    Be it our working life, our sociallife, or our home life, deserves to

    be constantly improved

    K IZEN PHILOSOPHY

    Kai-Zen Continual Improvement

  • 8/13/2019 SFC Board Layout1

    3/22

    Kaizen-make it a little better

    Its an incremental Improvement

    Kaizen

    http://images.google.com/imgres?imgurl=http://smartmortgageadvice.files.wordpress.com/2007/05/pennies-01_www.jpg&imgrefurl=http://brightest-kidz.squarespace.com/journal/2008/1/17/coin-powered-battery-project.html&usg=__L1718AcvKGzwIYwwSlnRrNlwwog=&h=900&w=900&sz=100&hl=en&start=18&tbnid=twyAdDT09Wr35M:&tbnh=146&tbnw=146&prev=/images%3Fq%3Dpile%2Bof%2Bpennies%26gbv%3D2%26hl%3Den
  • 8/13/2019 SFC Board Layout1

    4/22

    KAIZEN INNOVATION

    Long termUn-dramatic

    Effect Short termDramatic

    Small steps Pace Big steps

    Continuous & incremental

    Time

    frame

    Intermittent &

    non incremental

    Gradual & consistent Change Abrupt & volatile

    Everybody Involvement Champion

    Collectivism,

    group efforts, systemsapproach

    ApproachRugged individualism,

    individual ideas & efforts

    Kaizen Vs Innovation

  • 8/13/2019 SFC Board Layout1

    5/22

    Innovation

    Maintenance

    Maintenance

    Standard

    Standard

    Actual

    Actual

    Time

    Innovation Standard

    Standard

    KAIZENActual

    Actual

    KAIZEN

    Time

    Innovation

    Innovation + Kaizen

    Kaizen +Innovation

    // YIS//062709//

  • 8/13/2019 SFC Board Layout1

    6/22

  • 8/13/2019 SFC Board Layout1

    7/22

  • 8/13/2019 SFC Board Layout1

    8/22

  • 8/13/2019 SFC Board Layout1

    9/22

    -An outstanding performance award-A skill award

    -A fighting spirit award

    Focus more on process

    Rather than result !!!

    Kaizen Steps

  • 8/13/2019 SFC Board Layout1

    10/22

    Internal | NaP/BPS-CIP | 16/01/2013 | Bosch Limited 2013. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,

    distribution, as well as in the event of applications for industrial property rights.

    SFC Board Layout Tool for potential analysis

    TeamDetails1 2 3

    4 5

    7

    Caretaker Name & Tel

    Problem Bank Selection Criteria

    12 Steps & Road Map Problem solving sheet

    Savings

    6 Working sheet

    9 Summery Sheet

    10

    8 KPI Tree sheet

  • 8/13/2019 SFC Board Layout1

    11/2211Internal | NaP/BPS-CIP | 16/01/2013 | Bosch Limited 2013. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,

    distribution, as well as in the event of applications for industrial property rights.

    SFC Team & Meeting / Attendance

    SFC Meeting

    Every _____ at _____

    Time : ____ to ____

    Team Name: -

    Team Photo Name E no.

    Attendance:

    Agenda:

    11

  • 8/13/2019 SFC Board Layout1

    12/2212Internal | NaP/BPS-CIP | 16/01/2013 | Bosch Limited 2013. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,

    distribution, as well as in the event of applications for industrial property rights.

    Problem Bank

    Sr.

    No.Date Problem Name Sign.

    Type

    (A,B,C)

    12

  • 8/13/2019 SFC Board Layout1

    13/2213Internal | NaP/BPS-CIP | 16/01/2013 | Bosch Limited 2013. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,

    distribution, as well as in the event of applications for industrial property rights.

    Problem Selection criteria

    Problem Selection criteriaSr. No Problem Quality

    10

    Cost

    10

    Delivery

    10

    Safety

    10

    Business

    Case

    10

    Total

    1. 10 5 5 0 0 20/50

    2. 4 0 2 0 0 6/50

    3. 0 5 0 10 0 15/50

    Inscription Rolling not

    done.

    Filter pin pressing

    Coolant overflow at filter.

    13

    Rating:

    Maximum points can be given - 10Minimum points can be given - 0

  • 8/13/2019 SFC Board Layout1

    14/22

  • 8/13/2019 SFC Board Layout1

    15/22

    Internal | NaP/BPS-CIP | 16/01/2013 | Bosch Limited 2013. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,

    distribution, as well as in the event of applications for industrial property rights.

    Problem solving sheet

    15

  • 8/13/2019 SFC Board Layout1

    16/22

    Internal | NaP/BPS-CIP | 16/01/2013 | Bosch Limited 2013. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,

    distribution, as well as in the event of applications for industrial property rights.

    Problem solving sheet / samasyaa inavaarNa t@ta

    16

  • 8/13/2019 SFC Board Layout1

    17/22

    Internal | NaP/BPS-CIP | 16/01/2013 | Bosch Limited 2013. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,

    distribution, as well as in the event of applications for industrial property rights.

    Working sheet

    Data collection & Analysis sheet

    How data is collected

    Which tool is used for data collection

    How collected data is analyzed

    How collected data is Validated

    Instructions regarding who will do what before next meeting

    17

  • 8/13/2019 SFC Board Layout1

    18/2218Internal | NaP/BPS-CIP | 16/01/2013 | Bosch Limited 2013. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,

    distribution, as well as in the event of applications for industrial property rights.

    SFC Results

    Savings:

    1.Tangible.

    2. Intangible.

    3.Before / After Graphical Tracking orPictures

    18

  • 8/13/2019 SFC Board Layout1

    19/22

    NaP/BPS-CIP |16/01/2013| Bosch Limited 2013 All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution,

    as well as in the event of applications for industrial property rights.

    Before / After Pictures

    DD.MM .YY

    Machine /area name

    1. Describe here what is tochanged & why

    1. Describe changed what , andwhat is achieved after change

    Product-

    Photo Before change, mark

    to be changed in Red

    circle- see examples on

    best practices, dotted bold

    line

    Photo after change-

    Mark change in green

    circledotted bold line

    Mark below P- productivity- Q-Quality,

    C- Cost , D delivery to next & external

    customer& SHE- Safety , Health ,Environment- improved Morale- effect

    of action

    Name who did it !

    Date: Range & Work shop : W

    Place Description

    :

    AFTER

    Impact on :

    BEFORE

    SHEDCQ

    Responsible :

    Range :

    P

    19

  • 8/13/2019 SFC Board Layout1

    20/22

    Internal | NaP/BPS-CIP | 16/01/2013 | Bosch Limited 2013. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,

    distribution, as well as in the event of applications for industrial property rights.

    KPI Tree

    Product Cost

    (PHEK)

    COST DELIEVERY

    Productivity Tool Cost Maint. Cost

    OEE

    VaO/WH

    Tool cost

    Monitoring

    GEZ WIP

    MTTR

    MTBFWheel life

    Improvement

    QUALITY

    Defect cost

    Scrap

    improvemnt

    N 903

    from 1459

    to 572

    N 904

    DELIVERY

    FUFILMENT

    Typewise

  • 8/13/2019 SFC Board Layout1

    21/22

    Best process/best result from NaP Summery sheet

    Description of the idea/ solution

    Major actions are:Result :

    16/01/2013 | This is an exclusive property of Bosch Limited, India.

    Without their consent, it may not be reproduced or given to third parties.

    Product: Area :

    Department: Line:

    Contact :

    Description of the problem

    Transferability :

    21

  • 8/13/2019 SFC Board Layout1

    22/22