Page 1: Setting up pmo

Setting up

Project Management

Office

+38 (050) 388 49 [email protected] April, 2011

by Dmitry Bekinin

Page 2: Setting up pmo

1. Overview

Project Management Office (PMO):

1.More common in past with very large programs

2.Coincides with the rise of project management awareness

3.Many companies implemented with Y2K

4.Entered mainstream as a way to better manage and control projects

5.Still more common in IT organizations

www.bekinin.com

Page 3: Setting up pmo

1. Overview

Types of PMO:

Type I: - Project Reporting

Type II: - Project Management Infrastructure

Type III: - Coaching and Training Center

Type IV - Resource Center / Center of Excellence Responsible for project success

www.bekinin.com

Page 4: Setting up pmo

1. Overview

Better predictability for cycle time and costs

Improved quality of product deliverables

Early identification and proactive management of project issues andrisks

Better containment and management of project scope

Reduced time to get up to speed on new projects

The value of Project Management Office (PMO):

www.bekinin.com

Page 5: Setting up pmo

1. Overview

Provides one-stop view of project status

Develops and deploys common project management methodology

Determines skill gaps and areas of training focus

Accelerates adoption of project management through training and coaching

The value of Project Management Office (PMO):

www.bekinin.com

Page 6: Setting up pmo

Basic PMO Services

Page 7: Setting up pmo

2. Basic PMO Services

Basic PMO service

Provides consolidated view of all project status

High level

Follow-up with individual project teams for more details

Consolidate status reporting

www.bekinin.com

Page 8: Setting up pmo

2. Basic PMO Services

Graphic, visual display

Charts and graphs for overall status and trends

One line status per project –green/yellow/red

Drill down on each project for full status

Project dashboards

www.bekinin.com

Page 9: Setting up pmo

2. Basic PMO Services

One of the basic PMO responsibilities

Consistent and common project management methodology• Processes• Procedures• Best Practices• Templates• Examples• Standards and guidelines

Make sure the methodology is scalable

Methodology Management

www.bekinin.com

Page 10: Setting up pmo

2. Basic PMO Services

Usually one-on-one or small group

Advice is based on coach training and experience and is specific to the people being coached

Need to “touch”the person, so best if done in person

Competency Enhancement: Project Management Coaching

www.bekinin.com

Page 11: Setting up pmo

2. Basic PMO Services

Validate compliance

Provides opportunity for coaching

Use quality assurance techniques

Don’t have to audit every project

Project Audits

www.bekinin.com

Page 12: Setting up pmo

2. Basic PMO Services

Need a place to house documents

Can‘t reuse prior work if you can’t find it

Include methodology, PMO documents, and well-done examples of completed work

Can be automated tool or file directory

Track repository usage

Document Repository

www.bekinin.com

Page 13: Setting up pmo

2. Basic PMO Services

Project focused and PMO focused

Project management value focused

Organization scorecard focused

Benchmarking

Metrics Collection

www.bekinin.com

Page 14: Setting up pmo

2. Basic PMO Services

Periodically determine progress of PM implementation• Look at all services offered• Analyze all metrics and feedback• Summarize project audits

Compare against first and prior assessment

Validate the value of implementaion so far

Adjust plans as appropriate

Organizational Assessments

www.bekinin.com

Page 15: Setting up pmo

Advanced PMO

Services

Page 16: Setting up pmo

3. Advanced PMO Services

Designing a project management career path

Collecting project metrics for improved estimating and process improvement

Defining project time-reporting requirements

Providing product management for PM tools• Plan and implement• Manage contracts, licenses and finances• Coordinate release management

www.bekinin.com

Page 17: Setting up pmo

3. Advanced PMO Services

Portfolio management• Improved resource allocation• Improved alignment of the work• Improved balance of work

Portfolio management and the PMO• PMO sees all projects• PMO serves as a central coordination organization

Common resource pool• Skills inventory• Current assignments• Project end-dates

Establishing a portfolio management process

www.bekinin.com

Page 18: Setting up pmo

PMO Services

Implementation

Page 19: Setting up pmo

4. PMO Services Implementation

Many models for implementation

Use one that makes sense for your organization

Deploy in “waves”or phases

Don’t implement too much change at once

Deploy most important priorities first

www.bekinin.com

Page 20: Setting up pmo

4. PMO Services Implementation

Plan and manage as a project

Build overall communication plan• Multiple aspects of communication• Understand and satisfy target audience

Focus on the basics• Define the project (Project Definition / Charter)• Plan the project (workplan / schedule)• Manage the project (Project Management

Procedures)

First Phase

www.bekinin.com

Page 21: Setting up pmo

4. PMO Services Implementation

Second wave trainingMore sophisticated common processes and techniquesPMO review of all Project ChartersProject management support organizationAlign organizational objectives and rewards systemsProject auditsProject management toolsRepository of project management documentsKey learning to derive best practicesNew organization assessment

Second Phase examples

www.bekinin.com

Page 22: Setting up pmo

Common problems

and

best practices

Page 23: Setting up pmo

5. Common problems

Setting up processes and expecting everyone to follow

them

Expecting everyone in the PMO to be an expert

Making all projects follow the same approach

Not having the staying power

Not creating a support organization

Poor communication

Weak sponsorship

Trying to do too much with too little

Focusing on PMO activities and not value

www.bekinin.com

Page 24: Setting up pmo

5. Best Practices

Implementation best practices

Treat as a culture change initiative

• Resistance to change is normal

• Be aware of logical and emotional resistance

Show some results as quickly as possible

Treat implementation is a process and a project (s)

Sponsor at highest level

Have multi-year staying power

Be open to new ideas from the organization

www.bekinin.com

Page 25: Setting up pmo

Questions?