda

rds

Mee

tings

Grou

p M

eetin

gAr

chite

cts

Foru

mW

orks

hops

Conc

urre

ncy

Foru

m

Experiments

ALICE

CMS

NA62

Frameworks + LCG

Concurrency R&D

Data Processing Framework

External Packages +

LCG releases

Systems

CernVM

LHC@Home

PROOFxrootd

Simulation

GENSER

Geant4

Physics Validation

ROOT

IO, Interpreter

GUI, Graphics

Math, Statistics

Projects

Cros

s Pro

ject

Acti

vitie

s

Page 7: SFT in 2013 Draft proposal – Feedback Welcome John Harvey

PH-SFTHarvey Pardo

Serv

ices

SFTW

ebTo

ols

C++

Stan

dard

s

Mee

tings

Grou

p M

eetin

gAr

chite

cts

Foru

mW

orks

hops

Conc

urre

ncy

Foru

m

ExperimentsHarvey

Buncic

Carminati

Innocente

Pantaleo

Frameworks + LCGMato

Diez

Hegner

Petrova

Piparo

Wenzel

SystemsGanis

Berzano

Blomer

Meusel

SimulationCosmo

Apostolakis

Folger

Gayer

Pokorski

Ribon

Lestaris

ROOTRademakers

Bellenot

Bucur

Couet

Moneta

Naumann

Vasilev

Development Projects

Cros

s Pro

ject

Acti

vitie

s

Page 8: SFT in 2013 Draft proposal – Feedback Welcome John Harvey

Offices

Page 9: SFT in 2013 Draft proposal – Feedback Welcome John Harvey

Cross-Project Tasks• Everyone is also invited to contribute to cross-project tasks

– this is the area where we look for synergies between projects• Services typically run on machines in IT but are still managed by SFT

– Services include the central Build Service, Electric Commander, Web, Coverity, CDash, Savannah etc.

– Tasks to be done involve : licensing, user support, monitoring, managing interventions etc.– Benedikt has responsibility for managing the configuration of all machines and is the SFT

contact person with IT• Other service tasks involve the system administration of machines run for SFT

purposes e.g. Geant4, CernVM, Mac service• For example, contributions are welcome for:

– completing the migration of web infrastructure to IT Drupal service i.e. we need an SFT Drupal expert

– taking overall responsibility for some services e.g. Electric Commander, CDash• In 2013 we should continue to evolve towards a common infrastructure

– e.g. expand the common build cluster and reduce the number of machines we maintain– Benedikt will review the status and set goals for 2013 in the near future

Page 10: SFT in 2013 Draft proposal – Feedback Welcome John Harvey

Group Meeting• There have been 30 group meetings so far in 2012

– Planning of work programme (JIRA)– Project status reports– Trip reports– Invited talks (IT, Atlas, FP, …)– Dissemination of information (TL, ITUM, ITSR, C5, ….)

• Proposal to shift start time to 9.30 am on Mondays– This will allow Predrag to attend

• Proposal to ban use of laptops• Suggestions and feedback on all the above is welcome• Many thanks to Pere for organising and chairing

– JH will chair the meeting in 2013

Page 11: SFT in 2013 Draft proposal – Feedback Welcome John Harvey

Status of Group Budget• 33500 (SFT)– Budget 390k; Balance today is 15k; 95.96% spent

• 260k subsistence, 70k Travel, 60k investments – Remaining commitments means we will overspend

• Acquisition of some equipment postponed until next year

• 34301 (EU7-AIDA)– Budget 6k; Balance today 1.6k; 72% spent

• SFT budget request in 2013 – 400k• I would like Project Leaders to provide a plan for 2013

that prioritises :– Attendance at conferences and collaboration meetings– Support of colleagues through subsistence

Page 12: SFT in 2013 Draft proposal – Feedback Welcome John Harvey

R&DConcurrency

Forum Demonstrators

LCGArchitectsForum+LI

M

I T

Openlab

WLCG

andPH

WorkshopsROOT

G4CP

LPCC

ATLASCMSALICELHCb

ROOTGeant4CernVMExternals

CORAL/COOL

EOS

Panda/Crab

ExperimentsProjects

Page 13: SFT in 2013 Draft proposal – Feedback Welcome John Harvey

Xmas Xmas Party

Curling Club de Genève, Petit-Lancy Tuesday December 11th at 18.30We will be 31 participants for curling….and 33 people for dinner

Please contact Tania ASAP if you have not already registered.NB the cost will be born as far as we can by the group

See Doodle poll page for more details, public transport etc.

The rules of curling and how to play:http://www.fuzilogik.com/Sports-Library/Curling/Curling-Rules-and-How-Curling-is-Played.html